Low bidders on WSDOT contracts carried a median of $4.00 per LF for this item, from 14 DEC 2000 to 29 MAR 2023, across 50 low bids. Half of all 211 bids fell between $2.44 and $7.00.

Owner
Washington State DOT
Item
No code published
Unit
LF
Data through
07 OCT 2026

WSDOT prints this item as “REMOVING ASPHALT CONC. CURB”.

$4.00Low bidder's median, per LF
$4.50Median of all bids, per LF
50Contracts in the window
$3.25Engineer's estimate, median per LF

By year of letting

Removing asphalt concrete curb, WSDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
200011$10.636$9.00
200122$6.505$7.50
200222$2.454$2.45
200355$1.5015$1.75
200422$8.005$10.00
200533$1.508$2.62
200633$2.1510$2.58
200744$4.5019$5.00
200844$2.4526$2.49
200922$3.008$5.00
201044$4.5026$2.95
201111$2.005$2.00
201333$5.2013$5.00
201522$3.509$5.00
201622$9.4512$6.08
201722$8.006$5.22
201822$7.008$7.90
201922$15.009$10.00
202111$5.004$4.96
202211$6.007$9.00
202322$8.006$8.00

Bid prices as published, not adjusted for inflation.

By region

RegionLow bidsLow-bid medianAll bidsMedian, all bids
NWR region18$4.60105$4.20
OR region12$4.3043$4.91
NCR region6$1.8522$2.10
ER region7$2.7020$5.17
SWR region4$6.8816$5.92
SCR region3$3.005$3.00
Removing asphalt concrete curb, WSDOT: unit prices by region, all lettings

Regions with at least three low bids, over all lettings.

By quantity

Quantity (LF)Low bidsLow-bid median
6 to 19012$9.50
190 to 67013$5.20
670 to 1,70112$2.60
1,710 to 6,65513$3.50
Removing asphalt concrete curb, WSDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Who is lowest on this line

BidderLines bidLowest on the line
Lakeside Industries, Inc.146 (43%)
Granite Construction Company93 (33%)
Midmountain Contractors, Inc.63 (50%)
Tri-State Construction, Inc.62 (33%)
Tucci & Sons, Inc.61 (17%)
Wilder Construction Company60 (0%)
Removing asphalt concrete curb, WSDOT: bidders most often lowest on this line

The lowest unit price on each line, whoever won the contract, over all lettings in the data, for firms with five lines or more.

Latest contracts with this item

LetContractRegionQuantityLow bidder's priceMedianEstimateBidsLow bidderSource
29 MAR 2023009954NWR region1,571$8.00$7.62$20.002Granite Construction CompanyWSDOT
11 JAN 2023009909SWR region234$8.00$8.00$7.004Thompson Bros. Excavating, IncWSDOT
09 FEB 2022009763OR region480$6.00$9.00$11.007Kraemer North America, LLC.WSDOT
24 MAR 2021009636OR region330$5.00$4.96$8.004Graham Contracting, LTD.WSDOT
06 MAR 2019009392OR region313$20.00$20.00$5.003Dirt and Aggregate InterchangeWSDOT
09 JAN 2019009357NWR region185$10.00$9.00$5.006Massana Construction, Inc.WSDOT
14 MAR 2018009223ER region160$8.00$7.80$3.503Shamrock Paving, Inc.WSDOT
07 FEB 2018009204ER region220$6.00$10.00$8.005N.A. Degerstrom, Inc.WSDOT
13 DEC 2017009171OR region1,710$12.00$7.50$5.002Lakeside Industries, Inc.WSDOT
11 JAN 2017008992NWR region1,954$4.00$5.22$1.504Gary Merlino Construction Co.,WSDOT
20 APR 2016008877SCR region365$9.90$9.90$4.001Poe Asphalt Paving, Inc.WSDOT
09 MAR 2016008840NWR region100$9.00$6.00$3.0011Interwest Construction, Inc.WSDOT
16 DEC 2015008816NWR region6,655$3.00$4.25$3.004Midmountain Contractors, Inc.WSDOT
09 DEC 2015008822NWR region370$4.00$5.00$7.005Midmountain Contractors, Inc.WSDOT
24 APR 2013008461NWR region3,440$4.20$3.00$4.503Lakeside Industries, Inc.WSDOT
Latest WSDOT contracts carrying Removing asphalt concrete curb

Filter this item by your own quantity, region and period, or check your price against it, in the WSDOT explorer.

How these prices were read

WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are WSDOT's own: this item is compared with WSDOT contracts only.
  • Prices are bid prices, not paid prices. Use them as a reference range, never as a quote.
  • The data runs to the WSDOT letting of 07 OCT 2026 and was rebuilt on 26 NOV 2026.

Your own bid history, read the same way