FDOT contract T4724 bid tabulation
SR 862 (I-595) FROM SR 9 (I-95) NB OFF-RAMP TO EB I-595. Let by Florida DOT on May 28, 2025, Broward, District 4. 5 bids received; low bid $5,296,366 by Florida Engineering & Development Corp.
- Owner
- Florida DOT
- Letting
- 28 MAY 2025
- Pay items
- 139
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Florida Engineering & Development Corp | $5,296,366 | Low |
| 2 | General Asphalt Company, LLC | $5,464,749 | +3.0% |
| 3 | The Stout Group LLC | $5,810,131 | +10% |
| 4 | Strongcore Group, LLC | $6,293,400 | +19% |
| 5 | Ohla USA Inc | $6,628,169 | +25% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Florida Engineering & Development Corp | 2. General Asphalt Company, LLC | 3. The Stout Group LLC | 4. Strongcore Group, LLC | 5. Ohla USA Inc |
|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $529,500 | $325,000 | $570,000 | $620,000 | $650,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $450,000 | $500,000 | $570,000 | $362,000 | $848,722 |
| 0015 | Special detour- temporary pavement (0102-2200) | SY | 1 | $165,000 | $149,086 | $290,000 | $300,000 | $75,000 |
| 0020 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $100,000 | $172,138 | $75,000 | $159,907 | $75,000 |
| 0025 | Traffic control officer (0102-14) | HR | 200 | $85.00 | $94.40 | $90.00 | $75.00 | $125.00 |
| 0030 | Work zone sign (0102-60) | ED | 7,298 | $0.21 | $0.24 | $0.23 | $0.30 | $0.20 |
| 0035 | Barrier mounted work zone sign- index 700-013 (0102-62-13) | ED | 3,900 | $0.57 | $0.65 | $0.63 | $0.70 | $1.00 |
| 0040 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 3,610 | $41.79 | $46.02 | $42.00 | $42.00 | $42.10 |
| 0045 | Temporary barrier, relocate, anchored (0102-71-25) | LF | 4,130 | $17.90 | $18.88 | $17.00 | $17.50 | $17.30 |
| 0050 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 39,926 | $0.11 | $0.13 | $0.13 | $0.10 | $0.10 |
| 0055 | Arrow board / advance warning arrow panel (0102-76) | ED | 395 | $5.15 | $5.90 | $6.00 | $6.60 | $5.00 |
| 0060 | Temporary crash cushion, redirective option (0102-89-1) | LO | 6 | $937.30 | $1,073.80 | $1,100.00 | $2,500.00 | $2,300.00 |
| 0065 | Portable changeable message sign, temporary (0102-99) | ED | 846 | $9.79 | $11.21 | $11.00 | $12.50 | $10.00 |
| 0070 | Existing ITS maintenance (0102-112) | DA | 255 | $155.00 | $295.00 | $255.00 | $250.00 | $75.00 |
| 0075 | Type III barricade (0102-115) | ED | 510 | $0.68 | $0.78 | $0.75 | $0.90 | $0.23 |
| 0080 | Portable regulatory, sign (0102-150-1) | ED | 280 | $5.15 | $5.90 | $6.00 | $6.60 | $5.00 |
| 0085 | Radar speed display unit (0102-150-2) | ED | 280 | $5.15 | $5.90 | $6.00 | $6.60 | $5.00 |
| 0090 | Sediment barrier (0104-10-3) | LF | 6,580 | $2.99 | $3.78 | $6.00 | $7.80 | $5.00 |
| 0095 | Inlet protection system (0104-18) | EACH | 35 | $101.28 | $194.70 | $150.00 | $231.00 | $200.00 |
| 0100 | Litter removal (0107-1) | ACRE | 179.26 | $36.96 | $1.18 | $1.00 | $45.00 | $80.00 |
| 0105 | Mowing (0107-2) | ACRE | 166.24 | $47.67 | $1.18 | $1.00 | $140.00 | $80.00 |
| 0110 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $1,030.00 | $1.18 | $20,000 | $1,130.00 | $16,000 |
| 0115 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $12,978 | $1.18 | $20,000 | $25,000 | $17,000 |
| 0120 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $189,500 | $115,105 | $175,000 | $285,000 | $650,000 |
| 0125 | Tree protection barrier (0110-21) | LF | 2,229 | $6.92 | $4.43 | $12.00 | $7.50 | $8.00 |
| 0130 | Tree removal (0110-23) | EACH | 2 | $1,287.50 | $1,770.00 | $2,500.00 | $3,200.00 | $750.00 |
| 0135 | Regular excavation (0120-1) | CY | 1,624.90 | $40.28 | $38.35 | $20.00 | $35.00 | $9.00 |
| 0140 | Embankment (0120-6) | CY | 5,320.50 | $49.51 | $59.51 | $65.00 | $45.00 | $63.00 |
| 0145 | Type B stabilization (0160-4) | SY | 10,731 | $4.60 | $7.61 | $22.00 | $25.00 | $17.70 |
| 0150 | Optional base, base group 05 (0285-705) | SY | 3,393 | $17.06 | $55.12 | $28.00 | $46.00 | $24.40 |
| 0155 | Optional base, base group 06 (0285-706) | SY | 518 | $22.92 | $40.95 | $33.00 | $64.50 | $30.70 |
| 0160 | Optional base, base group 10 (0285-710) | SY | 433 | $30.31 | $38.61 | $35.00 | $81.50 | $40.05 |
| 0165 | Optional base, base group 11 (0285-711) | SY | 5,911 | $31.64 | $39.43 | $37.00 | $58.00 | $35.00 |
| 0170 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 13,646 | $3.60 | $3.29 | $5.00 | $6.50 | $5.10 |
| 0175 | Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11) | SY | 8,527 | $5.15 | $4.78 | $8.00 | $6.50 | $4.67 |
| 0180 | Milling existing asphalt pavement, 3/4" avg depth (0327-70-19) | SY | 2,089 | $7.25 | $6.92 | $4.25 | $6.50 | $13.80 |
| 0185 | Superpave asphaltic conc, traffic B (0334-1-12) | TN | 55.10 | $475.00 | $432.49 | $250.00 | $300.00 | $772.00 |
| 0190 | Superpave asphaltic conc, traffic E (0334-1-15) | TN | 1,145.40 | $227.00 | $202.14 | $205.00 | $210.00 | $190.00 |
| 0195 | Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52) | TN | 842.10 | $250.00 | $227.39 | $215.00 | $210.00 | $203.00 |
| 0200 | Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55) | TN | 1,898.90 | $226.00 | $199.01 | $225.00 | $210.00 | $175.00 |
| 0205 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 920.80 | $297.00 | $268.43 | $250.00 | $300.00 | $251.00 |
| 0210 | Miscellaneous asphalt (0339-1) | TN | 66.30 | $271.60 | $413.13 | $250.00 | $210.00 | $263.00 |
| 0215 | Inlets, gutter, type S, <10' (0425-1701) | EACH | 3 | $9,120.22 | $11,934 | $12,000 | $8,000.00 | $13,800 |
| 0220 | Inlets, gutter, type V, <10' (0425-1711) | EACH | 2 | $9,507.64 | $12,520 | $12,000 | $7,500.00 | $14,750 |
| 0225 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 209 | $310.98 | $177.00 | $320.00 | $250.00 | $370.00 |
| 0230 | Pipe culvert, opt material, round, 42"S/CD (0430-175142) | LF | 10 | $1,162.94 | $523.92 | $1,500.00 | $850.00 | $1,750.00 |
| 0235 | Straight concrete endwalls, single, 0 degrees, round (0430-518100) | EACH | 1 | $3,461.40 | $5,852.80 | $7,500.00 | $5,000.00 | $9,400.00 |
| 0240 | Straight concrete endwalls, single, 0 degrees, round (0430-542100) | EACH | 1 | $8,619.10 | $14,290 | $15,000 | $9,500.00 | $20,750 |
| 0245 | U-endwall with baffles, index 261/430-011, 1:2 slope, 18"pipe (0430-611325) | EACH | 2 | $4,262.82 | $6,121.84 | $9,000.00 | $5,000.00 | $6,500.00 |
| 0250 | Shoulder gutter- concrete (0520-6) | LF | 683 | $42.77 | $49.27 | $35.00 | $50.00 | $34.10 |
| 0255 | Concrete ditch pavt, non reinforced, 3" (0524-1-1) | SY | 312 | $62.78 | $66.67 | $65.00 | $100.00 | $48.88 |
| 0260 | Guardrail -roadway, general (0536-1-1) | LF | 1,210 | $29.36 | $32.45 | $27.51 | $30.00 | $28.25 |
| 0265 | Special guardrail post- post for shallow mount (0536-7-3) | EACH | 2 | $200.85 | $230.10 | $111.43 | $205.00 | $200.00 |
| 0270 | Guardrail removal (0536-73) | LF | 15 | $3.61 | $23.60 | $2.47 | $21.00 | $21.00 |
| 0275 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 2 | $1,751.00 | $2,065.00 | $1,386.02 | $1,800.00 | $1,800.00 |
| 0280 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 1 | $3,553.50 | $3,894.00 | $3,298.02 | $3,400.00 | $3,385.00 |
| 0285 | Crash cushion, TL-3, wide (0544-3-2) | EACH | 1 | $43,775 | $59,590 | $53,000 | $52,000 | $63,000 |
| 0290 | Performance turf (0570-1-1) | SY | 6,609 | $3.81 | $3.66 | $8.00 | $4.00 | $4.00 |
| 0295 | Performance turf, sod (0570-1-2) | SY | 4,881 | $3.81 | $3.66 | $8.00 | $4.00 | $6.18 |
| 0300 | Conduit, furnish & install, open trench (0630-2-11) | LF | 112 | $25.57 | $29.30 | $35.70 | $27.00 | $23.75 |
| 0305 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 7 | $1,792.47 | $2,053.51 | $1,630.00 | $3,310.00 | $1,900.00 |
| 0310 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $5,800.00 | $5,800.00 | $5,800.00 | $5,800.00 | $5,800.00 |
| 0315 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 11 | $2,184.86 | $2,503.04 | $3,485.70 | $2,580.00 | $3,560.00 |
| 0320 | Traffic monitoring site speed/classification unit, furnish & install, volume speed and classification (0695-3-11) | AS | 2 | $9,222.10 | $10,565 | $19,946 | $10,900 | $13,100 |
| 0325 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 11 | $2,190.28 | $2,509.26 | $2,366.00 | $2,590.00 | $3,600.00 |
| 0330 | Traffic monitoring site cabinet, furnish & install, type 4, 2 plane back, base mount (0695-7171) | EACH | 2 | $7,741.52 | $8,868.93 | $5,830.00 | $9,140.00 | $9,800.00 |
| 0335 | Traffic monitoring site communications modem furnish install (0695-8-11) | EACH | 2 | $4,897.97 | $5,611.27 | $888.00 | $5,780.00 | $5,950.00 |
| 0340 | Raised pavement marker, type B (0706-1-3) | EACH | 2,514 | $5.15 | $4.54 | $5.00 | $4.50 | $74.00 |
| 0345 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 4.40 | $1,648.00 | $2,006.00 | $1,600.00 | $1,970.00 | $25,200 |
| 0350 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 1.26 | $1,854.00 | $2,950.00 | $1,800.00 | $2,900.00 | $1,645.00 |
| 0355 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 437 | $3.09 | $2.12 | $3.00 | $2.10 | $2.40 |
| 0360 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 1.61 | $1,030.00 | $590.00 | $1,000.00 | $580.00 | $1,000.00 |
| 0365 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 18 | $87.55 | $47.20 | $85.00 | $46.50 | $100.50 |
| 0370 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 6 | $46.35 | $41.30 | $45.00 | $40.50 | $42.00 |
| 0375 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 3.02 | $1,648.00 | $2,065.00 | $1,600.00 | $2,020.00 | $1,200.00 |
| 0380 | Partnering, DO not bid (0999-16) | LS | 1 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0385 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 |
| 0390 | Ground-in rumble strips, 16" (0546-72-1) | GM | 0.45 | $6,881.96 | $46,648 | $41,000 | $41,000 | $79,000 |
| 0395 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 2 | $721.00 | $620.18 | $700.00 | $665.00 | $9,050.00 |
| 0400 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 16 | $2,266.00 | $1,956.74 | $2,200.00 | $1,790.00 | $1,300.00 |
| 0405 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 4 | $2,575.00 | $2,862.18 | $2,500.00 | $2,690.00 | $1,650.00 |
| 0410 | Single column ground sign assembly, remove (0700-1600) | EACH | 20 | $36.05 | $59.00 | $35.00 | $34.50 | $104.00 |
| 0415 | Enhanced highway sign AC powered, F&I ground mount, W/beacon, 12-20 SF of static sign panels (0700-141112) | EACH | 2 | $11,896 | $13,628 | $26,000 | $11,700 | $15,500 |
| 0420 | Object marker, type 1 (0705-10-1) | EACH | 11 | $309.00 | $413.59 | $300.00 | $397.00 | $219.00 |
| 0425 | Delineator, flexible tubular (0705-11-1) | EACH | 46 | $103.00 | $135.70 | $100.00 | $104.00 | $230.00 |
| 0430 | Raised pavement marker, type B (0706-1-3) | EACH | 629 | $5.15 | $4.54 | $5.00 | $4.50 | $4.75 |
| 0435 | Painted pavement markings, surface (0710-90) | LS | 1 | $15,450 | $16,911 | $15,000 | $16,600 | $10,100 |
| 0440 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 437 | $7.21 | $6.08 | $7.00 | $6.00 | $5.90 |
| 0445 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 10 | $309.00 | $102.66 | $300.00 | $101.00 | $260.00 |
| 0450 | Thermoplastic, standard, arrow (0711-11170) | EACH | 4 | $92.70 | $49.56 | $90.00 | $48.50 | $107.00 |
| 0455 | Thermoplastic, preformed, color route shield (0711-14660) | EACH | 6 | $4,120.00 | $2,126.36 | $4,000.00 | $2,080.00 | $1,005.00 |
| 0460 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 1.01 | $6,695.00 | $8,785.10 | $6,500.00 | $8,590.00 | $7,650.00 |
| 0465 | Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102) | GM | 0.48 | $7,725.00 | $11,714 | $7,500.00 | $11,400 | $9,400.00 |
| 0470 | Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131) | GM | 1.76 | $4,635.00 | $2,197.16 | $4,500.00 | $2,160.00 | $2,590.00 |
| 0475 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 1.04 | $6,695.00 | $8,216.34 | $6,500.00 | $8,090.00 | $7,630.00 |
| 0480 | Conduit, furnish & install, open trench (0630-2-11) | LF | 2,142 | $19.17 | $21.96 | $20.00 | $23.00 | $11.85 |
| 0485 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 17 | $1,784.61 | $2,044.50 | $2,016.00 | $2,130.00 | $1,900.00 |
| 0490 | Pull & splice box, install (0635-2-30) | EACH | 1 | $1,595.92 | $1,828.34 | $906.70 | $1,900.00 | $1,206.50 |
| 0495 | Electrical power service, F&I, overhead meter purchased by contractor from power company (0639-1112) | AS | 1 | $5,943.55 | $6,809.12 | $5,300.00 | $7,090.00 | $5,400.00 |
| 0500 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 7,724 | $3.89 | $4.46 | $3.20 | $4.60 | $3.56 |
| 0505 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 70 | $6.40 | $7.33 | $4.40 | $7.60 | $5.35 |
| 0510 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 1 | $20,693 | $23,706 | $20,214 | $24,700 | $23,400 |
| 0515 | Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 8' arm length (0715-61111) | EACH | 15 | $11,415 | $12,967 | $7,778.70 | $12,500 | $9,000.00 |
| 0520 | Light pole complete, F&I, STD pole STD foundation, wildlife sensitive luminaire, 25' mounting height, 8' arm length (0715-61811) | EACH | 1 | $12,437 | $14,249 | $6,525.70 | $14,800 | $9,300.00 |
| 0525 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 16 | $1,073.13 | $1,229.41 | $555.00 | $1,280.00 | $1,030.00 |
| 0530 | Relocate trees and palms, palms, 10.0"-18.0" DBH, 14.0' or greater of clear trunk (0581-1282) | EACH | 26 | $4,120.00 | $4,720.00 | $2,500.00 | $4,600.00 | $4,100.00 |
| 0535 | Relocate trees and palms, 3.1" to 4.0" DBH (0581-1310) | EACH | 2 | $2,060.00 | $2,360.00 | $500.00 | $2,300.00 | $2,050.00 |
| 0540 | Relocate trees and palms, 8.1" to 14.0" DBH (0581-1340) | EACH | 1 | $2,060.00 | $2,360.00 | $950.00 | $2,300.00 | $2,050.00 |
| 0545 | Relocate trees and palms, multi-trunk or clustering (0581-1500) | EACH | 1 | $1,545.00 | $1,770.00 | $1,000.00 | $1,730.00 | $1,525.00 |
| 0550 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 0.37 | $4,224.12 | $4,852.35 | $3,141.51 | $5,040.00 | $4,245.00 |
| 0555 | Itsfm location documentation- ITS site (0611-2-2) | EACH | 2 | $2,388.01 | $2,735.77 | $1,620.00 | $2,850.00 | $2,500.00 |
| 0560 | Conduit, furnish & install, open trench (0630-2-11) | LF | 928 | $23.84 | $27.32 | $28.00 | $28.50 | $21.50 |
