Righter Company Inc submitted 25 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 04 DEC 2025, and was the low bidder on 4 of them (16%). When it was not low, its total sat a median +30% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $5,178,988
- Latest bid
- 04 DEC 2025
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 9 | 0 | 0% |
| 2021 | 5 | 2 | 40% |
| 2022 | 10 | 1 | 10% |
| 2025 | 1 | 1 | 100% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| MAD | 2 | 0 | 0% |
| LIC | 2 | 0 | 0% |
| VIN | 2 | 0 | 0% |
| ATH | 2 | 0 | 0% |
| FRA | 2 | 0 | 0% |
| PER | 2 | 0 | 0% |
| COS | 1 | 0 | 0% |
| District 10 | 1 | 0 | 0% |
| MRG | 1 | 0 | 0% |
| District 5 | 1 | 0 | 0% |
| ASD | 1 | 0 | 0% |
| HIG | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 22 | 22 (100%) | $1.00 | $1.00 |
| Water | 659E35000 | MGAL | 19 | 14 (74%) | $1.00 | $1.00 |
| Lime | 659E31000 | ACRE | 18 | 9 (50%) | $123.15 | $150.00 |
| Subgrade compaction | 204E10000 | SY | 15 | 6 (40%) | $3.00 | $3.00 |
| Asphalt concrete surface course, type 1, (448), PG64-22 | 441E50000 | CY | 12 | 5 (42%) | $382.50 | $300.00 |
| Non-tracking tack coat | 407E20000 | GAL | 10 | 5 (50%) | $3.35 | $3.25 |
| Topsoil | 659E00300 | CY | 10 | 5 (50%) | $25.00 | $45.00 |
| Asphalt concrete base, PG64-22 | 301E46000 | CY | 9 | 5 (56%) | $266.00 | $235.00 |
| Sign, flat sheet | 630E80100 | SF | 7 | 5 (71%) | $25.00 | $24.00 |
| Seeding and mulching | 659E10000 | SY | 15 | 4 (27%) | $4.00 | $2.60 |
| Repair seeding and mulching | 659E14000 | SY | 8 | 4 (50%) | $1.18 | $1.25 |
| Removal of ground mounted post support and disposal | 630E86002 | EACH | 6 | 4 (67%) | $20.00 | $23.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Axis Civil Construction LLC | 11 | 8 of 11 |
| Complete General Construction Company | 7 | 5 of 7 |
| R C Construction Company and Son Inc | 6 | 4 of 6 |
| Parker Corporation | 5 | 5 of 5 |
| Shelly & Sands Inc | 5 | 3 of 5 |
| Buds Inc | 4 | 4 of 4 |
| BCC Ohio Inc | 4 | 4 of 4 |
| Eclipse Co LLC | 4 | 1 of 4 |
| Alan Stone Co Inc | 4 | 1 of 4 |
| Ohio-West Virginia Excavating Co | 3 | 2 of 3 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 DEC 2025 | 250566 | MOT | MOT-E Center St Bridge Rehab (BRIDGE REPAIR) | 1 of 1 | $1,016,073 | Low |
| 03 NOV 2022 | 220592 | CLA | CLA-Geo Rogers Clark Pk Lower Br (CULVERT REPLACEMENT) | 5 of 8 | $246,829 | +26% |
| 13 OCT 2022 | 224027 | LIC | LIC-US 62-18.90 (BRIDGE REPAIR) | 2 of 2 | $387,700 | +16% |
| 29 SEP 2022 | 224025 | PIC | PIC-SR 56-28.27 (CULVERT REPLACEMENT) | 3 of 4 | $546,000 | +14% |
| 28 JUL 2022 | 220445 | MOE | MOE-TR 384A-00.30 (BRIDGE REPAIR) | 1 of 2 | $1,267,988 | Low, -11% under the second |
| 12 MAY 2022 | 224015 | ATH | ATH-SR 691-05.17 (CULVERT REPLACEMENT) | 4 of 5 | $552,157 | +35% |
| 14 APR 2022 | 224014 | FRA | FRA-SR 3-20.40 (Oakland/Agler) (INTERSECTION) | 2 of 2 | $422,665 | +35% |
| 17 FEB 2022 | 220107 | PER | PER-MR 80-00.01 (BRIDGE REPLACEMENT (1 BRIDGE)) | 4 of 5 | $1,085,637 | +21% |
| 17 FEB 2022 | 220108 | PER | PER-MR Nuzum 00.04 (BRIDGE REPLACEMENT (1 BRIDGE)) | 6 of 7 | $417,965 | +19% |
| 27 JAN 2022 | 224006 | JAC | JAC-SR 776-06.18 Bridge Replacement (CULVERT REPLACEMENT) | 2 of 5 | $308,623 | +7.0% |
| 13 JAN 2022 | 224001 | WAR | WAR-SR 122-06.33 (CULVERT REPLACEMENT) | 4 of 4 | $547,024 | +96% |
| 18 NOV 2021 | 210603 | GAL | GAL-CR 71-00.90 (BRIDGE REPAIR) | 1 of 2 | $1,781,715 | Low, 6.0% under the second |
| 28 OCT 2021 | 210510 | HIG | HIG-HIGST-0000 Lynchburg (BRIDGE REPAIR) | 1 of 1 | $1,113,213 | Low |
| 29 JUL 2021 | 210446 | ASD | ASD-Mohican SP Sidewalk (BRIDGE REPAIR) | 6 of 6 | $148,331 | +111% |
| 27 MAY 2021 | 210300 | FRA | FRA-Etna St / Elbern Ave Pt 1 & Pt 2 (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 5 | $1,275,727 | +10% |
| 11 MAR 2021 | 214007 | ATH | ATH-SR 56-04.97 (SLIDE REPAIR) | 4 of 5 | $242,894 | +27% |
| 17 DEC 2020 | 200607 | VIN | VIN-Moonville Trail (BRIDGE REPAIR) | 3 of 4 | $588,425 | +31% |
| 05 NOV 2020 | 204023 | MAD | MAD-SR 29-07.02 (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 4 | $991,902 | +18% |
| 13 AUG 2020 | 204014 | District 5 | D05-BH FY2021 (BRIDGE REPAIR) | 4 of 4 | $932,210 | +109% |
| 02 JUL 2020 | 207032 | VIN | VIN-SR 93-06.67 (SLIDE REPAIR) | 7 of 8 | $441,136 | +74% |
| 04 JUN 2020 | 207026 | LIC | LIC-SR 16-23.68 (MISCELLANEOUS) | 5 of 7 | $98,022 | +33% |
| 26 MAR 2020 | 200168 | District 10 | D10-Culverts FY2020A (MISCELLANEOUS) | 5 of 9 | $237,027 | +63% |
| 26 MAR 2020 | 200192 | MRG | MRG-SR 555-16.94 (BRIDGE REPAIR) | 6 of 6 | $192,226 | +104% |
| 13 FEB 2020 | 204004 | MAD | MAD-SR 323-03.90 (BRIDGE REPAIR) | 3 of 4 | $446,472 | +30% |
| 23 JAN 2020 | 204000 | COS | COS-SR 93-15.72 (BRIDGE REPLACEMENT (1 BRIDGE)) | 5 of 6 | $846,743 | +12% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.