TDOT contract CNZ160 bid tabulation
The resurfacing on s.r. 155 from south of the nerr underpass (l.m. 8.87) to north of mcgavock pike (l.m. 12.18). Let by Tennessee DOT on May 9, 2025, Davidson County. 3 bids received; low bid $4,178,597 by Vulcan Construction Materials, LLC.
- Owner
- Tennessee DOT
- Letting
- 09 MAY 2025
- Pay items
- 40
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Vulcan Construction Materials, LLC | $4,178,597 | Low |
| 2 | Jones Bros. Contractors, LLC | $4,267,844 | +2.0% |
| 3 | Rogers Group, Inc. | $4,340,494 | +4.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Vulcan Construction Materials, LLC | 2. Jones Bros. Contractors, LLC | 3. Rogers Group, Inc. |
|---|---|---|---|---|---|---|
| 1 | Brooming & degrassing shoulders (208-01.05) | LM | 13.20 | $1,200.00 | $1,000.00 | $1,600.00 |
| 2 | Mineral aggregate, type A base, grading D (303-01) | TON | 221 | $55.00 | $45.00 | $85.70 |
| 3 | Asc mix (PG64-22) (BPMLC-HM) grading CS (307-01.15) | TON | 200 | $165.00 | $140.00 | $145.00 |
| 4 | Asphalt concrete mix (PG76-22) (BPMB-HM) grading B-M2 (307-03.08) | TON | 300 | $120.00 | $140.00 | $185.00 |
| 5 | Bituminous material for tack coat (TC) (403-01) | TON | 125 | $900.00 | $815.00 | $900.00 |
| 6 | Acs mix(PG76-22) grading D (411-03.10) | TON | 19,215 | $125.00 | $135.00 | $129.00 |
| 7 | Scoring shoulders (continuous) (16IN width) (411-12.01) | LM | 10.10 | $715.00 | $2,450.00 | $775.00 |
| 8 | Cold planing bituminous pavement (415-01.01) | TON | 19,034 | $24.00 | $25.00 | $22.00 |
| 9 | Adjustment of existing manhole (611-01.20) | EACH | 1 | $6,000.00 | $6,000.00 | $6,800.00 |
| 10 | Traffic control (712-01) | LS | 1 | $120,000 | $90,000 | $120,500 |
| 11 | Flexible drums (channelizing) (712-04.01) | EACH | 350 | $38.00 | $32.00 | $34.50 |
| 12 | Warning lights (type C) (712-05.03) | EACH | 88 | $5.00 | $1.00 | $1.10 |
| 13 | Signs (construction) (712-06) | SF | 1,700 | $9.00 | $7.30 | $8.75 |
| 14 | Signs (construction)(reduced speed warning) (712-06.16) | EACH | 2 | $600.00 | $600.00 | $645.00 |
| 15 | Temporary barricades (type III) (712-07.03) | LF | 72 | $20.00 | $12.00 | $12.75 |
| 16 | Arrow board (type C) (712-08.03) | EACH | 4 | $950.00 | $1,225.00 | $1,300.00 |
| 17 | Speed feedback sign assembly (712-08.08) | EACH | 2 | $3,700.00 | $4,675.00 | $5,000.00 |
| 18 | Digital speed limit sign assembly (712-08.09) | EACH | 10 | $3,500.00 | $4,800.00 | $5,125.00 |
| 19 | Queue protection truck (712-08.12) | DAY | 120 | $1,250.00 | $1,200.00 | $1,250.00 |
| 20 | Changeable message sign unit (713-16.01) | EACH | 4 | $3,700.00 | $6,225.00 | $6,650.00 |
| 21 | Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23) | EACH | 1,718 | $38.00 | $36.00 | $40.00 |
| 22 | Removal of snowplowable reflective marker (716-01.30) | EACH | 1,718 | $15.00 | $18.00 | $15.75 |
| 23 | Plastic pavement marking (stop line) (716-02.05) | LF | 100 | $20.00 | $20.00 | $21.00 |
| 24 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 15 | $200.00 | $200.00 | $210.25 |
| 25 | Plastic pavement marking (24" barrier line) (716-02.07) | LF | 919 | $12.00 | $14.00 | $12.75 |
| 26 | Plastic pavement marking (longitudinal cross-walk) (716-02.09) | LF | 275 | $40.00 | $35.00 | $42.00 |
| 27 | Plastic pavement marking (straight-turn arrow) (716-04.01) | EACH | 3 | $300.00 | $300.00 | $315.00 |
| 28 | Plastic pavement marking (exit only arrow) (716-04.07) | EACH | 10 | $450.00 | $350.00 | $475.00 |
| 29 | Plastic pavement marking (lane reduction arrow) (716-04.14) | EACH | 6 | $650.00 | $600.00 | $685.00 |
| 30 | Painted pavement marking (6" line) (716-05.20) | LM | 16.90 | $1,600.00 | $1,300.00 | $1,685.00 |
| 31 | Hydroblast removal of pavement marking (line) (716-08.30) | LM | 7.80 | $4,000.00 | $5,000.00 | $4,200.00 |
| 32 | Contrast PVMT shadow marking 6" (tape) (716-09.57) | LF | 1,122 | $8.00 | $5.00 | $8.50 |
| 33 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 16.90 | $7,500.00 | $7,500.00 | $7,885.00 |
| 34 | Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05) | LF | 4,373 | $2.00 | $2.00 | $2.10 |
| 35 | Enhanced flat line thermo (8IN line) (716-12.06) | LF | 5,316 | $3.00 | $3.00 | $3.15 |
| 36 | Preformed permanent tape (6IN line) (716-15.10) | LF | 36,169 | $7.75 | $5.00 | $8.15 |
| 37 | Preformed permanent tape (8IN line) (716-15.11) | LF | 3,670 | $10.00 | $7.00 | $10.50 |
| 38 | Preformed permanent tape (12IN line) (716-15.12) | LF | 335 | $14.00 | $10.00 | $14.75 |
| 39 | Preformed permanent tape (24IN barrier line) (716-15.20) | LF | 956 | $28.00 | $20.00 | $29.50 |
| 40 | Mobilization (717-01) | LS | 1 | $40,000 | $50,000 | $68,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of May 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.