ALDOT contract 20251205021 bid tabulation
RECONSTRUCTION/REHABILITATION AND RESURFACING ON I-59 FROM A POINT 1.000 MILE NORTH OF THE SR-7 (US-11) INTERCHANGE IN FORT PAYNE TO THE GEORGIA STATE LINE. Let by Alabama DOT on December 5, 2025, Dekalb, 0103. 3 bids received; low bid $47,544,197 by Wiregrass Construction Company, Inc..
- Owner
- Alabama DOT
- Letting
- 05 DEC 2025
- Pay items
- 143
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Wiregrass Construction Company, Inc. | $47,544,197 | Low |
| 2 | Rogers Group, Inc. | $49,525,000 | +4.0% |
| 3 | Vulcan Materials Asphalt and Construction, | $52,134,557 | +10% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Wiregrass Construction Company, Inc. | 2. Rogers Group, Inc. | 3. Vulcan Materials Asphalt and Construction, |
|---|---|---|---|---|---|---|
| 0010 | Clearing (201C000) | LS | 1 | $233,255 | $115,000 | $220,000 |
| 0020 | Removal of old box culvert, partial, station 1222+65.23 (206B009) | LS | 1 | $5,065.97 | $6,000.00 | $11,100 |
| 0030 | Removing concrete pavement (206C001) | SY | 162,284 | $6.53 | $5.70 | $5.00 |
| 0040 | Removing concrete flumes (206C003) | SY | 956 | $9.12 | $5.75 | $23.50 |
| 0050 | Removing pipe (206D000) | LF | 1,100 | $4.05 | $20.00 | $22.50 |
| 0060 | Removing guardrail (206D001) | LF | 4,690 | $5.39 | $5.00 | $5.50 |
| 0070 | Removing cable guiderail (206D033) | LF | 4,082 | $6.46 | $6.40 | $6.50 |
| 0080 | Removing headwalls (206E000) | EACH | 3 | $253.30 | $300.00 | $790.00 |
| 0090 | Removing inlets (206E001) | EACH | 10 | $253.30 | $425.00 | $1,350.00 |
| 0100 | Removing junction boxes (206E002) | EACH | 4 | $405.28 | $450.00 | $1,400.00 |
| 0110 | Removing guardrail end anchor (all type) (206E008) | EACH | 29 | $323.19 | $325.00 | $335.00 |
| 0120 | Removing slope paved headwall (206E050) | EACH | 8 | $253.30 | $275.00 | $770.00 |
| 0130 | Unclassified excavation (210A000) | CY | 306,014 | $9.21 | $12.50 | $5.50 |
| 0140 | Borrow excavation (210D000) | CY | 1,224 | $24.11 | $34.00 | $58.00 |
| 0150 | Borrow excavation (underwater embankment) (210E001) | CY | 108,043 | $25.23 | $26.75 | $23.50 |
| 0160 | Structure excavation (214A000) | CY | 1,909 | $15.20 | $14.00 | $30.00 |
| 0170 | Foundation backfill, commercial (214B001) | CY | 346 | $72.18 | $53.00 | $125.00 |
| 0180 | Planing existing pavement (approximately 2.10" thru 3.0" thick) (408A053) | SY | 24,288 | $1.53 | $1.55 | $2.90 |
| 0190 | Micro-milling existing pavement (approximately 0.00" thru 1.00" thick) (408B000) | SY | 70,166 | $0.85 | $1.30 | $1.60 |
| 0200 | Micro-milling existing pavement (approximately 1.10" thru 2.00" thick) (408B001) | SY | 192,245 | $1.33 | $1.30 | $1.90 |
| 0210 | Material remixing device (410H000) | EACH | 1 | $200,000 | $750,000 | $700,000 |
| 0220 | Superpave bituminous concrete wearing surface layer, patching, 3/8" maximum aggregate size mix, esal range C/D (424A357) | TON | 66 | $821.30 | $240.00 | $580.00 |
| 0230 | Superpave bituminous concrete upper binder layer, 1" maximum aggregate size mix, esal range C/D (424B651) | TON | 1,193 | $109.12 | $100.00 | $140.00 |
| 0240 | Superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range C/D (424B655) | TON | 500 | $236.01 | $150.00 | $240.00 |
| 0250 | Aggregate surfacing (1" down, crusher run) (430B043) | TON | 600 | $72.86 | $50.00 | $120.00 |
| 0260 | Removal of concrete pavement slab (453C000) | SY | 1,190 | $59.25 | $60.00 | $59.00 |
| 0270 | Concrete pavement replacement slab (453D000) | CY | 331 | $1,483.43 | $1,600.00 | $1,460.00 |
| 0280 | Cleaning and sealing concrete pavement, type II, cracks (454A003) | LF | 1,000 | $3.23 | $3.50 | $5.00 |
| 0290 | Patching (460A000) | LB | 1,000 | $4.58 | $5.00 | $6.00 |
| 0300 | Steel reinforcement (502A000) | LB | 717 | $10.84 | $1.15 | $10.00 |
| 0310 | Culvert concrete extension (524B010) | CY | 9 | $8,201.35 | $2,400.00 | $3,000.00 |
| 0320 | 24" roadway pipe (class 3 R.C.) (530A002) | LF | 465 | $213.82 | $130.00 | $112.00 |
| 0330 | 36" roadway pipe (class 3 R.C.) (530A004) | LF | 176 | $155.52 | $200.00 | $150.00 |
| 0340 | 18" roadway pipe (14 gauge C.M.) (temporary) (530A494) | LF | 1,558 | $120.68 | $78.00 | $81.00 |
| 0350 | 29" span, 18" rise roadway pipe (class 3 R.C.) (530B002) | LF | 106 | $131.68 | $140.00 | $140.00 |
| 0360 | 36" span, 23" rise roadway pipe (class 3 R.C.) (530B003) | LF | 105 | $174.36 | $165.00 | $150.00 |
| 0370 | 44" span, 27" rise roadway pipe (class 3 R.C.) (530B004) | LF | 186 | $222.09 | $230.00 | $190.00 |
| 0380 | Mobilization (600A000) | LS | 1 | $2,637,527 | $2,872,245 | $1,521,132 |
| 0390 | Furnishing type 2 field office (603A001) | EACH | 1 | $85,239 | $125,000 | $100,000 |
| 0400 | Pavement edge drain (605A001) | LF | 114,296 | $15.69 | $12.00 | $15.50 |
| 0410 | Special underdrain outlet, type A (605B000) | EACH | 151 | $533.26 | $900.00 | $540.00 |
| 0420 | Filter blanket, geotextile (610D003) | SY | 5,109 | $5.14 | $3.90 | $4.50 |
| 0430 | Slope paving (614A000) | CY | 488 | $1,050.86 | $525.00 | $1,000.00 |
| 0440 | 24" roadway pipe end treatment, class 1 (619A003) | EACH | 4 | $2,300.59 | $2,050.00 | $3,250.00 |
| 0450 | 24" side drain pipe end treatment, class 2 (619A127) | EACH | 2 | $3,125.15 | $2,800.00 | $3,650.00 |
| 0460 | 29" span, 18" rise roadway pipe end treatment, class 1 (619B017) | EACH | 1 | $2,936.17 | $3,200.00 | $5,150.00 |
| 0470 | 44" span, 27" rise roadway pipe end treatment, class 1 (619B019) | EACH | 1 | $4,356.11 | $3,800.00 | $6,250.00 |
| 0480 | Junction boxes, type 1 or 1P (621A011) | EACH | 3 | $4,204.61 | $5,500.00 | $7,300.00 |
| 0490 | Junction boxes, type 1 or 2P (621A019) | EACH | 8 | $3,325.63 | $5,500.00 | $10,300 |
| 0500 | Junction boxes, type 1 (special) (621A031) | EACH | 1 | $9,240.89 | $5,500.00 | $12,000 |
| 0510 | Junction box units, type 1 (special) (621B012) | EACH | 1 | $1,465.04 | $1,100.00 | $4,650.00 |
| 0520 | Junction box units, type 1 or 2P (621B014) | EACH | 5 | $1,465.04 | $1,100.00 | $3,150.00 |
| 0530 | Inlets, type Y (621C020) | EACH | 7 | $8,956.46 | $9,800.00 | $9,700.00 |
| 0540 | Inlets, type Y (modified) (621C132) | EACH | 4 | $8,956.47 | $9,900.00 | $11,900 |
| 0550 | Inlet units, type Y (621D019) | EACH | 2 | $1,888.05 | $1,100.00 | $3,050.00 |
| 0560 | Inlet units, type Y (modified) (621D055) | EACH | 1 | $1,888.05 | $1,100.00 | $2,200.00 |
| 0570 | Cable guiderail (624A000) | LF | 4,082 | $32.32 | $32.15 | $33.00 |
| 0580 | Steel beam guardrail, class A, type 2 (630A001) | LF | 1,988 | $25.86 | $28.00 | $26.00 |
| 0590 | Steel beam guardrail, class A, type 2 (8'-0" post) (630A034) | LF | 9,538 | $28.01 | $26.00 | $28.50 |
| 0600 | Guardrail end anchor, type 8 (MASH) (630C077) | EACH | 23 | $1,508.21 | $1,600.00 | $1,550.00 |
| 0610 | Guardrail end anchor, type 20 series (MASH) (630C080) | EACH | 28 | $3,662.80 | $3,700.00 | $3,750.00 |
| 0620 | Topsoil (650A000) | CY | 16,916 | $24.32 | $29.00 | $57.00 |
| 0630 | Seeding (652A100) | ACRE | 30 | $2,176.57 | $2,200.00 | $2,150.00 |
| 0640 | Mowing (652C000) | ACRE | 1,200 | $263.94 | $175.00 | $190.00 |
| 0650 | Solid sodding (bermuda) (654A001) | SY | 1,754 | $13.06 | $13.00 | $13.00 |
| 0660 | Mulching (656A010) | ACRE | 30 | $1,088.29 | $1,100.00 | $1,100.00 |
| 0670 | Erosion control product, type S3 (659C001) | SY | 6,855 | $1.47 | $1.35 | $1.50 |
| 0680 | Erosion control product, type S2 (659C002) | SY | 3,006 | $1.47 | $1.35 | $1.50 |
| 0690 | Temporary seeding (665A000) | ACRE | 16 | $544.14 | $600.00 | $550.00 |
| 0700 | Temporary mulching (665B001) | TON | 144 | $108.83 | $100.00 | $110.00 |
| 0710 | Temporary pipe (665C010) | LF | 160 | $96.66 | $92.00 | $92.00 |
| 0720 | Temporary pipe end treatment (665D001) | EACH | 22 | $3,550.82 | $2,000.00 | $1,650.00 |
| 0730 | Polyethylene (665E000) | SY | 3,200 | $5.33 | $3.00 | $3.20 |
| 0740 | Sand bags (665G000) | EACH | 15,110 | $4.90 | $4.50 | $4.50 |
| 0750 | Temporary riprap, class 2 (665I000) | TON | 320 | $49.31 | $55.00 | $120.00 |
| 0760 | Silt fence (665J002) | LF | 96,072 | $2.18 | $2.25 | $2.00 |
| 0770 | Temporary coarse aggregate,aldot number 1 (665N000) | TON | 1,008 | $53.15 | $43.00 | $105.00 |
| 0780 | Temporary coarse aggregate,aldot number 4 (665N001) | TON | 64 | $99.26 | $50.00 | $125.00 |
| 0790 | Silt fence removal (665O001) | LF | 96,072 | $0.54 | $0.50 | $0.50 |
| 0800 | Inlet protection, stage 3 or 4 (665P005) | EACH | 123 | $544.14 | $550.00 | $555.00 |
| 0810 | Wattle (665Q002) | LF | 20,750 | $6.80 | $6.25 | $6.50 |
| 0820 | Pest control treatment (666A001) | ACRE | 60 | $54.41 | $50.00 | $50.00 |
| 0830 | Geometric controls (680A001) | LS | 1 | $486,293 | $350,000 | $550,000 |
| 0840 | Construction fuel (maximum bid limited to $ 3,500,000.00) (698A000) | LS | 1 | $0.00 | $0.00 | $0.00 |
| 0850 | Solid temporary traffic stripe (paint) (701C003) | MI | 24 | $1,023.43 | $1,150.00 | $1,020.00 |
| 0860 | Solid temporary traffic stripe (tape) (701C005) | MI | 27 | $11,312 | $11,500 | $11,300 |
| 0870 | Solid traffic stripe removed (paint) (701D007) | MI | 24 | $2,693.23 | $3,000.00 | $2,690.00 |
| 0880 | Solid traffic stripe removed (plastic) (701D008) | MI | 16 | $2,962.55 | $2,800.00 | $2,970.00 |
| 0890 | Solid traffic stripe removed (tape) (701D009) | MI | 27 | $3,770.52 | $4,000.00 | $3,780.00 |
| 0900 | Broken traffic stripe removed (plastic) (701D015) | MI | 8 | $2,208.45 | $2,500.00 | $2,210.00 |
| 0910 | Temporary traffic control markings (tape) (703D000) | SF | 32 | $10.77 | $11.00 | $12.00 |
| 0920 | Pavement markers, class C, type 1- A (705A011) | EACH | 2,037 | $4.85 | $5.00 | $5.00 |
| 0930 | Pavement markers, class C, type 1- B (705A012) | EACH | 1,597 | $4.85 | $5.25 | $5.00 |
| 0940 | Pavement markers, class A-H, type 2-C (705A030) | EACH | 1,606 | $4.85 | $5.00 | $5.00 |
| 0950 | Pavement markers, class A-H, type 1-A (705A031) | EACH | 91 | $4.85 | $5.00 | $5.00 |
| 0960 | Pavement markers, class A-H, type 1-B (705A032) | EACH | 74 | $4.85 | $5.00 | $5.00 |
| 0970 | Pavement markers, class A-H, type 2-E (705A038) | EACH | 54 | $4.85 | $5.50 | $5.00 |
| 0980 | Milepost reset (709B000) | EACH | 8 | $161.59 | $170.00 | $165.00 |
| 0990 | Class 6 aluminum flat sign panels (type IV or XI background) (710A186) | SF | 165 | $43.09 | $45.00 | $44.00 |
| 1000 | Class 6 aluminum multiple flat sign panels (type IV or XI background) (710A188) | SF | 2,000 | $45.25 | $50.00 | $46.00 |
| 1010 | Roadway sign post (S4 X 7.7 steel beam) (710B006) | LF | 58 | $129.28 | $140.00 | $130.00 |
| 1020 | Roadway sign post (W12 X 26 steel beam) (710B015) | LF | 517 | $166.98 | $175.00 | $170.00 |
| 1030 | Removal of existing roadway signs (710C000) | LS | 1 | $10,773 | $11,000 | $11,000 |
| 1040 | Roadway sign relocation (711A000) | LS | 1 | $134,662 | $140,000 | $135,000 |
| 1050 | Portable concrete safety barriers, type 6 (726A000) | LF | 20,200 | $58.41 | $60.00 | $60.00 |
| 1060 | Portable concrete safety barriers, type 6-A (726A001) | LF | 10 | $10.13 | $11.00 | $11.00 |
| 1070 | Portable impact attenuator assembly (unidirectional,TL-3) (726D025) | EACH | 1 | $13,332 | $13,000 | $13,000 |
| 1080 | Truck mounted impact attenuator unit (728A000) | EACH | 2 | $42,128 | $10,000 | $40,000 |
| 1090 | Construction signs (740B000) | SF | 2,242 | $7.00 | $7.00 | $8.00 |
| 1100 | Channelizing drums (740D000) | EACH | 566 | $31.24 | $35.00 | $35.00 |
| 1110 | Cones (36 inches high) (740E000) | EACH | 200 | $20.88 | $18.00 | $25.00 |
| 1120 | Barricades, type III (740F002) | EACH | 6 | $237.00 | $270.00 | $250.00 |
| 1130 | Portable sequential arrow and chevron sign unit (741C010) | EACH | 2 | $4,255.31 | $4,000.00 | $4,400.00 |
| 1140 | Portable changeable message sign, type 2 (742A001) | EACH | 7 | $14,463 | $12,000 | $14,000 |
| 1150 | Trainee hours at 80 cents per hour (999 000) | HR | 5,600 | $0.80 | $0.80 | $0.80 |
| 1160 | Crushed aggregate base course, type B, plant mixed, 5" compacted thickness AA 1 (301A008) | SY | 120,536 | $12.94 | $13.00 | $14.00 |
| 1170 | Crushed aggregate base course, type B, plant mixed, 6" compacted thickness AA 1 (301A012) | SY | 190,844 | $14.53 | $17.00 | $15.50 |
| 1180 | Permeable asphalt treated base (PG76-22) AA 1 (327E001) | TON | 40,299 | $87.81 | $89.00 | $98.00 |
| 1190 | Bituminous treatment A AA 1 (401A000) | SY | 120,536 | $0.82 | $1.00 | $1.00 |
| 1200 | Bituminous treatment AE AA 1 (401A043) | SY | 190,844 | $2.64 | $2.00 | $3.20 |
| 1210 | Tack coat AA 1 (405A000) | GAL | 140,985 | $3.57 | $3.70 | $3.50 |
| 1220 | Smoothness testing, certified inertial profiler AA 1 (410I000) | EACH | 1 | $8,885.29 | $10,000 | $5,000.00 |
| 1230 | Stone matrix asphalt wearing layer, 1/2" maximum aggregate size AA 1 (423A003) | TON | 27,808 | $117.22 | $130.00 | $150.00 |
| 1240 | Stone matrix asphalt binder layer, 3/4" maximum aggregate size AA 1 (423B002) | TON | 18,672 | $103.79 | $112.00 | $130.00 |
| 1250 | Superpave bituminous concrete wearing surface layer, 3/8" maximum aggregate size mix, esal range A/B AA 1 (424A336) | TON | 9,261 | $134.69 | $133.00 | $140.00 |
| 1260 | Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range C/D AA 1 (424A360) | TON | 15,613 | $115.38 | $110.00 | $125.00 |
| 1270 | Superpave bituminous concrete lower binder layer, 1" maximum aggregate size mix, esal range E AA 1 (424B581) | TON | 80,559 | $83.89 | $89.00 | $115.00 |
| 1280 | Superpave bituminous concrete upper binder layer, 3/4" maximum aggregate size mix, esal range C/D AA 1 (424B650) | TON | 10,205 | $99.76 | $95.00 | $115.00 |
| 1290 | Superpave bituminous concrete lower binder layer, 1" maximum aggregate size mix, esal range C/D AA 1 (424B681) | TON | 31,115 | $88.23 | $90.00 | $115.00 |
| 1300 | Scoring bituminous pavement surface AA 1 (428A001) | MI | 48 | $287.96 | $270.00 | $290.00 |
| 1310 | Scoring concrete pavement surface by cutting AA 1 (428E001) | MI | 10 | $1,599.78 | $1,500.00 | $1,550.00 |
| 1320 | Broken white, class W, type A traffic stripe (5" wide) AA 1 (701A087) | MI | 3 | $5,655.79 | $5,500.00 | $5,560.00 |
| 1330 | Solid white, class W, type A traffic stripe (5" wide) AA 1 (701A091) | MI | 3 | $11,312 | $11,300 | $11,150 |
| 1340 | Solid yellow, class W, type A traffic stripe (5" wide) AA 1 (701A099) | MI | 3 | $11,312 | $11,300 | $11,150 |
| 1350 | Broken black, class W, type B traffic stripe (5" wide) AA 1 (701A108) | MI | 3 | $5,763.52 | $5,800.00 | $5,830.00 |
| 1360 | Solid white, class 2, type A traffic stripe (5" wide) AA 1 (701A227) | MI | 27 | $4,282.24 | $4,500.00 | $4,100.00 |
| 1370 | Solid yellow, class 2, type A traffic stripe (5" wide) AA 1 (701A230) | MI | 26 | $4,282.24 | $4,300.00 | $4,100.00 |
| 1380 | Broken white, class 2, type A traffic stripe (5" wide) AA 1 (701A239) | MI | 26 | $2,133.04 | $2,000.00 | $2,050.00 |
| 1390 | Dotted, class W, type A traffic stripe (5" wide) AA 1 (701B027) | LF | 1,542 | $2.15 | $2.00 | $2.20 |
| 1400 | Dotted class W,type B traffic stripe,black(5" wide) AA 1 (701B036) | LF | 1,542 | $2.15 | $2.15 | $2.20 |
| 1410 | Dotted, class 2, type A traffic stripe (5" wide) AA 1 (701B207) | LF | 6,275 | $1.35 | $1.30 | $1.40 |
| 1420 | Traffic control markings, class 2, type A AA 1 (703A002) | SF | 4,939 | $4.85 | $5.00 | $5.00 |
| 1430 | Traffic control markings, class W, type A AA 1 (703A011) | SF | 1,249 | $15.89 | $16.00 | $16.40 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of December 5, 2025. Compiled by Mirage Metrics.