NCDOT contract C204421 bid tabulation
GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. NC-43 CONNECTOR FROM US-17 BUSINESS TO SOUTH OF US-70. Let by North Carolina DOT on July 15, 2025, Craven. 5 bids received; low bid $31,775,931 by S T Wooten Corporation.
- Owner
- North Carolina DOT
- Letting
- 15 JUL 2025
- Pay items
- 259
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | S T Wooten Corporation | $31,775,931 | Low |
| 2 | Branch Civil Inc | $32,885,000 | +3.0% |
| 3 | Barnhill Contracting Company | $38,159,977 | +20% |
| 4 | K West Group LLC DBA Kwest Group LLC | $39,623,167 | +25% |
| 5 | FSC II LLC DBA Fred Smith Company | $40,876,543 | +29% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. S T Wooten Corporation | 2. Branch Civil Inc | 3. Barnhill Contracting Company | 4. K West Group LLC DBA Kwest Group LLC | 5. FSC II LLC DBA Fred Smith Company |
|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $1,575,000 | $1,600,000 | $1,914,000 | $1,980,000 | $2,040,000 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $450,000 | $402,451 | $2,000,000 | $500,000 | $375,000 |
| 0003 | Supplementary clearing & grubbing (0050000000-E) | ACRE | 3 | $5,500.00 | $6,100.00 | $5,000.00 | $6,000.00 | $5,000.00 |
| 0004 | Undercut excavation (0057000000-E) | CY | 32,850 | $15.00 | $14.30 | $48.55 | $25.00 | $20.00 |
| 0005 | Grading (0063000000-N) | LS | 1 | $8,025,000 | $3,200,000 | $6,677,905 | $6,250,000 | $7,848,144 |
| 0006 | Borrow excavation (0106000000-E) | CY | 294,210 | $1.00 | $11.75 | $16.00 | $24.50 | $28.00 |
| 0007 | Drainage ditch excavation (0134000000-E) | CY | 4,300 | $7.00 | $9.00 | $7.70 | $15.00 | $35.00 |
| 0008 | Select granular material (0195000000-E) | CY | 5,000 | $1.00 | $19.50 | $20.00 | $24.50 | $28.00 |
| 0009 | Geotextile for soil stabilization (0196000000-E) | SY | 45,900 | $5.00 | $3.70 | $3.75 | $2.25 | $4.25 |
| 0010 | Temporary shoring (0199000000-E) | SF | 2,100 | $117.46 | $111.00 | $250.00 | $75.00 | $110.00 |
| 0011 | Foundation conditioning material, minor structures (0318000000-E) | TON | 1,182 | $70.00 | $88.00 | $82.50 | $80.00 | $72.00 |
| 0012 | FND condit geotextile (4A) (0321000000-E) | SY | 4,737 | $5.00 | $3.70 | $7.75 | $3.50 | $3.50 |
| 0013 | **" side drain pipe - (36") (0342000000-E) | LF | 56 | $140.00 | $126.00 | $175.25 | $150.00 | $225.00 |
| 0014 | 15" side drain pipe (0343000000-E) | LF | 108 | $87.00 | $56.50 | $79.20 | $90.00 | $83.50 |
| 0015 | 18" side drain pipe (0344000000-E) | LF | 244 | $88.00 | $72.50 | $90.40 | $95.00 | $96.50 |
| 0016 | 15" RC pipe culverts, class III (0366000000-E) | LF | 1,128 | $90.00 | $85.50 | $63.95 | $90.00 | $83.50 |
| 0017 | 18" RC pipe culverts, class III (0372000000-E) | LF | 1,916 | $100.00 | $97.50 | $78.20 | $100.00 | $95.00 |
| 0018 | 24" RC pipe culverts, class III (0378000000-E) | LF | 152 | $125.00 | $124.00 | $97.25 | $125.00 | $126.50 |
| 0019 | 30" RC pipe culverts, class III (0384000000-E) | LF | 244 | $160.00 | $203.00 | $168.50 | $175.00 | $167.50 |
| 0020 | 36" RC pipe culverts, class III (0390000000-E) | LF | 12 | $445.00 | $291.00 | $259.00 | $250.00 | $276.50 |
| 0021 | 66" RC pipe culverts, class III (0420000000-E) | LF | 204 | $640.00 | $742.00 | $608.00 | $900.00 | $726.00 |
| 0022 | ***" RCP culv class IV - (54") (0448000000-E) | LF | 668 | $486.00 | $586.00 | $454.15 | $750.00 | $508.50 |
| 0023 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 1,044 | $96.00 | $93.00 | $126.65 | $150.00 | $91.00 |
| 0024 | 18" RC pipe culverts, class IV (0448300000-E) | LF | 1,296 | $110.00 | $107.00 | $138.90 | $175.00 | $104.50 |
| 0025 | 24" RC pipe culverts, class IV (0448400000-E) | LF | 132 | $140.00 | $139.00 | $130.50 | $195.00 | $139.00 |
| 0026 | 30" RC pipe culverts, class IV (0448500000-E) | LF | 200 | $185.00 | $225.00 | $232.00 | $225.00 | $188.00 |
| 0027 | 42" RC pipe culverts, class IV (0448700000-E) | LF | 528 | $287.00 | $350.00 | $284.80 | $375.00 | $348.00 |
| 0028 | Pipe removal (0995000000-E) | LF | 2,427 | $20.00 | $24.00 | $24.40 | $20.00 | $15.00 |
| 0029 | Shallow undercut (1099500000-E) | CY | 500 | $35.00 | $15.50 | $32.85 | $6.00 | $35.00 |
| 0030 | Class IV subgrade stabilization (1099700000-E) | TON | 950 | $55.00 | $70.00 | $58.60 | $50.00 | $50.00 |
| 0031 | Geotextile for subgrade stabilization (1112000000-E) | SY | 1,500 | $5.00 | $4.60 | $5.45 | $5.00 | $4.50 |
| 0032 | Aggregate base course (1121000000-E) | TON | 52,300 | $56.00 | $73.50 | $56.65 | $50.00 | $58.00 |
| 0033 | Incidental stone base (1220000000-E) | TON | 900 | $60.00 | $76.50 | $200.00 | $75.00 | $85.00 |
| 0034 | Mill asp PVMT *****" DTH - (2") (1297000000-E) | SY | 24,100 | $2.25 | $2.90 | $3.00 | $3.00 | $3.00 |
| 0035 | Mill asp PVMT *****" DTH - (2-1/2") (1297000000-E) | SY | 1,200 | $8.25 | $9.30 | $15.00 | $15.00 | $15.00 |
| 0036 | Incidental milling (1330000000-E) | SY | 3,000 | $6.00 | $7.10 | $20.00 | $20.00 | $20.00 |
| 0037 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 8,400 | $105.00 | $110.00 | $100.00 | $110.00 | $100.00 |
| 0038 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 30,900 | $94.00 | $76.00 | $70.00 | $80.00 | $80.00 |
| 0039 | Asphalt conc surface course, type S9.5B (1519000000-E) | TON | 900 | $130.00 | $138.00 | $125.00 | $135.00 | $125.00 |
| 0040 | Asphalt conc surface course, type S9.5C (1523000000-E) | TON | 28,000 | $85.00 | $82.00 | $75.00 | $85.00 | $85.00 |
| 0041 | Asphalt binder for plant mix (1575000000-E) | TON | 3,575 | $450.00 | $600.00 | $575.00 | $600.00 | $575.00 |
| 0042 | Asphalt plant mix, pavement repair (1693000000-E) | TON | 215 | $200.00 | $319.00 | $249.00 | $250.00 | $275.00 |
| 0043 | Subdrain excavation (2022000000-E) | CY | 672 | $35.00 | $39.00 | $35.00 | $25.00 | $35.00 |
| 0044 | Geotextile for subsurface drains (2026000000-E) | SY | 3,000 | $12.00 | $13.30 | $12.00 | $4.25 | $12.00 |
| 0045 | Subdrain coarse aggregate (2036000000-E) | CY | 504 | $85.00 | $94.50 | $85.00 | $85.00 | $85.00 |
| 0046 | 6" perforated subdrain pipe (2044000000-E) | LF | 3,000 | $17.00 | $18.90 | $17.00 | $20.00 | $17.00 |
| 0047 | Subdrain pipe outlet (2070000000-N) | EACH | 6 | $400.00 | $444.00 | $400.00 | $675.00 | $400.00 |
| 0048 | 6" outlet pipe (2077000000-E) | LF | 36 | $40.00 | $44.50 | $40.00 | $45.00 | $40.00 |
| 0049 | Endwalls (2209000000-E) | CY | 20 | $1,900.00 | $1,200.00 | $1,415.00 | $1,100.00 | $2,700.00 |
| 0050 | Reinforced endwalls (2220000000-E) | CY | 23.20 | $2,300.00 | $1,700.00 | $1,298.00 | $2,500.00 | $2,800.00 |
| 0051 | Pipe collars (2253000000-E) | CY | 0.76 | $9,500.00 | $1,775.00 | $8,423.00 | $4,000.00 | $4,000.00 |
| 0052 | Masonry drainage structures (2286000000-N) | EACH | 73 | $4,000.00 | $5,300.00 | $3,445.00 | $3,500.00 | $2,820.00 |
| 0053 | Masonry drainage structures (2308000000-E) | LF | 7.40 | $700.00 | $540.00 | $580.00 | $600.00 | $640.00 |
| 0054 | Frame with two grates, STD 840.16 (2364000000-N) | EACH | 20 | $1,325.00 | $1,200.00 | $920.00 | $900.00 | $1,650.00 |
| 0055 | Frame with two grates, STD 840.22 (2365000000-N) | EACH | 28 | $1,050.00 | $1,100.00 | $822.00 | $900.00 | $1,650.00 |
| 0056 | Frame with two grates, STD 840.24 (2366000000-N) | EACH | 1 | $1,050.00 | $1,100.00 | $834.00 | $900.00 | $1,650.00 |
| 0057 | Frame-GRT-HD 840.03 ** - (E) (2374000000-N) | EACH | 7 | $1,405.00 | $1,300.00 | $1,050.00 | $1,500.00 | $1,150.00 |
| 0058 | Frame-GRT-HD 840.03 ** - (F) (2374000000-N) | EACH | 9 | $1,450.00 | $1,300.00 | $1,050.00 | $1,500.00 | $1,150.00 |
| 0059 | Frame-GRT-HD 840.03 ** - (G) (2374000000-N) | EACH | 7 | $1,450.00 | $1,300.00 | $1,050.00 | $1,500.00 | $1,150.00 |
| 0060 | Frame with cover, STD 840.54 (2396000000-N) | EACH | 2 | $760.00 | $863.00 | $690.00 | $850.00 | $900.00 |
| 0061 | Concrete transitional section for catch basin (2440000000-N) | EACH | 10 | $1,340.00 | $567.00 | $750.00 | $1,000.00 | $500.00 |
| 0062 | Concrete transitional section for drop inlet (2451000000-N) | EACH | 19 | $1,645.00 | $567.00 | $750.00 | $1,000.00 | $500.00 |
| 0063 | **'-**" concrete curb & gutter - (2'-9") (2538000000-E) | LF | 2,040 | $37.75 | $44.50 | $34.00 | $32.00 | $34.00 |
| 0064 | 1'-6" concrete curb & gutter (2542000000-E) | LF | 6,510 | $26.75 | $33.00 | $21.71 | $27.00 | $24.00 |
| 0065 | 2'-6" concrete curb & gutter (2549000000-E) | LF | 610 | $47.75 | $44.50 | $35.85 | $35.00 | $34.00 |
| 0066 | 4" concrete sidewalk (2591000000-E) | SY | 180 | $82.50 | $82.50 | $52.39 | $80.00 | $58.00 |
| 0067 | Concrete curb ramps (2605000000-N) | EACH | 2 | $2,500.00 | $2,800.00 | $2,250.00 | $2,100.00 | $3,500.00 |
| 0068 | 6" concrete driveway (2612000000-E) | SY | 70 | $140.50 | $142.00 | $85.00 | $110.00 | $150.00 |
| 0069 | 4" concrete island cover (2627000000-E) | SY | 500 | $71.50 | $60.00 | $52.39 | $80.00 | $53.00 |
| 0070 | 5" monolithic concrete islands (keyed in) (2655000000-E) | SY | 2,900 | $88.00 | $65.50 | $70.35 | $131.00 | $58.00 |
| 0071 | Adjustment of drop inlets (2815000000-N) | EACH | 6 | $2,000.00 | $330.00 | $1,040.00 | $1,500.00 | $1,450.00 |
| 0072 | Adjustment of manholes (2830000000-N) | EACH | 1 | $3,200.00 | $330.00 | $1,215.00 | $1,500.00 | $1,450.00 |
| 0073 | Convert existing drop inlet to junction box (2905000000-N) | EACH | 1 | $3,850.00 | $2,700.00 | $3,185.00 | $5,000.00 | $1,725.00 |
| 0074 | Steel beam guardrail (3030000000-E) | LF | 700 | $23.50 | $26.00 | $23.50 | $23.50 | $23.50 |
| 0075 | 25' clear span guardrail sections (3140000000-E) | EACH | 2 | $1,650.00 | $1,800.00 | $1,650.00 | $1,650.00 | $1,650.00 |
| 0076 | Additional guardrail posts (3150000000-N) | EACH | 5 | $44.00 | $49.00 | $44.00 | $44.00 | $44.00 |
| 0077 | Guardrail end units, type cat-1 (3210000000-N) | EACH | 4 | $950.00 | $1,100.00 | $950.00 | $950.00 | $950.00 |
| 0078 | Remove existing guardrail (3360000000-E) | LF | 300 | $1.00 | $1.10 | $1.00 | $1.00 | $1.00 |
| 0079 | Temporary steel beam guardrail (3380000000-E) | LF | 1,100 | $6.25 | $6.90 | $6.25 | $6.25 | $6.25 |
| 0080 | Temporary steel beam guardrail, shop curved (3382000000-E) | LF | 50 | $8.00 | $8.90 | $8.00 | $8.00 | $8.00 |
| 0081 | Temp GDRL end units ***** - (TL-2) (3389150000-N) | EACH | 2 | $2,000.00 | $2,200.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 0082 | Temp GDRL end units ***** - (TL-3) (3389150000-N) | EACH | 1 | $2,100.00 | $2,300.00 | $2,100.00 | $2,100.00 | $2,100.00 |
| 0083 | Temporary additional guardrail posts (3389160000-N) | EACH | 5 | $12.00 | $13.30 | $12.00 | $12.00 | $12.00 |
| 0084 | Woven wire fence, 47" fabric (3503000000-E) | LF | 15,600 | $5.10 | $5.70 | $5.10 | $5.10 | $5.10 |
| 0085 | 4" timber fence posts, 7'-6" long (3509000000-E) | EACH | 1,006 | $35.60 | $40.00 | $35.60 | $35.60 | $35.60 |
| 0086 | 5" timber fence posts, 8'-0" long (3515000000-E) | EACH | 187 | $38.20 | $43.00 | $38.20 | $38.20 | $38.20 |
| 0087 | Rip rap, class I (3628000000-E) | TON | 350 | $94.00 | $110.00 | $109.15 | $125.00 | $120.00 |
| 0088 | Rip rap, class B (3649000000-E) | TON | 210 | $93.00 | $106.00 | $97.10 | $125.00 | $105.00 |
| 0089 | Geotextile for drainage (3656000000-E) | SY | 2,835 | $2.00 | $2.40 | $3.70 | $3.00 | $4.00 |
| 0090 | Plain concrete sign foundations (4054000000-E) | CY | 1 | $10.00 | $11.00 | $10.00 | $663.64 | $12.00 |
| 0091 | Supports, breakaway steel beam (4060000000-E) | LB | 560 | $18.00 | $20.00 | $18.00 | $18.80 | $18.00 |
| 0092 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 256 | $9.50 | $10.60 | $9.50 | $15.48 | $9.50 |
| 0093 | Supports, wood (4082000000-E) | LF | 2,350 | $22.00 | $24.50 | $22.00 | $33.18 | $22.00 |
| 0094 | Sign erection, type D (4096000000-N) | EACH | 4 | $350.00 | $389.00 | $350.00 | $259.93 | $350.00 |
| 0095 | Sign erection, type E (4102000000-N) | EACH | 100 | $175.00 | $194.00 | $175.00 | $259.92 | $175.00 |
| 0096 | Sign erection, type F (4108000000-N) | EACH | 14 | $350.00 | $389.00 | $350.00 | $259.92 | $350.00 |
| 0097 | Sign erection, type *** (GRD MTD) - (A) (4110000000-N) | EACH | 1 | $1,250.00 | $1,400.00 | $1,250.00 | $2,765.16 | $1,250.00 |
| 0098 | Sign erection, type *** (GRD MTD) - (B) (4110000000-N) | EACH | 2 | $1,250.00 | $1,400.00 | $1,250.00 | $995.46 | $1,250.00 |
| 0099 | Disposal of sign system, wood (4158000000-N) | EACH | 43 | $2.00 | $2.20 | $2.00 | $11.06 | $2.00 |
| 0100 | Stockpile sign, D, E or F (4237000000-N) | EACH | 1 | $50.00 | $55.50 | $50.00 | $71.89 | $50.00 |
| 0101 | Work zone signs (stationary) (4400000000-E) | SF | 805 | $10.00 | $10.60 | $7.35 | $12.00 | $6.75 |
| 0102 | Work zone signs (portable) (4405000000-E) | SF | 560 | $33.74 | $18.90 | $43.85 | $12.00 | $10.00 |
| 0103 | Work zone signs (barricade mounted) (4410000000-E) | SF | 306 | $6.75 | $10.60 | $18.50 | $10.00 | $6.75 |
| 0104 | Flashing arrow board (4415000000-N) | EACH | 3 | $3,650.00 | $3,900.00 | $3,960.00 | $3,500.00 | $1,000.00 |
| 0105 | Portable changeable message sign (4420000000-N) | EACH | 4 | $15,700 | $13,100 | $10,685 | $15,000 | $7,500.00 |
| 0106 | Drums (4430000000-N) | EACH | 378 | $55.00 | $64.50 | $72.05 | $100.00 | $50.00 |
| 0107 | Cones (4435000000-N) | EACH | 50 | $29.00 | $34.50 | $45.40 | $50.00 | $21.50 |
| 0108 | Barricades (type III) (4445000000-E) | LF | 1,200 | $25.00 | $42.50 | $36.75 | $50.00 | $29.00 |
| 0109 | Flagger (4455000000-N) | DAY | 1 | $1,500.00 | $500.00 | $2,500.00 | $1,200.00 | $985.00 |
| 0110 | Temporary crash cushions (4465000000-N) | EACH | 2 | $14,500 | $10,700 | $14,500 | $9,500.00 | $7,500.00 |
| 0111 | Remove & reset temporary crash cushion (4470000000-N) | EACH | 1 | $3,250.00 | $4,000.00 | $3,250.00 | $3,500.00 | $4,500.00 |
| 0112 | TMA (4480000000-N) | EACH | 3 | $14,750 | $42,500 | $31,000 | $50,000 | $15,000 |
| 0113 | Portable concrete barrier (4485000000-E) | LF | 1,657 | $48.45 | $59.00 | $49.66 | $40.00 | $54.00 |
| 0114 | Remove and reset portable concrete barrier (4500000000-E) | LF | 1,584 | $6.30 | $7.70 | $6.46 | $15.00 | $32.00 |
| 0115 | Law enforcement (4510000000-N) | HR | 32 | $90.00 | $94.50 | $66.00 | $75.00 | $70.00 |
| 0116 | Temporary raised pavement markers (4650000000-N) | EACH | 852 | $11.00 | $12.20 | $11.00 | $11.00 | $11.00 |
| 0117 | Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E) | LF | 78,905 | $0.97 | $1.10 | $0.97 | $0.97 | $0.97 |
| 0118 | Thermoplastic pavement marking lines (6", 90 mils) (4688000000-E) | LF | 4,443 | $1.22 | $1.40 | $1.22 | $1.22 | $1.22 |
| 0119 | Thermoplastic pavement marking lines (8", 90 mils) (4695000000-E) | LF | 6,742 | $1.52 | $1.70 | $1.52 | $1.52 | $1.52 |
| 0120 | Thermoplastic pavement marking lines (12", 90 mils) (4700000000-E) | LF | 1,008 | $3.76 | $4.20 | $3.76 | $3.76 | $3.76 |
| 0121 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 624 | $19.25 | $21.50 | $19.25 | $19.25 | $19.25 |
| 0122 | Thermoplastic pavement marking character (90 mils) (4720000000-E) | EACH | 12 | $160.00 | $178.00 | $160.00 | $160.00 | $160.00 |
| 0123 | Thermoplastic pavement marking symbol (90 mils) (4725000000-E) | EACH | 158 | $160.00 | $178.00 | $160.00 | $160.00 | $160.00 |
| 0124 | Paint pavement marking lines (4") (4810000000-E) | LF | 222,060 | $0.28 | $0.30 | $0.28 | $0.28 | $0.28 |
| 0125 | Paint pavement marking lines (6") (4815000000-E) | LF | 8,887 | $0.38 | $0.40 | $0.38 | $0.38 | $0.38 |
| 0126 | Paint pavement marking lines (8") (4820000000-E) | LF | 14,977 | $0.57 | $0.65 | $0.57 | $0.57 | $0.57 |
| 0127 | Paint pavement marking lines (12") (4825000000-E) | LF | 2,016 | $1.28 | $1.40 | $1.28 | $1.28 | $1.28 |
| 0128 | Paint pavement marking lines (24") (4835000000-E) | LF | 1,515 | $11.76 | $13.10 | $11.76 | $11.76 | $11.76 |
| 0129 | Paint pavement marking character (4840000000-N) | EACH | 24 | $74.00 | $82.00 | $74.00 | $74.00 | $74.00 |
| 0130 | Paint pavement marking symbol (4845000000-N) | EACH | 366 | $74.00 | $82.00 | $74.00 | $74.00 | $74.00 |
| 0131 | Removal of pavement marking lines (4") (4850000000-E) | LF | 44,293 | $0.40 | $0.45 | $0.40 | $0.40 | $0.40 |
| 0132 | Removal of pavement marking lines (8") (4860000000-E) | LF | 955 | $0.93 | $1.00 | $0.93 | $0.93 | $0.93 |
| 0133 | Removal of pavement marking lines (24") (4870000000-E) | LF | 244 | $11.50 | $12.80 | $11.50 | $11.50 | $11.50 |
| 0134 | Removal of pavement marking symbols & characters (4875000000-N) | EACH | 67 | $84.00 | $93.50 | $84.00 | $84.00 | $84.00 |
| 0135 | Generic pavement marking item (LF) - integrated mulitpolymer pavement marking lines, (4", 90 mils) (4890000000-E) | LF | 1,188 | $7.55 | $8.40 | $7.55 | $7.55 | $7.55 |
| 0136 | Generic pavement marking item (LF) - yield line paint pavement marking, (24") (4890000000-E) | LF | 31 | $64.00 | $71.00 | $64.00 | $64.00 | $64.00 |
| 0137 | Generic pavement marking item (LF) - yield line thermoplastic pavement marking, (24", 90 mils) (4890000000-E) | LF | 31 | $64.00 | $71.00 | $64.00 | $64.00 | $64.00 |
| 0138 | Generic pavement marking item (EA) - polycarbonate H-shaped markers (4895000000-N) | EACH | 1,059 | $53.40 | $59.50 | $53.40 | $53.40 | $53.40 |
| 0139 | Permanent raised pavement markers (4900000000-N) | EACH | 6 | $11.00 | $12.20 | $11.00 | $11.00 | $11.00 |
| 0140 | 7' U-channel posts (4915000000-E) | EACH | 28 | $46.42 | $83.50 | $75.00 | $50.00 | $75.00 |
| 0141 | Object markers (end of road) (4955000000-N) | EACH | 28 | $69.05 | $167.00 | $150.00 | $75.00 | $150.00 |
| 0142 | Object markers (type **) - (1) (4957000000-N) | EACH | 18 | $75.00 | $167.00 | $150.00 | $75.00 | $150.00 |
| 0143 | 6" water line (5325600000-E) | LF | 305 | $140.00 | $118.00 | $105.00 | $93.00 | $105.00 |
| 0144 | 8" water line (5325800000-E) | LF | 2,592 | $83.00 | $124.00 | $110.00 | $100.00 | $110.00 |
| 0145 | 10" water line (5326000000-E) | LF | 2,659 | $92.00 | $130.00 | $115.00 | $102.00 | $115.00 |
| 0146 | DI H2O pipe fittings (5329000000-E) | LB | 7,155 | $13.00 | $16.90 | $15.00 | $15.10 | $15.00 |
| 0147 | 6" valve (5540000000-E) | EACH | 8 | $2,745.00 | $3,700.00 | $3,300.00 | $3,000.00 | $3,300.00 |
| 0148 | 8" valve (5546000000-E) | EACH | 9 | $3,530.00 | $5,000.00 | $4,450.00 | $4,000.00 | $4,450.00 |
| 0149 | 10" valve (5552000000-E) | EACH | 4 | $5,000.00 | $7,200.00 | $6,400.00 | $5,200.00 | $6,400.00 |
| 0150 | 8" tapping sleeve & valve (5571800000-E) | EACH | 1 | $9,300.00 | $15,200 | $13,500 | $13,351 | $13,500 |
| 0151 | 2" air release valve (5589200000-E) | EACH | 3 | $10,600 | $18,600 | $16,500 | $9,300.00 | $16,500 |
| 0152 | Relocate water meter (5648000000-N) | EACH | 4 | $915.00 | $2,500.00 | $2,175.00 | $1,100.00 | $2,175.00 |
| 0153 | Relocate fire hydrant (5672000000-N) | EACH | 5 | $1,650.00 | $3,000.00 | $2,680.00 | $1,800.00 | $2,680.00 |
| 0154 | Fire hydrant leg (5673000000-E) | LF | 92 | $110.00 | $135.00 | $120.00 | $160.00 | $120.00 |
| 0155 | 8" line stop (5678600000-E) | EACH | 3 | $14,000 | $30,200 | $26,775 | $17,880 | $26,775 |
| 0156 | **" water service line - (2") (5686000000-E) | LF | 51 | $67.00 | $73.50 | $65.00 | $87.00 | $65.00 |
| 0157 | Water service line (<2") (5686500000-E) | LF | 103 | $65.00 | $45.00 | $40.00 | $43.50 | $40.00 |
| 0158 | 8" sanitary gravity sewer (5691300000-E) | LF | 1,164 | $147.00 | $237.00 | $210.00 | $194.43 | $210.00 |
| 0159 | 4" force main sewer (5709200000-E) | LF | 691 | $75.00 | $90.00 | $80.00 | $73.00 | $80.00 |
| 0160 | 6" force main sewer (5709300000-E) | LF | 1,197 | $79.00 | $101.00 | $90.00 | $79.00 | $90.00 |
| 0161 | 8" force main sewer (5709400000-E) | LF | 1,346 | $103.00 | $107.00 | $95.00 | $120.00 | $95.00 |
| 0162 | Ductile iron sewer pipe fittings (5769000000-E) | LB | 4,180 | $21.00 | $26.00 | $23.00 | $17.00 | $23.00 |
| 0163 | 4' dia utility manhole (5775000000-E) | EACH | 5 | $9,100.00 | $10,900 | $9,675.00 | $8,566.00 | $9,675.00 |
| 0164 | Utility manhole wall 4' dia (5781000000-E) | LF | 15 | $215.00 | $947.00 | $840.00 | $250.00 | $840.00 |
| 0165 | Abandon **" utility pipe - (4") (5798000000-E) | LF | 681 | $19.00 | $16.90 | $15.00 | $15.00 | $15.00 |
| 0166 | Abandon 6" utility pipe (5800000000-E) | LF | 904 | $18.00 | $20.50 | $18.00 | $23.70 | $18.00 |
| 0167 | Abandon 8" utility pipe (5801000000-E) | LF | 4,724 | $29.00 | $22.50 | $20.00 | $16.00 | $20.00 |
| 0168 | Abandon 10" utility pipe (5802000000-E) | LF | 2,323 | $25.00 | $25.00 | $22.00 | $18.00 | $22.00 |
| 0169 | Abandon utility manhole (5816000000-N) | EACH | 4 | $2,188.00 | $3,700.00 | $3,300.00 | $2,500.00 | $3,300.00 |
| 0170 | Direct drill **" - (4") (5872600000-E) | LF | 615 | $30.00 | $62.00 | $55.00 | $65.00 | $55.00 |
| 0171 | Direct drill **" - (8") (5872600000-E) | LF | 2,271 | $55.00 | $73.50 | $65.00 | $140.00 | $65.00 |
| 0172 | Temporary silt fence (6000000000-E) | LF | 52,375 | $2.70 | $3.10 | $1.00 | $3.49 | $2.70 |
| 0173 | Stone for erosion control, class A (6006000000-E) | TON | 1,480 | $94.34 | $68.50 | $85.00 | $110.00 | $40.00 |
| 0174 | Stone for erosion control, class B (6009000000-E) | TON | 4,786 | $50.00 | $101.00 | $85.00 | $90.00 | $55.00 |
| 0175 | Sediment control stone (6012000000-E) | TON | 3,300 | $50.00 | $98.00 | $75.00 | $110.00 | $50.00 |
| 0176 | Temporary mulching (6015000000-E) | ACRE | 63 | $1,600.00 | $1,800.00 | $1,600.00 | $1,495.00 | $1,600.00 |
| 0177 | Seed for temporary seeding (6018000000-E) | LB | 3,700 | $2.00 | $2.30 | $2.00 | $0.95 | $2.00 |
| 0178 | Fertilizer for temporary seeding (6021000000-E) | TON | 19 | $900.00 | $1,000.00 | $900.00 | $1,395.00 | $900.00 |
| 0179 | Temporary slope drains (6024000000-E) | LF | 4,010 | $5.00 | $22.00 | $20.00 | $27.00 | $28.00 |
| 0180 | Safety fence (6029000000-E) | LF | 1,920 | $2.80 | $3.20 | $2.80 | $6.50 | $2.80 |
| 0181 | Silt excavation (6030000000-E) | CY | 15,315 | $2.00 | $28.00 | $0.10 | $5.00 | $5.00 |
| 0182 | Matting for erosion control (6036000000-E) | SY | 67,098 | $1.55 | $1.80 | $1.55 | $1.69 | $1.55 |
| 0183 | Coir fiber mat (6037000000-E) | SY | 305 | $6.00 | $6.80 | $6.00 | $5.50 | $6.00 |
| 0184 | 1/4" hardware cloth (6042000000-E) | LF | 1,900 | $5.00 | $5.70 | $9.00 | $6.95 | $5.00 |
| 0185 | Low permeability geotextile (6043000000-E) | SY | 700 | $5.78 | $6.80 | $3.55 | $5.00 | $8.00 |
| 0186 | **" temporary pipe - (36") (6045000000-E) | LF | 270 | $105.00 | $135.00 | $200.00 | $225.00 | $100.00 |
| 0187 | Temporary pipe for stream crossing (6046000000-E) | LF | 100 | $62.63 | $109.00 | $113.30 | $125.00 | $125.00 |
| 0188 | Floating turbidity curtain (6048000000-E) | SY | 200 | $83.44 | $79.50 | $80.00 | $39.50 | $70.00 |
| 0189 | Special stilling basins (6070000000-N) | EACH | 6 | $1,400.00 | $517.00 | $1,025.00 | $1,400.00 | $1,500.00 |
| 0190 | Flocculant (6071002000-E) | LB | 1,460 | $1.00 | $6.70 | $0.10 | $17.95 | $17.50 |
| 0191 | Coir fiber wattle (6071012000-E) | LF | 5,760 | $9.00 | $10.20 | $5.00 | $9.89 | $9.00 |
| 0192 | Coir fiber baffle (6071030000-E) | LF | 3,800 | $2.00 | $7.90 | $7.00 | $6.95 | $7.00 |
| 0193 | **" skimmer - (1-1/2") (6071050000-E) | EACH | 25 | $4,500.00 | $1,100.00 | $6,020.00 | $980.00 | $883.92 |
| 0194 | **" skimmer - (2") (6071050000-E) | EACH | 3 | $6,000.00 | $1,300.00 | $6,240.00 | $1,289.00 | $1,000.00 |
| 0195 | **" skimmer - (2-1/2") (6071050000-E) | EACH | 1 | $7,500.00 | $1,600.00 | $6,435.00 | $1,729.00 | $1,250.00 |
| 0196 | Seeding and mulching (6084000000-E) | ACRE | 63 | $2,600.00 | $2,900.00 | $2,600.00 | $2,895.00 | $2,600.00 |
| 0197 | Mowing (6087000000-E) | ACRE | 32 | $180.00 | $204.00 | $180.00 | $295.00 | $180.00 |
| 0198 | Seed for repair seeding (6090000000-E) | LB | 700 | $4.50 | $5.10 | $4.50 | $8.95 | $4.50 |
| 0199 | Fertilizer for repair seeding (6093000000-E) | TON | 2.50 | $1,400.00 | $1,600.00 | $1,400.00 | $1,395.00 | $1,400.00 |
| 0200 | Seed for supplemental seeding (6096000000-E) | LB | 1,750 | $4.50 | $5.10 | $4.50 | $8.95 | $4.50 |
| 0201 | Fertilizer topdressing (6108000000-E) | TON | 52 | $900.00 | $1,000.00 | $900.00 | $1,795.00 | $900.00 |
| 0202 | Impervious dike (6111000000-E) | LF | 403.80 | $90.00 | $138.00 | $90.00 | $90.00 | $105.00 |
| 0203 | Specialized hand mowing (6114500000-N) | MHR | 10 | $140.00 | $159.00 | $140.00 | $95.00 | $175.00 |
| 0204 | Manual litter removal (6114800000-N) | MHR | 18 | $50.00 | $167.00 | $140.00 | $100.00 | $60.00 |
| 0205 | Litter disposal (6114900000-E) | TON | 4 | $500.00 | $155.00 | $200.00 | $500.00 | $300.00 |
| 0206 | Response for erosion control (6117000000-N) | EACH | 50 | $100.00 | $113.00 | $100.00 | $300.00 | $100.00 |
| 0207 | Concrete washout structure (6117500000-N) | EACH | 2 | $1,500.00 | $1,200.00 | $1,815.00 | $350.00 | $1,250.00 |
| 0208 | Reforestation (6123000000-E) | ACRE | 0.10 | $20,000 | $22,000 | $20,000 | $5,000.00 | $20,000 |
| 0209 | Streambank reforestation (6126000000-E) | ACRE | 1.20 | $2,000.00 | $2,300.00 | $2,000.00 | $4,000.00 | $2,000.00 |
| 0210 | Generic erosion control item (EA) - fabric insert inlet protection cleanout (6132000000-N) | EACH | 54 | $100.00 | $329.00 | $430.00 | $75.00 | $425.00 |
| 0211 | Generic erosion control item (EA) - fabric insert inlet protection, type 1 (6132000000-N) | EACH | 18 | $175.00 | $329.00 | $217.00 | $210.00 | $425.00 |
| 0212 | Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N) | EACH | 8 | $1,500.00 | $879.00 | $900.00 | $210.00 | $1,250.00 |
| 0213 | Generic erosion control item (SY) - permanent soil reinforcement mat, type 5 (6141000000-E) | SY | 275 | $18.00 | $20.50 | $18.00 | $6.00 | $18.00 |
| 0214 | Pedestrian signal head (16", 1 section W/countdown) (7048500000-E) | EACH | 2 | $1,200.00 | $1,300.00 | $1,200.00 | $1,136.71 | $1,200.00 |
| 0215 | Signal cable (7060000000-E) | LF | 9,700 | $5.00 | $5.60 | $5.00 | $5.29 | $5.00 |
| 0216 | Vehicle signal head (12", 1 section) (7108000000-E) | EACH | 8 | $710.00 | $796.00 | $710.00 | $1,004.53 | $710.00 |
| 0217 | Vehicle signal head (12", 3 section) (7120000000-E) | EACH | 30 | $1,400.00 | $1,600.00 | $1,400.00 | $1,268.88 | $1,400.00 |
| 0218 | Vehicle signal head (12", 4 section) (7132000000-E) | EACH | 14 | $1,600.00 | $1,800.00 | $1,600.00 | $1,501.51 | $1,600.00 |
| 0219 | Vehicle signal head (12", 5 section) (7144000000-E) | EACH | 1 | $2,100.00 | $2,400.00 | $2,100.00 | $1,665.41 | $2,100.00 |
| 0220 | Messenger cable (3/8") (7264000000-E) | LF | 490 | $10.00 | $11.20 | $10.00 | $5.29 | $10.00 |
| 0221 | Tracer wire (7279000000-E) | LF | 12,000 | $1.15 | $1.30 | $1.15 | $2.11 | $1.15 |
| 0222 | Unpaved trench (***********) - (2, 2") (7300000000-E) | LF | 11,950 | $12.00 | $13.50 | $12.00 | $19.03 | $12.00 |
| 0223 | Direct drill (***********) - (2, 2") (7301000000-E) | LF | 1,380 | $45.00 | $50.50 | $45.00 | $50.76 | $45.00 |
| 0224 | Junction box (***************) - (special over-sized, heavy duty) (7312000000-N) | EACH | 3 | $1,900.00 | $2,100.00 | $1,900.00 | $1,903.33 | $1,900.00 |
| 0225 | Junction box (standard size) (7324000000-N) | EACH | 12 | $770.00 | $864.00 | $770.00 | $687.31 | $770.00 |
| 0226 | Junction box (over-sized, heavy duty) (7348000000-N) | EACH | 36 | $1,500.00 | $1,700.00 | $1,500.00 | $1,374.62 | $1,500.00 |
| 0227 | Wood pole (7360000000-N) | EACH | 2 | $2,300.00 | $2,600.00 | $2,300.00 | $2,326.29 | $2,300.00 |
| 0228 | Guy assembly (7372000000-N) | EACH | 7 | $975.00 | $1,100.00 | $975.00 | $1,030.97 | $975.00 |
| 0229 | 2" riser with heat shrink tubing (7432000000-E) | EACH | 1 | $1,200.00 | $1,300.00 | $1,200.00 | $1,052.12 | $1,200.00 |
| 0230 | Inductive loop sawcut (7444000000-E) | LF | 3,640 | $20.00 | $22.50 | $20.00 | $12.69 | $20.00 |
| 0231 | Lead-in cable (14-2) (7456100000-E) | LF | 10,870 | $2.50 | $2.80 | $2.50 | $4.23 | $2.50 |
| 0232 | Communications cable (** fiber) - (12) (7516000000-E) | LF | 15,000 | $4.00 | $4.50 | $4.00 | $4.76 | $4.00 |
| 0233 | Drop cable (7528000000-E) | LF | 700 | $4.00 | $4.50 | $4.00 | $4.76 | $4.00 |
| 0234 | Splice enclosure (7540000000-N) | EACH | 4 | $4,000.00 | $4,500.00 | $4,000.00 | $5,921.46 | $4,000.00 |
| 0235 | Delineator marker (7566000000-N) | EACH | 36 | $165.00 | $185.00 | $165.00 | $185.05 | $165.00 |
| 0236 | Remove existing communications cable (7575160000-E) | LF | 750 | $1.50 | $1.70 | $1.50 | $2.11 | $1.50 |
| 0237 | Metal pole with single mast arm (7588000000-N) | EACH | 7 | $41,000 | $46,000 | $41,000 | $30,665 | $41,000 |
| 0238 | Metal pole with dual mast arm (7590000000-N) | EACH | 2 | $52,000 | $58,300 | $52,000 | $48,112 | $52,000 |
| 0239 | Soil test (7613000000-N) | EACH | 9 | $2,106.00 | $2,400.00 | $2,106.00 | $3,383.69 | $2,106.00 |
| 0240 | Drilled pier foundation (7614100000-E) | CY | 36 | $2,400.00 | $2,700.00 | $2,400.00 | $2,537.77 | $2,400.00 |
| 0241 | Mast arm with metal pole design (7631000000-N) | EACH | 9 | $110.00 | $123.00 | $110.00 | $898.79 | $110.00 |
| 0242 | Sign for signals (7636000000-N) | EACH | 12 | $675.00 | $757.00 | $675.00 | $687.31 | $675.00 |
| 0243 | Type II pedestal with foundation (7642200000-N) | EACH | 2 | $3,633.00 | $4,100.00 | $3,633.00 | $6,132.94 | $3,633.00 |
| 0244 | Type III pedestal with foundation (7642300000-N) | EACH | 4 | $5,800.00 | $6,500.00 | $5,800.00 | $8,987.93 | $5,800.00 |
| 0245 | Relocate existing sign (7648000000-N) | EACH | 4 | $1,845.00 | $2,100.00 | $1,845.00 | $158.61 | $1,845.00 |
| 0246 | Signal cabinet foundation (7684000000-N) | EACH | 3 | $2,888.00 | $3,200.00 | $2,888.00 | $2,643.51 | $2,888.00 |
| 0247 | Contlrs with CBNT (**************) - (type 2070LX, base mounted) (7696000000-N) | EACH | 3 | $27,000 | $30,300 | $27,000 | $28,814 | $27,000 |
| 0248 | Detector card (***********) - (2070E) (7708000000-N) | EACH | 6 | $380.00 | $426.00 | $380.00 | $528.70 | $380.00 |
| 0249 | Cabinet base extender (7901000000-N) | EACH | 3 | $600.00 | $673.00 | $600.00 | $687.31 | $600.00 |
| 0250 | Generic signal item (EA) - ethernet edge switch (7980000000-N) | EACH | 2 | $4,200.00 | $4,700.00 | $4,200.00 | $7,930.53 | $4,200.00 |
| 0251 | Generic signal item (EA) - microwave vehicle detection system - multiple zones (7980000000-N) | EACH | 16 | $12,500 | $14,000 | $12,500 | $26,435 | $12,500 |
| 0252 | Box culv excav @ ******** - (36+41.23 -Y-) (8130000000-N) | LS | 1 | $90,000 | $12,900 | $75,000 | $60,000 | $100,000 |
| 0253 | Box culv excav @ ******** - (43+54.00 -Y-) (8130000000-N) | LS | 1 | $140,000 | $110,000 | $124,000 | $125,000 | $225,000 |
| 0254 | Foundation conditioning material, box culvert (8133000000-E) | TON | 245 | $100.00 | $88.00 | $100.00 | $125.00 | $100.00 |
| 0255 | Class A concrete (culvert) (8196000000-E) | CY | 301.50 | $1,250.00 | $1,100.00 | $1,250.00 | $2,000.00 | $1,725.00 |
| 0256 | Reinforcing steel (culvert) (8245000000-E) | LB | 43,136 | $2.50 | $3.10 | $2.50 | $3.00 | $2.50 |
| 0257 | Cip gravity retaining walls (8802040000-E) | SF | 55 | $455.00 | $535.00 | $550.00 | $300.00 | $285.00 |
| 0258 | Fire hydrant (5666000000-N) | EACH | 1 | $6,565.00 | $10,100 | $9,400.00 | $5,500.00 | $10,000 |
| 0259 | Guardrail end units, type TL-3 (3287000000-N) | EACH | 8 | $3,200.00 | $3,600.00 | $3,200.00 | $3,200.00 | $3,200.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of July 15, 2025. Compiled by Mirage Metrics.