TDOT contract CNZ291 bid tabulation

The resurfacing on u.s. 127 (s.r. 28) from near s.r. 392 (l.m. 12.61) to near u.s. 70n (s.r. 24) (l.m. 14.96). Let by Tennessee DOT on December 5, 2025, Cumberland County. 2 bids received; low bid $1,900,000 by Rogers Group, Inc..

Owner
Tennessee DOT
Letting
05 DEC 2025
Pay items
38
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Rogers Group, Inc.$1,900,000Low
2Vulcan Construction Materials, LLC$2,402,231+26%
TDOT contract CNZ291: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Rogers Group, Inc.2. Vulcan Construction Materials, LLC
1Brooming & degrassing shoulders (208-01.05)LM1.60$2,800.00$2,900.00
2Mineral aggregate, type A base, grading D (303-01)TON150$62.00$60.00
3Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08)TON1,725$125.00$136.00
4Trackless tack coat (403-02.01)TON45$1,050.00$1,100.00
5Longitudinal joint sealant (411-01.21)LM7.10$3,010.00$2,850.00
6Acs mix(PG70-22) grading D (411-02.10)TON5,674$156.00$200.00
7Cold planing bituminous pavement (415-01.01)TON7,259$40.00$65.00
8Gray iron castings (catchbasin) (611-03.04)LB14,000$5.80$5.50
9Guardrail delineation enhancement (BI-directional) (705-04.22)EACH54$8.20$9.00
10Traffic control (712-01)LS1$75,000$100,000
11Flexible drums (channelizing) (712-04.01)EACH90$29.50$42.00
12Warning lights (type A) (712-05.01)EACH21$26.40$22.00
13Signs (construction) (712-06)SF1,838$8.45$7.00
14Temporary barricades (type III) (712-07.03)LF24$23.00$30.00
15Arrow board (type C) (712-08.03)EACH2$1,055.00$1,200.00
16Changeable message sign unit (713-16.01)EACH2$3,695.00$6,000.00
17Signs (W9-1, right lane ends 36"X36") (713-16.20)EACH1$263.00$425.00
18Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH322$40.00$40.00
19Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22)EACH224$40.00$40.00
20Plastic pavement marking (cross-walk) (716-02.03)LF3,100$6.85$12.00
21Plastic pavement marking(channelization striping) (716-02.04)SY402$26.40$20.00
22Plastic pavement marking (stop line) (716-02.05)LF1,221$11.60$12.00
23Plastic pavement marking (turn lane arrow) (716-02.06)EACH35$180.00$200.00
24Plastic pavement marking (8" dotted line) (716-02.08)LF980$2.65$2.00
25Plastic pavement marking (longitudinal cross-walk) (716-02.09)LF110$25.85$23.00
26Plastic pavement marking (8IN line) (716-02.12)LM0.50$8,975.00$10,500
27Plastic word pavement marking (only) (716-03.01)EACH12$264.00$125.00
28Plastic word pavement marking (ped-xing) (716-03.08)EACH4$370.00$400.00
29Plastic pavement marking (straight-turn arrow) (716-04.01)EACH4$205.00$400.00
30Plastic pavement marking (yield line) (716-04.12)SF108$15.30$15.00
31Plastic pavement marking (lane reduction arrow) (716-04.14)EACH3$290.00$350.00
32Painted pavement marking (4" line) (716-05.01)LM10.90$870.00$695.00
33Painted pavement marking (parking line) (716-05.08)LF3,947$1.05$2.00
34Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM10.90$6,675.00$6,100.00
35Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05)LF550$1.30$2.00
36Mobilization (717-01)LS1$36,697$55,000
37Saw slot (730-14.02)LF2,930$6.35$6.00
38Loop wire (730-14.03)LF6,000$1.05$1.00
TDOT contract CNZ291: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of December 5, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy