ODOT contract 250557 bid tabulation

HAM-CR 14-03.49 Dry Fork Rd (INTERCHANGE). Let by Ohio DOT on December 18, 2025, HAM. 4 bids received; low bid $8,255,027 by Eagle Bridge Co, -3.3% against the engineer's estimate of $8,537,000.

Owner
Ohio DOT
Letting
18 DEC 2025
Pay items
242
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Eagle Bridge Co$8,255,027Low-3.0%
2Complete General Construction Company$8,556,751+4.0%0.0%
3Sunesis Construction Co$9,156,077+11%+7.0%
4Beaty Construction Inc$9,895,710+20%+16%
ODOT contract 250557: bids by rank

Engineer's estimate: $8,537,000.

Bid tabulation

LinePay itemUnitQuantity1. Eagle Bridge Co2. Complete General Construction Company3. Sunesis Construction Co4. Beaty Construction Inc
1Clearing and grubbing (201E11000)LS1$25,000$10,000$23,000$100,000
2Pavement removed (202E23000)SY8,077$12.50$20.00$29.96$14.25
3Concrete barrier removed (202E30700)FT216$30.00$55.00$33.60$60.00
4Guardrail removed (202E38000)FT1,894$4.50$4.50$4.50$4.50
5Anchor assembly removed, as per plan (202E42207)EACH10$500.00$600.00$695.42$150.00
6Bridge terminal assembly removed, as per plan (202E47001)EACH4$125.00$600.00$125.00$125.00
7Removal misc.: loop detectors (202E98100)EACH7$20.00$300.00$20.00$20.00
8Excavation (203E10000)CY2,400$10.00$28.00$15.35$18.50
9Embankment (203E20000)CY7,600$8.00$32.00$17.45$25.00
10Subgrade compaction (204E10000)SY11,692$3.00$3.25$3.58$1.00
11Excavation of subgrade (204E13000)CY3,778$12.00$30.00$27.18$20.25
12Granular material, type C (204E30020)CY3,778$70.00$65.00$83.35$92.50
13Proof rolling (204E45000)HR4$150.00$330.00$229.50$560.00
14Geotextile fabric (204E50000)SY11,327$1.75$2.00$1.81$2.50
15Guardrail, type MGS (606E15050)FT1,162.50$23.55$23.55$23.55$23.55
16Guardrail, type MGS with long posts (606E15100)FT250$28.40$28.40$28.40$28.40
17Guardrail, type MGS half post spacing with long posts (606E15200)FT50$43.70$43.70$43.70$43.70
18Anchor assembly, MGS type E, MASH 2016 (606E26150)EACH6$2,375.00$2,375.00$2,375.00$2,375.00
19Anchor assembly, MGS type T (606E26550)EACH8$1,150.00$1,150.00$1,150.00$1,150.00
20MGS bridge terminal assembly, type 1 (606E35002)EACH4$2,375.00$2,375.00$2,375.00$2,375.00
21MGS bridge terminal assembly, type 2 (606E35102)EACH2$400.00$400.00$400.00$400.00
22Impact attenuator, type 2 (bidirectional), 36" (606E60028)EACH2$36,500$33,950$33,950$42,000
235" concrete walk (608E12000)SF949$12.00$9.00$12.39$11.75
24Curb ramp (608E52000)SF315$23.00$26.00$26.41$30.50
25Concrete barrier, single slope, type B (622E10060)FT158$375.00$425.00$550.00$400.00
26Concrete barrier, single slope, type D (622E10160)FT198$150.00$260.00$225.00$183.25
27Concrete barrier end section, type D (622E25000)EACH2$4,500.00$5,000.00$4,800.00$7,110.00
28Concrete barrier, end anchorage, reinforced, type B (622E25004)EACH2$10,000$9,000.00$4,800.00$13,900
29Concrete barrier, end anchorage, reinforced, type D (622E25050)EACH2$4,500.00$4,500.00$4,800.00$5,365.00
30Tied concrete block mat with type 1 underlayment (601E21050)SY4$155.00$190.00$134.09$389.00
31Rock channel protection, type C with filter (601E32200)CY1$225.00$555.00$559.45$640.00
32Topsoil (659E00300)CY1,010$5.00$37.00$22.48$68.00
33Seeding and mulching (659E10000)SY9,097$2.00$1.35$3.71$1.35
34Repair seeding and mulching (659E14000)SY455$2.00$1.00$2.20$1.00
35Commercial fertilizer (659E20000)TON1.23$1,250.00$1,500.00$1,400.00$1,500.00
36Lime (659E31000)ACRE1.88$10.00$200.00$450.00$200.00
37Water (659E35000)MGAL49$5.00$1.00$50.00$1.00
38Mowing (659E40000)MSF21$15.00$4.00$50.00$1.00
39Storm water pollution prevention plan (832E15000)LS1$4,250.00$2,500.00$3,800.00$4,025.00
40Storm water pollution prevention inspections (832E15002)LS1$15,000$9,000.00$9,240.00$16,120
41Storm water pollution prevention inspection software (832E15010)LS1$13,500$11,673$11,673$2,800.00
42Erosion control (832E30000)EACH30,000$1.00$1.00$1.00$1.00
