ARDOT unit bid prices and bid tabulations
Unit prices bid on 1,118 Arkansas DOT contracts let from 12 JAN 2022 to 04 NOV 2026, read from ARDOT's own tabulations. 121 pay items have enough recent bids for a page of their own; every item is in the explorer.
- Contracts
- 1,118
- Bids
- 2,578
- Unit prices
- 80,673
- Latest letting
- 04 NOV 2026
Price a ARDOT pay item
Loading the bids.
Check my bid
Add the lines you are pricing, with your quantity and unit price. Each line is placed against what bidders carried in the last 24 months, at a similar quantity when enough bids exist. Your numbers stay in this browser.
Competitors
Who bids, how often they are low, how far off they are when they lose, and how much they leave on the table when they win.
Lettings
Open any contract to read the full tabulation: every line, every bidder.
Where the numbers come from
Each price is copied from a bid tabulation the owner published after the letting. Nothing is estimated or averaged before it reaches this page.
How each bid was checked
For every bidder, quantity times unit price was summed over all lines of the contract and compared with the total bid printed by the owner. A bid is published only when the two match to within one dollar. The states marked not checkable or third party are explained in the table.
Read the numbers like an estimator
- Item codes and measurement rules are each owner's. Prices are compared inside one state and never pooled across states.
- Unit price moves with quantity, location and season. Set your quantity and region before you trust a median.
- Some bidders price a line at a cent and load the cost elsewhere. Those token prices, and bids more than three times the low bid, are left out of statistics by default and stay visible in tabulations.
- The low bidder's price on one line is not always the lowest price on that line. Orange marks the bidder who was low on the whole contract.
- Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.
The ARDOT pay items bid most often
| Pay item | Code | Unit | Low-bid median | Low bids | Window | Bids, all time |
|---|---|---|---|---|---|---|
| Signs | 604003 | SF | $8.00 | 393 | Last 24 months | 2,444 |
| Achm patching of existing roadway | 415011 | TON | $200.00 | 314 | Last 24 months | 1,930 |
| Tack coat | 401011 | GAL | $3.95 | 219 | Last 24 months | 1,776 |
| Mineral aggregate in achm surface course (1/2") | 407162 | TON | $112.47 | 232 | Last 24 months | 1,463 |
| Raised pavement markers (type ii) | 721002 | EACH | $5.55 | 204 | Last 24 months | 1,314 |
| Cold milling asphalt pavement | 412002 | SY | $5.14 | 217 | Last 24 months | 1,293 |
| Aggregate base course (class 7) | 303117 | TON | $47.93 | 225 | Last 24 months | 1,194 |
| Construction pavement markings | 604041 | LF | $0.20 | 186 | Last 24 months | 1,153 |
| Asphalt binder (pg 64-22) in achm surface course (1/2") (minimum bid $120.00) | 407432 | TON | $120.00 | 168 | Last 24 months | 1,153 |
| Thermoplastic pavement marking yellow (6") | 719102 | LF | $0.70 | 154 | Last 24 months | 898 |
| Thermoplastic pavement marking white (6") | 719002 | LF | $0.71 | 153 | Last 24 months | 881 |
| Mineral aggregate in achm surface course (3/8") | 407161 | TON | $121.00 | 136 | Last 24 months | 869 |
| Water | 620030 | MGAL | $10.00 | 105 | Last 24 months | 809 |
| Asphalt binder (pg 64-22) in achm surface course (3/8") (minimum bid $120.00) | 407431 | TON | $120.00 | 123 | Last 24 months | 801 |
| Silt fence | 621021 | LF | $3.68 | 100 | Last 24 months | 750 |
| Traffic drums | 604023 | EACH | $30.00 | 119 | Last 24 months | 746 |
| Mulch cover | 620022 | ACRE | $1,164.23 | 89 | Last 24 months | 738 |
| Lime | 620001 | TON | $125.00 | 90 | Last 24 months | 736 |
| Seeding | 620011 | ACRE | $1,500.00 | 88 | Last 24 months | 734 |
| Mineral aggregate in achm binder course (1") | 406161 | TON | $112.40 | 100 | Last 24 months | 712 |
| Reflectorized paint pavement marking yellow (4") | 718101 | LF | $0.19 | 126 | Last 24 months | 679 |
| Reinforcing steel-roadway (grade 60) | 804003 | LB | $2.50 | 93 | Last 24 months | 666 |
| Sediment removal and disposal | 621111 | CY | $19.77 | 77 | Last 24 months | 663 |
| Temporary seeding | 621001 | ACRE | $816.50 | 68 | Last 24 months | 632 |
| Removal and disposal of guardrail | 202132 | LF | $9.80 | 93 | Last 24 months | 591 |
| Guardrail (type a) | 617005 | LF | $34.00 | 92 | Last 24 months | 571 |
| Asphalt concrete patching for maintenance of traffic | 414011 | TON | $211.00 | 91 | Last 24 months | 565 |
| Guardrail terminal (type 2) | 617312 | EACH | $3,285.07 | 91 | Last 24 months | 564 |
| Unclassified excavation | 210213 | CY | $24.35 | 79 | Last 24 months | 562 |
| Compacted embankment | 210611 | CY | $30.00 | 77 | Last 24 months | 556 |
| Asphalt binder (pg 64-22) in achm binder course (1") (minimum bid $120.00) | 406402 | TON | $120.00 | 64 | Last 24 months | 556 |
| Solid sodding | 624001 | SY | $8.40 | 67 | Last 24 months | 529 |
| Barricades | 604013 | LF | $24.00 | 61 | Last 24 months | 523 |
| Aggregate base course (class 7) | 303107 | TON | $52.08 | 44 | Last 24 months | 523 |
| Thermoplastic pavement marking (arrows) | 719202 | EACH | $283.00 | 90 | Last 24 months | 520 |
| Second seeding application | 623001 | ACRE | $471.00 | 59 | Last 24 months | 514 |
| Thermoplastic pavement marking (words) | 719201 | EACH | $303.35 | 92 | Last 24 months | 511 |
| Sand bag ditch checks | 621031 | BAG | $10.90 | 68 | Last 24 months | 508 |
| Thermoplastic pavement marking white (12") | 719005 | LF | $7.00 | 86 | Last 24 months | 502 |
| Rock ditch checks | 621151 | CY | $104.87 | 59 | Last 24 months | 496 |
| Thrie beam guardrail terminal | 617332 | EACH | $2,274.00 | 74 | Last 24 months | 478 |
| Removal and disposal of pipe culverts | 202096 | EACH | $1,000.00 | 59 | Last 24 months | 473 |
| Grubbing | 201111 | STA | $1,286.00 | 53 | Last 24 months | 459 |
| Rumble strips in asphalt shoulders | 642001 | LF | $0.16 | 75 | Last 24 months | 458 |
| Furnishing field office | 602011 | EACH | $33,600 | 49 | Last 24 months | 452 |
| Soil stabilization | 210702 | TON | $322.27 | 44 | Last 24 months | 435 |
| Reflectorized paint pavement marking yellow (6") | 718102 | LF | $0.30 | 47 | Last 24 months | 422 |
| Reflectorized paint pavement marking white (6") | 718002 | LF | $0.33 | 47 | Last 24 months | 416 |
| Asphalt binder (pg 70-22) in achm surface course (1/2") (minimum bid $120.00) | 407442 | TON | $120.00 | 80 | Last 24 months | 396 |
| Clearing | 201011 | STA | $2,000.00 | 45 | Last 24 months | 392 |
| Approach gutters | 504264 | CY | $1,850.00 | 65 | Last 24 months | 388 |
| Cold milling asphalt pavement | 412001 | SY | $5.60 | 41 | Last 24 months | 387 |
| Selected pipe bedding | 606994 | CY | $61.77 | 47 | Last 24 months | 377 |
| Standard sign | 726002 | SF | $24.00 | 61 | Last 24 months | 377 |
| 4" pipe underdrains | 611008 | LF | $21.20 | 38 | Last 24 months | 375 |
| Vertical panels | 604083 | EACH | $35.35 | 48 | Last 24 months | 364 |
| Centerline rumble stripes in asphalt roadways | 642102 | LF | $0.14 | 68 | Last 24 months | 363 |
| Underdrain outlet protectors | 611013 | EACH | $700.62 | 37 | Last 24 months | 358 |
| Mailboxes | 637001 | EACH | $56.65 | 39 | Last 24 months | 330 |
| Unclassified excavation for structures-roadway | 801101 | CY | $125.00 | 33 | Last 24 months | 312 |
| Removal of permanent pavement markings | 604061 | LF | $1.06 | 48 | Last 24 months | 308 |
| Rumble stripes in asphalt shoulders | 642011 | LF | $0.14 | 55 | Last 24 months | 305 |
| Furnishing and installing precast concrete barrier | 604031 | LF | $56.86 | 28 | Last 24 months | 301 |
| Class s concrete-roadway | 802012 | CY | $1,484.00 | 35 | Last 24 months | 300 |
| Channel post sign support (type c) | 729003 | EACH | $86.14 | 44 | Last 24 months | 291 |
| 18" side drain | 606703 | LF | $91.00 | 30 | Last 24 months | 290 |
