Dunn Services, Inc.: TxDOT bid record

Dunn Services, Inc. submitted 11 bids on Texas DOT contracts in the data, from 08 SEP 2022 to 06 DEC 2023, and was the low bidder on 1 of them (9%). When it was not low, its total sat a median +18% above the low bid.

Owner
Texas DOT
Low bid volume
$1,282,152
Latest bid
06 DEC 2023
Data through
19 NOV 2026
11Bids
1Low bids
9Win rate, percent
+18%Median gap to the low bid when not low, 10 bids

By year

YearBidsLow bidsWin rate
20224125%
2023700%
Dunn Services, Inc., TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Corpus Christi District300%
Yoakum District3133%
Austin District200%
San Antonio District100%
Bryan District100%
Brownwood District100%
Dunn Services, Inc., TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Reflectorized pavement marker type II-A-A672-7004EACH73 (43%)$8.56$5.00
Reflectorized pavement marking type I (W)24"(solid)(100MIL)666-7036LF53 (60%)$11.31$8.00
Barricades, signs and traffic handling502-7001MO112 (18%)$7,500.00$5,000.00
Temporary sediment control fence (install)506-7039LF92 (22%)$4.59$4.00
Install small roadside sign support and assembly type 10BWG(1)SA(P)644-7001EACH62 (33%)$734.17$710.00
Eliminating existing pavement marking & markers (4")677-6001LF52 (40%)$0.99$0.60
Driveways (concrete)530-7006SY52 (40%)$115.00$110.00
Vegetative watering168-7001MG81 (13%)$47.92$29.97
TMA (mobile operation)505-7003DAY51 (20%)$355.28$291.17
Work zone pavement marking SHT terminal (tab)type Y-2662-7114EACH51 (20%)$1.53$1.41
Tack coat3076-6066GAL51 (20%)$4.78$4.00
Dunn Services, Inc., TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Dunn Services, Inc., TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
06 DEC 202312233219Brownwood DistrictVA Construct pedestrian infrastructure from VARIOUS LOCATIONS IN CITY OF EARLY2 of 5$1,199,248+14%
06 SEP 202309233025Austin DistrictCR Construct pedestrian infrastructure from DRIPPING SPRINGS MIDDLE SCHOOL to ROGER HANKS PARKWAY/BROKEN LANCE RO8 of 9$1,905,228+49%
03 AUG 202308233228Bryan DistrictFM 975 Rehabilitate existing road from SH 21 to UPRR OVERPASS2 of 3$5,372,634+2.0%
03 AUG 202308233238Corpus Christi DistrictFM 743 Traffic signal improvements from ON FM743 FROM US 181 to .815 MI E OF FM 6234 of 4$3,189,177+25%
28 JUN 202306233624San Antonio DistrictUA 90 Hazard elimination & safety from 500 FT EAST OF WEBER RD to 500 FT WEST OF CR 202 (AUX AIRPORT5 of 5$3,182,580+43%
27 JUN 202306233428Yoakum DistrictFM 457 Adding shoulders with no added capacity from FM 2611 to CANEY DRIVE4 of 5$4,295,074+8.0%
27 JUN 202306233454Corpus Christi DistrictUS 181 Bridge maintenance from NB AND SB FRONTAGE ROADS to AT POESTA CREEK6 of 8$272,296+91%
02 DEC 202212223226Yoakum DistrictUS 87 Bridge replacement from BIRDS CREEK to STR # 0143-08-017)1 of 8$1,282,152Low, 23% under the second
01 DEC 202212223012Yoakum DistrictUS 77 Rehabilitate existing roadway from FM 155 to 1.50 MI SOUTH OF FM 1553 of 6$4,426,088+18%
15 NOV 202211221603Corpus Christi DistrictUS0059 Bridge scour repair from US 59 SB @ COLETO CR RES to 1.80 MI E OF FM 29874 of 8$303,755+8.0%
08 SEP 202209223224Austin DistrictSL 230 Construct pedestrian infrastructure from MCSWEENEY STREET to GRESHAM STREET2 of 5$442,757+18%
Dunn Services, Inc.: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy