TDOT contract CNZ237 bid tabulation

The resurfacing (microsurface or thin mix overlay) on s.r. 186 from the madison county line (l.m. 0.00) to u.s. 70a (u.s. 79, s.r. 76) (l.m. 6.17). Let by Tennessee DOT on July 25, 2025, Gibson County. 2 bids received; low bid $1,243,724 by Delta Contracting Company, LLC.

Owner
Tennessee DOT
Letting
25 JUL 2025
Pay items
43
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Delta Contracting Company, LLC$1,243,724Low
2Jones Bros. Contractors, LLC$1,489,557+20%
TDOT contract CNZ237: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Delta Contracting Company, LLC2. Jones Bros. Contractors, LLC
1Removal of asphalt pavement (202-03.01)SY3,622$16.00$30.25
2Water (203-06)MG8$0.01$1.00
3Brooming & degrassing shoulders (208-01.05)LM12.40$1,100.00$2,355.00
4Mineral aggregate, type B base, grading (C or D) (303-02)TON708$22.00$35.00
5Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01)TON73$145.00$175.00
6Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08)TON409$145.00$135.00
7Trackless tack coat (403-02.01)TON2$350.00$855.00
8Acs mix(PG64-22) grading D (411-01.10)TON230$140.00$155.00
9Longitudinal joint sealant (411-01.21)LM0.10$45,000$50,000
10Scoring for rumble stripe (non-continuous) (4IN width) (411-12.04)LM9.90$1,100.00$1,290.00
11Asphalt emulsion (scrub seal) (414-04.03)TON103$1,508.00$1,508.00
12Mineral aggregate (scrub seal) (414-04.04)TON848$73.70$73.70
13Cold planing bituminous pavement (415-01.01)TON135$70.00$111.05
14Gray iron castings (catchbasin) (611-03.04)LB250$20.00$24.00
15Guardrail transition 27IN to 31IN (705-02.10)EACH8$188.00$150.00
16GR terminal (energy absorbing) MASH TL-2 (705-06.30)EACH8$3,509.00$3,400.00
17Guardrail removed (706-01)LF200$1.00$4.00
18Traffic control (712-01)LS1$30,000$100,000
19Signs (construction) (712-06)SF772$6.25$7.00
20Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH407$42.00$42.00
21Plastic pavement marking (stop line) (716-02.05)LF98$25.00$25.00
22Plastic pavement marking (turn lane arrow) (716-02.06)EACH4$225.00$225.00
23Plastic pavement marking (24" barrier line) (716-02.07)LF72$25.00$25.00
24Plastic pavement marking (longitudinal cross-walk) (716-02.09)LF263$49.00$49.00
25Plastic pavement marking (8IN line) (716-02.12)LM0.10$20,000$20,000
26Plastic word pavement marking (stop ahead) (716-03.03)EACH2$1,000.00$1,000.00
27Plastic pavement marking (straight arrow) (716-04.05)EACH2$225.00$225.00
28Painted pavement marking (6" line) (716-05.20)LM24.90$1,900.00$1,900.00
29Removal of pavement marking (turn lane arrow) (716-08.06)EACH4$200.00$200.00
30Removal of pavement marking (straight-turn arrow) (716-08.07)EACH2$200.00$200.00
31Removal of word pavement marking (stop ahead) (716-08.11)EACH2$750.00$750.00
32Removal of pavement marking (line) (716-08.20)LM24.60$1,050.00$1,230.00
33Removal of pavement marking (24IN barrier line) (716-08.21)LF72$18.00$18.00
34Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM24.90$7,500.00$7,500.00
35Mobilization (717-01)LS1$42,000$125,000
36Conduit 1" diameter (PVC schedule 40) (730-12.01)LF50$25.00$28.00
37Shielded detector cable (730-14.01)LF50$3.00$2.00
38Saw slot (730-14.02)LF612$6.00$8.00
39Loop wire (730-14.03)LF1,224$1.00$2.00
40Trackless tack coat (403-02.01)TON18$350.00$855.00
41Acs mix(PG64-22) thin lift asphalt (411-03.07)TON2,707$140.00$135.00
42Cold planing bituminous pavement (415-01.01)TON58$70.00$111.05
43Signs (construction) (712-06)SF64$6.25$7.00
TDOT contract CNZ237: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of July 25, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy