TDOT contract CNZ120 bid tabulation

The resurfacing on s.r. 99 from s.r. 106 in maury county (l.m. 28.84) to u.s. 31a (s.r. 11) in marshall county (l.m. 7.29), including bridge expansion joint repair and thin epoxy overlay. Let by Tennessee DOT on March 21, 2025, Marshall And Maury Counties. 3 bids received; low bid $2,646,640 by Volunteer Paving, LLC.

Owner
Tennessee DOT
Letting
21 MAR 2025
Pay items
37
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Volunteer Paving, LLC$2,646,640Low
2Lincoln Paving, LLC$2,895,383+9.0%
3Rogers Group, Inc.$3,125,999+18%
TDOT contract CNZ120: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Volunteer Paving, LLC2. Lincoln Paving, LLC3. Rogers Group, Inc.
1Grade and reshape shoulders (208-01.03)LM14.90$1,331.38$1,200.00$3,000.00
2Brooming & degrassing shoulders (208-01.05)LM14.90$1,114.58$800.00$2,100.00
3Mineral aggregate, type A base, grading D (303-01)TON4,983$21.13$22.50$26.50
4Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08)TON300$122.39$98.68$165.00
5Asc mix (PG64-22) (BPMLC-HM) grading CS (307-01.15)TON3,460$85.05$99.86$98.00
6Bituminous material for prime coat (PC) (402-01)TON52$1,130.84$10.00$1,000.00
7Aggregate for cover material (PC) (402-02)TON615$64.20$1.00$45.00
8Bituminous material for tack coat (TC) (403-01)TON83$941.38$988.00$850.00
9Acs mix (PG64-22) grading E shoulder (411-01.07)TON8,340$82.41$99.70$87.00
10Acs mix(PG70-22) grading D (411-02.10)TON7,644$98.43$110.37$113.50
11Scoring shoulders (non-continuous) (16IN width) (411-12.02)LM11.90$626.00$625.00$2,100.00
12Cold planing bituminous pavement (415-01.01)TON12,519$5.02$11.15$11.25
13Guardrail transition 27IN to 31IN (705-02.10)EACH2$100.00$100.00$240.00
14Single guardrail (type 2) long post (6 FT-9 FT) (705-02.20)LF163$47.50$47.50$42.50
15Tangent energy absorbing term MASH TL-3 (705-06.20)EACH2$3,250.00$3,250.00$3,700.00
16Guardrail removed (706-01)LF263$0.75$0.75$5.30
17Traffic control (712-01)LS1$138,750$43,100$120,443
18Flexible drums (channelizing) (712-04.01)EACH50$31.00$1.00$1.06
19Signs (construction) (712-06)SF1,460$7.50$7.55$8.00
20Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH494$30.00$35.00$37.00
21Plastic pavement marking(channelization striping) (716-02.04)SY90$25.00$35.00$37.00
22Plastic pavement marking (stop line) (716-02.05)LF440$20.00$20.00$21.25
23Plastic pavement marking (turn lane arrow) (716-02.06)EACH1$150.00$200.00$212.00
24Plastic pavement marking (8" dotted line) (716-02.08)LF750$1.00$3.00$3.20
25Plastic pavement marking (8IN line) (716-02.12)LM0.10$5,000.00$15,000$16,000
26Plastic word pavement marking (stop ahead) (716-03.03)EACH2$200.00$900.00$950.00
27Plastic pavement marking (transverse shoulder) (716-04.04)LF85$10.00$10.00$10.60
28Plastic pavement marking (yield line) (716-04.12)SF48$20.00$35.00$37.25
29Plastic pavement marking (lane reduction arrow) (716-04.14)EACH1$250.00$650.00$690.00
30Painted pavement marking (6" line) (716-05.20)LM24.20$850.00$1,400.00$1,480.00
31Removal of pavement marking (line) (716-08.01)LF930$0.50$1.50$1.59
32Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM24.20$5,500.00$7,200.00$7,650.00
33Preformed permanent tape (6IN line) (716-15.10)LF930$2.75$8.00$8.50
34Mobilization (717-01)LS1$59,865$69,450$120,000
35Expansion joint repairs (604-10.44)LF68$51.50$275.00$152.00
36Concrete overlayed bridge deck repair (partial depth) (604-10.56)SY10$2,400.00$1,550.00$690.00
37Type 1 thin epoxy overlay (epoxy-urethane) (617-04.01)SY797$60.00$57.00$80.00
TDOT contract CNZ120: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of March 21, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy