TDOT contract CNZ244 bid tabulation
The culvert repair including retaining walls on u.s. 41 (u.s. 64, s.r. 2, lee highway) at l.m. 17.25. Let by Tennessee DOT on July 25, 2025, Marion County. 2 bids received; low bid $882,882 by APAC-Atlantic, Inc..
- Owner
- Tennessee DOT
- Letting
- 25 JUL 2025
- Pay items
- 72
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | APAC-Atlantic, Inc. | $882,882 | Low |
| 2 | J. Hill Excavating, LLC | $1,252,318 | +42% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. APAC-Atlantic, Inc. | 2. J. Hill Excavating, LLC |
|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $8,800.00 | $49,000 |
| 2 | Clearing and grubbing (201-01) | LS | 1 | $15,728 | $63,750 |
| 3 | Removal of pipe (66" CMP) (202-01.13) | LF | 140 | $83.15 | $126.00 |
| 4 | Removal of structures & obstructions (CB, sta. 13+39.03 off. 32.5') (202-01.56) | LS | 1 | $7,881.04 | $6,900.00 |
| 5 | Road & drainage excavation (unclassified) (203-01) | CY | 2,443 | $36.33 | $43.50 |
| 6 | Placing and spreading topsoil (203-04) | CY | 85 | $39.43 | $39.75 |
| 7 | Furnishing & spreading topsoil (203-07) | CY | 50 | $208.44 | $90.00 |
| 8 | Foundation fill material (204-08) | CY | 3 | $1,006.73 | $117.00 |
| 9 | 18" temporary slope drain (209-02.07) | LF | 96 | $22.58 | $41.25 |
| 10 | Stream mitigation - articulated concrete mat (209-03.53) | SY | 660 | $69.33 | $285.00 |
| 11 | Sediment removal (209-05) | CY | 13 | $76.16 | $25.00 |
| 12 | Temporary silt fence (with backing) (209-08.02) | LF | 244 | $6.05 | $12.00 |
| 13 | Sandbags (209-09.01) | BAG | 360 | $31.39 | $15.65 |
| 14 | Sediment filter bag(15' X 10') (209-09.04) | EACH | 4 | $2,605.54 | $2,100.00 |
| 15 | Polyethylene sheeting (6 mil. minimum) (209-20.03) | SY | 32 | $50.60 | $20.00 |
| 16 | Temporary in stream diversion (209-65.04) | LF | 222 | $7.56 | $105.00 |
| 17 | Granular backfill (roadway) (303-01.01) | TON | 99 | $66.77 | $85.00 |
| 18 | Mineral aggregate (size 57) (303-10.01) | TON | 145 | $66.78 | $88.00 |
| 19 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 96 | $251.00 | $345.00 |
| 20 | Bituminous material for prime coat (PC) (402-01) | TON | 0.30 | $4,371.60 | $5,650.00 |
| 21 | Bituminous material for tack coat (TC) (403-01) | TON | 3 | $825.00 | $2,100.00 |
| 22 | Saw cutting asphalt pavement (407-20.05) | LF | 150 | $13.20 | $23.75 |
| 23 | Acs mix(PG64-22) grading D (411-01.10) | TON | 437 | $171.47 | $280.00 |
| 24 | Cold planing bituminous pavement (415-01.02) | SY | 5,488 | $3.51 | $7.55 |
| 25 | Structural steel (602-01) | LB | 180.50 | $5.50 | $27.00 |
| 26 | Class A concrete (roadway) (604-01.01) | CY | 13 | $5,044.00 | $2,600.00 |
| 27 | Steel bar reinforcement (roadway) (604-01.02) | LB | 2,550 | $5.50 | $3.45 |
| 28 | Retaining wall (R1, sta. 13+00.39 to sta. 13+33.46 RT) (604-07.01) | SF | 155 | $286.49 | $260.00 |
| 29 | Retaining wall (R2, sta. 13+46.30 to sta. 13+72.10 RT) (604-07.02) | SF | 134 | $329.99 | $278.50 |
| 30 | 42" temporary drainage pipe (621-03.06) | LF | 40 | $204.25 | $120.00 |
| 31 | Temporary shoring (621-05.02) | LS | 1 | $47,667 | $10,000 |
| 32 | Earth pad for type 38 GR end treatment (705-04.09) | EACH | 1 | $1,980.00 | $1,895.00 |
| 33 | W beam GR (type 2) MASH TL-3 (long post) (705-06.02) | LF | 196 | $38.50 | $52.00 |