| Removal and disposal of fence | 202011 | LF | $4.20 | 27 | Last 24 months | 289 |
| Filter blanket | 816003 | SY | $9.26 | 31 | Last 24 months | 286 |
| Concrete ditch paving (type b) | 605012 | SY | $153.94 | 31 | Last 24 months | 279 |
| Sediment basin | 621071 | CY | $11.68 | 24 | Last 24 months | 277 |
| Obliteration of sediment basin | 621101 | CY | $10.80 | 24 | Last 24 months | 276 |
| Dumped riprap | 816111 | CY | $95.00 | 27 | Last 24 months | 274 |
| Reinforcing steel-bridge (grade 60) | 804013 | LB | $2.00 | 18 | Last 24 months | 251 |
| Reflectorized paint pavement marking white (4") | 718001 | LF | $0.22 | 39 | Last 24 months | 249 |
| Removable construction pavement markings | 604051 | LF | $3.50 | 35 | Last 24 months | 240 |
| Temporary impact attenuation barrier | 731071 | EACH | $7,144.50 | 24 | Last 24 months | 238 |
| Filter sock (12") | 621168 | LF | $8.76 | 34 | Last 24 months | 234 |
| Epoxy coated reinforcing steel (grade 60) | 804023 | LB | $2.04 | 16 | Last 24 months | 234 |
| Temporary impact attenuation barrier (repair) | 731072 | EACH | $900.00 | 23 | Last 24 months | 234 |
| Filter sock (18") | 621169 | LF | $12.00 | 29 | Last 24 months | 224 |
| Construction pavement markings (arrows) | 604046 | EACH | $100.00 | 36 | Last 24 months | 224 |
| Construction pavement markings (words) | 604045 | EACH | $127.50 | 36 | Last 24 months | 221 |
| Erosion control matting (class 3) | 626003 | SY | $6.95 | 20 | Last 24 months | 217 |
| Trenching and shoulder preparation | 215011 | STA | $186.87 | 51 | Last 24 months | 216 |
| 24" side drain | 606704 | LF | $95.00 | 25 | Last 24 months | 216 |
| 24" reinforced concrete pipe culverts (class iii) | 605606 | LF | $130.37 | 30 | Last 24 months | 215 |
| Relocating precast concrete barrier (max. bid 25% of item number ) | 604036 | LF | $15.00 | 23 | Last 24 months | 208 |
| Asphalt binder (pg 76-22) in achm surface course (1/2") (minimum bid $120.00) | 407452 | TON | $120.00 | 37 | Last 24 months | 205 |
| Class s(ae) concrete-bridge | 802122 | CY | $1,576.33 | 16 | Last 24 months | 200 |
| Mailbox supports (single) | 637011 | EACH | $111.00 | 89 | All lettings | 194 |
| Portable traffic signal system - actuated | 701603 | WEEK | $1,200.00 | 48 | Last 24 months | 193 |
| Class s concrete-bridge | 802112 | CY | $1,595.00 | 16 | Last 24 months | 191 |
| 24" flared end sections for reinforced concrete pipe culverts | 605858 | EACH | $2,035.73 | 28 | Last 24 months | 190 |
| Bridge name plate (type d) | 812004 | EACH | $2,500.00 | 15 | Last 24 months | 190 |
| Removal of construction pavement markings | 604055 | LF | $1.00 | 26 | Last 24 months | 188 |
| Approach slabs | 504031 | CY | $885.00 | 16 | Last 24 months | 186 |
| 18" reinforced concrete pipe culverts (class iii) | 605601 | LF | $90.00 | 31 | Last 24 months | 177 |
| Mineral aggregate in achm base course (1 1/2") | 405161 | TON | $130.00 | 25 | Last 24 months | 174 |
| Wattle (20") | 621173 | LF | $12.98 | 27 | Last 24 months | 170 |
| Removal and disposal of signs | 202191 | EACH | $507.50 | 24 | Last 24 months | 169 |
| Class 2 protective surface treatment | 803004 | SY | $7.50 | 16 | Last 24 months | 169 |
| Portable changeable message sign | 604078 | WEEK | $260.50 | 26 | Last 24 months | 168 |
| Reflectorized paint pavement marking white (12") | 718005 | LF | $5.23 | 27 | Last 24 months | 165 |
| Unclassified excavation for structures-bridge | 801001 | CY | $136.25 | 12 | Last 24 months | 164 |
| Asphalt binder (pg 70-22) in achm binder course (1") (minimum bid $120.00) | 406412 | TON | $120.00 | 34 | Last 24 months | 163 |
| Silicone joint sealant | 809015 | LF | $95.00 | 11 | Last 24 months | 162 |
| Stone backfill | 207011 | TON | $82.50 | 26 | Last 24 months | 161 |
| Elastomeric bearings | 808002 | CUIN | $4.30 | 12 | Last 24 months | 156 |
| Removal and disposal of gates | 202017 | EACH | $315.50 | 16 | Last 24 months | 154 |
| Construction project information sign update | 604010 | EACH | $75.00 | 16 | Last 24 months | 152 |
| 16' steel gates | 619332 | EACH | $985.00 | 13 | Last 24 months | 148 |
| Thermoplastic pavement marking white (8") | 719003 | LF | $3.00 | 31 | Last 24 months | 147 |
| Loop wiring class iii (1C/16 a.w.g.) | 704036 | LF | $14.00 | 25 | Last 24 months | 141 |
| Concrete combination curb and gutter (type a) (1' 6") | 634201 | LF | $41.00 | 26 | Last 24 months | 136 |
| Mailbox supports (single) | 637017 | EACH | $168.50 | 38 | Last 24 months | 132 |
| Preboring | 805504 | LF | $330.00 | 10 | Last 24 months | 130 |
| Removal and disposal of curb and gutter | 202003 | LF | $19.50 | 26 | Last 24 months | 129 |
| Portland cement concrete driveway | 505011 | SY | $140.00 | 23 | Last 24 months | 129 |
| Channel post sign support (type a) | 729001 | EACH | $100.00 | 15 | Last 24 months | 125 |
| Advance warning arrow panel | 604071 | DAY | $18.88 | 18 | Last 24 months | 125 |
| Thermoplastic pavement marking (railroad emblems) | 719203 | EACH | $650.00 | 22 | Last 24 months | 122 |
Latest lettings
| Let | Contract | County | Project | Bids | Low bid | Source |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | A10059 | Phillips | THE PURPOSE OF THIS PROJECT IS TO PLACE CHIP SEAL AND FOG SEAL APPROXIMATELY 9.670 MILES OF HIGHWAY 85 IN PHILLIPS COUNTY. THIS PROJECT CONS | 1 | $3,918,524 | ARDOT |
| 04 NOV 2026 | A20044 | Arkansas | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 23.707 MILES OF HIGHWAY 130 IN ARKANSAS COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND | 4 | $8,699,968 | ARDOT |
| 04 NOV 2026 | A30049 | Hempstead, Howard | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 18.474 MILES OF HIGHWAY 73 IN HEMPSTEAD AND HOWARD COUNTIES. THIS PROJECT C | 3 | $7,118,756 | ARDOT |
| 04 NOV 2026 | 040904 | Crawford | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT GRADING AND STRUCTURES OF A FOUR - LANE INTERSTATE FACILITY, INCLUDING IMPROVEMENTS TO THE INTER | 4 | $124,456,577 | ARDOT |
| 04 NOV 2026 | A40062 | Polk | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 11.620 MILES OF HIGHWAY 375 IN POLK COUNTY. THIS PROJECT CONSISTS OF TRENCHING AND S | 1 | $4,997,122 | ARDOT |
| 04 NOV 2026 | 050439 | Independence | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE ON HIGHWAY 25 IN INDEPENDENCE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, R | 5 | $4,165,923 | ARDOT |
| 04 NOV 2026 | A50033 | White | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY AND PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 5.952 MILES OF HIGHWAY 367 IN | 3 | $1,835,643 | ARDOT |
| 04 NOV 2026 | A50052 | Independence | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 5.996 MILES OF HIGHWAY 14 IN INDEPENDENCE COUNTY. THIS PROJECT CONSISTS OF REMOVAL A | 2 | $1,628,560 | ARDOT |
| 04 NOV 2026 | 061922 | Garland | THE PURPOSE OF THIS PROJECT IS TO IMPROVE ADA COMPLIANCE AND SAFETY FOR PEDESTRIANS ON HIGHWAYS 7 AND 70B IN GARLAND COUNTY. THIS PROJECT CO | 2 | $4,364,137 | ARDOT |
| 04 NOV 2026 | A60066 | Pulaski | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 5.078 MILES OF HIGHWAY 338 IN PULASKI COUNTY. THIS PROJECT CONSISTS OF EART | 2 | $2,399,719 | ARDOT |
| 04 NOV 2026 | A70049 | Calhoun | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 3.373 MILES OF HIGHWAY 167 IN CALHOUN COUNTY. THIS PROJECT CONSISTS OF FOG | 1 | $2,223,118 | ARDOT |
| 04 NOV 2026 | A70050 | Clark | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 12.433 MILES OF HIGHWAY 182 IN CLARK COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DI | 2 | $5,459,333 | ARDOT |
Where these numbers come from
ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
| Year | Contracts |
|---|---|
| 2022 | 233 |
| 2023 | 267 |
| 2024 | 236 |
| 2025 | 189 |
| 2026 | 193 |
Every state's coverage and check is on the bid results hub.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.