TDOT contract CNZ293 bid tabulation

The resurfacing on s.r. 136 from the i-40 eb ramps (l.m. 2.27) to u.s. 70n (s.r. 24) (l.m. 4.15). Let by Tennessee DOT on December 5, 2025, Putnam County. 2 bids received; low bid $1,723,939 by Vulcan Construction Materials, LLC.

Owner
Tennessee DOT
Letting
05 DEC 2025
Pay items
46
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Vulcan Construction Materials, LLC$1,723,939Low
2Rogers Group, Inc.$1,814,703+5.0%
TDOT contract CNZ293: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Vulcan Construction Materials, LLC2. Rogers Group, Inc.
1Removal of asphalt pavement (202-03.01)SY64$80.00$21.00
2Road & drainage excavation (unclassified) (203-01)CY200$50.00$100.00
3Brooming & degrassing shoulders (208-01.05)LM0.40$3,000.00$4,200.00
4Mineral aggregate, type A base, grading D (303-01)TON170$61.00$65.00
5Asphalt concrete mix (PG70-22) (BPMB-HM) grading A (307-02.01)TON100$146.00$118.00
6Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08)TON1,100$113.00$115.00
7Trackless tack coat (403-02.01)TON36$925.00$1,063.00
8Saw cutting asphalt pavement (407-20.05)LF360$13.50$3.30
9Longitudinal joint sealant (411-01.21)LM11.40$2,350.00$2,481.00
10Acs mix(PG70-22) grading D (411-02.10)TON4,861$142.00$136.25
11Cold planing bituminous pavement (415-01.01)TON5,555$24.50$37.50
12Full depth PCC pavement repair high early (502-03.25)CY19$800.00$1,450.00
13Sawing concrete pavement (full depth) (502-04.01)LF300$16.50$7.25
14Adjustment of existing manhole (611-01.20)EACH21$1,750.00$1,895.00
15Gray iron castings (catchbasin) (611-03.04)LB14,500$4.50$4.90
16Concrete curb ramp (retrofit) (701-02.01)SF1,818$35.00$39.75
17Concrete curb ramp (701-02.03)SF48$27.00$26.85
18Concrete median pavement (701-03)CY37$650.00$643.00
19Concrete curb (702-01)CY15$900.00$939.25
20Traffic control (712-01)LS1$95,000$100,000
21Flexible drums (channelizing) (712-04.01)EACH140$42.00$23.25
22Warning lights (type C) (712-05.03)EACH16$22.00$21.00
23Signs (construction) (712-06)SF1,106$10.00$7.65
24Arrow board (type C) (712-08.03)EACH2$1,200.00$1,583.50
25Changeable message sign unit (713-16.01)EACH3$6,000.00$5,068.00
26Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH363$40.00$41.25
27Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22)EACH412$40.00$41.25
28Plastic pavement marking(channelization striping) (716-02.04)SY35$23.00$28.50
29Plastic pavement marking (stop line) (716-02.05)LF1,419$15.00$11.60
30Plastic pavement marking (turn lane arrow) (716-02.06)EACH54$250.00$184.75
31Plastic pavement marking (24" barrier line) (716-02.07)LF165$10.00$11.60
32Plastic pavement marking (8" dotted line) (716-02.08)LF70$3.00$2.15
33Plastic pavement marking (longitudinal cross-walk) (716-02.09)LF1,115$25.00$26.00
34Plastic pavement marking (8IN line) (716-02.12)LM0.60$2.00$10,030
35Plastic word pavement marking (only) (716-03.01)EACH11$150.00$290.00
36Plastic word pavement marking (stop) (716-03.07)EACH2$175.00$290.00
37Plastic pavement marking (straight-turn arrow) (716-04.01)EACH7$350.00$206.00
38Plastic pavement marking (straight arrow) (716-04.05)EACH1$200.00$158.50
39Painted pavement marking (6" line) (716-05.20)LM10.30$895.00$1,240.50
40Painted pavement marking(4"dotted line) (716-05.21)LF70$0.50$1.10
41Preformed plastic pavement marking (interstate shield) (716-10.50)EACH1$2,000.00$2,296.50
42Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM10.30$7,500.00$6,809.50
43Enhanced flat line thermo (8IN line) (716-12.06)LF368$3.00$2.10
44Mobilization (717-01)LS1$35,000$50,000
45Saw slot (730-14.02)LF9,123$6.00$5.30
46Loop wire (730-14.03)LF29,400$1.00$1.20
TDOT contract CNZ293: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of December 5, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy