TDOT contract CNZ253 bid tabulation
The slope repair on u.s. 27 (s.r. 29, alberta street) at l.m. 18.75. Let by Tennessee DOT on October 3, 2025, Scott County. 2 bids received; low bid $557,000 by Rogers Group, Inc..
- Owner
- Tennessee DOT
- Letting
- 03 OCT 2025
- Pay items
- 54
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rogers Group, Inc. | $557,000 | Low |
| 2 | Advanced Grading Worx LLC | $957,051 | +72% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rogers Group, Inc. | 2. Advanced Grading Worx LLC |
|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $10,000 | $10,000 |
| 2 | Clearing and grubbing (201-01) | LS | 1 | $15,000 | $40,000 |
| 3 | Removal of structures & obstructions (1000 SF concrete pad) (202-01.56) | LS | 1 | $10,000 | $5,000.00 |
| 4 | Removal of structures & obstructions (360 SF wood porch) (202-01.57) | LS | 1 | $1,250.00 | $5,000.00 |
| 5 | Removal of structures & obstructions (79 LF of chain link fence) (202-01.58) | LS | 1 | $700.00 | $2,000.00 |
| 6 | Removal of pipe (30" CMP, sta.113+62.80) (202-02.01) | LF | 8 | $85.00 | $100.00 |
| 7 | Removal of pipe (18" CMP, sta.113+62.80) (202-02.02) | LF | 6 | $115.00 | $100.00 |
| 8 | Removal of buildings (6574 SF, 2 story concrete block tract no. 3) (202-06.01) | LS | 1 | $56,000 | $60,000 |
| 9 | Road & drainage excavation (unclassified) (203-01) | CY | 223 | $35.00 | $45.00 |
| 10 | Borrow excavation (unclassified) (203-03) | CY | 2,186 | $35.00 | $25.00 |
| 11 | Water (203-06) | MG | 6 | $225.00 | $200.00 |
| 12 | Furnishing & spreading topsoil (203-07) | CY | 144 | $65.00 | $75.00 |
| 13 | Brooming & degrassing shoulders (208-01.05) | LM | 0.20 | $1,275.00 | $13,000 |
| 14 | Filter sock (18 inch) (209-03.22) | LF | 320 | $10.00 | $15.00 |
| 15 | Sediment removal (209-05) | CY | 6 | $85.00 | $166.50 |
| 16 | Catch basin protection (type D) (209-40.33) | EACH | 4 | $610.00 | $500.00 |
| 17 | Mineral aggregate, type A base, grading D (303-01) | TON | 260 | $75.00 | $50.00 |
| 18 | Bituminous material for prime coat (PC) (402-01) | TON | 4 | $1,410.00 | $1,410.00 |
| 19 | Aggregate for cover material (PC) (402-02) | TON | 4 | $680.00 | $680.00 |
| 20 | Bituminous material for tack coat (TC) (403-01) | TON | 3 | $1,050.00 | $1,050.00 |
| 21 | Acs mix(PG64-22) grading D (411-01.10) | TON | 290 | $246.00 | $243.00 |
| 22 | Cold planing bituminous pavement (415-01.01) | TON | 287 | $97.00 | $97.00 |
| 23 | 18" concrete pipe culvert (class III) (607-03.02) | LF | 25 | $160.00 | $275.00 |
| 24 | Manholes, > 4' - 8' depth (611-01.02) | EACH | 1 | $5,800.00 | $6,000.00 |
| 25 | Class A concrete (pipe endwalls) (611-07.01) | CY | 1 | $2,600.00 | $4,358.00 |
| 26 | Steel bar reinforcement (pipe endwalls) (611-07.02) | LB | 45 | $2.30 | $7.50 |
| 27 | Temporary shoring (621-05.01) | SF | 3,450 | $10.00 | $72.50 |
| 28 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 330 | $30.00 | $33.00 |
| 29 | GR terminal (in-inline) MASH TL-3 (705-06.11) | EACH | 1 | $1,400.00 | $3,000.00 |
| 30 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 1 | $4,000.00 | $5,500.00 |
| 31 | GR terminal (energy absorbing) MASH TL-2 (705-06.30) | EACH | 1 | $3,675.00 | $4,950.00 |
| 32 | Radius rail (706-06.03) | LF | 22 | $37.00 | $72.00 |
| 33 | Machined rip-rap (class A-3) (709-05.05) | TON | 100 | $68.00 | $50.00 |
| 34 | Traffic control (712-01) | LS | 1 | $25,000 | $25,000 |
| 35 | Interconnected portable barrier rail (712-02.02) | LF | 370 | $33.00 | $60.00 |
| 36 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 4 | $8,000.00 | $9,000.00 |
| 37 | Flexible drums (channelizing) (712-04.01) | EACH | 60 | $33.00 | $100.00 |
| 38 | Barrier rail delineator (712-04.50) | EACH | 23 | $15.00 | $50.00 |
| 39 | Signs (construction) (712-06) | SF | 842 | $9.50 | $16.00 |
| 40 | Temporary barricades (type III) (712-07.03) | LF | 36 | $23.25 | $40.00 |
| 41 | Removable pavement marking (stop line) (712-09.04) | LF | 35 | $32.00 | $50.00 |
| 42 | Removal of signs, posts and footings (713-15) | LS | 1 | $215.00 | $1,000.00 |
| 43 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 12 | $212.00 | $200.00 |
| 44 | Removal of snowplowable reflective marker (716-01.30) | EACH | 12 | $53.00 | $60.00 |
| 45 | Painted pavement marking (6" line) (716-05.20) | LM | 0.60 | $3,170.00 | $4,500.00 |
| 46 | Removal of pavement marking (line) (716-08.20) | LM | 0.20 | $8,000.00 | $4,500.00 |
| 47 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 0.40 | $12,700 | $20,000 |
| 48 | Mobilization (717-01) | LS | 1 | $51,000 | $170,050 |
| 49 | Geotextile (type III)(erosion control) (740-10.03) | SY | 172 | $5.50 | $10.50 |
| 50 | Temporary sediment tube 12IN (740-11.02) | LF | 80 | $7.50 | $12.00 |
| 51 | Temporary seeding (with mulch) (801-01.07) | UNIT | 5 | $370.00 | $1,000.00 |
| 52 | Seeding (without mulch) (801-02) | UNIT | 10 | $95.00 | $750.00 |
| 53 | Water (seeding & sodding) (801-03) | MG | 1 | $315.00 | $400.00 |
| 54 | Sodding (new sod) (803-01) | SY | 1,112 | $7.50 | $15.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of October 3, 2025. Compiled by Mirage Metrics.