TDOT contract CNZ186 bid tabulation

The repair of the bridge on i-75 over branch (l.m. 4.13). Let by Tennessee DOT on June 27, 2025, Hamilton County. 4 bids received; low bid $1,222,732 by Wright Brothers Civil Construction, LLC.

Owner
Tennessee DOT
Letting
27 JUN 2025
Pay items
41
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Wright Brothers Civil Construction, LLC$1,222,732Low
2Mid-State Construction Company, Inc.$1,364,087+12%
3Dement Construction Group, LLC$1,918,438+57%
4Southern Constructors, Inc.$2,318,500+90%
TDOT contract CNZ186: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Wright Brothers Civil Construction, LLC2. Mid-State Construction Company, Inc.3. Dement Construction Group, LLC4. Southern Constructors, Inc.
1Construction stakes, lines and grades (105-01)LS1$4,500.00$25,088$5,000.00$75,000
2Clearing and grubbing (201-01)LS1$98,000$15,397$200,000$80,000
3Removal of asphalt pavement (202-03.01)SY1,643$17.00$18.87$30.00$32.00
4Road & drainage excavation (unclassified) (203-01)CY548$123.00$55.35$50.00$100.00
5Borrow excavation (unclassified) (203-03)CY548$102.00$146.04$40.00$100.00
6Sediment removal (209-05)CY17$35.00$39.00$100.00$80.00
7Temporary silt fence (with backing) (209-08.02)LF1,538$5.25$6.11$4.70$10.00
8Enhanced rock check dam (209-08.08)EACH2$1,675.00$1,950.00$700.00$2,000.00
9Sediment filter bag(15' X 10') (209-09.04)EACH1$925.00$971.75$1,000.00$1,500.00
10Temporary in stream diversion (209-65.04)LF150$335.00$181.92$60.00$500.00
11Mineral aggregate, type A base, grading D (303-01)TON371$51.00$90.00$75.00$85.00
12Mineral aggregate (size 57) (303-10.01)TON8$70.00$70.75$250.00$85.00
13Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08)TON163$178.00$178.00$300.00$325.00
14Bituminous material for prime coat (PC) (402-01)TON3$1,050.00$1,050.00$1,500.00$1,750.00
15Aggregate for cover material (PC) (402-02)TON9$200.00$200.00$100.00$125.00
16Bituminous material for tack coat (TC) (403-01)TON2$1,025.00$1,025.00$1,500.00$1,250.00
17Acs mix(PG64-22) grading D (411-01.10)TON109$240.00$240.00$350.00$375.00
18Bracing repairs (602-10.05)LS1$1.00$65,526$50,000$75,000
19Class A concrete (box bridges) (604-02.01)CY41$3,125.00$5,265.84$10,000$4,500.00
20Steel bar reinforcement (box bridges) (604-02.02)LB5,271$13.45$4.10$7.00$10.00
21Concrete (604-10.05)SF480$315.00$375.00$400.00$450.00
22Concrete repairs (604-10.54)SF480$280.00$375.00$400.00$450.00
23Earth pad for type 38 GR end treatment (705-04.09)EACH2$880.00$1,040.00$800.00$2,000.00
24W beam GR (type 2) MASH TL-3 (705-06.01)LF275$32.00$39.00$30.00$45.00
25GR terminaltrailing end (type 13) MASH TL-3 (705-06.10)EACH2$1,850.00$2,177.50$1,675.00$2,250.00
26Tangent energy absorbing term MASH TL-3 (705-06.20)EACH2$3,750.00$4,420.00$3,400.00$5,000.00
27Guardrail removed (706-01)LF385$0.55$0.65$0.50$15.00
28High-visibility construction fence (707-08.11)LF1,400$2.80$3.25$2.50$8.00
29Traffic control (712-01)LS1$90,000$87,259$196,281$310,000
30Portable barrier rail (MASH TL-3) (712-02.10)LF1,540$46.00$63.90$100.00$75.00
31Temporary work zone crash cushion (MASH TL-3) (712-02.60)EACH1$11,400$9,912.50$7,625.00$11,500
32Flexible drums (channelizing) (712-04.01)EACH50$44.50$40.30$31.00$50.00
33Signs (construction) (712-06)SF101$8.75$9.75$7.50$25.00
34Arrow board (type C) (712-08.03)EACH1$2,000.00$1,690.00$1,300.00$3,000.00
35Plastic pavement marking (24" barrier line) (716-02.07)LF200$16.50$19.50$15.00$40.00
36Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM0.50$13,750$15,275$12,500$12,000
37Mobilization (717-01)LS1$122,000$132,952$190,000$508,109
38Geotextile (type III)(erosion control) (740-10.03)SY80$9.00$16.25$10.00$35.00
39Temporary seeding (with mulch) (801-01.07)UNIT19$54.00$63.05$48.50$150.00
40Natve seed MX final stablizatn of slopes (801-01.38)UNIT19$111.00$130.00$100.00$200.00
41Water (seeding & sodding) (801-03)MG2$130.00$162.50$125.00$250.00
TDOT contract CNZ186: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of June 27, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy