Diaco Contracting, Inc. DBA Grade Construction: NJDOT bid record
Diaco Contracting, Inc. DBA Grade Construction submitted 14 bids on New Jersey DOT contracts in the data, from 12 SEP 2024 to 26 MAR 2026, and was the low bidder on 3 of them (21%). When it was not low, its total sat a median +8.0% above the low bid.
- Owner
- New Jersey DOT
- Low bid volume
- $15,176,508
- Latest bid
- 26 MAR 2026
- Data through
- 16 APR 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2024 | 7 | 1 | 14% |
| 2025 | 5 | 2 | 40% |
| 2026 | 2 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| C4 | 6 | 1 | 17% |
| S4 | 5 | 2 | 40% |
| H4 | 2 | 0 | 0% |
| N4 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Overtime differential (OD) | MMG025M | DOL | 12 | 12 (100%) | $1.00 | $1.00 |
| Solid waste disposal | MMB173M | DOL | 12 | 12 (100%) | $1.00 | $1.00 |
| Crew coordinator | MMB092M | HR | 12 | 12 (100%) | $130.00 | $135.00 |
| Disposal of regulated material, hazardous | MMG064M | DOL | 12 | 12 (100%) | $1.00 | $1.00 |
| Telephone service | MMG010M | DOL | 10 | 10 (100%) | $1.00 | $1.00 |
| Disposal of regulated material | MMG027M | DOL | 10 | 10 (100%) | $1.00 | $1.00 |
| Adjustment factor , (force account) | MMG095M | PCT | 10 | 7 (70%) | $1.00 | $1.10 |
| Performance bond and payment bond | 151006M | DOL | 11 | 5 (45%) | $30,286 | $32,468 |
| Labor crew , concrete | MMB186M | HR | 8 | 2 (25%) | $780.00 | $762.00 |
| Lane closures | MMB172M | HR | 5 | 2 (40%) | $60.00 | $1.00 |
| Labor crew , welding | MMB186M | HR | 8 | 1 (13%) | $207.39 | $275.00 |
| Labor crew , diving | MMB186M | HR | 6 | 1 (17%) | $420.00 | $386.54 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Iew Construction Group, Inc. | 13 | 7 of 13 |
| Joseph M. Sanzari, Inc. | 6 | 2 of 6 |
| Colonnelli Brothers, Inc. | 5 | 2 of 5 |
| Sparwick Contracting, Inc. | 5 | 4 of 5 |
| Berto Construction, Inc. | 3 | 1 of 3 |
| PKF-Mark III, Inc. | 3 | 1 of 3 |
| Konkus Corporation | 2 | 1 of 2 |
| Ferreira Construction Co., Inc. | 2 | 0 of 2 |
| Power Concrete Co., Inc. | 1 | 1 of 1 |
| South State, Inc. | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 26 MAR 2026 | 26439 | S4 | MTN Infrastructure Repair South - 2026 | 3 of 3 | $8,888,889 | +48% |
| 24 MAR 2026 | 26438 | C4 | MTN Infrastructure Repair Central - 2026 | 4 of 4 | $10,000,000 | +46% |
| 16 OCT 2025 | 26427 | S4 | MTN CONCRETE STRUC. REP. SOUTH - 2026 | 1 of 2 | $3,496,147 | Low, 10% under the second |
| 14 OCT 2025 | 26426 | C4 | MTN CONCRETE STRUC. REP. CENTRAL - 2026 | 1 of 4 | $7,039,778 | Low, 5.0% under the second |
| 20 MAR 2025 | 25439 | S4 | MTN Infrastructure Repair South - 2025 | 2 of 4 | $4,434,417 | +8.0% |
| 18 MAR 2025 | 25438 | C4 | MTN Infrastructure Repair Central - 2025 | 2 of 7 | $6,135,855 | +3.0% |
| 07 JAN 2025 | 24472 | H4 | MTN JOC Bridge Repair, Statewide-2024 | 4 of 4 | $7,218,182 | +61% |
| 19 DEC 2024 | 25436 | S4 | MTN TIMBER AND UNDERWATER, SOUTH - 2025 | 2 of 3 | $5,229,801 | +5.0% |
| 17 DEC 2024 | 25435 | C4 | MTN TIMBER AND UNDERWATER, CENTRAL - 2025 | 3 of 4 | $7,347,551 | +5.0% |
| 21 NOV 2024 | 23463 | H4 | Bridge Preventive Maintenance Contract 2023-2 | 3 of 7 | $9,529,881 | +21% |
| 31 OCT 2024 | 25427 | S4 | MTN CONCRETE STRUC. REP. SOUTH - 2025 | 1 of 2 | $4,640,583 | Low, 3.0% under the second |
| 29 OCT 2024 | 25426 | C4 | MTN CONCRETE STRUC. REP. CENTRAL - 2025 | 2 of 4 | $8,840,790 | +4.0% |
| 17 SEP 2024 | 25455 | C4 | MTN ORPHAN BRIDGE REP. CENTRAL-2025 | 3 of 5 | $1,999,220 | +5.0% |
| 12 SEP 2024 | 25454 | N4 | MTN ORPHAN BRIDGE REP. NORTH-2025 | 2 of 4 | $2,243,389 | +17% |
How this record was read
NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
- Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.