| 34 | GR terminaltrailing end (type 13) MASH TL-3 (705-06.10) | EACH | 1 | $1,980.00 | $2,275.00 |
| 35 | GR terminal (in-inline) MASH TL-3 (705-06.11) | EACH | 2 | $1,760.00 | $2,125.00 |
| 36 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 1 | $3,850.00 | $3,855.00 |
| 37 | Radius rail (706-06.03) | LF | 60 | $55.00 | $49.00 |
| 38 | Rounded end element (706-10.26) | EACH | 1 | $165.00 | $380.00 |
| 39 | Chain link fence (6 foot) (707-01.11) | LF | 130 | $42.90 | $45.00 |
| 40 | End & corner post assembly(chain-link fence 6') (707-01.12) | EACH | 2 | $1,650.00 | $2,500.00 |
| 41 | Removal of fence (tract 1) (707-06.01) | LF | 130 | $28.56 | $15.00 |
| 42 | Removal and reset fence (tract 1) (707-06.03) | LF | 130 | $28.56 | $45.00 |
| 43 | High-visibility construction fence (707-08.11) | LF | 43 | $9.35 | $8.00 |
| 44 | Machined rip-rap (class A-3) (709-05.05) | TON | 50 | $82.32 | $88.00 |
| 45 | Machined rip-rap (class A-1) (709-05.06) | TON | 23 | $88.92 | $90.00 |
| 46 | Machined rip-rap (class B) (709-05.08) | TON | 16 | $149.16 | $102.00 |
| 47 | Traffic control (712-01) | LS | 1 | $2,200.00 | $85,500 |
| 48 | Interconnected portable barrier rail (712-02.02) | LF | 290 | $47.95 | $89.00 |
| 49 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 2 | $7,150.00 | $11,250 |
| 50 | Flexible drums (channelizing) (712-04.01) | EACH | 100 | $41.80 | $43.00 |
| 51 | Signs (construction) (712-06) | SF | 269 | $9.19 | $10.00 |
| 52 | Temporary barricades (type III) (712-07.03) | LF | 20 | $17.60 | $20.00 |
| 53 | Arrow board (type C) (712-08.03) | EACH | 2 | $550.00 | $1,230.00 |
| 54 | Removable pavement marking (8" barrier line) (712-09.02) | LF | 4,500 | $4.95 | $6.15 |
| 55 | Removable pavement marking (stop line) (712-09.04) | LF | 40 | $27.50 | $25.00 |
| 56 | Removable black-out tape (6") (712-09.30) | LF | 2,500 | $10.45 | $5.45 |
| 57 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 55 | $55.00 | $112.00 |
| 58 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 10 | $55.00 | $114.00 |
| 59 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 130 | $30.25 | $35.00 |
| 60 | Plastic pavement marking (stop line) (716-02.05) | LF | 55 | $13.20 | $19.00 |
| 61 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 2 | $192.50 | $380.00 |
| 62 | Plastic pavement marking (8IN line) (716-02.12) | LM | 0.10 | $13,750 | $13,000 |
| 63 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 1 | $9,625.00 | $8,200.00 |
| 64 | Mobilization (717-01) | LS | 1 | $111,127 | $105,000 |
| 65 | Modification of existing traffic signal equipment (730-01.04) | LS | 1 | $14,410 | $15,500 |
| 66 | Geotextile (type III)(erosion control) (740-10.03) | SY | 240 | $6.18 | $7.00 |
| 67 | Temporary sediment tube 18IN (740-11.03) | LF | 619 | $6.05 | $7.77 |
| 68 | Temporary seeding (with mulch) (801-01.07) | UNIT | 9 | $93.50 | $235.00 |
| 69 | Natve seed MX final stablizatn of slopes (801-01.38) | UNIT | 14 | $192.50 | $246.00 |
| 70 | Temporary mulch (801-01.65) | UNIT | 1 | $1,100.00 | $127.55 |
| 71 | Water (seeding & sodding) (801-03) | MG | 2 | $220.00 | $118.00 |
| 72 | Erosion control blanket (type II) (805-12.02) | SY | 800 | $1.76 | $3.48 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of July 25, 2025. Compiled by Mirage Metrics.