TDOT contract CNZ017 bid tabulation

76(125),09s076-f3-005,09s076-f8-005 the resurfacing on u.s. 79 (s.r. 76) from near winston/sydnor road (l.m. 11.94) to the henry county line (l.m. 18.36) in carroll county, and on u.s. 45e (s.r. 43) from l.m. 4.72 to l.m. 4.88 in gibson county. Let by Tennessee DOT on February 7, 2025, Carroll And Gibson Counties. 2 bids received; low bid $4,781,595 by Delta Contracting Company, LLC.

Owner
Tennessee DOT
Letting
07 FEB 2025
Pay items
44
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Delta Contracting Company, LLC$4,781,595Low
2Jones Bros. Contractors, LLC$5,339,140+12%
TDOT contract CNZ017: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Delta Contracting Company, LLC2. Jones Bros. Contractors, LLC
1Removal of asphalt pavement (202-03.01)SY8,038$6.00$12.85
2Water (203-06)MG47.50$0.01$55.00
3Brooming & degrassing shoulders (208-01.05)LM7.60$1,900.00$1,540.00
4Mineral aggregate, type B base, grading (C or D) (303-02)TON6,351$5.00$35.00
5Asphalt concrete mix (PG70-22) (BPMB-HM) grading A (307-02.01)TON3,698$70.00$110.00
6Trackless tack coat (403-02.01)TON135.80$300.00$810.00
7Longitudinal joint sealant (411-01.21)LM35.60$2,800.00$2,800.00
8Acs mix(PG70-22) grading D (411-02.10)TON25,218$122.00$119.00
9Scoring shoulders (continuous) (16IN width) (411-12.01)LM0.30$13,335$20,000
10Scoring shoulders (non-continuous) (16IN width) (411-12.02)LM0.40$10,000$20,000
11Cold planing bituminous pavement (415-01.01)TON24,360$19.00$25.55
12Guardrail transition 27IN to 31IN (705-02.10)EACH1$150.00$150.00
13Tangent energy absorbing term MASH TL-3 (705-06.20)EACH1$5,500.00$5,500.00
14Guardrail removed (706-01)LF50$8.00$8.00
15Traffic control (712-01)LS1$85,200$156,000
16Flexible drums (channelizing) (712-04.01)EACH112$15.00$15.00
17Warning lights (type A) (712-05.01)EACH38$10.00$10.00
18Warning lights (type C) (712-05.03)EACH20$10.00$10.00
19Signs (construction) (712-06)SF3,209$7.00$7.00
20Arrow board (type C) (712-08.03)EACH2$950.00$950.00
21Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH921$28.00$28.00
22Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22)EACH789$28.00$28.00
23Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23)EACH60$28.00$28.00
24Removal of snowplowable reflective marker (716-01.30)EACH799$5.00$15.00
25Plastic pavement marking(channelization striping) (716-02.04)SY243$25.00$25.00
26Plastic pavement marking (stop line) (716-02.05)LF770$12.00$12.00
27Plastic pavement marking (turn lane arrow) (716-02.06)EACH52$175.00$175.00
28Plastic pavement marking (longitudinal cross-walk) (716-02.09)LF217$48.00$48.00
29Plastic word pavement marking (only) (716-03.01)EACH1$150.00$150.00
30Plastic word pavement marking (bike lane) (716-03.05)EACH11$300.00$300.00
31Plastic pavement marking (transverse shoulder) (716-04.04)LF528$7.00$7.00
32Plastic pavement marking (straight arrow) (716-04.05)EACH11$140.00$140.00
33Plastic pavement marking (yield line) (716-04.12)SF135$21.00$21.00
34Painted pavement marking (6" line) (716-05.20)LM32.70$1,100.00$1,100.00
35Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM32.70$6,600.00$6,600.00
36Enhanced flat line thermo (8IN line) (716-12.06)LF703$3.00$3.00
37Mobilization (717-01)LS1$158,900$85,000
38Conduit 1" diameter (PVC schedule 40) (730-12.01)LF50$25.00$10.00
39Shielded detector cable (730-14.01)LF50$3.00$3.00
40Saw slot (730-14.02)LF1,912$6.00$6.00
41Loop wire (730-14.03)LF4,704$1.00$1.00
42Bridge deck repairs (partial depth of slab) (604-10.50)SY8$700.00$980.00
43Concrete repairs (604-10.53)SY23$700.00$980.00
44Type 1 thin epoxy overlay (epoxy-urethane) (617-04.01)SY1,412$50.00$44.46
TDOT contract CNZ017: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of February 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy