TDOT contract CNZ900 bid tabulation

94,84384-4219-04,84384-8219-14,stp/hsip-54(52),84s054-f3-002,84s054-f8- 002,84s054-m3-003 the resurfacing on s.r. 54, s.r. 384, and u.s. 51 (s.r. 3), including bridge expansion joint repair and thin epoxy overlay. Let by Tennessee DOT on May 9, 2025, Tipton County. 1 bid received; low bid $5,489,405 by Lehman-Roberts Company.

Owner
Tennessee DOT
Letting
09 MAY 2025
Pay items
65
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Lehman-Roberts Company$5,489,405Low
TDOT contract CNZ900: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Lehman-Roberts Company
1Removal of asphalt pavement (202-03.01)SY1,152$38.75
2Water (203-06)MG26.50$383.40
3Brooming & degrassing shoulders (208-01.05)LM22.90$2,333.50
4Mineral aggregate, type B base, grading (C or D) (303-02)TON3,270$51.00
5Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01)TON498$177.00
6Asphalt concrete mix (PG70-22) (BPMB-HM) grading A (307-02.01)TON33$450.00
7Trackless tack coat (403-02.01)TON112$1,310.00
8Acs mix(PG64-22) grading D (411-01.10)TON17,812$146.00
9Longitudinal joint sealant (411-01.21)LM4.23$2,825.00
10Acs mix(PG70-22) grading D (411-02.10)TON760$170.00
11Scoring shoulders (non-continuous) (16IN width) (411-12.02)LM0.12$1,625.00
12Scoring for rumble stripe (non-continuous) (8IN width) (411-12.03)LM13.12$1,625.00
13Cold planing bituminous pavement (415-01.01)TON17,131$35.70
14Catchbasin retrofit (611-09.04)EACH15$2,450.00
15Concrete curb ramp (retrofit) (701-02.01)SF150$60.65
16Guardrail at bridge ends (705-01.01)LF567$161.75
17Guardrail transition 27IN to 31IN (705-02.10)EACH12$156.50
18Earth pad for guard rail end treatment (705-04.10)EACH25$991.25
19GR terminal (in-inline) MASH TL-3 (705-06.11)EACH1$1,040.00
20Tangent energy absorbing term MASH TL-3 (705-06.20)EACH20$3,912.00
21GR terminal (energy absorbing) MASH TL-2 (705-06.30)EACH13$3,625.75
22Line post reflective marker (705-80.16)EACH4$100.00
23Guardrail removed (706-01)LF525$8.35
24Radius rail (706-06.03)LF12.50$57.40
25Drill BR. par. wall for michigan end shoe (706-10.83)EACH20$834.70
26Traffic control (712-01)LS1$164,250
27Flexible drums (channelizing) (712-04.01)EACH216$50.40
28Warning lights (type A) (712-05.01)EACH117$11.30
29Warning lights (type C) (712-05.03)EACH24$11.30
30Signs (construction) (712-06)SF3,793$12.35
31Temporary barricades (type III) (712-07.03)LF12$25.70
32Arrow board (type C) (712-08.03)EACH4$1,953.00
33Sign post delineation enhancement (713-02.21)LF35$20.50
34Remove sign, support & footing (713-15.36)EACH9$200.45
35Railroad advance warning sign and support (713-16.09)EACH8$359.80
36Signs (TN state route 54 sign (M1-1) (713-16.21)EACH1$359.80
37Signs (junction plaque (M2-1) (713-16.22)EACH1$359.80
38Signs (stop ahead (W3-1) (713-16.23)EACH2$359.80
39Signs (highway-rail grade crossing advance warning sign (W10-4) (713-16.24)EACH1$359.80
40Signs (stop sign (R1-1) (713-16.25)EACH2$359.80
41Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH577$52.45
42Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22)EACH82$52.45
43Removal of snowplowable reflective marker (716-01.30)EACH283$48.50
44Plastic pavement marking(channelization striping) (716-02.04)SY341$47.15
45Plastic pavement marking (stop line) (716-02.05)LF949$26.20
46Plastic pavement marking (turn lane arrow) (716-02.06)EACH17$235.95
47Plastic pavement marking (8" dotted line) (716-02.08)LF272$4.20
48Plastic pavement marking (8IN line) (716-02.12)LM0.16$22,145
49Plastic word pavement marking (only) (716-03.01)EACH6$246.40
50Plastic word pavement marking (RXR) (716-03.02)EACH8$1,258.25
51Plastic word pavement marking (stop ahead) (716-03.03)EACH3$1,258.25
52Plastic pavement marking (straight-turn arrow) (716-04.01)EACH8$471.85
53Plastic pavement marking (transverse shoulder) (716-04.04)LF667$13.65
54Plastic pavement marking (straight arrow) (716-04.05)EACH1$246.40
55Plastic pavement marking (handicap symbol) (716-04.10)EACH4$262.15
56Painted pavement marking (parking line) (716-05.08)LF3,150$5.25
57Painted pavement marking (6" line) (716-05.20)LM48.83$2,306.75
58Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM50.71$7,968.75
59Mobilization (717-01)LS1$250,250
60Conduit 1" diameter (PVC schedule 40) (730-12.01)LF50$24.70
61Shielded detector cable (730-14.01)LF50$2.05
62Saw slot (730-14.02)LF204$8.20
63Loop wire (730-14.03)LF408$2.50
64Expansion joint repairs (604-10.44)LF155$127.50
65Type 1 thin epoxy overlay (epoxy-urethane) (617-04.01)SY2,555$40.20
TDOT contract CNZ900: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of May 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy