TDOT contract CNZ160 bid tabulation

The resurfacing on s.r. 155 from south of the nerr underpass (l.m. 8.87) to north of mcgavock pike (l.m. 12.18). Let by Tennessee DOT on May 9, 2025, Davidson County. 3 bids received; low bid $4,178,597 by Vulcan Construction Materials, LLC.

Owner
Tennessee DOT
Letting
09 MAY 2025
Pay items
40
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Vulcan Construction Materials, LLC$4,178,597Low
2Jones Bros. Contractors, LLC$4,267,844+2.0%
3Rogers Group, Inc.$4,340,494+4.0%
TDOT contract CNZ160: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Vulcan Construction Materials, LLC2. Jones Bros. Contractors, LLC3. Rogers Group, Inc.
1Brooming & degrassing shoulders (208-01.05)LM13.20$1,200.00$1,000.00$1,600.00
2Mineral aggregate, type A base, grading D (303-01)TON221$55.00$45.00$85.70
3Asc mix (PG64-22) (BPMLC-HM) grading CS (307-01.15)TON200$165.00$140.00$145.00
4Asphalt concrete mix (PG76-22) (BPMB-HM) grading B-M2 (307-03.08)TON300$120.00$140.00$185.00
5Bituminous material for tack coat (TC) (403-01)TON125$900.00$815.00$900.00
6Acs mix(PG76-22) grading D (411-03.10)TON19,215$125.00$135.00$129.00
7Scoring shoulders (continuous) (16IN width) (411-12.01)LM10.10$715.00$2,450.00$775.00
8Cold planing bituminous pavement (415-01.01)TON19,034$24.00$25.00$22.00
9Adjustment of existing manhole (611-01.20)EACH1$6,000.00$6,000.00$6,800.00
10Traffic control (712-01)LS1$120,000$90,000$120,500
11Flexible drums (channelizing) (712-04.01)EACH350$38.00$32.00$34.50
12Warning lights (type C) (712-05.03)EACH88$5.00$1.00$1.10
13Signs (construction) (712-06)SF1,700$9.00$7.30$8.75
14Signs (construction)(reduced speed warning) (712-06.16)EACH2$600.00$600.00$645.00
15Temporary barricades (type III) (712-07.03)LF72$20.00$12.00$12.75
16Arrow board (type C) (712-08.03)EACH4$950.00$1,225.00$1,300.00
17Speed feedback sign assembly (712-08.08)EACH2$3,700.00$4,675.00$5,000.00
18Digital speed limit sign assembly (712-08.09)EACH10$3,500.00$4,800.00$5,125.00
19Queue protection truck (712-08.12)DAY120$1,250.00$1,200.00$1,250.00
20Changeable message sign unit (713-16.01)EACH4$3,700.00$6,225.00$6,650.00
21Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23)EACH1,718$38.00$36.00$40.00
22Removal of snowplowable reflective marker (716-01.30)EACH1,718$15.00$18.00$15.75
23Plastic pavement marking (stop line) (716-02.05)LF100$20.00$20.00$21.00
24Plastic pavement marking (turn lane arrow) (716-02.06)EACH15$200.00$200.00$210.25
25Plastic pavement marking (24" barrier line) (716-02.07)LF919$12.00$14.00$12.75
26Plastic pavement marking (longitudinal cross-walk) (716-02.09)LF275$40.00$35.00$42.00
27Plastic pavement marking (straight-turn arrow) (716-04.01)EACH3$300.00$300.00$315.00
28Plastic pavement marking (exit only arrow) (716-04.07)EACH10$450.00$350.00$475.00
29Plastic pavement marking (lane reduction arrow) (716-04.14)EACH6$650.00$600.00$685.00
30Painted pavement marking (6" line) (716-05.20)LM16.90$1,600.00$1,300.00$1,685.00
31Hydroblast removal of pavement marking (line) (716-08.30)LM7.80$4,000.00$5,000.00$4,200.00
32Contrast PVMT shadow marking 6" (tape) (716-09.57)LF1,122$8.00$5.00$8.50
33Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM16.90$7,500.00$7,500.00$7,885.00
34Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05)LF4,373$2.00$2.00$2.10
35Enhanced flat line thermo (8IN line) (716-12.06)LF5,316$3.00$3.00$3.15
36Preformed permanent tape (6IN line) (716-15.10)LF36,169$7.75$5.00$8.15
37Preformed permanent tape (8IN line) (716-15.11)LF3,670$10.00$7.00$10.50
38Preformed permanent tape (12IN line) (716-15.12)LF335$14.00$10.00$14.75
39Preformed permanent tape (24IN barrier line) (716-15.20)LF956$28.00$20.00$29.50
40Mobilization (717-01)LS1$40,000$50,000$68,000
TDOT contract CNZ160: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of May 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy