ODOT contract 250557 bid tabulation
HAM-CR 14-03.49 Dry Fork Rd (INTERCHANGE). Let by Ohio DOT on December 18, 2025, HAM. 4 bids received; low bid $8,255,027 by Eagle Bridge Co, -3.3% against the engineer's estimate of $8,537,000.
- Owner
- Ohio DOT
- Letting
- 18 DEC 2025
- Pay items
- 242
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Eagle Bridge Co | $8,255,027 | Low | -3.0% |
| 2 | Complete General Construction Company | $8,556,751 | +4.0% | 0.0% |
| 3 | Sunesis Construction Co | $9,156,077 | +11% | +7.0% |
| 4 | Beaty Construction Inc | $9,895,710 | +20% | +16% |
Engineer's estimate: $8,537,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Eagle Bridge Co | 2. Complete General Construction Company | 3. Sunesis Construction Co | 4. Beaty Construction Inc |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $25,000 | $10,000 | $23,000 | $100,000 |
| 2 | Pavement removed (202E23000) | SY | 8,077 | $12.50 | $20.00 | $29.96 | $14.25 |
| 3 | Concrete barrier removed (202E30700) | FT | 216 | $30.00 | $55.00 | $33.60 | $60.00 |
| 4 | Guardrail removed (202E38000) | FT | 1,894 | $4.50 | $4.50 | $4.50 | $4.50 |
| 5 | Anchor assembly removed, as per plan (202E42207) | EACH | 10 | $500.00 | $600.00 | $695.42 | $150.00 |
| 6 | Bridge terminal assembly removed, as per plan (202E47001) | EACH | 4 | $125.00 | $600.00 | $125.00 | $125.00 |
| 7 | Removal misc.: loop detectors (202E98100) | EACH | 7 | $20.00 | $300.00 | $20.00 | $20.00 |
| 8 | Excavation (203E10000) | CY | 2,400 | $10.00 | $28.00 | $15.35 | $18.50 |
| 9 | Embankment (203E20000) | CY | 7,600 | $8.00 | $32.00 | $17.45 | $25.00 |
| 10 | Subgrade compaction (204E10000) | SY | 11,692 | $3.00 | $3.25 | $3.58 | $1.00 |
| 11 | Excavation of subgrade (204E13000) | CY | 3,778 | $12.00 | $30.00 | $27.18 | $20.25 |
| 12 | Granular material, type C (204E30020) | CY | 3,778 | $70.00 | $65.00 | $83.35 | $92.50 |
| 13 | Proof rolling (204E45000) | HR | 4 | $150.00 | $330.00 | $229.50 | $560.00 |
| 14 | Geotextile fabric (204E50000) | SY | 11,327 | $1.75 | $2.00 | $1.81 | $2.50 |
| 15 | Guardrail, type MGS (606E15050) | FT | 1,162.50 | $23.55 | $23.55 | $23.55 | $23.55 |
| 16 | Guardrail, type MGS with long posts (606E15100) | FT | 250 | $28.40 | $28.40 | $28.40 | $28.40 |
| 17 | Guardrail, type MGS half post spacing with long posts (606E15200) | FT | 50 | $43.70 | $43.70 | $43.70 | $43.70 |
| 18 | Anchor assembly, MGS type E, MASH 2016 (606E26150) | EACH | 6 | $2,375.00 | $2,375.00 | $2,375.00 | $2,375.00 |
| 19 | Anchor assembly, MGS type T (606E26550) | EACH | 8 | $1,150.00 | $1,150.00 | $1,150.00 | $1,150.00 |
| 20 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 4 | $2,375.00 | $2,375.00 | $2,375.00 | $2,375.00 |
| 21 | MGS bridge terminal assembly, type 2 (606E35102) | EACH | 2 | $400.00 | $400.00 | $400.00 | $400.00 |
| 22 | Impact attenuator, type 2 (bidirectional), 36" (606E60028) | EACH | 2 | $36,500 | $33,950 | $33,950 | $42,000 |
| 23 | 5" concrete walk (608E12000) | SF | 949 | $12.00 | $9.00 | $12.39 | $11.75 |
| 24 | Curb ramp (608E52000) | SF | 315 | $23.00 | $26.00 | $26.41 | $30.50 |
| 25 | Concrete barrier, single slope, type B (622E10060) | FT | 158 | $375.00 | $425.00 | $550.00 | $400.00 |
| 26 | Concrete barrier, single slope, type D (622E10160) | FT | 198 | $150.00 | $260.00 | $225.00 | $183.25 |
| 27 | Concrete barrier end section, type D (622E25000) | EACH | 2 | $4,500.00 | $5,000.00 | $4,800.00 | $7,110.00 |
| 28 | Concrete barrier, end anchorage, reinforced, type B (622E25004) | EACH | 2 | $10,000 | $9,000.00 | $4,800.00 | $13,900 |
| 29 | Concrete barrier, end anchorage, reinforced, type D (622E25050) | EACH | 2 | $4,500.00 | $4,500.00 | $4,800.00 | $5,365.00 |
| 30 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 4 | $155.00 | $190.00 | $134.09 | $389.00 |
| 31 | Rock channel protection, type C with filter (601E32200) | CY | 1 | $225.00 | $555.00 | $559.45 | $640.00 |
| 32 | Topsoil (659E00300) | CY | 1,010 | $5.00 | $37.00 | $22.48 | $68.00 |
| 33 | Seeding and mulching (659E10000) | SY | 9,097 | $2.00 | $1.35 | $3.71 | $1.35 |
| 34 | Repair seeding and mulching (659E14000) | SY | 455 | $2.00 | $1.00 | $2.20 | $1.00 |
| 35 | Commercial fertilizer (659E20000) | TON | 1.23 | $1,250.00 | $1,500.00 | $1,400.00 | $1,500.00 |
| 36 | Lime (659E31000) | ACRE | 1.88 | $10.00 | $200.00 | $450.00 | $200.00 |
| 37 | Water (659E35000) | MGAL | 49 | $5.00 | $1.00 | $50.00 | $1.00 |
| 38 | Mowing (659E40000) | MSF | 21 | $15.00 | $4.00 | $50.00 | $1.00 |
| 39 | Storm water pollution prevention plan (832E15000) | LS | 1 | $4,250.00 | $2,500.00 | $3,800.00 | $4,025.00 |
| 40 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $15,000 | $9,000.00 | $9,240.00 | $16,120 |
| 41 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $13,500 | $11,673 | $11,673 | $2,800.00 |
| 42 | Erosion control (832E30000) | EACH | 30,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 43 | Concrete masonry (602E20000) | CY | 2.10 | $2,500.00 | $5,000.00 | $3,865.17 | $2,800.00 |
| 44 | 6" base pipe underdrains (605E14000) | FT | 4,082 | $11.00 | $18.00 | $18.78 | $22.50 |
| 45 | 12" conduit, type C (611E04600) | FT | 227 | $80.00 | $115.00 | $67.86 | $135.00 |
| 46 | 30" conduit, type C (611E13600) | FT | 105 | $125.00 | $195.00 | $134.53 | $235.00 |
| 47 | Conduit, misc.: 33" conduit, type C (611E97400) | FT | 12 | $325.00 | $420.00 | $363.32 | $625.00 |
| 48 | Catch basin, no. 3A (611E98180) | EACH | 4 | $4,500.00 | $4,400.00 | $4,377.64 | $9,900.00 |
| 49 | Catch basin, no. 2-2A (611E98450) | EACH | 1 | $2,300.00 | $2,400.00 | $2,417.99 | $5,750.00 |
| 50 | Manhole, no. 3 (611E99574) | EACH | 1 | $4,700.00 | $6,000.00 | $4,064.92 | $6,850.00 |
| 51 | Precast reinforced concrete outlet (611E99710) | EACH | 2 | $350.00 | $530.00 | $451.30 | $830.00 |
| 52 | Pavement planing, asphalt concrete, 3.75" depth (254E01000) | SY | 1,015 | $9.00 | $15.00 | $16.03 | $15.00 |
| 53 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 754 | $295.00 | $270.00 | $270.00 | $270.00 |
| 54 | Aggregate base (304E20000) | CY | 1,953 | $95.00 | $100.00 | $92.56 | $104.00 |
| 55 | 9" concrete base, class QC 1P (305E13010) | SY | 124 | $139.50 | $215.00 | $157.44 | $434.75 |
| 56 | Non-tracking tack coat (407E20000) | GAL | 755 | $1.00 | $5.00 | $5.00 | $5.00 |
| 57 | Asphalt concrete surface course, 12.5 MM, type A (448) (442E20000) | CY | 244 | $360.00 | $430.00 | $430.00 | $430.00 |
| 58 | Asphalt concrete intermediate course, 19 MM, type A (448) (442E20200) | CY | 407 | $320.00 | $385.00 | $385.00 | $385.00 |
| 59 | 12" non-reinforced concrete pavement, class QC 1P (452E15010) | SY | 6,323 | $135.00 | $105.00 | $134.35 | $132.35 |
| 60 | Combination curb and gutter, type 4, as per plan (609E23001) | FT | 75 | $44.00 | $85.00 | $44.01 | $110.00 |
| 61 | Curb, type 6 (609E26000) | FT | 426 | $35.00 | $38.00 | $35.71 | $66.50 |
| 62 | Connection, fused pull apart (625E00450) | EACH | 32 | $145.10 | $130.00 | $145.10 | $145.10 |
| 63 | Connection, unfused pull apart (625E00460) | EACH | 22 | $145.10 | $125.00 | $145.10 | $145.10 |
| 64 | Connection, unfused permanent (625E00480) | EACH | 30 | $124.10 | $115.00 | $124.10 | $124.10 |
| 65 | Light pole, conventional, as per plan, AT15B36 (625E10491) | EACH | 14 | $3,655.00 | $2,900.00 | $3,655.00 | $3,655.00 |
| 66 | Light pole foundation, 24" X 6' deep (625E14000) | EACH | 14 | $1,830.00 | $1,800.00 | $1,830.00 | $1,830.00 |
| 67 | No. 2/0 AWG 2400 volt distribution cable (625E22910) | FT | 330 | $10.55 | $11.00 | $10.55 | $10.55 |
| 68 | No. 2 AWG 600 volt distribution cable (625E23100) | FT | 1,965 | $4.70 | $5.00 | $4.70 | $4.70 |
| 69 | No. 10 AWG pole and bracket cable (625E23400) | FT | 2,826 | $1.90 | $2.50 | $1.90 | $1.90 |
| 70 | 1-1/2" duct cable with three no. 2 AWG 2400 volt cables (625E24330) | FT | 6,080 | $15.70 | $16.50 | $15.70 | $15.70 |
| 71 | Conduit, 2", 725.04 (625E25400) | FT | 131 | $22.10 | $27.00 | $22.10 | $22.10 |
| 72 | Conduit, jacked or drilled, 725.04, 3" (625E25902) | FT | 544 | $68.85 | $58.00 | $68.85 | $68.85 |
| 73 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 14 | $435.00 | $525.00 | $435.00 | $435.00 |
| 74 | Trench, 24" deep (625E29002) | FT | 6,454 | $12.15 | $9.00 | $12.15 | $12.15 |
| 75 | Pull box, 725.08, 18" (625E30700) | EACH | 9 | $973.00 | $1,250.00 | $973.00 | $973.00 |
| 76 | Ground rod (625E32000) | EACH | 28 | $256.00 | $300.00 | $256.00 | $256.00 |
| 77 | Power service, as per plan (625E34001) | EACH | 1 | $13,114 | $11,500 | $13,114 | $13,114 |
| 78 | Underground warning marking tape (625E36010) | FT | 6,211 | $1.60 | $1.85 | $1.60 | $1.60 |
| 79 | Arc flash calculations and label, LCC (625E76000) | EACH | 1 | $4,140.00 | $3,100.00 | $4,140.00 | $4,140.00 |
| 80 | RPM (621E00100) | EACH | 97 | $57.40 | $76.00 | $57.40 | $57.40 |
| 81 | Barrier reflector, type 2, one-way (626E00110) | EACH | 17 | $10.00 | $10.00 | $10.00 | $10.00 |
| 82 | Ground mounted support, no. 3 post (630E03100) | FT | 165 | $16.00 | $27.00 | $16.00 | $16.00 |
| 83 | Ground mounted structural beam support, W6X9 (630E06500) | FT | 43.40 | $45.00 | $92.00 | $45.00 | $45.00 |
| 84 | One way support, no. 3 post (630E08004) | FT | 162 | $18.00 | $27.00 | $18.00 | $18.00 |
| 85 | Street name sign support, no. 4 post (630E08530) | FT | 16 | $29.00 | $36.00 | $29.00 | $29.00 |
| 86 | Sign post reflector (630E08600) | EACH | 13 | $59.50 | $75.00 | $59.50 | $59.50 |
| 87 | Breakaway structural beam connection (630E09000) | EACH | 2 | $460.00 | $724.00 | $460.00 | $460.00 |
| 88 | Sign hanger assembly, mast arm (630E79100) | EACH | 6 | $355.00 | $503.00 | $355.00 | $355.00 |
| 89 | Sign, flat sheet (630E80100) | SF | 271.40 | $20.00 | $29.00 | $20.00 | $20.00 |
| 90 | Sign, ground mounted extrusheet (630E80200) | SF | 344 | $31.00 | $26.00 | $31.00 | $31.00 |
| 91 | Sign, double faced, street name (630E80500) | EACH | 2 | $90.00 | $296.00 | $90.00 | $90.00 |
| 92 | Ground mounted structural beam support foundation (630E84500) | EACH | 2 | $1,550.00 | $1,140.00 | $1,550.00 | $1,550.00 |
| 93 | Removal of ground mounted sign and disposal (630E84900) | EACH | 23 | $25.00 | $17.00 | $25.00 | $25.00 |
| 94 | Removal of ground mounted sign and reerection (630E85100) | EACH | 1 | $1,750.00 | $75.00 | $1,750.00 | $1,750.00 |
| 95 | Removal of ground mounted major sign and disposal (630E85400) | EACH | 5 | $225.00 | $235.00 | $225.00 | $225.00 |
| 96 | Removal of ground mounted post support and disposal (630E86002) | EACH | 17 | $50.00 | $22.00 | $50.00 | $50.00 |
| 97 | Removal of ground mounted structural beam support (630E86102) | EACH | 10 | $175.00 | $496.00 | $175.00 | $175.00 |
| 98 | Edge line, 6" (644E00104) | MI | 0.31 | $4,805.00 | $7,195.00 | $4,805.00 | $4,805.00 |
| 99 | Center line (644E00300) | MI | 0.20 | $7,390.00 | $8,555.00 | $7,390.00 | $7,390.00 |
| 100 | Channelizing line, 12" (644E00404) | FT | 733 | $2.75 | $1.90 | $2.75 | $2.75 |
| 101 | Stop line (644E00500) | FT | 134 | $9.25 | $5.50 | $9.25 | $9.25 |
| 102 | Transverse/diagonal line (644E00700) | FT | 358 | $9.25 | $5.25 | $9.25 | $9.25 |
| 103 | Chevron marking (644E00720) | FT | 85 | $9.25 | $5.25 | $9.25 | $9.25 |
| 104 | Island marking (644E00900) | SF | 284 | $5.50 | $5.00 | $5.50 | $5.50 |
| 105 | Lane arrow (644E01300) | EACH | 2 | $156.00 | $200.00 | $156.00 | $156.00 |
| 106 | Dotted line, 6" (644E01510) | FT | 504 | $3.70 | $1.85 | $3.70 | $3.70 |
| 107 | Edge line, 6" (646E10010) | MI | 0.44 | $3,600.00 | $8,170.00 | $3,600.00 | $3,600.00 |
| 108 | Lane line, 6" (646E10110) | MI | 0.15 | $2,000.00 | $3,915.00 | $2,000.00 | $2,000.00 |
| 109 | Center line (646E10200) | MI | 0.10 | $7,000.00 | $10,320 | $7,000.00 | $7,000.00 |
| 110 | Channelizing line, 12" (646E10310) | FT | 1,118 | $2.70 | $2.00 | $2.70 | $2.70 |
| 111 | Stop line (646E10400) | FT | 144 | $8.80 | $13.50 | $8.80 | $8.80 |
| 112 | Crosswalk line, 24" (646E10520) | FT | 136 | $4.45 | $12.50 | $4.45 | $4.45 |
| 113 | Transverse/diagonal line (646E10600) | FT | 75 | $8.80 | $13.00 | $8.80 | $8.80 |
| 114 | Chevron marking (646E10620) | FT | 70 | $8.80 | $13.00 | $8.80 | $8.80 |
| 115 | Lane arrow (646E20300) | EACH | 19 | $150.00 | $250.00 | $150.00 | $150.00 |
| 116 | Wrong way arrow (646E20320) | EACH | 3 | $220.00 | $450.00 | $220.00 | $220.00 |
| 117 | Lane reduction arrow (646E20350) | EACH | 2 | $290.00 | $550.00 | $290.00 | $290.00 |
| 118 | Dotted line (646E20500) | FT | 185 | $3.50 | $1.75 | $3.50 | $3.50 |
| 119 | Bracket arm, 20', as per plan (625E18401) | EACH | 4 | $1,282.00 | $1,350.00 | $1,282.00 | $1,282.00 |
| 120 | No. 8 AWG 600 volt distribution cable (625E23304) | FT | 465 | $2.80 | $2.50 | $2.80 | $2.80 |
| 121 | Conduit, 2", 725.051 (625E25408) | FT | 203 | $6.20 | $14.00 | $6.20 | $6.20 |
| 122 | Conduit, 4", 725.051 (625E25604) | FT | 80 | $12.65 | $24.00 | $12.65 | $12.65 |
| 123 | Conduit, jacked or drilled, 725.052, 4" (625E25908) | FT | 661 | $42.40 | $41.00 | $42.40 | $42.40 |
| 124 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 4 | $435.00 | $525.00 | $435.00 | $435.00 |
| 125 | Pull box, 725.08, 24" (625E30706) | EACH | 10 | $1,135.00 | $1,600.00 | $1,135.00 | $1,135.00 |
| 126 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate (632E05006) | EACH | 21 | $1,124.00 | $1,050.00 | $1,124.00 | $1,124.00 |
| 127 | Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate (632E05086) | EACH | 1 | $1,807.00 | $1,700.00 | $1,807.00 | $1,807.00 |
| 128 | Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731) | EACH | 4 | $689.00 | $800.00 | $689.00 | $689.00 |
| 129 | Accessible pedestrian pushbutton (632E20750) | EACH | 4 | $845.50 | $1,200.00 | $845.50 | $845.50 |
| 130 | Covering of vehicular signal head (632E25000) | EACH | 22 | $37.25 | $40.00 | $37.25 | $37.25 |
| 131 | Covering of pedestrian signal head (632E25010) | EACH | 4 | $37.25 | $35.00 | $37.25 | $37.25 |
| 132 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 323 | $2.70 | $3.00 | $2.70 | $2.70 |
| 133 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 2,318 | $3.10 | $3.50 | $3.10 | $3.10 |
| 134 | Signal support foundation, as per plan (632E64011) | EACH | 4 | $7,733.00 | $12,000 | $7,733.00 | $7,733.00 |
| 135 | Pedestal foundation (632E64020) | EACH | 7 | $1,435.00 | $1,600.00 | $1,435.00 | $1,435.00 |
| 136 | Loop detector lead-in cable, 2 conductor, no. 14 AWG (632E65300) | FT | 303 | $2.10 | $2.25 | $2.10 | $2.10 |
| 137 | Power cable, 3 conductor, no. 6 AWG (632E68300) | FT | 152 | $4.95 | $6.00 | $4.95 | $4.95 |
| 138 | Service cable, 3 conductor, no. 6 AWG (632E69800) | FT | 299 | $4.95 | $6.00 | $4.95 | $4.95 |
| 139 | Power service, as per plan (632E70001) | EACH | 1 | $5,600.00 | $4,500.00 | $5,600.00 | $5,600.00 |
| 140 | Power service, as per plan (632E70001) | EACH | 1 | $4,430.00 | $3,100.00 | $4,430.00 | $4,430.00 |
| 141 | Combination signal support, type TC-81.22, design 13 (632E79140) | EACH | 2 | $21,660 | $20,400 | $21,660 | $21,660 |
| 142 | Combination signal support, misc.:type TC-12.31 DE (632E81700) | EACH | 1 | $39,145 | $40,200 | $39,145 | $39,145 |
| 143 | Combination signal support, misc.:type TC-12.31 DE (632E81700) | EACH | 1 | $46,460 | $43,400 | $46,460 | $46,460 |
| 144 | Pedestal, 8', transformer base (632E89900) | EACH | 3 | $838.00 | $1,050.00 | $838.00 | $838.00 |
| 145 | Pedestal, misc.: pedestal, 15', transformer base, (632E90010) | EACH | 4 | $2,170.00 | $1,900.00 | $2,170.00 | $2,170.00 |
| 146 | Removal of traffic signal installation, as per plan (632E90101) | EACH | 2 | $5,260.00 | $3,600.00 | $5,260.00 | $5,260.00 |
| 147 | Signalization, misc.: vacuum excavation of foundat (632E90400) | EACH | 2 | $3,170.00 | $6,100.00 | $3,170.00 | $3,170.00 |
| 148 | Cabinet, type 332, as per plan (633E65521) | EACH | 2 | $9,453.00 | $18,500 | $9,453.00 | $9,453.00 |
| 149 | Cabinet foundation, as per plan (633E67101) | EACH | 2 | $1,600.00 | $4,200.00 | $1,600.00 | $1,600.00 |
| 150 | Controller work pad (633E67200) | EACH | 2 | $1,115.00 | $2,000.00 | $1,115.00 | $1,115.00 |
| 151 | Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001) | EACH | 2 | $7,990.00 | $7,900.00 | $7,990.00 | $7,990.00 |
| 152 | CCTV IP-camera system, dome-type (809E60000) | EACH | 2 | $7,780.00 | $7,800.00 | $7,780.00 | $7,780.00 |
| 153 | Advance radar detection, as per plan (809E69001) | EACH | 2 | $9,200.00 | $8,500.00 | $9,200.00 | $9,200.00 |
| 154 | Stop line radar detection, as per plan (809E69101) | EACH | 4 | $8,870.00 | $7,500.00 | $8,870.00 | $8,870.00 |
| 155 | Atc controller, as per plan (809E69123) | EACH | 2 | $1,225.00 | $800.00 | $1,225.00 | $1,225.00 |
| 156 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 40 | $150.00 | $95.00 | $85.00 | $95.00 |
| 157 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 4 | $2,193.00 | $2,200.00 | $2,192.99 | $2,425.00 |
| 158 | Detour signing (614E12420) | LS | 1 | $12,500 | $12,750 | $12,755 | $25,000 |
| 159 | Barrier reflector, type 3, one way (614E13314) | EACH | 22 | $15.00 | $11.63 | $11.63 | $11.63 |
| 160 | Object marker, one way (614E13350) | EACH | 22 | $20.00 | $19.14 | $19.14 | $19.14 |
| 161 | Portable changeable message sign, as per plan (614E18601) | SNMT | 12 | $700.00 | $909.00 | $908.65 | $1,500.00 |
| 162 | Work zone lane line, class I, 4" (614E20000) | MI | 0.30 | $340.00 | $275.00 | $340.00 | $275.00 |
| 163 | Work zone lane line, class III, 4", 642 paint (614E20550) | MI | 0.15 | $340.00 | $275.00 | $340.00 | $275.00 |
| 164 | Work zone center line, class I (614E21000) | MI | 0.60 | $760.00 | $1,045.00 | $760.00 | $1,045.00 |
| 165 | Work zone center line, class III, 642 paint (614E21550) | MI | 0.30 | $760.00 | $1,045.00 | $760.00 | $1,045.00 |
| 166 | Work zone edge line, class I, 4", 642 paint (614E22100) | MI | 2.08 | $505.00 | $605.00 | $505.00 | $605.00 |
| 167 | Work zone edge line, class III, 4", 642 paint (614E22350) | MI | 1.04 | $505.00 | $605.00 | $505.00 | $605.00 |
| 168 | Work zone channelizing line, class I, 8" (614E23000) | FT | 3,702 | $0.65 | $0.55 | $0.65 | $0.55 |
| 169 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 1,851 | $0.65 | $0.55 | $0.65 | $0.55 |
| 170 | Work zone dotted line, class I (614E24000) | FT | 1,382 | $1.25 | $0.45 | $1.25 | $0.45 |
| 171 | Work zone dotted line, class III, 4", 642 paint (614E24610) | FT | 691 | $1.25 | $0.45 | $1.25 | $0.45 |
| 172 | Work zone transverse/diagonal line, class I (614E25000) | FT | 1,176 | $1.50 | $3.25 | $1.50 | $3.25 |
| 173 | Work zone transverse/diagonal line, class III, 642 paint (614E25620) | FT | 588 | $1.50 | $3.25 | $1.50 | $3.25 |
| 174 | Work zone stop line, class I (614E26000) | FT | 556 | $2.10 | $3.50 | $2.10 | $3.50 |
| 175 | Work zone stop line, class III, 642 paint (614E26610) | FT | 278 | $2.10 | $3.50 | $2.10 | $3.50 |
| 176 | Work zone crosswalk line, class I, 12" (614E27010) | FT | 240 | $1.05 | $3.00 | $1.05 | $3.00 |
| 177 | Work zone crosswalk line, class III, 12", 642 paint (614E27250) | FT | 120 | $1.05 | $3.00 | $1.05 | $3.00 |
| 178 | Work zone arrow, class I (614E30000) | EACH | 52 | $25.00 | $75.00 | $25.00 | $75.00 |
| 179 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 26 | $25.00 | $75.00 | $25.00 | $75.00 |
| 180 | Work zone island marking, class I (614E32700) | SF | 568 | $0.85 | $3.00 | $0.85 | $3.00 |
| 181 | Work zone island marking, class III, 642 paint (614E32800) | SF | 284 | $0.85 | $3.00 | $0.85 | $3.00 |
| 182 | Water (616E10000) | MGAL | 81 | $10.00 | $100.00 | $14.08 | $14.00 |
| 183 | Portable barrier, unanchored (622E41100) | FT | 1,245 | $30.00 | $36.68 | $36.68 | $37.25 |
| 184 | Portable barrier, anchored (622E41110) | FT | 300 | $45.00 | $42.15 | $42.15 | $44.00 |
| 185 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $225,000 | $200,000 | $240,236 | $325,000 |
| 186 | Approach slab removed (202E22900) | SY | 133 | $45.00 | $55.00 | $34.10 | $42.75 |
| 187 | Wearing course removed (202E23500) | SY | 133 | $11.00 | $15.00 | $6.31 | $5.00 |
| 188 | Removal misc.: portions of structure removed, bulb (202E98200) | FT | 499 | $45.00 | $22.00 | $1.81 | $33.00 |
| 189 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $75,000 | $95,000 | $1.41 | $125,000 |
| 190 | Unclassified excavation (503E21300) | LS | 1 | $75,000 | $100,000 | $150,987 | $135,000 |
| 191 | Pile driving equipment mobilization (505E11100) | LS | 1 | $40,000 | $25,000 | $24,681 | $85,000 |
| 192 | 12" cast-in-place reinforced concrete piles, driven (507E00500) | FT | 1,760 | $6.00 | $10.00 | $41.63 | $72.50 |
| 193 | 12" cast-in-place reinforced concrete piles, furnished (507E00550) | FT | 2,140 | $100.00 | $80.00 | $60.69 | $40.00 |
| 194 | Epoxy coated steel reinforcement (509E10000) | LB | 223,132 | $1.40 | $1.40 | $1.48 | $1.40 |
| 195 | Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001) | LB | 500 | $1.00 | $1.44 | $5.75 | $1.25 |
| 196 | Galvanized steel reinforcement (509E26000) | LB | 4,763 | $2.00 | $2.09 | $2.36 | $2.00 |
| 197 | No. 4 deformed GFRP reinforcement (509E30020) | FT | 4,256 | $1.90 | $1.63 | $1.76 | $0.95 |
| 198 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 238 | $35.00 | $16.00 | $20.05 | $35.00 |
| 199 | Semi-integral diaphragm guide (511E33500) | EACH | 2 | $6,500.00 | $3,500.00 | $4,075.51 | $4,600.00 |
| 200 | Class QC2 concrete with QC/QA, bridge deck (511E34446) | CY | 631 | $940.00 | $1,000.00 | $1,371.07 | $1,125.00 |
| 201 | Class QC2 concrete with QC/QA, bridge deck (parapet) (511E34450) | CY | 45 | $825.00 | $950.00 | $939.73 | $715.00 |
| 202 | Class QC1 concrete with QC/QA, pier above footings (511E41012) | CY | 158 | $1,250.00 | $1,100.00 | $1,986.83 | $1,725.00 |
| 203 | Class QC1 concrete with QC/QA, abutment not including footing (511E44112) | CY | 67 | $1,250.00 | $1,300.00 | $1,102.28 | $1,525.00 |
| 204 | Class QC1 concrete with QC/QA, footing (511E46512) | CY | 130 | $750.00 | $600.00 | $923.82 | $1,025.00 |
| 205 | Class QC2 concrete with QC/QA, sidewalk (511E51512) | CY | 57 | $700.00 | $550.00 | $700.84 | $660.00 |
| 206 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 222 | $16.00 | $16.00 | $16.00 | $16.00 |
| 207 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 1,059 | $25.50 | $25.50 | $25.50 | $25.50 |
| 208 | Concrete repair by epoxy injection (512E10600) | FT | 100 | $65.00 | $85.00 | $60.00 | $85.00 |
| 209 | Structural steel members, level 3 (513E10260) | LB | 268,700 | $3.10 | $2.90 | $3.85 | $3.25 |
| 210 | Welded stud shear connectors (513E20000) | EACH | 8,952 | $4.40 | $4.70 | $4.70 | $4.40 |
| 211 | Surface preparation of existing structural steel (514E00050) | SF | 4,400 | $25.00 | $30.00 | $30.26 | $32.00 |
| 212 | Field painting of existing structural steel, prime coat (514E00056) | SF | 4,400 | $18.00 | $14.00 | $14.12 | $10.00 |
| 213 | Field painting structural steel, intermediate coat (514E00060) | SF | 19,680 | $10.00 | $8.00 | $8.07 | $5.00 |
| 214 | Field painting structural steel, finish coat (514E00066) | SF | 19,680 | $7.50 | $5.50 | $5.55 | $5.00 |
| 215 | Grinding fins, tears, slivers on existing structural steel (514E00504) | MNHR | 10 | $200.00 | $200.00 | $201.76 | $170.00 |
| 216 | Final inspection repair (514E10000) | EACH | 9 | $200.00 | $200.00 | $201.76 | $250.00 |
| 217 | Field painting of damaged structural steel, as per plan (514E20001) | SF | 56 | $250.00 | $250.00 | $252.20 | $145.00 |
| 218 | Field painting, misc.: coating of beam ends (514E27700) | SF | 251 | $140.00 | $140.00 | $141.23 | $110.00 |
| 219 | Armorless preformed joint seal (516E10010) | FT | 148 | $50.00 | $85.00 | $45.51 | $38.00 |
| 220 | 1" preformed expansion joint filler (516E13600) | SF | 13 | $8.00 | $16.00 | $7.33 | $9.00 |
| 221 | 2" preformed expansion joint filler (516E13900) | SF | 86 | $15.00 | $15.00 | $10.80 | $13.00 |
| 222 | Semi-integral abutment expansion joint seal (516E14020) | FT | 171 | $45.00 | $48.00 | $53.90 | $63.25 |
| 223 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44201) | EACH | 18 | $2,100.00 | $1,700.00 | $2,308.52 | $1,850.00 |
| 224 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44201) | EACH | 27 | $1,675.00 | $1,300.00 | $1,717.56 | $1,425.00 |
| 225 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $75,000 | $60,310 | $70,680 | $60,000 |
| 226 | Railing (concrete parapet with twin steel tube railing and vandal protection fence) (517E75122) | FT | 300 | $300.00 | $485.00 | $377.46 | $313.25 |
| 227 | Porous backfill with geotextile fabric (518E21200) | CY | 288 | $125.00 | $130.00 | $90.59 | $160.00 |
| 228 | 6" perforated corrugated plastic pipe (518E40000) | FT | 180 | $14.00 | $12.00 | $2.23 | $9.75 |
| 229 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 100 | $40.00 | $30.00 | $43.66 | $34.75 |
| 230 | Patching concrete structure, as per plan (519E11101) | SF | 100 | $140.00 | $185.00 | $185.00 | $185.00 |
| 231 | Reinforced concrete approach slabs with QC/QA (T=1 (526E25010) | SY | 411 | $350.00 | $360.00 | $340.59 | $370.00 |
| 232 | Type C installation (526E90030) | FT | 148 | $250.00 | $265.00 | $220.04 | $340.00 |
| 233 | Crushed aggregate slope protection (601E20000) | SY | 271 | $35.00 | $100.00 | $37.93 | $87.00 |
| 234 | Vandal protection fence, 6' straight, coated fabric (607E39900) | FT | 249 | $137.50 | $137.50 | $137.50 | $137.50 |
| 235 | Vandal protection fence, 12' curved, coated fabric (607E39930) | FT | 249 | $170.00 | $170.00 | $170.00 | $170.00 |
| 236 | Structure grounding system (625E33000) | EACH | 1 | $8,800.00 | $18,000 | $8,800.00 | $8,800.00 |
| 237 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $70,000 | $43,000 | $40,439 | $43,000 |
| 238 | Maintaining traffic (614E11000) | LS | 1 | $75,000 | $155,000 | $70,261 | $594,994 |
| 239 | Field office, type C, as per plan (619E16021) | MNTH | 18 | $3,750.00 | $4,300.00 | $1,987.78 | $5,575.00 |
| 240 | Construction layout stakes and surveying (623E10000) | LS | 1 | $30,000 | $44,000 | $103,750 | $175,000 |
| 241 | Mobilization (624E10000) | LS | 1 | $270,000 | $260,000 | $171,385 | $200,000 |
| 300 | Dynamic load testing (523E20000) | EACH | 2 | $5,000.00 | $5,800.00 | $6,650.42 | $6,800.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of December 18, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.