| 1 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $30,000 |
| 2 | Headwall removed (202E20010) | EACH | 1 | $1,000.00 |
| 3 | Pavement removed (202E23000) | SY | 339 | $30.00 |
| 4 | Walk removed (202E30000) | SF | 726 | $7.50 |
| 5 | Steps removed (202E30200) | FT | 11 | $250.00 |
| 6 | Curb removed (202E32000) | FT | 216 | $15.00 |
| 7 | Pipe removed, 24" and under (202E35100) | FT | 67 | $50.00 |
| 8 | Guardrail removed (202E38000) | FT | 492 | $2.00 |
| 9 | Mailbox removed (202E53100) | EACH | 3 | $25.00 |
| 10 | Manhole removed (202E58000) | EACH | 1 | $900.00 |
| 11 | Catch basin removed (202E58100) | EACH | 2 | $500.00 |
| 12 | Special - fill and plug existing conduit (202E70000) | FT | 25 | $76.20 |
| 13 | Removal misc.: post removed (202E98100) | EACH | 1 | $300.00 |
| 14 | Removal misc.: private sign removed (202E98100) | EACH | 1 | $300.00 |
| 15 | Removal misc.: satellite dish removed (202E98100) | EACH | 1 | $300.00 |
| 16 | Excavation (203E10000) | CY | 120 | $50.00 |
| 17 | Embankment (203E20000) | CY | 281 | $25.00 |
| 18 | Subgrade compaction (204E10000) | SY | 364 | $30.00 |
| 19 | Guardrail, type MGS (606E15050) | FT | 312.50 | $19.60 |
| 20 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 3 | $2,530.00 |
| 21 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 3 | $2,650.00 |
| 22 | 4" concrete walk (608E10000) | SF | 635 | $20.00 |
| 23 | 6" concrete walk (608E13000) | SF | 20 | $70.00 |
| 24 | Curb ramp (608E52000) | SF | 25 | $90.00 |
| 25 | Reference monument, type A (623E40500) | EACH | 4 | $1,041.00 |
| 26 | Special - mailbox support (690E50000) | EACH | 3 | $220.00 |
| 27 | Rock channel protection, type C with geotextile fabric (601E32204) | CY | 309 | $95.00 |
| 28 | Topsoil (659E00300) | CY | 80 | $30.00 |
| 29 | Seeding and mulching (659E10000) | SY | 723 | $3.00 |
| 30 | Repair seeding and mulching (659E14000) | SY | 36 | $4.50 |
| 31 | Inter-seeding (659E15000) | SY | 36 | $4.50 |
| 32 | Commercial fertilizer (659E20000) | TON | 0.10 | $1,400.00 |
| 33 | Lime (659E31000) | ACRE | 0.15 | $450.00 |
| 34 | Water (659E35000) | MGAL | 4 | $1.00 |
| 35 | Erosion control (832E30000) | EACH | 3,000 | $1.00 |
| 36 | Concrete masonry (602E20000) | CY | 0.60 | $5,000.00 |
| 37 | 12" conduit, type C (611E04600) | FT | 10 | $12.00 |
| 38 | 15" conduit, type B (611E05900) | FT | 36 | $195.00 |
| 39 | 15" conduit, type C (611E06100) | FT | 7 | $195.00 |
| 40 | 18" conduit, type B (611E07400) | FT | 8 | $250.00 |
| 41 | 18" conduit, type C (611E07600) | FT | 66 | $235.00 |
| 42 | Catch basin, no. 3, as per plan (611E98151) | EACH | 2 | $4,500.00 |
| 43 | Manhole, no. 3 (611E99574) | EACH | 1 | $4,500.00 |
| 44 | Pavement planing, asphalt concrete (+/-1.5" depth) (254E01000) | SY | 480 | $17.25 |
| 45 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 73 | $398.00 |
| 46 | Aggregate base (304E20000) | CY | 59 | $250.00 |
| 47 | Non-tracking tack coat (407E20000) | GAL | 122 | $4.10 |
| 48 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 48 | $398.00 |
| 49 | Asphalt concrete intermediate course, type 1, (449) (441E70200) | CY | 14 | $398.00 |
| 50 | 6" non-reinforced concrete pavement, class QC 1P (452E10010) | SY | 9 | $295.00 |
| 51 | Curb, type 6 (609E26000) | FT | 153 | $50.00 |
| 52 | Manhole adjusted to grade (611E99654) | EACH | 1 | $1,234.17 |
| 53 | Connection, unfused permanent (625E00480) | EACH | 24 | $135.00 |
| 54 | Light pole, decorative (625E10480) | EACH | 4 | $2,400.00 |
| 55 | Light pole, decorative, as per plan (625E10481) | EACH | 2 | $4,000.00 |
| 56 | Light pole anchor bolts on structure (625E10614) | EACH | 16 | $320.00 |
| 57 | Light pole foundation, 24" X 6' deep (625E14000) | EACH | 2 | $4,000.00 |
| 58 | No. 4 AWG 600 volt distribution cable (625E23000) | FT | 1,090 | $3.25 |
| 59 | No. 2 AWG 600 volt distribution cable (625E23100) | FT | 1,244 | $4.00 |
| 60 | No. 12 AWG pole and bracket cable (625E23410) | FT | 280 | $2.00 |
| 61 | Conduit, 2", 725.04 (625E25400) | FT | 628 | $28.00 |
| 62 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 2 | $550.00 |
| 63 | Luminaire, post top, solid state (LED), as per plan (625E27403) | EACH | 4 | $1,150.00 |
| 64 | Trench, 24" deep (625E29002) | FT | 115 | $9.00 |
| 65 | Structure junction box (625E29920) | EACH | 7 | $2,750.00 |
| 66 | Pull box, 725.08, 18" (625E30700) | EACH | 3 | $1,500.00 |
| 67 | Ground rod (625E32000) | EACH | 2 | $300.00 |
| 68 | Structure grounding system, as per plan (625E33001) | EACH | 8 | $3,000.00 |
| 69 | Power service, as per plan (625E34001) | EACH | 1 | $10,000 |
| 70 | Underground warning marking tape (625E36010) | FT | 115 | $1.50 |
| 71 | Light pole removed (625E75400) | EACH | 8 | $500.00 |
| 72 | Luminaire removed (625E75506) | EACH | 8 | $200.00 |
| 73 | Lighting, misc.: power supply, pole mounted (625E98000) | EACH | 1 | $5,000.00 |
| 74 | RPM (621E00100) | EACH | 2 | $1,300.00 |
| 75 | Barrier reflector, type 1 (bidirectional) (626E00102) | EACH | 10 | $12.70 |
| 76 | Barrier reflector, type 3 (bidirectional) (626E00112) | EACH | 10 | $14.00 |
| 77 | Ground mounted support, no. 3 post (630E03100) | FT | 42.50 | $20.00 |
| 78 | Sign support assembly, bridge mounted, type 1, as per plan (630E79601) | EACH | 2 | $3,860.00 |
| 79 | Removal of ground mounted sign and reerection (630E85100) | EACH | 5 | $65.00 |
| 80 | Removal of ground mounted post support and disposal (630E86002) | EACH | 3 | $15.00 |
| 81 | Removal of structure mounted sign and reerection (630E86320) | EACH | 1 | $345.00 |
| 82 | Removal of pole mounted sign and reerection (630E87520) | EACH | 1 | $140.00 |
| 83 | Center line, type 1 (642E00300) | MI | 0.10 | $22,025 |
| 84 | Traffic compacted surface, type A or B (410E12000) | CY | 25 | $116.49 |
| 85 | Increased barrier delineation (614E11630) | FT | 1,140 | $1.98 |
| 86 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 6 | $1,800.00 |
| 87 | Asphalt concrete for maintaining traffic (614E13000) | CY | 25 | $400.07 |
| 88 | Object marker, two way (614E13360) | EACH | 32 | $19.93 |
| 89 | Work zone center line, class III, 642 paint (614E21550) | MI | 0.10 | $14,590 |
| 90 | Work zone edge line, class I, 4" (614E22000) | MI | 0.14 | $23,250 |
| 91 | Work zone edge line, class I, 4", 740.06, type I (614E22200) | MI | 0.18 | $10,354 |
| 92 | Work zone stop line, class I, 740.06, type I (614E26400) | FT | 34 | $6.95 |
| 93 | Water (616E10000) | MGAL | 4 | $100.00 |
| 94 | Portable barrier, unanchored (622E41100) | FT | 880 | $25.00 |
| 95 | Portable barrier, anchored (622E41110) | FT | 260 | $39.00 |
| 96 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $272,876 |
| 97 | Approach slab removed (202E22900) | SY | 206 | $89.91 |
| 98 | Wearing course removed (202E23500) | SY | 1,274 | $2.00 |
| 99 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $395,000 |
| 100 | Unclassified excavation, as per plan (503E21301) | LS | 1 | $95,000 |
| 101 | Pile driving equipment mobilization (505E11100) | LS | 1 | $35,000 |
| 102 | Steel piles HP10X42, furnished (507E00100) | FT | 5,865 | $32.50 |
| 103 | Steel piles HP10X42, driven (507E00150) | FT | 5,495 | $25.00 |
| 104 | Steel points or shoes (507E93300) | EACH | 74 | $135.00 |
| 105 | Epoxy coated steel reinforcement (509E10000) | LB | 208,799 | $1.50 |
| 106 | Class QC2 concrete with QC/QA, bridge deck, as per plan (511E34447) | CY | 480 | $900.00 |
| 107 | Class QC1 concrete with QC/QA, pier above footings (511E40512) | CY | 243 | $1,002.46 |
| 108 | Class QC1 concrete with QC/QA, abutment including footing (511E43512) | CY | 106 | $1,438.71 |
| 109 | Class QC1 concrete with QC/QA, footing (511E46512) | CY | 213 | $375.00 |
| 110 | Concrete, misc.:architectural treatment (511E71200) | SF | 937 | $22.50 |
| 111 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 1,358 | $26.50 |
| 112 | Type 2 waterproofing (512E33000) | SY | 175 | $50.00 |
| 113 | Structural steel members, level 2, as per plan (513E10241) | LB | 398,114 | $3.12 |
| 114 | Welded stud shear connectors, as per plan (513E20001) | EACH | 7,020 | $5.80 |
| 115 | Armorless preformed joint seal (516E10010) | FT | 98 | $80.00 |
| 116 | Sidewalk cover plate (516E12310) | LB | 342 | $44.00 |
| 117 | 1/2" preformed expansion joint filler (516E13200) | SF | 86 | $10.00 |
| 118 | 1" preformed expansion joint filler (516E13600) | SF | 86 | $13.00 |
| 119 | 2" preformed expansion joint filler (516E13900) | SF | 67 | $10.00 |
| 120 | Integral abutment expansion joint seal (516E14014) | FT | 137 | $25.50 |
| 121 | Elastomeric bearing with internal laminates and load plate (516E44100) | EACH | 12 | $1,500.00 |
| 122 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44201) | EACH | 12 | $1,300.00 |
| 123 | Railing (concrete parapet with twin steel tube railing), as per plan (517E75121) | FT | 499 | $360.00 |
| 124 | Scuppers, including supports, as per plan (518E12201) | EACH | 12 | $2,300.00 |
| 125 | Porous backfill with geotextile fabric (518E21200) | CY | 106 | $95.00 |
| 126 | 6" perforated corrugated plastic pipe (518E40000) | FT | 155 | $10.00 |
| 127 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 50 | $15.00 |
| 128 | Reinforced concrete approach slabs with QC/QA (T=1 (526E25011) | SY | 256 | $450.00 |
| 129 | Type C installation (526E90030) | FT | 98 | $395.00 |
| 130 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $27,000 |
| 131 | Maintaining traffic (614E11000) | LS | 1 | $110,000 |
| 132 | Field office, type B (619E16010) | MNTH | 6 | $3,000.00 |
| 133 | Construction layout stakes and surveying (623E10000) | LS | 1 | $25,000 |
| 134 | Mobilization (624E10000) | LS | 1 | $250,000 |