Righter Company Inc: ODOT bid record

Righter Company Inc submitted 25 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 04 DEC 2025, and was the low bidder on 4 of them (16%). When it was not low, its total sat a median +30% above the low bid.

Owner
Ohio DOT
Low bid volume
$5,178,988
Latest bid
04 DEC 2025
Data through
12 NOV 2026
25Bids
4Low bids
16Win rate, percent
+30%Median gap to the low bid when not low, 21 bids

By year

YearBidsLow bidsWin rate
2020900%
20215240%
202210110%
202511100%
Righter Company Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
MAD200%
LIC200%
VIN200%
ATH200%
FRA200%
PER200%
COS100%
District 10100%
MRG100%
District 5100%
ASD100%
HIG11100%
Righter Company Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH2222 (100%)$1.00$1.00
Water659E35000MGAL1914 (74%)$1.00$1.00
Lime659E31000ACRE189 (50%)$123.15$150.00
Subgrade compaction204E10000SY156 (40%)$3.00$3.00
Asphalt concrete surface course, type 1, (448), PG64-22441E50000CY125 (42%)$382.50$300.00
Non-tracking tack coat407E20000GAL105 (50%)$3.35$3.25
Topsoil659E00300CY105 (50%)$25.00$45.00
Asphalt concrete base, PG64-22301E46000CY95 (56%)$266.00$235.00
Sign, flat sheet630E80100SF75 (71%)$25.00$24.00
Seeding and mulching659E10000SY154 (27%)$4.00$2.60
Repair seeding and mulching659E14000SY84 (50%)$1.18$1.25
Removal of ground mounted post support and disposal630E86002EACH64 (67%)$20.00$23.50
Righter Company Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Righter Company Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
04 DEC 2025250566MOTMOT-E Center St Bridge Rehab (BRIDGE REPAIR)1 of 1$1,016,073Low
03 NOV 2022220592CLACLA-Geo Rogers Clark Pk Lower Br (CULVERT REPLACEMENT)5 of 8$246,829+26%
13 OCT 2022224027LICLIC-US 62-18.90 (BRIDGE REPAIR)2 of 2$387,700+16%
29 SEP 2022224025PICPIC-SR 56-28.27 (CULVERT REPLACEMENT)3 of 4$546,000+14%
28 JUL 2022220445MOEMOE-TR 384A-00.30 (BRIDGE REPAIR)1 of 2$1,267,988Low, -11% under the second
12 MAY 2022224015ATHATH-SR 691-05.17 (CULVERT REPLACEMENT)4 of 5$552,157+35%
14 APR 2022224014FRAFRA-SR 3-20.40 (Oakland/Agler) (INTERSECTION)2 of 2$422,665+35%
17 FEB 2022220107PERPER-MR 80-00.01 (BRIDGE REPLACEMENT (1 BRIDGE))4 of 5$1,085,637+21%
17 FEB 2022220108PERPER-MR Nuzum 00.04 (BRIDGE REPLACEMENT (1 BRIDGE))6 of 7$417,965+19%
27 JAN 2022224006JACJAC-SR 776-06.18 Bridge Replacement (CULVERT REPLACEMENT)2 of 5$308,623+7.0%
13 JAN 2022224001WARWAR-SR 122-06.33 (CULVERT REPLACEMENT)4 of 4$547,024+96%
18 NOV 2021210603GALGAL-CR 71-00.90 (BRIDGE REPAIR)1 of 2$1,781,715Low, 6.0% under the second
28 OCT 2021210510HIGHIG-HIGST-0000 Lynchburg (BRIDGE REPAIR)1 of 1$1,113,213Low
29 JUL 2021210446ASDASD-Mohican SP Sidewalk (BRIDGE REPAIR)6 of 6$148,331+111%
27 MAY 2021210300FRAFRA-Etna St / Elbern Ave Pt 1 & Pt 2 (BRIDGE REPLACEMENT (1 BRIDGE))3 of 5$1,275,727+10%
11 MAR 2021214007ATHATH-SR 56-04.97 (SLIDE REPAIR)4 of 5$242,894+27%
17 DEC 2020200607VINVIN-Moonville Trail (BRIDGE REPAIR)3 of 4$588,425+31%
05 NOV 2020204023MADMAD-SR 29-07.02 (BRIDGE REPLACEMENT (1 BRIDGE))3 of 4$991,902+18%
13 AUG 2020204014District 5D05-BH FY2021 (BRIDGE REPAIR)4 of 4$932,210+109%
02 JUL 2020207032VINVIN-SR 93-06.67 (SLIDE REPAIR)7 of 8$441,136+74%
04 JUN 2020207026LICLIC-SR 16-23.68 (MISCELLANEOUS)5 of 7$98,022+33%
26 MAR 2020200168District 10D10-Culverts FY2020A (MISCELLANEOUS)5 of 9$237,027+63%
26 MAR 2020200192MRGMRG-SR 555-16.94 (BRIDGE REPAIR)6 of 6$192,226+104%
13 FEB 2020204004MADMAD-SR 323-03.90 (BRIDGE REPAIR)3 of 4$446,472+30%
23 JAN 2020204000COSCOS-SR 93-15.72 (BRIDGE REPLACEMENT (1 BRIDGE))5 of 6$846,743+12%
Righter Company Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy