TDOT contract CNZ292 bid tabulation
The resurfacing on i-24 from near u.s. 72 (s.r. 27) (l.m. 17.61) to east of s.r. 28 (l.m. 21.76). Let by Tennessee DOT on December 5, 2025, Marion County. 2 bids received; low bid $6,009,116 by Rogers Group, Inc..
- Owner
- Tennessee DOT
- Letting
- 05 DEC 2025
- Pay items
- 38
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rogers Group, Inc. | $6,009,116 | Low |
| 2 | APAC-Atlantic, Inc. | $6,821,466 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rogers Group, Inc. | 2. APAC-Atlantic, Inc. |
|---|---|---|---|---|---|
| 1 | Brooming & degrassing shoulders (208-01.05) | LM | 18.60 | $800.00 | $1,154.65 |
| 2 | Mineral aggregate, type A base, grading D (303-01) | TON | 3,697 | $54.00 | $58.33 |
| 3 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 776 | $150.00 | $172.46 |
| 4 | Asphalt concrete mix (PG64-22) grading CM (307-01.18) | TON | 3,872 | $120.00 | $145.58 |
| 5 | Asphalt concrete mix (PG76-22) grading CM (307-03.12) | TON | 10,842 | $120.00 | $137.94 |
| 6 | Bituminous material for prime coat (PC) (402-01) | TON | 18 | $1,100.00 | $1,355.42 |
| 7 | High performance fog seals (403-01.10) | SY | 19,500 | $0.71 | $1.79 |
| 8 | Acs mix(PG76-22) grading D (411-03.10) | TON | 465 | $210.00 | $291.80 |
| 9 | Acs mix (PG76-22) ogfc (411-03.23) | TON | 10,627 | $173.00 | $207.83 |
| 10 | Scoring shoulders (continuous) (16IN width) (411-12.01) | LM | 16.60 | $1,050.00 | $810.00 |
| 11 | Cold planing bituminous pavement (415-01.01) | TON | 14,527.20 | $38.75 | $44.65 |
| 12 | Guardrail delineation enhancement (705-04.20) | EACH | 2,860 | $5.20 | $5.82 |
| 13 | Traffic control (712-01) | LS | 1 | $255,066 | $216,500 |
| 14 | Flexible drums (channelizing) (712-04.01) | EACH | 50 | $53.00 | $60.00 |
| 15 | Warning lights (type A) (712-05.01) | EACH | 100 | $1.05 | $1.20 |
| 16 | Signs (construction) (712-06) | SF | 2,235 | $7.50 | $8.34 |
| 17 | Arrow board (type C) (712-08.03) | EACH | 2 | $1,325.00 | $1,500.00 |
| 18 | Speed feedback sign assembly (712-08.08) | EACH | 6 | $6,400.00 | $7,200.00 |
| 19 | Digital speed limit sign assembly (712-08.09) | EACH | 6 | $6,000.00 | $6,840.00 |
| 20 | Queue protection truck (712-08.12) | DAY | 100 | $1,450.00 | $1,560.00 |
| 21 | Removable pavement marking (stop line) (712-09.04) | LF | 122 | $31.50 | $30.00 |
| 22 | Changeable message sign unit (713-16.01) | EACH | 6 | $1,100.00 | $7,320.00 |
| 23 | Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23) | EACH | 748 | $47.50 | $48.00 |
| 24 | Removal of snowplowable reflective marker (716-01.30) | EACH | 748 | $16.00 | $10.20 |
| 25 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 1,000 | $26.00 | $27.30 |
| 26 | Plastic pavement marking (stop line) (716-02.05) | LF | 122 | $21.00 | $18.00 |
| 27 | Plastic pavement marking (wrong way arrow) (716-04.06) | EACH | 6 | $425.00 | $300.00 |
| 28 | Plastic pavement marking (yield line) (716-04.12) | SF | 32 | $21.00 | $36.00 |
| 29 | Plastic pavement marking (yield symbol) (716-04.17) | EACH | 1 | $370.00 | $300.00 |
| 30 | Painted pavement marking (6" line) (716-05.20) | LM | 2.10 | $1,425.00 | $1,800.00 |
| 31 | Hydroblast removal of pavement marking (line) (716-08.30) | LM | 2.10 | $6,850.00 | $9,000.00 |
| 32 | Contrast pavement marking 6" (716-09.86) | LM | 2.10 | $50,000 | $59,100 |
| 33 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 21 | $8,250.00 | $9,000.00 |
| 34 | Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05) | LF | 3,000 | $3.15 | $3.30 |
| 35 | Enhanced flat line thermo (8IN line) (716-12.06) | LF | 2,100 | $3.15 | $3.30 |
| 36 | Mobilization (717-01) | LS | 1 | $285,000 | $151,250 |
| 38 | Trackless tack coat (403-02.01) | TON | 84 | $900.00 | $1,008.00 |
| 39 | Hot applied tack coat (403-02.02) | TON | 118 | $750.00 | $975.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of December 5, 2025. Compiled by Mirage Metrics.