| 0565 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 479 | $54.98 | $62.99 | $42.50 | $65.50 | $54.00 |
| 0570 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 15 | $53.81 | $61.64 | $60.00 | $64.00 | $35.60 |
| 0575 | Fiber optic cable, F&I, underground,13-48 fibers (0633-1122) | LF | 197 | $5.37 | $6.15 | $3.90 | $6.40 | $5.40 |
| 0580 | Fiber optic cable, F&I, underground, 97 - 144 fibers (0633-1124) | LF | 7,397 | $5.81 | $6.66 | $4.00 | $6.90 | $6.00 |
| 0585 | Fiber optic cable, remove, underground (0633-1620) | LF | 7,191 | $1.47 | $1.69 | $1.00 | $1.80 | $1.20 |
| 0590 | Fiber optic connection, install, splice (0633-2-31) | EACH | 316 | $66.13 | $75.76 | $45.00 | $79.00 | $62.50 |
| 0595 | Fiber optic connection hardware, F&I, splice (0633-3-11) | EACH | 2 | $1,873.67 | $2,146.53 | $1,300.00 | $2,230.00 | $1,880.00 |
| 0600 | Fiber optic connection hardware, F&I, splice tray (0633-3-12) | EACH | 27 | $73.48 | $84.18 | $55.00 | $87.50 | $72.00 |
| 0605 | Fiber optic connection hardware, F&I, preterminated connector assembly (0633-3-13) | EACH | 168 | $80.82 | $92.59 | $58.50 | $96.50 | $106.00 |
| 0610 | Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16) | EACH | 2 | $4,254.31 | $4,873.87 | $2,900.00 | $5,070.00 | $4,441.00 |
| 0615 | Fiber optic connection hardware, F&I, connector panel (0633-3-17) | EACH | 13 | $146.95 | $168.35 | $130.00 | $175.00 | $224.00 |
| 0620 | Fiber optic cable locator (0633-6) | DA | 255 | $353.31 | $404.76 | $255.00 | $400.00 | $371.00 |
| 0625 | Multi-conductor cable, furnish & install, cat 6 (0633-8-11) | LF | 86 | $18.51 | $21.20 | $4.00 | $20.00 | $7.70 |
| 0630 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 7 | $2,224.88 | $2,548.89 | $1,850.00 | $2,650.00 | $1,900.00 |
| 0635 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 3 | $3,535.86 | $4,050.79 | $4,500.00 | $4,220.00 | $3,705.00 |
| 0640 | Electrical service wire, & install (0639-2-1) | LF | 150 | $11.41 | $13.07 | $9.50 | $13.50 | $11.00 |
| 0645 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 1 | $3,820.81 | $4,377.23 | $1,850.00 | $4,560.00 | $4,635.00 |
| 0650 | Electrical power service- transformer, F&I, <5 kva, single phase, copper windings (0639-6111) | EACH | 1 | $3,545.63 | $4,061.98 | $12,599 | $4,230.00 | $4,220.00 |
| 0655 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $4,213.91 | $4,827.58 | $2,578.80 | $5,030.00 | $2,970.00 |
| 0660 | ITS cabinet, furnish & install, base mount, 334, 24" W X 66" H X 30" D (0676-2143) | EACH | 1 | $13,200 | $15,122 | $3,965.60 | $15,700 | $18,000 |
| 0665 | ITS cabinet- adjust/modify (0676-2500) | EACH | 1 | $2,327.02 | $2,665.90 | $2,466.80 | $2,770.00 | $4,250.00 |
| 0670 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 1 | $10,059 | $11,524 | $6,900.00 | $12,000 | $10,000 |
| 0675 | Managed field ethernet switch, adjust / modify (0684-1-5) | EACH | 1 | $367.38 | $420.88 | $250.00 | $438.00 | $516.00 |
| 0680 | Device server, furnish & install (0684-2-1) | EACH | 1 | $1,359.32 | $1,557.28 | $950.00 | $1,620.00 | $1,527.00 |
| 0685 | Uninterruptible power supply, furnish and install, line interactive (0685-1-11) | EACH | 1 | $6,444.37 | $7,264.87 | $7,055.00 | $7,560.00 | $9,250.00 |
| 0690 | Remote power management rpmu, furnish and install (0685-2-1) | EACH | 1 | $1,894.67 | $2,170.60 | $841.80 | $2,260.00 | $1,400.00 |
| 0695 | Road weather information system (rwis) (0920-688100) | EACH | 1 | $53,100 | $60,833 | $45,225 | $63,300 | $55,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of May 28, 2025. Compiled by Mirage Metrics.