TDOT contract CNZ092 bid tabulation

The resurfacing (either microsurface or thin lift overlay) on s.r. 13 from west of jim johnson road (l.m. 28.67) to the kentucky state line (l.m. 31.99). Let by Tennessee DOT on March 21, 2025, Montgomery County. 3 bids received; low bid $744,519 by Eubank Asphalt Paving & Sealing, LLC.

Owner
Tennessee DOT
Letting
21 MAR 2025
Pay items
38
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Eubank Asphalt Paving & Sealing, LLC$744,519Low
2Vulcan Construction Materials, LLC$813,900+9.0%
3Jones Bros. Contractors, LLC$838,611+13%
TDOT contract CNZ092: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Eubank Asphalt Paving & Sealing, LLC2. Vulcan Construction Materials, LLC3. Jones Bros. Contractors, LLC
1Brooming & degrassing shoulders (208-01.05)LM6.60$1,000.00$1,200.00$1,500.00
2Mineral aggregate, type A base, grading D (303-01)TON794$38.00$45.00$36.00
3Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08)TON93$100.00$235.00$245.00
4Scoring for rumble stripe (non-continuous) (8IN width) (411-12.03)LM5.10$700.00$1,875.00$1,875.00
5Scoring for rumble stripe (non-continuous) (4IN width) (411-12.04)LM0.20$700.00$1,875.00$1,875.00
6Cold planing bituminous pavement (415-01.01)TON47$85.00$325.00$331.00
7Guardrail transition 27IN to 31IN (705-02.10)EACH1$210.00$200.00$210.00
8Tangent energy absorbing term MASH TL-3 (705-06.20)EACH1$4,833.00$4,000.00$4,833.00
9Guardrail removed (706-01)LF50$2.50$3.00$2.50
10Traffic control (712-01)LS1$7,500.00$24,000$35,000
11Flexible drums (channelizing) (712-04.01)EACH135$5.00$40.00$36.00
12Signs (construction) (712-06)SF744$7.50$8.50$7.90
13Sign post delineation enhancement (713-02.21)LF10$53.84$7.50$8.00
14Remove and replace sign (W10-1) (713-16.50)EACH2$336.00$315.00$320.00
15Remove and replace sign (TN-17B) (713-16.51)EACH2$336.00$175.00$225.00
16Remove and replace sign (TN-7A) (713-16.52)EACH1$311.00$350.00$235.00
17Remove and replace sign (TN-13) (713-16.53)EACH1$311.00$275.00$260.00
18Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH214$30.00$32.00$32.00
19Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22)EACH34$30.00$32.00$32.00
20Plastic pavement marking(channelization striping) (716-02.04)SY63$35.00$25.00$25.00
21Plastic pavement marking (stop line) (716-02.05)LF102$20.00$25.00$25.00
22Plastic pavement marking (turn lane arrow) (716-02.06)EACH5$225.00$250.00$250.00
23Plastic pavement marking (8" dotted line) (716-02.08)LF153$2.00$4.00$4.00
24Plastic pavement marking (8IN line) (716-02.12)LM0.10$15,000$15,000$15,000
25Plastic word pavement marking (RXR) (716-03.02)EACH2$600.00$700.00$700.00
26Painted pavement marking (4" line) (716-05.01)LM23.40$1,400.00$1,200.00$1,200.00
27Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM11.70$7,200.00$7,200.00$7,200.00
28Mobilization (717-01)LS1$18,000$35,000$35,000
29Bituminous material (BSC) (405-01.01)TON88$1,325.00$850.00$1,167.20
30Mineral aggregate (BSC) (405-01.02)TON771$65.00$110.00$59.15
31Removal of pavement marking (channelization striping) (716-08.04)SY515$10.00$12.00$12.00
32Removal of pavement marking (stop line) (716-08.05)LF102$10.00$10.00$10.00
33Removal of pavement marking (turn lane arrow) (716-08.06)EACH5$85.00$100.00$100.00
34Removal of pavement marking (dotted line) (716-08.09)LF528$1.75$2.00$2.00
35Removal of word pavement marking (RXR) (716-08.11)EACH2$300.00$300.00$300.00
36Removal of pavement marking (line) (716-08.20)LM11.70$3,000.00$5,000.00$5,000.00
37Bituminous material for tack coat (TC) (403-01)TON21$300.00$900.00$795.00
38Acs mix(PG64-22) thin lift D asphalt (411-03.12)TON2,239$135.00$121.00$135.00
TDOT contract CNZ092: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of March 21, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy