FDOT contract T7560 bid tabulation
SR 39 (PAUL S BUCHMAN HWY) FROM N OF CENTRAL AVE TO US 301.. Let by Florida DOT on April 30, 2025, Pasco, District 7. 7 bids received; low bid $5,146,581 by Pigott Asphalt and Sitework LLC.
- Owner
- Florida DOT
- Letting
- 30 APR 2025
- Pay items
- 124
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Pigott Asphalt and Sitework LLC | $5,146,581 | Low |
| 2 | Superior Asphalt, Inc. | $5,922,001 | +15% |
| 3 | C.W. Roberts Contracting, Inc. | $5,978,651 | +16% |
| 4 | Watson Civil Construction, Inc. | $6,012,380 | +17% |
| 5 | Hubbard Construction Company | $6,061,537 | +18% |
| 6 | Preferred Materials Inc. | $6,271,802 | +22% |
| 7 | Ajax Paving Industries of Florida LLC | $9,457,706 | +84% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Pigott Asphalt and Sitework LLC | 2. Superior Asphalt, Inc. | 3. C.W. Roberts Contracting, Inc. | 4. Watson Civil Construction, Inc. | 5. Hubbard Construction Company | 6. Preferred Materials Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $480,000 | $714,451 | $577,380 | $600,000 | $484,881 | $621,400 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $346,000 | $345,000 | $446,922 | $699,000 | $384,806 | $329,500 |
| 0015 | Special detour- temporary pavement (0102-2200) | SY | 1 | $75,000 | $100,420 | $84,906 | $103,000 | $149,679 | $35,000 |
| 0020 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $50,000 | $24,240 | $39,472 | $40,000 | $16,386 | $25,000 |
| 0025 | Commercial material for temporary driveway maintenance (0102-3) | CY | 205.10 | $100.00 | $76.50 | $157.09 | $88.00 | $87.78 | $259.04 |
| 0030 | Traffic control officer (0102-14) | HR | 356 | $100.00 | $125.00 | $94.97 | $96.00 | $109.24 | $88.00 |
| 0035 | Work zone sign (0102-60) | ED | 15,940 | $0.30 | $0.30 | $0.27 | $0.33 | $0.25 | $0.23 |
| 0040 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 1,638 | $42.00 | $39.00 | $41.58 | $37.00 | $49.90 | $20.00 |
| 0045 | Temporary barrier, relocate, anchored (0102-71-25) | LF | 1,350 | $20.00 | $15.00 | $16.05 | $14.20 | $18.68 | $8.00 |
| 0050 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 27,167 | $0.10 | $0.15 | $0.12 | $0.15 | $0.11 | $0.10 |
| 0055 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 1,265 | $1.00 | $0.10 | $0.08 | $0.10 | $0.09 | $0.09 |
| 0060 | Arrow board / advance warning arrow panel (0102-76) | ED | 529 | $10.00 | $5.20 | $5.77 | $7.00 | $5.85 | $5.50 |
| 0065 | Temporary crash cushion, redirective option (0102-89-1) | LO | 7 | $1,500.00 | $1,177.20 | $4,572.49 | $1,120.00 | $1,050.68 | $1,154.96 |
| 0070 | Portable changeable message sign, temporary (0102-99) | ED | 1,238 | $12.00 | $11.90 | $11.54 | $14.00 | $11.70 | $11.00 |
| 0075 | Temporary signalization and maintenance, intersection (0102-104) | ED | 520 | $25.00 | $20.00 | $22.01 | $30.00 | $29.64 | $4.17 |
| 0080 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 520 | $25.00 | $1.10 | $1.19 | $10.00 | $21.34 | $4.17 |
| 0082 | Existing ITS maintenance (0102-112) | DA | 260 | $110.00 | $350.00 | $383.16 | $420.00 | $237.10 | $357.49 |
| 0085 | Type III barricade (0102-115) | ED | 1,142 | $0.50 | $0.30 | $0.29 | $0.35 | $0.41 | $0.38 |
| 0090 | Temporary raised rumble per day, includes all sets and relocations (0102-909) | DA | 260 | $40.00 | $28.65 | $57.71 | $70.00 | $37.45 | $35.20 |
| 0095 | Sediment barrier (0104-10-3) | LF | 5,307 | $2.50 | $1.35 | $1.11 | $2.00 | $1.03 | $2.58 |
| 0100 | Soil tracking prevention device (0104-15) | EACH | 2 | $3,500.00 | $8,865.00 | $3,880.97 | $4,600.00 | $3,449.74 | $9,029.69 |
| 0105 | Inlet protection system (0104-18) | EACH | 14 | $250.00 | $135.00 | $140.05 | $125.00 | $201.24 | $137.50 |
| 0110 | Litter removal (0107-1) | ACRE | 277.46 | $10.00 | $47.25 | $53.97 | $51.00 | $51.09 | $48.13 |
| 0115 | Mowing (0107-2) | ACRE | 246.77 | $50.00 | $79.50 | $90.78 | $85.00 | $85.92 | $80.96 |
| 0120 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $86,500 | $127,500 | $126,407 | $300,000 | $100,654 | $265,457 |
| 0125 | Removal of existing concrete (0110-4-10) | SY | 140 | $65.00 | $45.45 | $75.10 | $33.00 | $52.67 | $68.84 |
| 0130 | Mailbox, F&I single (0110-7-1) | EACH | 9 | $300.00 | $135.00 | $250.27 | $410.00 | $329.64 | $424.30 |
| 0135 | Regular excavation (0120-1) | CY | 834.60 | $25.00 | $55.55 | $46.10 | $21.00 | $46.82 | $68.38 |
| 0140 | Subsoil excavation (0120-4) | CY | 1,951.50 | $12.00 | $56.10 | $68.44 | $20.00 | $46.82 | $91.18 |
| 0145 | Embankment (0120-6) | CY | 2,461.90 | $10.00 | $45.90 | $44.66 | $30.00 | $39.79 | $102.86 |
| 0150 | Type B stabilization (0160-4) | SY | 6,994 | $12.00 | $37.85 | $32.06 | $35.00 | $32.77 | $43.47 |
| 0155 | Optional base, base group 01 type B 12.5 (0285-701) | SY | 1,532 | $75.00 | $42.05 | $50.43 | $47.00 | $37.65 | $76.70 |
| 0160 | Optional base, base group 09 type B 12.5 (0285-709) | SY | 1,036 | $85.00 | $62.35 | $57.37 | $67.00 | $103.27 | $114.91 |
| 0165 | Turnout construction- asphalt/driveway base- asphalt material (0286-2) | TN | 363.60 | $75.00 | $242.00 | $393.09 | $234.00 | $162.15 | $475.97 |
| 0170 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 25,318 | $2.50 | $3.70 | $4.82 | $2.75 | $8.26 | $3.41 |
| 0175 | Milling existing asphalt pavement, 4" avg depth (0327-70-7) | SY | 37,561 | $2.50 | $4.65 | $5.62 | $4.35 | $7.01 | $2.68 |
| 0180 | Milling existing asphalt pavement, 6" avg depth (0327-70-23) | SY | 1,157 | $12.00 | $12.05 | $21.71 | $6.70 | $13.69 | $17.82 |
| 0185 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 6,014.80 | $178.50 | $168.00 | $134.92 | $141.00 | $166.09 | $134.68 |
| 0190 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 5,440.90 | $175.00 | $182.00 | $169.89 | $178.00 | $178.89 | $164.50 |
| 0195 | Miscellaneous asphalt (0339-1) | TN | 37.30 | $250.00 | $552.70 | $1,072.14 | $265.00 | $1,349.18 | $671.50 |
| 0200 | Inlets, DT bot, type H, <10' (0425-1581) | EACH | 5 | $12,500 | $13,635 | $12,203 | $7,300.00 | $15,800 | $12,761 |
| 0205 | Inlets, closed flume (0425-1910) | EACH | 2 | $12,000 | $9,690.00 | $6,896.46 | $12,400 | $11,119 | $10,547 |
| 0210 | Pipe culvert, optional material, other shape - ellip/arch, 18"SD (0430-174218) | LF | 120 | $195.00 | $151.50 | $170.40 | $186.00 | $175.56 | $237.43 |
| 0215 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 4 | $250.00 | $151.50 | $892.04 | $254.00 | $175.56 | $291.00 |
| 0220 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 1,968 | $200.00 | $153.00 | $168.83 | $167.00 | $175.56 | $266.44 |
| 0225 | Pipe culvert, opt material, shape - elip/arch, 30"S/CD (0430-175230) | LF | 4 | $1,000.00 | $357.00 | $2,461.10 | $689.00 | $409.64 | $668.43 |
| 0230 | Mitered end section, optional round, 18" CD (0430-982125) | EACH | 1 | $2,500.00 | $2,525.00 | $4,101.59 | $2,000.00 | $2,925.99 | $3,898.61 |
| 0235 | Mitered end section, optional round, 24" CD (0430-982129) | EACH | 2 | $2,600.00 | $2,525.00 | $7,884.01 | $2,500.00 | $2,925.99 | $4,205.58 |
| 0240 | Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625) | EACH | 4 | $3,500.00 | $2,550.00 | $4,395.57 | $2,300.00 | $2,925.99 | $3,796.27 |
| 0245 | Pipe handrail - guiderail, aluminum (0515-1-2) | LF | 13 | $150.00 | $77.35 | $79.98 | $74.00 | $84.43 | $122.89 |
| 0250 | Concrete curb & gutter, type F (0520-1-10) | LF | 181 | $75.00 | $56.10 | $141.15 | $126.00 | $68.83 | $57.26 |
| 0255 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 129 | $120.00 | $131.30 | $202.80 | $110.00 | $152.15 | $153.09 |
| 0260 | Concrete ditch pavement, 4", reinforced (0524-1-29) | SY | 34 | $100.00 | $252.50 | $198.86 | $150.00 | $292.60 | $171.76 |
| 0265 | Detectable warnings (0527-2) | SF | 68 | $35.00 | $28.20 | $78.69 | $50.00 | $70.22 | $34.92 |
| 0270 | Guardrail -roadway, general (0536-1-1) | LF | 789 | $25.00 | $24.95 | $25.79 | $24.00 | $27.22 | $33.97 |
| 0275 | Guardrail removal (0536-73) | LF | 238 | $10.00 | $2.45 | $2.50 | $2.35 | $2.64 | $3.19 |
| 0280 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 6 | $3,200.00 | $3,195.00 | $3,301.74 | $3,050.00 | $3,485.39 | $4,105.53 |
| 0285 | Performance turf, sod (0570-1-2) | SY | 9,276 | $4.00 | $4.89 | $7.46 | $6.95 | $6.19 | $4.45 |
| 0290 | Performance turf, sod and shoulder treatment index (0570-1-3) | SY | 8,170 | $5.00 | $10.97 | $8.30 | $7.60 | $10.24 | $7.92 |
| 0295 | Conduit, furnish & install, open trench (0630-2-11) | LF | 28 | $10.00 | $27.50 | $30.34 | $27.20 | $22.52 | $86.80 |
| 0300 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 2 | $1,250.00 | $1,375.00 | $1,511.22 | $1,360.00 | $2,222.77 | $1,447.23 |
| 0305 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 4 | $2,500.00 | $2,650.00 | $2,916.53 | $2,659.00 | $3,909.70 | $2,156.54 |
| 0310 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 4 | $1,500.00 | $2,190.00 | $2,410.80 | $2,200.00 | $3,497.16 | $1,911.70 |
| 0315 | Traffic monitoring site cabinet, furnish & install, type 3, pedestal mount (0695-7132) | EACH | 2 | $6,500.00 | $7,230.00 | $7,966.60 | $7,200.00 | $9,393.71 | $7,441.64 |
| 0320 | Raised pavement marker, type B (0706-1-3) | EACH | 2,325 | $5.00 | $4.35 | $5.25 | $4.50 | $5.25 | $4.40 |
| 0325 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 7.58 | $1,500.00 | $2,160.00 | $2,627.97 | $2,240.00 | $1,575.61 | $2,199.34 |
| 0330 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 810 | $1.00 | $1.85 | $2.23 | $1.91 | $1.17 | $1.87 |
| 0335 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 175 | $2.00 | $1.95 | $2.36 | $13.20 | $2.33 | $1.98 |
| 0340 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 1,198 | $3.00 | $2.05 | $2.49 | $2.15 | $3.50 | $2.09 |
| 0345 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 0.02 | $1,000.00 | $567.00 | $626.82 | $534.00 | $1,060.91 | $525.00 |
| 0350 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.71 | $1,000.00 | $777.60 | $947.74 | $797.00 | $1,154.22 | $783.02 |
| 0355 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 3 | $100.00 | $48.60 | $59.07 | $51.00 | $99.23 | $49.50 |
| 0360 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 52 | $50.00 | $43.20 | $52.50 | $45.00 | $52.53 | $44.00 |
| 0365 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 7.42 | $1,500.00 | $2,160.00 | $2,626.98 | $2,240.00 | $1,574.96 | $2,198.44 |
| 0370 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 499 | $2.00 | $1.94 | $2.36 | $2.05 | $2.33 | $1.98 |
| 0375 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.08 | $1,000.00 | $777.60 | $910.96 | $777.00 | $1,125.18 | $763.37 |
| 0380 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $54,000 | $54,000 | $54,000 | $54,000 | $54,000 | $54,000 |
| 0385 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 6.33 | $1,600.00 | $1,650.00 | $3,164.53 | $2,350.00 | $2,379.01 | $4,671.16 |
| 0390 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 14 | $600.00 | $567.00 | $733.08 | $610.00 | $612.90 | $659.98 |
| 0395 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 5 | $2,500.00 | $2,376.00 | $2,795.23 | $1,420.00 | $2,568.33 | $1,539.95 |
| 0400 | Single column ground sign assembly, relocate (0700-1500) | EACH | 1 | $1,200.00 | $1,296.00 | $577.23 | $152.00 | $1,400.89 | $164.99 |
| 0405 | Single column ground sign assembly, remove (0700-1600) | EACH | 17 | $25.00 | $27.00 | $72.15 | $51.00 | $29.19 | $55.00 |
| 0410 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 14 | $400.00 | $399.60 | $342.01 | $405.00 | $431.95 | $439.98 |
| 0415 | Sign panel, furnish & install ground mount, 12-20 SF (0700-3102) | EACH | 10 | $550.00 | $540.00 | $1,451.73 | $607.00 | $583.71 | $659.98 |
| 0420 | Sign panel, furnish & install ground mount, 21-30 SF (0700-3103) | EACH | 2 | $1,000.00 | $864.00 | $1,844.25 | $910.00 | $933.94 | $989.96 |
| 0425 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 4 | $1,200.00 | $1,080.00 | $1,178.03 | $1,015.00 | $1,167.42 | $1,099.96 |
| 0430 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 18 | $200.00 | $189.00 | $43.29 | $51.00 | $204.30 | $55.00 |
| 0435 | Sign panel, remove, 12-20 SF (0700-3602) | EACH | 10 | $150.00 | $135.00 | $101.02 | $51.50 | $145.93 | $55.00 |
| 0440 | Sign panel, remove, 21-30 SF (0700-3603) | EACH | 2 | $200.00 | $162.00 | $144.30 | $52.00 | $175.12 | $55.00 |
| 0445 | Tubular marker, 36" yellow (0704-1-4) | EACH | 24 | $250.00 | $216.00 | $353.55 | $203.00 | $291.86 | $219.99 |
| 0450 | Object marker, type 1 (0705-10-1) | EACH | 5 | $350.00 | $162.00 | $281.40 | $152.00 | $379.41 | $164.99 |
| 0455 | Object marker, type 3 (0705-10-3) | EACH | 4 | $350.00 | $162.00 | $281.40 | $153.00 | $379.42 | $165.00 |
| 0460 | Raised pavement marker, type B (0706-1-3) | EACH | 1,599 | $5.00 | $4.35 | $5.25 | $4.50 | $5.25 | $4.40 |
| 0465 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 40 | $10.00 | $5.40 | $6.56 | $5.60 | $11.67 | $5.50 |
| 0470 | Painted pavement markings, surface (0710-90) | LS | 1 | $35,000 | $48,000 | $58,339 | $47,000 | $37,941 | $48,888 |
| 0475 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 810 | $5.00 | $3.50 | $4.21 | $3.60 | $4.67 | $3.53 |
| 0480 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 175 | $6.00 | $5.20 | $6.33 | $5.40 | $5.84 | $5.30 |
| 0485 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 388 | $7.00 | $6.95 | $8.43 | $7.20 | $7.00 | $7.06 |
| 0490 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (6/10) gap 6" (0711-11141) | GM | 0.71 | $5,000.00 | $2,430.00 | $2,878.28 | $2,490.00 | $5,194.05 | $2,446.95 |
| 0495 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 3 | $250.00 | $81.00 | $98.44 | $84.00 | $262.67 | $82.50 |
| 0500 | Thermoplastic, standard, arrow (0711-11170) | EACH | 49 | $100.00 | $59.40 | $72.19 | $61.50 | $105.07 | $60.50 |
| 0505 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 499 | $5.00 | $4.85 | $5.87 | $5.05 | $5.84 | $4.92 |
| 0510 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (2/4) dotted guide line, 6" (0711-11241) | GM | 0.11 | $5,000.00 | $2,430.00 | $3,108.77 | $2,470.00 | $5,069.12 | $2,388.07 |
| 0515 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 752 | $17.00 | $16.45 | $19.98 | $17.00 | $18.68 | $16.74 |
| 0520 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 6.18 | $5,500.00 | $5,310.00 | $6,459.79 | $5,500.00 | $6,068.64 | $5,404.56 |
| 0525 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.02 | $5,000.00 | $1,330.00 | $1,466.82 | $1,400.00 | $3,714.55 | $1,228.64 |
| 0530 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 5.81 | $5,500.00 | $4,975.00 | $6,047.93 | $5,150.00 | $6,062.24 | $5,059.44 |
| 0535 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 651 | $6.00 | $2.15 | $2.63 | $2.25 | $6.42 | $2.20 |
| 0540 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.12 | $50,000 | $38,880 | $46,101 | $40,000 | $36,446 | $39,706 |
| 0545 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.12 | $50,000 | $38,880 | $46,101 | $40,000 | $36,446 | $39,706 |
| 0550 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 2.77 | $3,500.00 | $1,825.00 | $2,008.14 | $1,800.00 | $3,892.86 | $1,832.86 |
| 0555 | Itsfm location documentation- intersection (0611-2-1) | EACH | 1 | $2,650.00 | $1,825.00 | $2,007.41 | $1,800.00 | $3,044.90 | $1,838.16 |
| 0560 | Conduit, furnish & install, open trench (0630-2-11) | LF | 253 | $10.00 | $26.00 | $28.56 | $28.00 | $31.71 | $58.18 |
| 0565 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 392 | $50.00 | $67.50 | $74.37 | $71.00 | $47.42 | $68.67 |
| 0570 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 1 | $20,000 | $16,695 | $18,395 | $16,700 | $13,019 | $14,097 |
| 0575 | Signal cable, remove- intersection (0632-7-6) | PI | 1 | $650.00 | $3,335.00 | $3,673.32 | $3,300.00 | $1,778.21 | $1,447.01 |
| 0580 | Fiber optic cable locator (0633-6) | DA | 260 | $5.00 | $250.00 | $274.87 | $280.00 | $423.81 | $419.11 |
| 0585 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 8 | $1,500.00 | $1,375.00 | $1,511.22 | $1,360.00 | $1,894.39 | $1,447.23 |
| 0590 | Aluminum signals pole, (0646-1-11) | EACH | 8 | $2,500.00 | $2,556.00 | $3,296.12 | $3,000.00 | $3,482.93 | $2,603.58 |
| 0595 | Aluminum signals pole, remove (0646-1-60) | EACH | 7 | $300.00 | $532.80 | $367.69 | $330.00 | $652.01 | $542.63 |
| 0600 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 8 | $750.00 | $990.00 | $1,092.36 | $977.00 | $1,398.27 | $1,030.48 |
| 0605 | Pedestrian detector, furnish & install, accessible (0665-1-12) | EACH | 8 | $5,600.00 | $1,610.00 | $1,771.81 | $1,600.00 | $503.83 | $1,817.21 |
| 0610 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 4 | $7,500.00 | $5,300.00 | $5,841.38 | $5,250.00 | $7,684.26 | $8,607.23 |
| 0615 | Internally illuminated sign, remove (0700-5-60) | EACH | 4 | $400.00 | $333.75 | $367.69 | $329.00 | $533.46 | $361.76 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of April 30, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.