ODOT contract 250001 bid tabulation
FRA-IR 70-00.00 (MAJOR RECONSTRUCTION). Let by Ohio DOT on January 30, 2025, FRA. 4 bids received; low bid $54,398,185 by Shelly & Sands Inc, -14% against the engineer's estimate of $63,340,000.
- Owner
- Ohio DOT
- Letting
- 30 JAN 2025
- Pay items
- 289
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly & Sands Inc | $54,398,185 | Low | -14% |
| 2 | Kokosing Construction Company Inc | $57,481,207 | +6.0% | -9.0% |
| 3 | Miller Bros Const Inc | $60,620,565 | +11% | -4.0% |
| 4 | Complete General Construction Company | $65,692,752 | +21% | +4.0% |
Engineer's estimate: $63,340,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly & Sands Inc | 2. Kokosing Construction Company Inc | 3. Miller Bros Const Inc | 4. Complete General Construction Company |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $255,800 | $41,100 | $50,000 | $45,000 |
| 2 | Headwall removed (202E20010) | EACH | 23 | $225.00 | $500.00 | $300.00 | $350.00 |
| 3 | Pavement removed (202E23000) | SY | 7,634 | $7.00 | $11.50 | $7.50 | $5.00 |
| 4 | Pavement removed, as per plan (202E23001) | SY | 305,325 | $7.50 | $10.50 | $21.50 | $17.80 |
| 5 | Pipe removed, 24" and under (202E35100) | FT | 6,895 | $7.50 | $15.00 | $8.00 | $20.00 |
| 6 | Guardrail removed (202E38000) | FT | 12,717 | $2.50 | $2.50 | $2.50 | $2.00 |
| 7 | Anchor assembly removed, type E (202E42010) | EACH | 24 | $200.00 | $200.00 | $200.00 | $150.00 |
| 8 | Anchor assembly removed, type T (202E42040) | EACH | 17 | $125.00 | $125.00 | $125.00 | $100.00 |
| 9 | Bridge terminal assembly removed (202E47000) | EACH | 18 | $125.00 | $125.00 | $125.00 | $75.00 |
| 10 | Cable barrier removed (202E48000) | FT | 28,053 | $2.00 | $5.00 | $2.00 | $1.20 |
| 11 | Manhole removed (202E58000) | EACH | 2 | $450.00 | $1,200.00 | $750.00 | $990.00 |
| 12 | Catch basin removed (202E58100) | EACH | 37 | $250.00 | $900.00 | $750.00 | $480.00 |
| 13 | Fence removed (202E75000) | FT | 30 | $10.00 | $125.00 | $13.50 | $9.00 |
| 14 | Excavation (203E10000) | CY | 110,659 | $12.00 | $12.00 | $18.50 | $29.50 |
| 15 | Embankment (203E20000) | CY | 6,389 | $10.00 | $6.00 | $15.50 | $7.00 |
| 16 | Proof rolling (204E45000) | HR | 122 | $420.00 | $225.00 | $250.00 | $350.00 |
| 17 | Cement (206E10500) | TON | 9,458 | $205.00 | $190.50 | $180.00 | $199.00 |
| 18 | Curing coat (206E11000) | SY | 366,237 | $0.65 | $1.05 | $1.05 | $1.08 |
| 19 | Cement stabilized subgrade, 12 inches deep (206E15010) | SY | 366,237 | $2.23 | $3.27 | $3.10 | $3.90 |
| 20 | Mixture design for chemically stabilized soils (206E30000) | LS | 1 | $87,000 | $89,000 | $65,000 | $87,600 |
| 21 | Reshaping under guardrail, as per plan (209E15051) | MI | 1.25 | $2,500.00 | $6,500.00 | $2,500.00 | $8,800.00 |
| 22 | Guardrail, type MGS (606E15050) | FT | 6,084 | $19.00 | $19.00 | $19.00 | $19.60 |
| 23 | Guardrail, barrier design, type MGS (606E15550) | FT | 200 | $32.00 | $32.00 | $32.00 | $31.00 |
| 24 | Anchor assembly, MGS type B (606E26050) | EACH | 5 | $2,400.00 | $2,400.00 | $2,400.00 | $2,300.00 |
| 25 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 20 | $2,500.00 | $2,500.00 | $2,500.00 | $2,680.00 |
| 26 | Anchor assembly, MGS type T (606E26550) | EACH | 15 | $1,200.00 | $1,200.00 | $1,200.00 | $1,420.00 |
| 27 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 17 | $2,450.00 | $2,450.00 | $2,450.00 | $2,550.00 |
| 28 | MGS bridge terminal assembly, type 2 (606E35102) | EACH | 1 | $500.00 | $500.00 | $500.00 | $725.00 |
| 29 | Special - cable barrier with concrete line post foundation (606E55010) | FT | 28,480 | $18.75 | $18.75 | $18.75 | $22.50 |
| 30 | Special - cable barrier, anchor assembly (606E55150) | EACH | 26 | $3,850.00 | $3,850.00 | $3,850.00 | $3,260.00 |
| 31 | Special - cable barrier, splice (606E55180) | EACH | 2 | $30.00 | $30.00 | $30.00 | $495.00 |
| 32 | Special - cable barrier, post reflector (606E55190) | EACH | 376 | $12.00 | $12.00 | $12.00 | $15.00 |
| 33 | Impact attenuator, type 1 (bidirectional) (606E60012) | EACH | 6 | $8,000.00 | $8,000.00 | $8,000.00 | $9,125.00 |
| 34 | Fence, type 47RA (607E15100) | FT | 50 | $40.00 | $40.00 | $40.00 | $69.50 |
| 35 | Concrete barrier, type D (622E24000) | FT | 230 | $200.00 | $160.00 | $200.00 | $210.00 |
| 36 | Concrete barrier end section, type D (622E25000) | EACH | 8 | $4,000.00 | $5,000.00 | $4,500.00 | $4,795.00 |
| 37 | Concrete barrier, end anchorage, reinforced, type D (622E25050) | EACH | 8 | $4,000.00 | $5,000.00 | $4,500.00 | $5,070.00 |
| 38 | Inspection and compaction testing of unbound materials (878E25000) | LS | 1 | $145,000 | $250,000 | $65,875 | $200,000 |
| 40 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 237 | $150.00 | $160.00 | $75.00 | $145.00 |
| 41 | Bioretention cell (601E45050) | CY | 1,618 | $110.00 | $105.00 | $88.50 | $100.00 |
| 42 | Soil analysis test (659E00100) | EACH | 6 | $75.00 | $50.00 | $50.00 | $75.00 |
| 43 | Topsoil (659E00300) | CY | 27,325 | $8.75 | $7.00 | $5.00 | $30.00 |
| 44 | Seeding and mulching (659E10000) | SY | 245,900 | $0.54 | $0.48 | $0.48 | $0.54 |
| 45 | Repair seeding and mulching (659E14000) | SY | 12,295 | $0.50 | $0.45 | $0.45 | $0.45 |
| 46 | Inter-seeding (659E15000) | SY | 12,295 | $0.50 | $0.01 | $0.01 | $0.25 |
| 47 | Commercial fertilizer (659E20000) | TON | 34.30 | $500.00 | $1,000.00 | $1,000.00 | $500.00 |
| 48 | Lime (659E31000) | ACRE | 50.81 | $10.00 | $1.00 | $1.00 | $10.00 |
| 49 | Water (659E35000) | MGAL | 1,361 | $1.00 | $1.00 | $1.00 | $0.25 |
| 50 | Mowing (659E40000) | MSF | 553 | $4.80 | $1.00 | $1.00 | $4.80 |
| 51 | Ditch erosion protection (670E00700) | SY | 11,575 | $1.75 | $1.95 | $1.95 | $1.75 |
| 52 | Storm water pollution prevention plan, as per plan (832E15001) | LS | 1 | $12,000 | $10,000 | $7,535.00 | $12,500 |
| 53 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $45,000 | $50,000 | $33,350 | $47,000 |
| 54 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $22,000 | $30,000 | $22,195 | $22,000 |
| 55 | Erosion control (832E30000) | EACH | 996,615 | $1.00 | $1.00 | $1.00 | $1.00 |
| 56 | Concrete masonry (602E20000) | CY | 7.80 | $3,100.00 | $5,500.00 | $2,850.00 | $2,780.00 |
| 57 | 6" shallow pipe underdrains with geotextile fabric (605E11110) | FT | 125,266 | $10.00 | $9.50 | $10.50 | $14.90 |
| 58 | 6" base pipe underdrains with geotextile fabric (605E14020) | FT | 119,872 | $8.00 | $6.50 | $8.30 | $12.20 |
| 59 | 6" conduit, type F (611E01500) | FT | 4,265 | $22.00 | $27.50 | $33.00 | $17.00 |
| 60 | 15" conduit, type B (611E05900) | FT | 2,166 | $105.00 | $165.00 | $60.00 | $115.00 |
| 61 | 15" conduit, type C (611E06100) | FT | 924 | $70.00 | $125.00 | $65.00 | $88.00 |
| 62 | 18" conduit, type C (611E07600) | FT | 1,346 | $82.00 | $120.00 | $80.00 | $97.00 |
| 63 | 24" conduit, type B (611E10400) | FT | 397 | $145.00 | $240.00 | $130.00 | $152.00 |
| 64 | 24" conduit, type C (611E10600) | FT | 2,062 | $100.00 | $160.00 | $105.00 | $125.00 |
| 65 | Catch basin, no. 4 (611E98230) | EACH | 33 | $6,200.00 | $9,000.00 | $5,200.00 | $6,000.00 |
| 66 | Catch basin, no. 2-2B (611E98470) | EACH | 4 | $3,000.00 | $4,000.00 | $1,900.00 | $1,960.00 |
| 67 | Manhole, no. 3 (611E99574) | EACH | 6 | $4,150.00 | $7,000.00 | $3,900.00 | $5,150.00 |
| 68 | Precast reinforced concrete outlet (611E99710) | EACH | 96 | $425.00 | $950.00 | $400.00 | $315.00 |
| 69 | Pavement planing, asphalt concrete (1.5") (254E01000) | SY | 123,344 | $3.40 | $2.15 | $3.15 | $3.15 |
| 70 | Asphalt concrete base, as per plan (302E66001) | CY | 96,316 | $135.00 | $138.00 | $153.25 | $153.25 |
| 71 | Aggregate base (304E20000) | CY | 60,609 | $50.00 | $60.00 | $50.00 | $50.15 |
| 72 | Non-tracking tack coat (407E20000) | GAL | 34,004 | $3.50 | $4.00 | $4.05 | $4.05 |
| 73 | Stabilized crushed aggregate (411E10000) | CY | 2,180 | $85.00 | $110.00 | $75.00 | $76.25 |
| 74 | Asphalt concrete intermediate course, type 1, (449), (under guardrail), as per plan (441E70801) | CY | 300 | $305.00 | $450.00 | $255.00 | $255.00 |
| 75 | Asphalt concrete intermediate course, 12.5 MM, type A (446) (442E10080) | CY | 16,532 | $165.00 | $180.00 | $186.50 | $186.50 |
| 76 | Asphalt concrete surface course, 12.5 MM, type A (447) (442E10300) | CY | 19,309 | $230.00 | $238.00 | $241.50 | $241.50 |
| 77 | 14.5" non-reinforced concrete pavement, class QC 1P with QC/QA (452E17060) | SY | 7,507 | $150.00 | $165.00 | $149.00 | $140.00 |
| 78 | Rumble strips, shoulder (asphalt concrete) (618E40600) | MI | 20.66 | $1,000.00 | $1,300.00 | $1,000.00 | $1,000.00 |
| 80 | Rumble stripes, edge line (asphalt concrete) (618E41000) | MI | 20.45 | $1,300.00 | $1,400.00 | $1,400.00 | $2,000.00 |
| 81 | Connection, unfused permanent (625E00480) | EACH | 3 | $100.00 | $300.00 | $100.00 | $280.00 |
| 82 | Light tower foundation, 36" X 25' deep (625E15200) | EACH | 5 | $11,700 | $15,000 | $11,700 | $23,000 |
| 83 | 1-1/2" duct cable with three no. 1/0 AWG 2400 volt cables (625E24314) | FT | 2,306 | $24.00 | $25.00 | $24.00 | $24.00 |
| 84 | Conduit, 3", 725.04 (625E25500) | FT | 98 | $27.00 | $60.00 | $27.00 | $60.00 |
| 85 | Removal of luminaire and reerection (625E27520) | EACH | 15 | $250.00 | $550.00 | $250.00 | $400.00 |
| 86 | Trench, 24" deep (625E29002) | FT | 2,246 | $11.00 | $11.00 | $11.00 | $6.50 |
| 87 | Pull box, 725.08, 18" (625E30700) | EACH | 2 | $1,300.00 | $1,500.00 | $1,300.00 | $1,150.00 |
| 88 | Ground rod (625E32000) | EACH | 10 | $265.00 | $325.00 | $265.00 | $400.00 |
| 89 | RE-erect existing light tower, as per plan (625E35021) | EACH | 5 | $4,400.00 | $7,500.00 | $4,400.00 | $6,000.00 |
| 90 | Underground warning marking tape (625E36010) | FT | 2,246 | $3.00 | $2.00 | $3.00 | $2.00 |
| 91 | Light tower removed for storage (625E75360) | EACH | 5 | $3,200.00 | $4,000.00 | $3,200.00 | $3,000.00 |
| 92 | Light tower foundation removed (625E75540) | EACH | 5 | $300.00 | $450.00 | $300.00 | $775.00 |
| 93 | Disconnect circuit (625E75800) | EACH | 1 | $206.00 | $150.00 | $206.00 | $300.00 |
| 94 | RPM (621E00100) | EACH | 1,012 | $39.00 | $38.75 | $39.00 | $38.75 |
| 95 | Barrier reflector, type 1, one way (626E00102) | EACH | 24 | $12.00 | $12.00 | $12.00 | $12.50 |
| 96 | Barrier reflector, type 5, one way (626E00116) | EACH | 126 | $12.00 | $22.00 | $22.00 | $16.00 |
| 97 | Ground mounted support, no. 2 post (630E02100) | FT | 184 | $12.00 | $12.00 | $12.00 | $14.00 |
| 98 | Ground mounted support, no. 3 post (630E03100) | FT | 391 | $13.00 | $13.00 | $13.00 | $15.00 |
| 99 | Ground mounted support, no. 4 post (630E04100) | FT | 188 | $22.00 | $22.00 | $22.00 | $17.00 |
| 100 | Ground mounted support, no. 6 post (630E06100) | FT | 193 | $25.00 | $25.00 | $25.00 | $19.00 |
| 101 | Ground mounted structural beam support, S4X7.7 (630E06400) | FT | 28 | $16.00 | $16.00 | $16.00 | $40.00 |
| 102 | Ground mounted structural beam support, W6X9 (630E06500) | FT | 70 | $17.00 | $17.00 | $17.00 | $45.00 |
| 103 | Ground mounted structural beam support, W10X12 (630E07600) | FT | 171 | $21.00 | $21.00 | $21.00 | $52.00 |
| 104 | Ground mounted support, pipe (630E08200) | EACH | 1 | $1,200.00 | $1,200.00 | $1,200.00 | $825.00 |
| 105 | Sign post reflector (630E08600) | EACH | 6 | $45.00 | $45.00 | $45.00 | $45.00 |
| 106 | Overhead sign support, type TC-15.116, design 2 (630E72420) | EACH | 2 | $74,500 | $74,500 | $74,500 | $84,650 |
| 107 | Sign, flat sheet (630E80100) | SF | 562 | $19.50 | $19.50 | $19.50 | $17.00 |
| 108 | Sign, ground mounted extrusheet (630E80200) | SF | 120 | $22.50 | $22.50 | $22.50 | $24.00 |
| 109 | Sign, overhead extrusheet (630E80224) | SF | 565 | $22.50 | $22.50 | $22.50 | $24.00 |
| 110 | Ground mounted structural beam support foundation (630E84500) | EACH | 12 | $950.00 | $950.00 | $950.00 | $975.00 |
| 111 | Ground mounted pipe support foundation (630E84600) | EACH | 1 | $650.00 | $650.00 | $650.00 | $625.00 |
| 112 | Removal of ground mounted sign and disposal (630E84900) | EACH | 60 | $15.00 | $15.00 | $15.00 | $15.00 |
| 113 | Removal of ground mounted sign and reerection (630E85100) | EACH | 6 | $100.00 | $100.00 | $100.00 | $65.00 |
| 114 | Removal of ground mounted post support and disposal (630E86002) | EACH | 72 | $15.00 | $15.00 | $15.00 | $20.00 |
| 115 | Removal of ground mounted structural beam support (630E86102) | EACH | 14 | $375.00 | $375.00 | $375.00 | $265.00 |
| 116 | Removal of ground mounted pipe support and disposal (630E86272) | EACH | 1 | $375.00 | $375.00 | $375.00 | $125.00 |
| 117 | Removal of overhead mounted sign and disposal (630E87400) | EACH | 4 | $300.00 | $300.00 | $300.00 | $295.00 |
| 118 | Removal of overhead sign support and disposal, type TC-15.115 (630E89804) | EACH | 2 | $3,500.00 | $3,500.00 | $3,500.00 | $3,650.00 |
| 119 | Wet reflective epoxy pavement marking, edge line, 6" (807E12010) | MI | 1.42 | $11,980 | $11,980 | $11,980 | $11,980 |
| 120 | Wet reflective epoxy pavement marking, lane line, 6" (807E12110) | MI | 0.39 | $6,900.00 | $6,900.00 | $6,900.00 | $6,900.00 |
| 121 | Wet reflective thermoplastic pavement marking, edge line, 6" (807E14010) | MI | 26.06 | $5,214.00 | $5,214.00 | $5,214.00 | $5,214.00 |
| 122 | Wet reflective thermoplastic pavement marking, lane line, 6" (807E14110) | MI | 26.20 | $2,110.00 | $2,110.00 | $2,110.00 | $2,110.00 |
| 123 | Wet reflective thermoplastic pavement marking, channelizing line, 12" (807E14310) | FT | 10,738 | $2.60 | $2.60 | $2.60 | $2.60 |
| 124 | Wet reflective thermoplastic pavement marking, dotted line, 6" (807E14410) | FT | 5,251 | $1.00 | $1.00 | $1.00 | $1.00 |
| 125 | Grooving for 6" recessed pavement marking, (asphalt) (850E10010) | MI | 53.26 | $1,959.00 | $1,959.00 | $1,959.00 | $1,959.00 |
| 126 | Grooving for 12" recessed pavement marking, (asphalt) (850E10130) | FT | 10,738 | $1.30 | $1.30 | $1.30 | $1.30 |
| 127 | Grooving for 6" recessed pavement marking, (concrete) (850E20010) | MI | 1.79 | $2,990.00 | $2,990.00 | $2,990.00 | $2,990.00 |
| 128 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 2,000 | $104.00 | $112.50 | $100.00 | $120.00 |
| 129 | Special - work zone guardrail (614E12200) | FT | 2,189.50 | $25.00 | $25.00 | $25.00 | $25.20 |
| 130 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 26 | $2,200.00 | $3,500.00 | $1,990.71 | $2,200.00 |
| 131 | Work zone increased penalties sign (614E12484) | EACH | 18 | $950.00 | $800.00 | $251.40 | $700.00 |
| 132 | Work zone crossover lighting system (614E12756) | EACH | 4 | $47,000 | $80,000 | $45,375 | $80,000 |
| 133 | Work zone raised pavement marker, as per plan (614E12801) | EACH | 5,265 | $33.00 | $45.00 | $41.00 | $45.00 |
| 134 | Barrier reflector, type 1 , bidirectional (614E13310) | EACH | 2,514 | $6.00 | $7.00 | $12.43 | $8.60 |
| 135 | Barrier reflector, type 1 , one way (614E13310) | EACH | 512 | $7.00 | $7.00 | $11.42 | $6.80 |
| 136 | Barrier reflector, type 2, one way (614E13312) | EACH | 29 | $9.00 | $18.00 | $11.07 | $24.00 |
| 137 | Object marker, one way (614E13350) | EACH | 1,769 | $13.00 | $17.00 | $18.92 | $18.50 |
| 138 | Portable changeable message sign (614E18600) | SNMT | 48 | $700.00 | $550.00 | $925.32 | $1,300.00 |
| 144 | Roads for maintaining traffic (615E10000) | LS | 1 | $575,000 | $300,000 | $150,000 | $800,000 |
| 145 | Pavement for maintaining traffic, class A (615E20000) | SY | 31,699 | $55.00 | $80.00 | $65.50 | $58.00 |
| 146 | Water (616E10000) | MGAL | 1,500 | $95.00 | $75.00 | $75.00 | $75.00 |
| 147 | Portable barrier, 50", as per plan (622E41011) | FT | 62,797 | $17.00 | $12.00 | $16.50 | $26.00 |
| 148 | Portable barrier, unanchored (622E41100) | FT | 25,209 | $16.00 | $7.00 | $10.50 | $20.00 |
| 149 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 180 | $600.00 | $475.00 | $750.00 | $1,000.00 |
| 150 | Work zone egress warning system (829E00100) | SNMT | 24 | $2,000.00 | $1,000.00 | $900.00 | $6,000.00 |
| 151 | Portable non-intrusive traffic sensor, class I (896E00010) | SNMT | 96 | $1,275.00 | $800.00 | $800.00 | $5,000.00 |
| 152 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $75,000 | $60,000 | $40,000 | $110,000 |
| 153 | Approach slab removed (202E22900) | SY | 200 | $40.00 | $85.00 | $43.00 | $95.00 |
| 154 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $16,500 | $1.00 | $7,500.00 | $400.00 |
| 155 | Unclassified excavation (503E21300) | LS | 1 | $2,000.00 | $25,000 | $9,500.00 | $50,000 |
| 156 | Epoxy coated steel reinforcement (509E10000) | LB | 13,723 | $1.25 | $1.50 | $1.10 | $1.50 |
| 157 | Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001) | LB | 700 | $1.00 | $1.50 | $1.40 | $1.50 |
| 158 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 136 | $35.00 | $32.00 | $35.00 | $50.00 |
| 159 | Class QC2 concrete, superstructure (511E34410) | CY | 43 | $1,750.00 | $1,800.00 | $1,625.00 | $2,500.00 |
| 160 | Class QC2 concrete, bridge deck (parapet) (511E34448) | CY | 9 | $1,450.00 | $1,200.00 | $1,725.00 | $2,500.00 |
| 161 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 47 | $47.00 | $26.68 | $20.00 | $26.68 |
| 162 | Sealing of concrete surfaces (non-epoxy), as per plan (512E10051) | SY | 161 | $65.00 | $32.74 | $56.00 | $32.74 |
| 163 | Type 2 waterproofing (512E33000) | SY | 5 | $150.00 | $33.00 | $161.00 | $95.00 |
| 164 | Armorless preformed joint seal (516E10010) | FT | 109 | $50.00 | $75.00 | $41.00 | $90.00 |
| 165 | 1/2" preformed expansion joint filler (516E13200) | SF | 113 | $12.00 | $6.00 | $7.00 | $15.00 |
| 166 | 1" preformed expansion joint filler (516E13600) | SF | 112 | $14.00 | $10.00 | $7.00 | $15.00 |
| 167 | Integral abutment expansion joint seal (516E14014) | FT | 127 | $45.00 | $29.00 | $30.00 | $46.00 |
| 168 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $60,000 | $30,000 | $31,050 | $60,000 |
| 169 | Porous backfill with geotextile fabric (518E21200) | CY | 53 | $140.00 | $130.00 | $159.00 | $175.00 |
| 170 | 6" perforated corrugated plastic pipe (518E40000) | FT | 126 | $7.00 | $10.00 | $11.00 | $15.00 |
| 171 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 100 | $12.00 | $22.00 | $19.00 | $15.00 |
| 172 | Reinforced concrete approach slabs (T=15") (526E25000) | SY | 297 | $325.00 | $370.00 | $355.00 | $395.00 |
| 173 | Type C installation (526E90030) | FT | 109 | $285.00 | $330.00 | $200.00 | $450.00 |
| 174 | Crushed aggregate slope protection (601E20000) | SY | 25 | $170.00 | $44.00 | $250.00 | $35.00 |
| 175 | Superplasticized dense concrete overlay using hydrodemolition (848E10200) | SY | 347 | $115.00 | $90.00 | $93.00 | $150.00 |
| 176 | Surface preparation using hydrodemolition (848E20000) | SY | 310 | $115.00 | $147.00 | $107.00 | $140.00 |
| 177 | Superplasticized dense concrete overlay (variable thickness), material only (848E30200) | CY | 2 | $275.00 | $278.00 | $248.00 | $264.00 |
| 178 | Hand chipping (848E50000) | SY | 4 | $170.00 | $750.00 | $256.00 | $150.00 |
| 179 | Test slab (848E50100) | LS | 1 | $2,900.00 | $4,800.00 | $2,400.00 | $10,000 |
| 180 | Existing concrete overlay removed, 1 3/4" thick (848E50320) | SY | 547 | $9.50 | $7.50 | $12.00 | $17.50 |
| 181 | Removal of debonded or deteriorated existing variable thickness concrete overlay (848E50340) | SY | 4 | $175.00 | $750.00 | $256.00 | $200.00 |
| 182 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $75,000 | $60,000 | $40,000 | $90,000 |
| 183 | Approach slab removed (202E22900) | SY | 200 | $40.00 | $85.00 | $43.00 | $80.00 |
| 184 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $15,000 | $1.00 | $7,500.00 | $400.00 |
| 185 | Unclassified excavation (503E21300) | LS | 1 | $2,000.00 | $25,000 | $9,500.00 | $30,000 |
| 186 | Epoxy coated steel reinforcement (509E10000) | LB | 13,723 | $1.25 | $1.50 | $1.10 | $1.25 |
| 187 | Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001) | LB | 700 | $1.00 | $1.50 | $1.40 | $1.25 |
| 188 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 136 | $35.00 | $32.00 | $35.00 | $30.00 |
| 189 | Class QC2 concrete, superstructure (511E34410) | CY | 43 | $1,750.00 | $1,800.00 | $1,630.00 | $2,000.00 |
| 190 | Class QC2 concrete, bridge deck (parapet) (511E34448) | CY | 9 | $1,450.00 | $1,200.00 | $1,725.00 | $2,000.00 |
| 191 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 47 | $36.00 | $26.68 | $20.00 | $26.68 |
| 192 | Sealing of concrete surfaces (non-epoxy), as per plan (512E10051) | SY | 161 | $65.00 | $32.74 | $56.00 | $32.74 |
| 193 | Type 2 waterproofing (512E33000) | SY | 5 | $150.00 | $33.00 | $161.00 | $80.00 |
| 194 | Armorless preformed joint seal (516E10010) | FT | 109 | $60.00 | $75.00 | $41.00 | $90.00 |
| 195 | 1/2" preformed expansion joint filler (516E13200) | SF | 113 | $12.00 | $6.00 | $7.00 | $10.00 |
| 196 | 1" preformed expansion joint filler (516E13600) | SF | 112 | $14.00 | $10.00 | $7.00 | $10.00 |
| 197 | Integral abutment expansion joint seal (516E14014) | FT | 127 | $45.00 | $29.00 | $30.00 | $46.00 |
| 198 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $60,000 | $30,000 | $31,250 | $40,000 |
| 199 | Porous backfill with geotextile fabric (518E21200) | CY | 53 | $140.00 | $130.00 | $159.00 | $125.00 |
| 200 | 6" perforated corrugated plastic pipe (518E40000) | FT | 126 | $8.00 | $10.00 | $11.00 | $10.00 |
| 201 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 100 | $12.00 | $22.00 | $19.00 | $10.00 |
| 202 | Reinforced concrete approach slabs (T=15") (526E25000) | SY | 297 | $325.00 | $370.00 | $355.00 | $325.00 |
| 203 | Type C installation (526E90030) | FT | 109 | $275.00 | $330.00 | $200.00 | $375.00 |
| 204 | Crushed aggregate slope protection (601E20000) | SY | 25 | $170.00 | $44.00 | $250.00 | $35.00 |
| 205 | Superplasticized dense concrete overlay using hydrodemolition (848E10200) | SY | 347 | $120.00 | $90.00 | $93.00 | $105.00 |
| 206 | Surface preparation using hydrodemolition (848E20000) | SY | 310 | $116.00 | $147.00 | $107.00 | $105.00 |
| 207 | Superplasticized dense concrete overlay (variable thickness), material only (848E30200) | CY | 2 | $275.00 | $278.00 | $248.00 | $264.00 |
| 208 | Hand chipping (848E50000) | SY | 4 | $170.00 | $750.00 | $256.00 | $125.00 |
| 209 | Existing concrete overlay removed, 1 3/4" thick (848E50320) | SY | 547 | $9.50 | $7.50 | $12.00 | $14.00 |
| 210 | Removal of debonded or deteriorated existing variable thickness concrete overlay (848E50340) | SY | 4 | $170.00 | $750.00 | $256.00 | $150.00 |
| 211 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $88,000 | $60,000 | $40,000 | $130,000 |
| 212 | Approach slab removed (202E22900) | SY | 200 | $40.00 | $85.00 | $43.00 | $95.00 |
| 213 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $14,000 | $1.00 | $7,550.00 | $400.00 |
| 214 | Unclassified excavation (503E21300) | LS | 1 | $2,000.00 | $25,000 | $9,500.00 | $50,000 |
| 215 | Epoxy coated steel reinforcement (509E10000) | LB | 11,558 | $1.24 | $1.50 | $1.20 | $1.50 |
| 216 | Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001) | LB | 800 | $1.00 | $1.50 | $1.40 | $1.50 |
| 217 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 146 | $32.00 | $32.00 | $36.50 | $50.00 |
| 218 | Class QC2 concrete, superstructure (511E34410) | CY | 49 | $1,550.00 | $1,800.00 | $1,575.00 | $2,500.00 |
| 219 | Class QC2 concrete, bridge deck (parapet) (511E34448) | CY | 9 | $1,500.00 | $1,200.00 | $1,725.00 | $2,500.00 |
| 220 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 50 | $36.00 | $25.49 | $26.00 | $25.49 |
| 221 | Sealing of concrete surfaces (non-epoxy), as per plan (512E10051) | SY | 216 | $65.00 | $28.95 | $54.00 | $28.95 |
| 222 | Type 2 waterproofing (512E33000) | SY | 5 | $150.00 | $33.00 | $161.00 | $95.00 |
| 223 | Armorless preformed joint seal (516E10010) | FT | 118 | $50.00 | $75.00 | $41.50 | $90.00 |
| 224 | 1/2" preformed expansion joint filler (516E13200) | SF | 122 | $14.00 | $6.00 | $8.00 | $15.00 |
| 225 | 1" preformed expansion joint filler (516E13600) | SF | 120 | $13.00 | $10.00 | $8.00 | $15.00 |
| 226 | Integral abutment expansion joint seal (516E14014) | FT | 136 | $45.00 | $29.00 | $30.50 | $46.00 |
| 227 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $60,000 | $30,000 | $31,250 | $60,000 |
| 228 | Porous backfill with geotextile fabric (518E21200) | CY | 57 | $130.00 | $130.00 | $160.00 | $175.00 |
| 229 | 6" perforated corrugated plastic pipe (518E40000) | FT | 135 | $7.00 | $10.00 | $12.00 | $15.00 |
| 230 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 100 | $14.00 | $22.00 | $19.00 | $15.00 |
| 231 | Reinforced concrete approach slabs (T=15") (526E25000) | SY | 297 | $325.00 | $370.00 | $359.00 | $395.00 |
| 232 | Type C installation (526E90030) | FT | 118 | $275.00 | $330.00 | $203.00 | $450.00 |
| 233 | Crushed aggregate slope protection (601E20000) | SY | 35 | $180.00 | $44.00 | $144.00 | $45.00 |
| 234 | Superplasticized dense concrete overlay using hydrodemolition (848E10200) | SY | 496 | $100.00 | $90.00 | $82.00 | $120.00 |
| 235 | Surface preparation using hydrodemolition (848E20000) | SY | 459 | $105.00 | $147.00 | $104.00 | $120.00 |
| 236 | Superplasticized dense concrete overlay (variable thickness), material only (848E30200) | CY | 3 | $275.00 | $278.00 | $279.00 | $264.00 |
| 237 | Hand chipping (848E50000) | SY | 5 | $135.00 | $750.00 | $214.00 | $250.00 |
| 238 | Existing concrete overlay removed, 1 3/4" thick (848E50320) | SY | 696 | $8.50 | $7.50 | $13.00 | $15.00 |
| 239 | Removal of debonded or deteriorated existing variable thickness concrete overlay (848E50340) | SY | 5 | $135.00 | $750.00 | $214.00 | $300.00 |
| 240 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $88,000 | $60,000 | $40,000 | $105,000 |
| 241 | Approach slab removed (202E22900) | SY | 200 | $40.00 | $85.00 | $43.25 | $80.00 |
| 242 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $14,000 | $1.00 | $7,550.00 | $400.00 |
| 243 | Unclassified excavation (503E21300) | LS | 1 | $2,000.00 | $25,000 | $9,500.00 | $30,000 |
| 244 | Epoxy coated steel reinforcement (509E10000) | LB | 11,558 | $1.24 | $1.50 | $1.20 | $1.25 |
| 245 | Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001) | LB | 800 | $1.00 | $1.50 | $1.40 | $1.25 |
| 246 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 146 | $32.00 | $32.00 | $36.50 | $30.00 |
| 247 | Class QC2 concrete, superstructure (511E34410) | CY | 49 | $1,550.00 | $1,800.00 | $1,580.00 | $1,900.00 |
| 248 | Class QC2 concrete, bridge deck (parapet) (511E34448) | CY | 9 | $1,500.00 | $1,200.00 | $1,725.00 | $1,900.00 |
| 249 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 50 | $36.00 | $25.49 | $26.00 | $25.49 |
| 250 | Sealing of concrete surfaces (non-epoxy), as per plan (512E10051) | SY | 216 | $65.00 | $28.95 | $53.50 | $28.95 |
| 251 | Type 2 waterproofing (512E33000) | SY | 5 | $150.00 | $33.00 | $161.00 | $80.00 |
| 252 | Armorless preformed joint seal (516E10010) | FT | 118 | $50.00 | $75.00 | $41.50 | $90.00 |
| 253 | 1/2" preformed expansion joint filler (516E13200) | SF | 122 | $14.00 | $6.00 | $7.60 | $10.00 |
| 254 | 1" preformed expansion joint filler (516E13600) | SF | 120 | $12.00 | $10.00 | $7.80 | $10.00 |
| 255 | Integral abutment expansion joint seal (516E14014) | FT | 136 | $45.00 | $29.00 | $30.50 | $46.00 |
| 256 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $60,000 | $30,000 | $31,250 | $40,000 |
| 257 | Porous backfill with geotextile fabric (518E21200) | CY | 57 | $130.00 | $130.00 | $159.00 | $125.00 |
| 258 | 6" perforated corrugated plastic pipe (518E40000) | FT | 135 | $7.00 | $10.00 | $11.75 | $10.00 |
| 259 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 100 | $14.00 | $22.00 | $18.50 | $10.00 |
| 260 | Reinforced concrete approach slabs (T=15") (526E25000) | SY | 297 | $325.00 | $370.00 | $358.00 | $325.00 |
| 261 | Type C installation (526E90030) | FT | 118 | $275.00 | $330.00 | $203.00 | $375.00 |
| 262 | Crushed aggregate slope protection (601E20000) | SY | 35 | $180.00 | $44.00 | $144.00 | $45.00 |
| 263 | Superplasticized dense concrete overlay using hydrodemolition (848E10200) | SY | 496 | $95.00 | $90.00 | $81.50 | $105.00 |
| 264 | Surface preparation using hydrodemolition (848E20000) | SY | 459 | $105.00 | $147.00 | $104.00 | $105.00 |
| 265 | Superplasticized dense concrete overlay (variable thickness), material only (848E30200) | CY | 3 | $275.00 | $278.00 | $279.00 | $264.00 |
| 266 | Hand chipping (848E50000) | SY | 5 | $135.00 | $750.00 | $214.00 | $250.00 |
| 267 | Existing concrete overlay removed, 1 3/4" thick (848E50320) | SY | 696 | $8.50 | $7.50 | $13.00 | $12.00 |
| 268 | Removal of debonded or deteriorated existing variable thickness concrete overlay (848E50340) | SY | 5 | $135.00 | $750.00 | $214.00 | $250.00 |
| 269 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $285,043 | $300,000 | $225,000 | $305,000 |
| 270 | CPM progress schedule (108E10000) | LS | 1 | $29,000 | $10,000 | $5,000.00 | $25,000 |
| 271 | Special - departments share facilitated partnering costs (111E10100) | EACH | 18,500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 272 | Maintaining traffic (614E11000) | LS | 1 | $1,856,500 | $2,111,800 | $1,887,000 | $1,130,000 |
| 273 | Field office, type C (619E16020) | MNTH | 30 | $6,250.00 | $6,000.00 | $5,000.00 | $2,600.00 |
| 274 | Construction layout stakes and surveying (623E10000) | LS | 1 | $575,000 | $400,000 | $142,400 | $400,000 |
| 275 | Mobilization (624E10000) | LS | 1 | $2,700,000 | $2,900,000 | $3,030,000 | $3,000,000 |
| 300 | Pavement for maintaining traffic, class B, as per plan (615E25001) | SY | 200 | $130.00 | $190.00 | $41.00 | $41.00 |
| 302 | Pavement for maintaining traffic, class B, as per plan (615E25001) | SY | 250 | $125.00 | $275.00 | $96.25 | $96.25 |
| 303 | Pavement for maintaining traffic, class B, as per plan (615E25001) | SY | 250 | $120.00 | $275.00 | $69.50 | $69.50 |
| 304 | Special - cable barrier, mow strip (606E55000) | FT | 29,780 | $15.30 | $21.00 | $22.50 | $29.00 |
| 305 | Work zone lane line, class I, 6", 648 (614E20366) | MI | 46.45 | $1,100.00 | $1,100.00 | $2,100.00 | $1,100.00 |
| 306 | Work zone edge line, class I, 6", 648 (614E22336) | MI | 80.98 | $1,984.00 | $1,984.00 | $4,100.00 | $1,984.00 |
| 307 | Work zone channelizing line, class I, 12", 648 (614E23150) | FT | 34,946 | $1.25 | $1.25 | $2.50 | $1.25 |
| 308 | Work zone dotted line, class I, 6", 648 (614E24142) | FT | 20,916 | $0.75 | $0.75 | $2.90 | $0.75 |
| 309 | Work zone transverse/diagonal line, class I, 648 (614E25120) | FT | 309 | $7.00 | $7.00 | $8.00 | $7.00 |
| 310 | Anti-segregation equipment (442E00100) | CY | 24,962 | $8.00 | $1.00 | $7.00 | $7.00 |
| 311 | Pavement for maintaining traffic, class B, as per plan (615E25001) | SY | 200 | $150.00 | $190.00 | $40.00 | $40.00 |
| 312 | Pavement for maintaining traffic, class B, as per plan (615E25001) | SY | 13,800 | $50.00 | $17.00 | $17.00 | $17.00 |
| 313 | Special - noise barrier panel removal and reuse (606E10720) | EACH | 3 | $1,800.00 | $8,000.00 | $2,700.00 | $10,000 |
| 314 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 26.59 | $650.00 | $650.00 | $880.00 | $650.00 |
| 315 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 27.48 | $860.00 | $860.00 | $970.00 | $860.00 |
| 316 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 10,738 | $1.00 | $1.00 | $0.70 | $1.00 |
| 317 | Work zone dotted line, class III, 6", 642 paint (614E24612) | FT | 5,251 | $0.85 | $0.85 | $0.50 | $0.85 |
| 318 | Portable changeable message sign, as per plan (896E00021) | SNMT | 24 | $1,000.00 | $600.00 | $700.00 | $1,250.00 |
| 319 | Partial depth pavement repair (asphalt concrete base), as per plan (251E01043) | CY | 500 | $450.00 | $425.00 | $389.00 | $389.00 |
| 320 | Ground rod (625E32000) | EACH | 4 | $265.00 | $425.00 | $265.00 | $500.00 |
| 321 | Rigid overhead sign support foundation (630E84510) | EACH | 4 | $10,750 | $10,750 | $10,750 | $13,450 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 30, 2025. Compiled by Mirage Metrics.