TDOT contract CNZ240 bid tabulation
The resurfacing on s.r. 201 from s.r. 104 (l.m. 4.60) in henderson county to s.r. 202 (l.m. 0.88) in decatur county, including repair work on bridge. Let by Tennessee DOT on July 25, 2025, Decatur And Henderson Counties. 3 bids received; low bid $2,829,128 by Delta Contracting Company, LLC.
- Owner
- Tennessee DOT
- Letting
- 25 JUL 2025
- Pay items
- 32
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Delta Contracting Company, LLC | $2,829,128 | Low |
| 2 | Jones Bros. Contractors, LLC | $3,408,263 | +20% |
| 3 | Volunteer Paving, LLC | $3,834,991 | +36% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Delta Contracting Company, LLC | 2. Jones Bros. Contractors, LLC | 3. Volunteer Paving, LLC |
|---|---|---|---|---|---|---|
| 1 | Removal of asphalt pavement (202-03.01) | SY | 4,028 | $20.00 | $27.15 | $21.03 |
| 2 | Water (203-06) | MG | 28 | $0.01 | $55.00 | $2.34 |
| 3 | Brooming & degrassing shoulders (208-01.05) | LM | 21.40 | $1,050.00 | $1,900.00 | $1,513.10 |
| 4 | Mineral aggregate, type B base, grading (C or D) (303-02) | TON | 3,649 | $5.00 | $37.50 | $68.86 |
| 5 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01) | TON | 1,321 | $125.00 | $130.00 | $155.65 |
| 6 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 456 | $125.00 | $225.00 | $266.68 |
| 7 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading C-W (307-01.10) | TON | 12,382 | $109.00 | $125.00 | $123.24 |
| 8 | Trackless tack coat (403-02.01) | TON | 33 | $300.00 | $855.00 | $994.19 |
| 9 | Scoring for rumble stripe (non-continuous) (4IN width) (411-12.04) | LM | 15.90 | $975.00 | $1,325.00 | $810.84 |
| 10 | Asphalt emulsion (scrub seal) (414-04.03) | TON | 189 | $1,522.00 | $1,600.00 | $1,598.10 |
| 11 | Mineral aggregate (scrub seal) (414-04.04) | TON | 1,560 | $64.50 | $67.75 | $67.73 |
| 12 | Cold planing bituminous pavement (415-01.01) | TON | 175 | $65.00 | $111.00 | $186.55 |
| 13 | Guardrail transition 27IN to 31IN (705-02.10) | EACH | 26 | $135.00 | $135.00 | $141.75 |
| 14 | Earth pad for guard rail end treatment (705-04.10) | EACH | 13 | $975.00 | $975.00 | $1,023.75 |
| 15 | GR terminal (in-inline) MASH TL-3 (705-06.11) | EACH | 2 | $1,050.00 | $1,050.00 | $1,102.50 |
| 16 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 2 | $3,500.00 | $3,500.00 | $3,675.00 |
| 17 | GR terminal (energy absorbing) MASH TL-2 (705-06.30) | EACH | 20 | $3,300.00 | $3,300.00 | $3,465.00 |
| 18 | Guardrail removed (706-01) | LF | 1,350 | $4.00 | $4.00 | $4.20 |
| 19 | Radius rail (706-06.03) | LF | 30 | $48.00 | $48.00 | $50.40 |
| 20 | Traffic control (712-01) | LS | 1 | $40,500 | $65,000 | $138,537 |
| 21 | Signs (construction) (712-06) | SF | 3,496 | $6.80 | $7.00 | $8.40 |
| 22 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 685 | $31.00 | $31.00 | $50.00 |
| 23 | Plastic pavement marking (stop line) (716-02.05) | LF | 140 | $15.00 | $15.00 | $25.00 |
| 24 | Painted pavement marking (stop line) (716-05.05) | LF | 280 | $15.00 | $15.00 | $20.00 |
| 25 | Painted pavement marking (6" line) (716-05.20) | LM | 82.60 | $1,100.00 | $1,100.00 | $1,200.00 |
| 26 | Removal of pavement marking (stop line) (716-08.05) | LF | 140 | $14.00 | $14.00 | $10.00 |
| 27 | Removal of pavement marking (line) (716-08.20) | LM | 41.30 | $1,050.00 | $1,640.00 | $5,280.00 |
| 28 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 41.30 | $6,700.00 | $6,700.00 | $7,500.00 |
| 29 | Mobilization (717-01) | LS | 1 | $49,000 | $110,000 | $110,684 |
| 30 | Expansion joint repairs (604-10.44) | LF | 53 | $300.00 | $330.00 | $378.00 |
| 31 | Concrete repairs (604-10.53) | SY | 5 | $850.00 | $600.00 | $1,890.00 |
| 32 | Type 1 thin epoxy overlay (epoxy-urethane) (617-04.01) | SY | 433 | $90.20 | $88.00 | $102.90 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of July 25, 2025. Compiled by Mirage Metrics.