NCDOT contract C204992 bid tabulation
GRADING, DRAINAGE, PAVING, AND SIGNALS. NC-211 FROM NORTH OF SR-1225 (ASHEMONT RD) TO EAST OF SR-1244 (W PALMER ST)/SR-1311 (MOCKINGBIRD HILL RD). Let by North Carolina DOT on January 21, 2025, Hoke. 4 bids received; low bid $90,150,409 by Barnhill Contracting Company.
- Owner
- North Carolina DOT
- Letting
- 21 JAN 2025
- Pay items
- 295
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Barnhill Contracting Company | $90,150,409 | Low |
| 2 | Branch Civil Inc | $90,685,000 | +1.0% |
| 3 | S T Wooten Corporation | $99,736,527 | +11% |
| 4 | Vecellio & Grogan Inc | $103,150,000 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Barnhill Contracting Company | 2. Branch Civil Inc | 3. S T Wooten Corporation | 4. Vecellio & Grogan Inc |
|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $4,510,000 | $4,500,000 | $4,975,000 | $5,157,000 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $2,950,000 | $837,000 | $1,800,000 | $915,000 |
| 0003 | Supplementary clearing & grubbing (0008000000-E) | ACRE | 4 | $2,000.00 | $8,300.00 | $5,100.00 | $15,000 |
| 0004 | Sealing abandoned wells (0015000000-N) | EACH | 3 | $2,500.00 | $2,800.00 | $2,500.00 | $4,180.00 |
| 0005 | Unclassified excavation (0022000000-E) | CY | 156,000 | $9.40 | $5.00 | $7.80 | $12.22 |
| 0006 | Undercut excavation (0036000000-E) | CY | 39,700 | $5.00 | $14.25 | $19.00 | $10.00 |
| 0007 | Borrow excavation (0106000000-E) | CY | 872,000 | $6.00 | $10.50 | $15.25 | $21.42 |
| 0008 | Drainage ditch excavation (0134000000-E) | CY | 10,920 | $7.40 | $8.25 | $17.00 | $10.00 |
| 0009 | Berm ditch construction (0141000000-E) | LF | 620 | $6.40 | $8.50 | $3.75 | $5.00 |
| 0010 | Removal of existing asphalt pavement (0156000000-E) | SY | 124,430 | $11.04 | $8.00 | $9.75 | $5.00 |
| 0011 | Breaking of existing asphalt pavement (0177000000-E) | SY | 20,370 | $5.40 | $1.35 | $7.25 | $2.50 |
| 0012 | Proof rolling (0192000000-N) | HR | 100 | $444.00 | $200.00 | $320.00 | $220.00 |
| 0013 | Select granular material, class III (0194000000-E) | CY | 16,697 | $50.00 | $12.25 | $34.50 | $100.00 |
| 0014 | Geotextile for soil stabilization (0196000000-E) | SY | 16,575 | $2.90 | $2.75 | $3.00 | $4.60 |
| 0015 | Temporary shoring (0199000000-E) | SF | 2,340 | $78.00 | $70.00 | $85.00 | $75.00 |
| 0016 | Generic grading item (TON) - hauling and disposal of petroleum contaminated soil (0255000000-E) | TON | 75 | $79.80 | $66.25 | $200.00 | $145.00 |
| 0017 | Foundation conditioning material, minor structures (0318000000-E) | TON | 6,729 | $62.85 | $63.50 | $58.50 | $45.00 |
| 0018 | FND condit geotextile (4A) (0321000000-E) | SY | 68,976 | $2.90 | $3.05 | $11.30 | $1.90 |
| 0019 | **" drainage pipe - (72") (0335000000-E) | LF | 56 | $645.20 | $998.00 | $817.00 | $750.00 |
| 0020 | 15" drainage pipe (0335200000-E) | LF | 4,016 | $67.10 | $65.75 | $86.50 | $65.00 |
| 0021 | 18" drainage pipe (0335300000-E) | LF | 1,292 | $72.80 | $71.00 | $96.00 | $84.00 |
| 0022 | 24" drainage pipe (0335400000-E) | LF | 644 | $95.75 | $86.25 | $129.01 | $110.00 |
| 0023 | 30" drainage pipe (0335500000-E) | LF | 212 | $135.00 | $189.00 | $163.00 | $140.00 |
| 0024 | 36" drainage pipe (0335600000-E) | LF | 232 | $177.50 | $215.00 | $231.00 | $175.00 |
| 0025 | 48" drainage pipe (0335800000-E) | LF | 28 | $269.85 | $378.00 | $351.00 | $300.00 |
| 0026 | **" drainage pipe elbow - (15") (0335850000-E) | EACH | 8 | $469.00 | $843.00 | $594.00 | $395.00 |
| 0027 | **" drainage pipe elbow - (18") (0335850000-E) | EACH | 4 | $505.00 | $889.00 | $650.00 | $585.00 |
| 0028 | 15" RC pipe culverts, class III (0366000000-E) | LF | 10,520 | $67.45 | $84.75 | $77.00 | $75.00 |
| 0029 | 18" RC pipe culverts, class III (0372000000-E) | LF | 2,788 | $76.15 | $97.75 | $87.50 | $80.00 |
| 0030 | 24" RC pipe culverts, class III (0378000000-E) | LF | 2,420 | $104.40 | $126.00 | $116.00 | $110.00 |
| 0031 | 30" RC pipe culverts, class III (0384000000-E) | LF | 608 | $128.00 | $206.00 | $151.00 | $175.00 |
| 0032 | 36" RC pipe culverts, class III (0390000000-E) | LF | 2,052 | $182.85 | $235.00 | $188.00 | $185.00 |
| 0033 | 42" RC pipe culverts, class III (0396000000-E) | LF | 688 | $199.00 | $293.00 | $233.00 | $230.00 |
| 0034 | 48" RC pipe culverts, class III (0402000000-E) | LF | 248 | $243.75 | $380.00 | $333.00 | $280.00 |
| 0035 | 54" RC pipe culverts, class III (0408000000-E) | LF | 16 | $374.40 | $853.00 | $562.00 | $460.00 |
| 0036 | 60" RC pipe culverts, class III (0414000000-E) | LF | 448 | $407.60 | $612.00 | $521.00 | $475.00 |
| 0037 | 66" RC pipe culverts, class III (0420000000-E) | LF | 156 | $587.70 | $699.00 | $720.00 | $765.00 |
| 0038 | 72" RC pipe culverts, class III (0426000000-E) | LF | 72 | $635.60 | $998.00 | $800.00 | $715.00 |
| 0039 | ***" RCP culv class IV - (48") (0448000000-E) | LF | 132 | $281.10 | $434.00 | $352.00 | $335.00 |
| 0040 | ***" RCP culv class IV - (54") (0448000000-E) | LF | 116 | $387.30 | $611.00 | $498.00 | $475.00 |
| 0041 | ***" RCP culv class IV - (60") (0448000000-E) | LF | 396 | $480.40 | $736.00 | $592.00 | $680.00 |
| 0042 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 464 | $99.15 | $94.00 | $93.00 | $80.00 |
| 0043 | 18" RC pipe culverts, class IV (0448300000-E) | LF | 860 | $77.90 | $109.00 | $98.00 | $95.00 |
| 0044 | 24" RC pipe culverts, class IV (0448400000-E) | LF | 352 | $159.25 | $152.00 | $133.00 | $125.00 |
| 0045 | 30" RC pipe culverts, class IV (0448500000-E) | LF | 412 | $147.30 | $220.00 | $169.00 | $166.00 |
| 0046 | 36" RC pipe culverts, class IV (0448600000-E) | LF | 1,392 | $184.75 | $269.00 | $212.00 | $212.00 |
| 0047 | 42" RC pipe culverts, class IV (0448700000-E) | LF | 860 | $236.00 | $354.00 | $266.00 | $265.00 |
| 0048 | **" RC pipe culv class V - (15") (0449000000-E) | LF | 712 | $98.30 | $103.00 | $91.00 | $90.00 |
| 0049 | **" RC pipe culv class V - (24") (0449000000-E) | LF | 148 | $153.10 | $162.00 | $158.00 | $160.00 |
| 0050 | **" RC pipe culv class V - (36") (0449000000-E) | LF | 104 | $210.85 | $291.00 | $242.00 | $250.00 |
| 0051 | **" RC pipe culv class V - (42") (0449000000-E) | LF | 96 | $287.75 | $372.00 | $310.00 | $315.00 |
| 0052 | **" RC pipe culv class V - (48") (0449000000-E) | LF | 172 | $348.00 | $488.00 | $398.00 | $387.00 |
| 0053 | ***" HDPE pipe culvts - (6") (0536000000-E) | LF | 36 | $37.90 | $77.50 | $48.00 | $85.00 |
| 0054 | **"WLD STL pipe grad B in soil - (30", 0.500") (0973100000-E) | LF | 36 | $795.00 | $884.00 | $880.00 | $1,726.51 |
| 0055 | **"WLD STL pipe grad B in soil - (36", 0.500") (0973100000-E) | LF | 108 | $995.00 | $1,100.00 | $1,100.00 | $1,253.70 |
| 0056 | **"WLD STL pipe grad B in soil - (42", 0.500") (0973100000-E) | LF | 290 | $1,250.00 | $1,300.00 | $1,500.00 | $1,426.03 |
| 0057 | **"WLD STL pipe grad B in soil - (48", 0.625") (0973100000-E) | LF | 190 | $1,450.00 | $1,700.00 | $1,750.00 | $2,028.88 |
| 0058 | **"WLD STL pipe grad B in soil - (54", 0.750") (0973100000-E) | LF | 136 | $1,900.00 | $1,900.00 | $2,100.00 | $2,391.05 |
| 0059 | **"WLD STL pipe grad B in soil - (60", 0.875") (0973100000-E) | LF | 352 | $2,295.00 | $2,200.00 | $2,600.00 | $2,848.85 |
| 0060 | **"WLD STL pipe grad B in soil - (72", 1.000") (0973100000-E) | LF | 52 | $3,775.00 | $2,600.00 | $4,200.00 | $4,366.94 |
| 0061 | **"WLD STL pipe grad B not in soil - (30", 0.500") (0973300000-E) | LF | 36 | $0.01 | $1.00 | $0.01 | $0.10 |
| 0062 | **"WLD STL pipe grad B not in soil - (36", 0.500") (0973300000-E) | LF | 108 | $0.01 | $1.00 | $0.01 | $0.10 |
| 0063 | **"WLD STL pipe grad B not in soil - (42", 0.500") (0973300000-E) | LF | 290 | $0.01 | $1.00 | $0.01 | $0.10 |
| 0064 | **"WLD STL pipe grad B not in soil - (48", 0.625") (0973300000-E) | LF | 190 | $0.01 | $1.00 | $0.01 | $0.10 |
| 0065 | **"WLD STL pipe grad B not in soil - (54", 0.750") (0973300000-E) | LF | 136 | $0.01 | $1.00 | $0.01 | $0.10 |
| 0066 | **"WLD STL pipe grad B not in soil - (60", 0.875") (0973300000-E) | LF | 352 | $0.01 | $1.00 | $0.01 | $0.10 |
| 0067 | **"WLD STL pipe grad B not in soil - (72", 1.000") (0973300000-E) | LF | 52 | $0.01 | $1.00 | $0.01 | $0.10 |
| 0068 | Pipe removal (0995000000-E) | LF | 6,184 | $32.10 | $31.50 | $38.00 | $16.50 |
| 0069 | Pipe clean out (0996000000-N) | EACH | 2 | $1,890.00 | $5,000.00 | $7,175.00 | $5,500.00 |
| 0070 | Fine grading (1011000000-N) | LS | 1 | $4,371,432 | $2,150,000 | $5,500,000 | $2,005,000 |
| 0071 | Shallow undercut (1099500000-E) | CY | 3,950 | $10.80 | $12.25 | $28.00 | $15.00 |
| 0072 | Class IV subgrade stabilization (1099700000-E) | TON | 11,250 | $41.50 | $45.25 | $44.00 | $37.50 |
| 0073 | Geotextile for subgrade stabilization (1112000000-E) | SY | 16,650 | $3.50 | $5.00 | $3.00 | $4.25 |
| 0074 | Aggregate base course (1121000000-E) | TON | 154,840 | $42.95 | $51.00 | $45.25 | $48.00 |
| 0075 | Incidental stone base (1220000000-E) | TON | 6,190 | $30.00 | $53.50 | $48.00 | $43.75 |
| 0076 | Prime coat (1275000000-E) | GAL | 118,710 | $2.00 | $3.45 | $5.70 | $2.22 |
| 0077 | Incidental milling (1330000000-E) | SY | 2,340 | $15.00 | $11.50 | $8.40 | $4.18 |
| 0078 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 39,170 | $77.00 | $114.00 | $105.00 | $85.56 |
| 0079 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 102,150 | $76.75 | $91.00 | $84.50 | $85.28 |
| 0080 | Asphalt conc surface course, type S9.5B (1519000000-E) | TON | 3,800 | $88.00 | $124.00 | $114.50 | $97.78 |
| 0081 | Asphalt conc surface course, type S9.5C (1523000000-E) | TON | 88,950 | $73.00 | $93.00 | $86.00 | $83.33 |
| 0082 | Asphalt binder for plant mix (1575000000-E) | TON | 12,165 | $594.00 | $480.00 | $450.00 | $672.22 |
| 0083 | Asphalt plant mix, pavement repair (1693000000-E) | TON | 953 | $124.00 | $329.00 | $220.00 | $220.00 |
| 0084 | Generic paving item (SY) - 12" jointed concrete truck apron (1891000000-E) | SY | 460 | $153.00 | $170.00 | $186.00 | $168.30 |
| 0085 | Right-of-way markers (2000000000-N) | EACH | 624 | $360.00 | $289.00 | $260.00 | $291.84 |
| 0086 | Subdrain excavation (2022000000-E) | CY | 5,914 | $35.00 | $39.75 | $35.00 | $38.50 |
| 0087 | Geotextile for subsurface drains (2026000000-E) | SY | 17,600 | $12.00 | $13.50 | $12.00 | $13.20 |
| 0088 | Subdrain coarse aggregate (2036000000-E) | CY | 2,957 | $80.00 | $90.75 | $80.00 | $88.00 |
| 0089 | 6" perforated subdrain pipe (2044000000-E) | LF | 17,600 | $16.00 | $18.25 | $16.00 | $17.60 |
| 0090 | Subdrain pipe outlet (2070000000-N) | EACH | 36 | $400.00 | $454.00 | $400.00 | $440.00 |
| 0091 | 6" outlet pipe (2077000000-E) | LF | 216 | $40.00 | $45.50 | $40.00 | $44.00 |
| 0092 | Endwalls (2209000000-E) | CY | 115.30 | $1,325.00 | $2,400.00 | $3,220.00 | $1,448.25 |
| 0093 | Reinforced endwalls (2220000000-E) | CY | 59.80 | $1,380.00 | $1,800.00 | $1,920.00 | $1,937.72 |
| 0094 | Pipe collars (2253000000-E) | CY | 19.35 | $1,203.00 | $2,300.00 | $5,140.00 | $582.52 |
| 0095 | Flowable fill (2275000000-E) | CY | 470 | $567.00 | $444.00 | $530.00 | $287.16 |
| 0096 | Masonry drainage structures (2286000000-N) | EACH | 265 | $6,137.40 | $5,700.00 | $4,050.00 | $4,550.00 |
| 0097 | Masonry drainage structures (2297000000-E) | CY | 39.46 | $6,000.00 | $3,300.00 | $5,850.00 | $4,200.00 |
| 0098 | Masonry drainage structures (2308000000-E) | LF | 197.40 | $245.20 | $840.00 | $560.00 | $485.00 |
| 0099 | Frame with two grates, STD 840.16 (2364000000-N) | EACH | 3 | $1,169.50 | $1,200.00 | $1,295.00 | $1,025.60 |
| 0100 | Frame with two grates, STD 840.20 (2364200000-N) | EACH | 32 | $1,054.60 | $1,100.00 | $1,360.00 | $1,025.60 |
| 0101 | Frame with two grates, STD 840.22 (2365000000-N) | EACH | 80 | $1,029.00 | $1,000.00 | $1,175.00 | $1,025.60 |
| 0102 | Frame with two grates, STD 840.24 (2366000000-N) | EACH | 40 | $1,029.00 | $1,000.00 | $1,160.00 | $1,025.60 |
| 0103 | Frame with two grates, STD 840.29 (2367000000-N) | EACH | 14 | $1,048.20 | $1,100.00 | $1,340.00 | $1,073.31 |
| 0104 | Frame-GRT-HD 840.03 ** - (E) (2374000000-N) | EACH | 5 | $1,205.30 | $1,300.00 | $1,370.00 | $1,073.31 |
| 0105 | Frame-GRT-HD 840.03 ** - (F) (2374000000-N) | EACH | 18 | $1,230.80 | $1,400.00 | $1,415.00 | $1,073.31 |
| 0106 | Frame-GRT-HD 840.03 ** - (G) (2374000000-N) | EACH | 18 | $1,230.80 | $1,400.00 | $1,415.00 | $1,073.31 |
| 0107 | Frame with cover, STD 840.54 (2396000000-N) | EACH | 11 | $898.75 | $875.00 | $740.00 | $1,025.60 |
| 0108 | Steel frame with two grates, STD 840.37 (2407000000-N) | EACH | 47 | $3,027.70 | $3,600.00 | $3,660.00 | $1,025.60 |
| 0109 | Concrete transitional section for drop inlet (2451000000-N) | EACH | 44 | $1,100.00 | $987.00 | $1,800.00 | $1,210.00 |
| 0110 | 1'-6" concrete curb & gutter (2542000000-E) | LF | 1,000 | $31.10 | $31.25 | $38.75 | $34.21 |
| 0111 | 2'-6" concrete curb & gutter (2549000000-E) | LF | 6,280 | $35.00 | $32.50 | $36.25 | $38.50 |
| 0112 | Shoulder berm gutter (2556000000-E) | LF | 6,910 | $37.30 | $37.25 | $36.50 | $41.03 |
| 0113 | Concrete expressway gutter (2577000000-E) | LF | 1,030 | $59.15 | $42.50 | $55.25 | $65.07 |
| 0114 | 4" concrete sidewalk (2591000000-E) | SY | 1,480 | $57.40 | $61.50 | $67.00 | $63.14 |
| 0115 | Concrete curb ramps (2605000000-N) | EACH | 2 | $2,750.00 | $3,500.00 | $3,500.00 | $3,025.00 |
| 0116 | 6" concrete driveway (2612000000-E) | SY | 1,048 | $88.75 | $73.25 | $120.00 | $97.63 |
| 0117 | 4" concrete paved ditch (2619000000-E) | SY | 22 | $166.65 | $184.00 | $550.00 | $183.32 |
| 0118 | 4" concrete island cover (2627000000-E) | SY | 600 | $57.40 | $61.50 | $70.00 | $63.14 |
| 0119 | 5" monolithic concrete islands (keyed in) (2655000000-E) | SY | 9,390 | $79.60 | $98.75 | $91.25 | $87.56 |
| 0120 | Adjustment of catch basins (2800000000-N) | EACH | 6 | $2,255.00 | $634.00 | $925.00 | $2,196.18 |
| 0121 | Adjustment of drop inlets (2815000000-N) | EACH | 1 | $2,255.00 | $634.00 | $925.00 | $2,318.17 |
| 0122 | Adjustment of manholes (2830000000-N) | EACH | 2 | $2,255.00 | $634.00 | $1,548.00 | $2,318.16 |
| 0123 | Steel beam guardrail (3030000000-E) | LF | 7,600 | $24.50 | $27.75 | $24.50 | $27.92 |
| 0124 | Steel beam guardrail, shop curved (3045000000-E) | LF | 430 | $26.00 | $29.50 | $26.00 | $33.50 |
| 0125 | Steel beam guardrail terminal sections (3105000000-N) | EACH | 2 | $90.00 | $102.00 | $90.00 | $2,010.15 |
| 0126 | Additional guardrail posts (3150000000-N) | EACH | 10 | $55.00 | $62.25 | $55.00 | $39.09 |
| 0127 | Guardrail end units, type cat-1 (3210000000-N) | EACH | 10 | $980.00 | $1,100.00 | $980.00 | $1,060.91 |
| 0128 | Guardrail end units, type TL-3 (3287000000-N) | EACH | 12 | $3,450.00 | $3,900.00 | $3,450.00 | $3,573.60 |
| 0129 | Remove existing guardrail (3360000000-E) | LF | 5,850 | $1.00 | $1.15 | $1.00 | $1.12 |
| 0130 | Temp GDRL end units ***** - (TL-3) (3389150000-N) | EACH | 1 | $2,000.00 | $2,300.00 | $2,000.00 | $3,350.26 |
| 0131 | Generic guardrail item (EA) - steel bollards (3435000000-N) | EACH | 4 | $1,250.00 | $1,400.00 | $1,250.00 | $1,100.00 |
| 0132 | Generic fencing item (LF) - wildlife fence with posts (3575000000-E) | LF | 5,410 | $89.00 | $101.00 | $89.00 | $87.55 |
| 0133 | Rip rap, class I (3628000000-E) | TON | 740 | $93.50 | $119.00 | $96.00 | $75.00 |
| 0134 | Rip rap, class II (3635000000-E) | TON | 90 | $103.00 | $167.00 | $99.00 | $90.00 |
| 0135 | Rip rap, class A (3642000000-E) | TON | 10 | $114.15 | $89.75 | $106.50 | $72.00 |
| 0136 | Rip rap, class B (3649000000-E) | TON | 8,160 | $81.50 | $105.00 | $92.00 | $72.00 |
| 0137 | Geotextile for drainage (3656000000-E) | SY | 24,070 | $3.40 | $2.90 | $1.00 | $4.55 |
| 0138 | Generic erosion control item (SF) - tied concrete block mat (3678000000-E) | SF | 17,450 | $8.15 | $8.75 | $12.50 | $10.10 |
| 0139 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 5,470 | $6.00 | $8.50 | $7.10 | $8.01 |
| 0140 | Sign erection, type D (4096000000-N) | EACH | 12 | $85.00 | $120.00 | $200.00 | $225.64 |
| 0141 | Sign erection, type E (4102000000-N) | EACH | 244 | $65.00 | $91.75 | $125.00 | $118.46 |
| 0142 | Sign erection, type F (4108000000-N) | EACH | 43 | $75.00 | $106.00 | $200.00 | $225.64 |
| 0143 | Sign erect, reloc ** GRD MTD - (D) (4116100000-N) | EACH | 11 | $95.00 | $134.00 | $200.00 | $225.64 |
| 0144 | Disposal of sign system, U-channel (4155000000-N) | EACH | 136 | $10.00 | $14.25 | $10.00 | $11.28 |
| 0145 | Disposal of support, U-channel (4192000000-N) | EACH | 11 | $10.00 | $14.25 | $10.00 | $11.28 |
| 0146 | Work zone signs (stationary) (4400000000-E) | SF | 3,508 | $6.00 | $7.00 | $7.10 | $7.33 |
| 0147 | Work zone signs (portable) (4405000000-E) | SF | 745 | $27.40 | $16.50 | $25.50 | $9.31 |
| 0148 | Work zone signs (barricade mounted) (4410000000-E) | SF | 834 | $18.65 | $8.25 | $9.50 | $10.72 |
| 0149 | Flashing arrow board (4415000000-N) | EACH | 2 | $8,362.00 | $3,200.00 | $2,845.00 | $2,369.23 |
| 0150 | Portable changeable message sign (4420000000-N) | EACH | 2 | $16,089 | $9,500.00 | $11,375 | $10,379 |
| 0151 | Drums (4430000000-N) | EACH | 1,000 | $56.00 | $47.50 | $10.00 | $75.00 |
| 0152 | Sequential flashing warning lights (4434000000-N) | EACH | 26 | $320.50 | $113.00 | $703.00 | $160.21 |
| 0153 | Cones (4435000000-N) | EACH | 300 | $38.90 | $25.00 | $5.00 | $15.00 |
| 0154 | Barricades (type III) (4445000000-E) | LF | 2,104 | $32.30 | $22.50 | $23.00 | $25.95 |
| 0155 | Pedestrian channelizing devices (4447000000-E) | LF | 16 | $76.50 | $23.25 | $30.31 | $27.64 |
| 0156 | Flagger (4455000000-N) | DAY | 480 | $650.00 | $459.00 | $600.00 | $470.00 |
| 0157 | Temporary crash cushions (4465000000-N) | EACH | 6 | $12,000 | $14,200 | $12,750 | $9,000.00 |
| 0158 | Remove & reset temporary crash cushion (4470000000-N) | EACH | 4 | $6,000.00 | $7,100.00 | $3,250.00 | $3,600.00 |
| 0159 | TMA (4480000000-N) | EACH | 2 | $10,000 | $59,400 | $20,000 | $24,750 |
| 0160 | Portable concrete barrier (4485000000-E) | LF | 1,260 | $35.00 | $41.50 | $59.91 | $66.40 |
| 0161 | Remove and reset portable concrete barrier (4500000000-E) | LF | 1,080 | $30.00 | $35.50 | $16.05 | $17.88 |
| 0162 | Law enforcement (4510000000-N) | HR | 24 | $72.00 | $94.50 | $125.00 | $70.00 |
| 0163 | Temporary raised pavement markers (4650000000-N) | EACH | 3,477 | $7.85 | $8.75 | $7.85 | $8.64 |
| 0164 | Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E) | LF | 40,204 | $0.51 | $0.55 | $0.51 | $0.56 |
| 0165 | Thermoplastic pavement marking lines (6", 90 mils) (4688000000-E) | LF | 243,038 | $0.66 | $0.75 | $0.66 | $0.73 |
| 0166 | Thermoplastic pavement marking lines (8", 90 mils) (4695000000-E) | LF | 128 | $1.27 | $1.40 | $1.27 | $1.40 |
| 0167 | Thermoplastic pavement marking lines (12", 90 mils) (4700000000-E) | LF | 32,778 | $1.61 | $1.80 | $1.61 | $1.77 |
| 0168 | Thermoplastic pavement marking lines (16", 90 mils) (4704000000-E) | LF | 240 | $18.00 | $20.00 | $18.00 | $19.80 |
| 0169 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 1,163 | $20.00 | $22.25 | $20.00 | $22.00 |
| 0170 | Thermoplastic pavement marking character (90 mils) (4720000000-E) | EACH | 26 | $130.00 | $145.00 | $130.00 | $143.00 |
| 0171 | Thermoplastic pavement marking symbol (90 mils) (4725000000-E) | EACH | 211 | $130.00 | $145.00 | $130.00 | $143.00 |
| 0172 | Paint pavement marking lines (4") (4810000000-E) | LF | 938,378 | $0.16 | $0.20 | $0.16 | $0.18 |
| 0173 | Paint pavement marking lines (8") (4820000000-E) | LF | 67,470 | $0.31 | $0.35 | $0.31 | $0.34 |
| 0174 | Paint pavement marking lines (12") (4825000000-E) | LF | 23,208 | $0.59 | $0.65 | $0.59 | $0.65 |
| 0175 | Paint pavement marking lines (16") (4830000000-E) | LF | 720 | $3.00 | $3.35 | $3.00 | $3.30 |
| 0176 | Paint pavement marking lines (24") (4835000000-E) | LF | 6,910 | $3.12 | $3.45 | $3.12 | $3.43 |
| 0177 | Paint pavement marking character (4840000000-N) | EACH | 60 | $58.67 | $65.25 | $58.67 | $64.54 |
| 0178 | Paint pavement marking symbol (4845000000-N) | EACH | 516 | $58.67 | $65.25 | $58.67 | $64.54 |
| 0179 | Removal of pavement marking lines (4") (4850000000-E) | LF | 59,666 | $0.24 | $0.25 | $0.24 | $0.26 |
| 0180 | Removal of pavement marking lines (8") (4860000000-E) | LF | 53 | $0.50 | $0.55 | $0.50 | $0.55 |
| 0181 | Removal of pavement marking lines (12") (4865000000-E) | LF | 2,335 | $0.68 | $0.75 | $0.68 | $0.75 |
| 0182 | Removal of pavement marking lines (24") (4870000000-E) | LF | 416 | $1.38 | $1.55 | $1.38 | $1.52 |
| 0183 | Removal of pavement marking symbols & characters (4875000000-N) | EACH | 55 | $85.00 | $94.50 | $85.00 | $93.50 |
| 0184 | Generic pavement marking item (LF) - yield line thermoplastic pavement marking (24", 90 mils) (4890000000-E) | LF | 132 | $20.00 | $22.25 | $20.00 | $22.00 |
| 0185 | Permanent raised pavement markers (4900000000-N) | EACH | 3,032 | $7.85 | $8.75 | $7.85 | $8.64 |
| 0186 | Elect duct BD, size ***** - (2") (5155000000-E) | LF | 2,820 | $14.00 | $30.50 | $25.00 | $302.50 |
| 0187 | Elec JB ************ - (IG25) (5240000000-N) | EACH | 7 | $1,475.00 | $1,300.00 | $1,500.00 | $715.00 |
| 0188 | 6" water line (5325600000-E) | LF | 2,291 | $70.15 | $48.50 | $90.00 | $48.31 |
| 0189 | 8" water line (5325800000-E) | LF | 11,650 | $55.58 | $50.75 | $57.00 | $50.55 |
| 0190 | 12" water line (5326200000-E) | LF | 40,207 | $72.74 | $67.75 | $82.00 | $67.40 |
| 0191 | DI H2O pipe fittings (5329000000-E) | LB | 41,150 | $14.57 | $22.50 | $15.00 | $22.47 |
| 0192 | 6" valve (5540000000-E) | EACH | 55 | $2,704.59 | $2,600.00 | $2,350.00 | $2,583.82 |
| 0193 | 8" valve (5546000000-E) | EACH | 28 | $3,567.88 | $3,600.00 | $3,100.00 | $3,538.71 |
| 0194 | 12" valve (5558000000-E) | EACH | 45 | $5,697.57 | $6,500.00 | $5,815.00 | $6,459.56 |
| 0195 | **" insertion valve - (6") (5562000000-E) | EACH | 5 | $16,046 | $18,300 | $16,800 | $18,199 |
| 0196 | **" insertion valve - (8") (5562000000-E) | EACH | 1 | $16,942 | $21,300 | $18,200 | $21,176 |
| 0197 | 3/4" water meter (5643100000-E) | EACH | 39 | $2,076.82 | $2,000.00 | $1,900.00 | $2,022.12 |
| 0198 | Reconnect water meter (5649000000-N) | EACH | 37 | $1,960.33 | $1,400.00 | $743.00 | $1,404.25 |
| 0199 | Fire hydrant (5666000000-N) | EACH | 41 | $5,887.98 | $8,500.00 | $6,186.00 | $7,863.81 |
| 0200 | Fire hydrant leg (5673000000-E) | LF | 400 | $113.24 | $73.50 | $97.07 | $73.02 |
| 0201 | **" water service line - (1") (5686000000-E) | LF | 650 | $42.51 | $39.50 | $32.00 | $39.32 |
| 0202 | **" water service line - (3/4") (5686000000-E) | LF | 5,889 | $28.93 | $33.75 | $34.00 | $33.70 |
| 0203 | 8" sanitary gravity sewer (5691300000-E) | LF | 1,941 | $128.22 | $226.00 | $90.00 | $224.68 |
| 0204 | 10" sanitary gravity sewer (5691400000-E) | LF | 410 | $354.57 | $282.00 | $84.25 | $280.85 |
| 0205 | 4' dia utility manhole (5775000000-E) | EACH | 12 | $6,381.19 | $9,000.00 | $6,725.00 | $7,863.81 |
| 0206 | Utility manhole wall 4' dia (5781000000-E) | LF | 48.51 | $937.83 | $790.00 | $619.00 | $786.38 |
| 0207 | Abandon 6" utility pipe (5800000000-E) | LF | 1,978 | $17.79 | $9.00 | $24.50 | $8.99 |
| 0208 | Abandon 8" utility pipe (5801000000-E) | LF | 53,878 | $19.61 | $11.25 | $4.00 | $11.23 |
| 0209 | Abandon 10" utility pipe (5802000000-E) | LF | 345 | $29.10 | $28.25 | $22.82 | $28.08 |
| 0210 | Abandon 12" utility pipe (5804000000-E) | LF | 270 | $36.95 | $33.75 | $30.50 | $33.70 |
| 0211 | Remove water meter (5815000000-N) | EACH | 68 | $474.28 | $564.00 | $185.00 | $561.70 |
| 0212 | Remove fire hydrant (5815500000-N) | EACH | 36 | $1,087.24 | $1,400.00 | $1,550.00 | $1,404.25 |
| 0213 | Abandon utility manhole (5816000000-N) | EACH | 11 | $2,610.84 | $1,700.00 | $1,855.00 | $1,685.10 |
| 0214 | 12" encasement pipe (5835600000-E) | LF | 320 | $148.85 | $100.00 | $129.00 | $157.43 |
| 0215 | 16" encasement pipe (5835700000-E) | LF | 286 | $89.55 | $122.00 | $131.00 | $202.09 |
| 0216 | 20" encasement pipe (5835900000-E) | LF | 38 | $199.05 | $150.00 | $200.00 | $234.47 |
| 0217 | 24" encasement pipe (5836000000-E) | LF | 1,569 | $191.80 | $183.00 | $160.00 | $254.57 |
| 0218 | Bore & jack **" - (12") (5872500000-E) | LF | 289 | $360.33 | $334.00 | $405.00 | $736.91 |
| 0219 | Bore & jack **" - (16") (5872500000-E) | LF | 286 | $472.52 | $439.00 | $505.00 | $658.75 |
| 0220 | Bore & jack **" - (20") (5872500000-E) | LF | 113 | $734.33 | $484.00 | $707.00 | $960.21 |
| 0221 | Bore & jack **" - (24") (5872500000-E) | LF | 1,508 | $608.54 | $545.00 | $622.00 | $681.08 |
| 0222 | Generic utility item (EA) - 12" pressure reducing valve assembly (5882000000-N) | EACH | 2 | $94,841 | $103,000 | $90,200 | $102,230 |
| 0223 | Generic utility item (EA) - abandon meter vault (5882000000-N) | EACH | 1 | $8,209.48 | $5,600.00 | $7,235.00 | $5,617.01 |
| 0224 | Generic utility item (EA) - abandon PRV vault (5882000000-N) | EACH | 1 | $15,523 | $5,600.00 | $7,235.00 | $5,617.01 |
| 0225 | Temporary silt fence (6000000000-E) | LF | 62,500 | $2.20 | $2.20 | $1.00 | $2.92 |
| 0226 | Stone for erosion control, class A (6006000000-E) | TON | 6,850 | $71.60 | $86.50 | $25.00 | $80.00 |
| 0227 | Stone for erosion control, class B (6009000000-E) | TON | 16,750 | $71.60 | $0.01 | $30.00 | $75.00 |
| 0228 | Sediment control stone (6012000000-E) | TON | 12,500 | $60.00 | $0.01 | $20.00 | $60.50 |
| 0229 | Temporary mulching (6015000000-E) | ACRE | 600 | $1,575.00 | $1,800.00 | $1,575.00 | $1,795.92 |
| 0230 | Seed for temporary seeding (6018000000-E) | LB | 24,200 | $1.75 | $1.95 | $1.75 | $1.12 |
| 0231 | Fertilizer for temporary seeding (6021000000-E) | TON | 121 | $925.00 | $1,000.00 | $925.00 | $1,010.20 |
| 0232 | Temporary slope drains (6024000000-E) | LF | 13,300 | $27.60 | $5.00 | $2.00 | $17.50 |
| 0233 | Safety fence (6029000000-E) | LF | 1,600 | $3.10 | $3.45 | $3.10 | $2.24 |
| 0234 | Silt excavation (6030000000-E) | CY | 61,400 | $9.60 | $5.00 | $1.00 | $4.27 |
| 0235 | Matting for erosion control (6036000000-E) | SY | 295,500 | $1.45 | $1.60 | $1.45 | $1.63 |
| 0236 | Coir fiber mat (6037000000-E) | SY | 450 | $6.25 | $7.00 | $6.25 | $8.98 |
| 0237 | Permanent soil reinforcement mat (6038000000-E) | SY | 6,000 | $6.00 | $6.75 | $6.00 | $4.04 |
| 0238 | 1/4" hardware cloth (6042000000-E) | LF | 12,500 | $18.60 | $3.35 | $1.00 | $4.49 |
| 0239 | Low permeability geotextile (6043000000-E) | SY | 2,750 | $2.20 | $5.00 | $1.00 | $4.49 |
| 0240 | **" temporary pipe - (24") (6045000000-E) | LF | 70 | $92.20 | $102.00 | $24.00 | $95.00 |
| 0241 | Special stilling basins (6070000000-N) | EACH | 1 | $2,189.00 | $1,000.00 | $1,000.00 | $7,633.80 |
| 0242 | Flocculant (6071002000-E) | LB | 18,000 | $9.90 | $5.50 | $1.00 | $4.49 |
| 0243 | Coir fiber wattle (6071012000-E) | LF | 20,625 | $12.70 | $10.25 | $5.00 | $10.10 |
| 0244 | Wattle barrier (6071013000-E) | LF | 1,375 | $15.15 | $11.00 | $10.00 | $12.35 |
| 0245 | Coir fiber baffle (6071030000-E) | LF | 22,700 | $5.00 | $5.50 | $2.00 | $7.86 |
| 0246 | **" skimmer - (1-1/2") (6071050000-E) | EACH | 12 | $2,327.00 | $1,100.00 | $4,000.00 | $1,700.00 |
| 0247 | **" skimmer - (2") (6071050000-E) | EACH | 8 | $2,518.00 | $1,400.00 | $5,800.00 | $2,300.00 |
| 0248 | **" skimmer - (2-1/2") (6071050000-E) | EACH | 6 | $2,305.00 | $1,700.00 | $5,900.00 | $2,600.00 |
| 0249 | Seeding and mulching (6084000000-E) | ACRE | 400 | $2,500.00 | $2,800.00 | $2,500.00 | $2,806.12 |
| 0250 | Mowing (6087000000-E) | ACRE | 500 | $200.00 | $222.00 | $200.00 | $224.49 |
| 0251 | Seed for repair seeding (6090000000-E) | LB | 6,500 | $5.00 | $5.50 | $5.00 | $2.24 |
| 0252 | Fertilizer for repair seeding (6093000000-E) | TON | 18 | $800.00 | $890.00 | $800.00 | $897.96 |
| 0253 | Seed for supplemental seeding (6096000000-E) | LB | 9,000 | $3.00 | $3.35 | $3.00 | $3.37 |
| 0254 | Fertilizer topdressing (6108000000-E) | TON | 350 | $800.00 | $890.00 | $800.00 | $1,010.20 |
| 0255 | Impervious dike (6111000000-E) | LF | 460 | $85.00 | $10.50 | $35.00 | $115.21 |
| 0256 | Specialized hand mowing (6114500000-N) | MHR | 75 | $170.00 | $189.00 | $170.00 | $123.47 |
| 0257 | Manual litter removal (6114800000-N) | MHR | 250 | $90.00 | $145.00 | $90.00 | $123.47 |
| 0258 | Litter disposal (6114900000-E) | TON | 18.75 | $200.00 | $270.00 | $200.00 | $269.39 |
| 0259 | Response for erosion control (6117000000-N) | EACH | 190 | $1.00 | $1.10 | $1.00 | $56.12 |
| 0260 | Concrete washout structure (6117500000-N) | EACH | 20 | $2,463.00 | $1,300.00 | $1,500.00 | $2,596.66 |
| 0261 | Culvert diversion channel (6120000000-E) | CY | 15 | $32.50 | $461.00 | $350.00 | $87.50 |
| 0262 | Generic planting item (LS) - removal of japanese knotweed (6674000000-N) | LS | 1 | $1.00 | $41,900 | $25,000 | $69,653 |
| 0263 | Signal cable (7060000000-E) | LF | 3,950 | $5.00 | $5.75 | $5.00 | $4.44 |
| 0264 | Vehicle signal head (12", 3 section) (7120000000-E) | EACH | 26 | $1,250.00 | $1,400.00 | $1,250.00 | $1,333.33 |
| 0265 | Vehicle signal head (12", 4 section) (7132000000-E) | EACH | 4 | $1,400.00 | $1,600.00 | $1,400.00 | $1,666.67 |
| 0266 | Louver (7204000000-N) | EACH | 2 | $350.00 | $397.00 | $350.00 | $333.34 |
| 0267 | Messenger cable (3/8") (7264000000-E) | LF | 1,050 | $5.00 | $5.75 | $5.00 | $8.89 |
| 0268 | Paved trench (***********) - (1, 2") (7288000000-E) | LF | 25 | $35.00 | $39.75 | $35.00 | $97.78 |
| 0269 | Unpaved trench (***********) - (1, 2") (7300000000-E) | LF | 2,100 | $25.00 | $28.25 | $25.00 | $17.78 |
| 0270 | Direct drill (***********) - (1, 2") (7301000000-E) | LF | 500 | $40.00 | $45.50 | $40.00 | $55.56 |
| 0271 | Junction box (standard size) (7324000000-N) | EACH | 14 | $900.00 | $1,000.00 | $900.00 | $777.78 |
| 0272 | Junction box (over-sized, heavy duty) (7348000000-N) | EACH | 12 | $1,500.00 | $1,700.00 | $1,500.00 | $1,555.56 |
| 0273 | Wood pole (7360000000-N) | EACH | 4 | $2,000.00 | $2,300.00 | $2,000.00 | $1,833.34 |
| 0274 | Guy assembly (7372000000-N) | EACH | 8 | $950.00 | $1,100.00 | $950.00 | $1,000.00 |
| 0275 | 1" riser with weatherhead (7408000000-E) | EACH | 5 | $750.00 | $851.00 | $750.00 | $611.11 |
| 0276 | 2" riser with weatherhead (7420000000-E) | EACH | 1 | $1,200.00 | $13,600 | $1,200.00 | $1,111.11 |
| 0277 | Inductive loop sawcut (7444000000-E) | LF | 1,875 | $12.00 | $13.50 | $12.00 | $22.22 |
| 0278 | Lead-in cable (14-2) (7456100000-E) | LF | 6,175 | $2.50 | $3.00 | $2.50 | $2.22 |
| 0279 | Site survey (7481000000-N) | EACH | 4 | $100.00 | $113.00 | $100.00 | $1,388.89 |
| 0280 | Camera without internal loop emulator processing unit (7481240000-N) | EACH | 18 | $4,500.00 | $5,100.00 | $4,500.00 | $2,444.44 |
| 0281 | External loop emulator processing unit (7481260000-N) | EACH | 4 | $6,500.00 | $7,400.00 | $6,500.00 | $15,000 |
| 0282 | Metal strain signal pole (7576000000-N) | EACH | 4 | $19,500 | $22,100 | $19,500 | $23,889 |
| 0283 | Metal pole with single mast arm (7588000000-N) | EACH | 2 | $26,000 | $29,500 | $26,000 | $25,556 |
| 0284 | Soil test (7613000000-N) | EACH | 6 | $2,500.00 | $2,800.00 | $2,500.00 | $1,888.89 |
| 0285 | Drilled pier foundation (7614100000-E) | CY | 48 | $2,000.00 | $2,300.00 | $2,000.00 | $1,444.44 |
| 0286 | Mast arm with metal pole design (7631000000-N) | EACH | 2 | $250.00 | $284.00 | $250.00 | $166.67 |
| 0287 | Sign for signals (7636000000-N) | EACH | 9 | $350.00 | $397.00 | $350.00 | $500.00 |
| 0288 | Type II pedestal with foundation (7642200000-N) | EACH | 2 | $4,500.00 | $5,100.00 | $4,500.00 | $3,333.34 |
| 0289 | Signal cabinet foundation (7684000000-N) | EACH | 4 | $2,500.00 | $2,800.00 | $2,500.00 | $4,000.00 |
| 0290 | Contlrs with CBNT (**************) - (2070LX, base mounted) (7696000000-N) | EACH | 4 | $24,000 | $27,200 | $24,000 | $28,889 |
| 0291 | Contlrs with CBNT (**************) - (2070LX, pole mounted) (7696000000-N) | EACH | 1 | $24,000 | $27,200 | $24,000 | $25,556 |
| 0292 | Detector card (type 170) (7744000000-N) | EACH | 15 | $275.00 | $312.00 | $275.00 | $361.11 |
| 0293 | Cabinet base extender (7901000000-N) | EACH | 4 | $750.00 | $851.00 | $750.00 | $888.89 |
| 0294 | Generic signal item (EA) - luminaire arm for temporary video system (7980000000-N) | EACH | 12 | $250.00 | $284.00 | $250.00 | $1,000.00 |
| 0295 | Clearing & grubbing (0001000000-E) | LS | 1 | $3,000,000 | $790,965 | $3,600,000 | $257,062 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of January 21, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.