43Concrete masonry (602E20000)CY2.10$2,500.00$5,000.00$3,865.17$2,800.00
446" base pipe underdrains (605E14000)FT4,082$11.00$18.00$18.78$22.50
4512" conduit, type C (611E04600)FT227$80.00$115.00$67.86$135.00
4630" conduit, type C (611E13600)FT105$125.00$195.00$134.53$235.00
47Conduit, misc.: 33" conduit, type C (611E97400)FT12$325.00$420.00$363.32$625.00
48Catch basin, no. 3A (611E98180)EACH4$4,500.00$4,400.00$4,377.64$9,900.00
49Catch basin, no. 2-2A (611E98450)EACH1$2,300.00$2,400.00$2,417.99$5,750.00
50Manhole, no. 3 (611E99574)EACH1$4,700.00$6,000.00$4,064.92$6,850.00
51Precast reinforced concrete outlet (611E99710)EACH2$350.00$530.00$451.30$830.00
52Pavement planing, asphalt concrete, 3.75" depth (254E01000)SY1,015$9.00$15.00$16.03$15.00
53Asphalt concrete base, PG64-22, (449) (301E56000)CY754$295.00$270.00$270.00$270.00
54Aggregate base (304E20000)CY1,953$95.00$100.00$92.56$104.00
559" concrete base, class QC 1P (305E13010)SY124$139.50$215.00$157.44$434.75
56Non-tracking tack coat (407E20000)GAL755$1.00$5.00$5.00$5.00
57Asphalt concrete surface course, 12.5 MM, type A (448) (442E20000)CY244$360.00$430.00$430.00$430.00
58Asphalt concrete intermediate course, 19 MM, type A (448) (442E20200)CY407$320.00$385.00$385.00$385.00
5912" non-reinforced concrete pavement, class QC 1P (452E15010)SY6,323$135.00$105.00$134.35$132.35
60Combination curb and gutter, type 4, as per plan (609E23001)FT75$44.00$85.00$44.01$110.00
61Curb, type 6 (609E26000)FT426$35.00$38.00$35.71$66.50
62Connection, fused pull apart (625E00450)EACH32$145.10$130.00$145.10$145.10
63Connection, unfused pull apart (625E00460)EACH22$145.10$125.00$145.10$145.10
64Connection, unfused permanent (625E00480)EACH30$124.10$115.00$124.10$124.10
65Light pole, conventional, as per plan, AT15B36 (625E10491)EACH14$3,655.00$2,900.00$3,655.00$3,655.00
66Light pole foundation, 24" X 6' deep (625E14000)EACH14$1,830.00$1,800.00$1,830.00$1,830.00
67No. 2/0 AWG 2400 volt distribution cable (625E22910)FT330$10.55$11.00$10.55$10.55
68No. 2 AWG 600 volt distribution cable (625E23100)FT1,965$4.70$5.00$4.70$4.70
69No. 10 AWG pole and bracket cable (625E23400)FT2,826$1.90$2.50$1.90$1.90
701-1/2" duct cable with three no. 2 AWG 2400 volt cables (625E24330)FT6,080$15.70$16.50$15.70$15.70
71Conduit, 2", 725.04 (625E25400)FT131$22.10$27.00$22.10$22.10
72Conduit, jacked or drilled, 725.04, 3" (625E25902)FT544$68.85$58.00$68.85$68.85
73Luminaire, conventional, solid state (LED), as per plan (625E26253)EACH14$435.00$525.00$435.00$435.00
74Trench, 24" deep (625E29002)FT6,454$12.15$9.00$12.15$12.15
75Pull box, 725.08, 18" (625E30700)EACH9$973.00$1,250.00$973.00$973.00
76Ground rod (625E32000)EACH28$256.00$300.00$256.00$256.00
77Power service, as per plan (625E34001)EACH1$13,114$11,500$13,114$13,114
78Underground warning marking tape (625E36010)FT6,211$1.60$1.85$1.60$1.60
79Arc flash calculations and label, LCC (625E76000)EACH1$4,140.00$3,100.00$4,140.00$4,140.00
80RPM (621E00100)EACH97$57.40$76.00$57.40$57.40
81Barrier reflector, type 2, one-way (626E00110)EACH17$10.00$10.00$10.00$10.00
82Ground mounted support, no. 3 post (630E03100)FT165$16.00$27.00$16.00$16.00
83Ground mounted structural beam support, W6X9 (630E06500)FT43.40$45.00$92.00$45.00$45.00
84One way support, no. 3 post (630E08004)FT162$18.00$27.00$18.00$18.00
85Street name sign support, no. 4 post (630E08530)FT16$29.00$36.00$29.00$29.00
86Sign post reflector (630E08600)EACH13$59.50$75.00$59.50$59.50
87Breakaway structural beam connection (630E09000)EACH2$460.00$724.00$460.00$460.00
88Sign hanger assembly, mast arm (630E79100)EACH6$355.00$503.00$355.00$355.00
89Sign, flat sheet (630E80100)SF271.40$20.00$29.00$20.00$20.00
90Sign, ground mounted extrusheet (630E80200)SF344$31.00$26.00$31.00$31.00
91Sign, double faced, street name (630E80500)EACH2$90.00$296.00$90.00$90.00
92Ground mounted structural beam support foundation (630E84500)EACH2$1,550.00$1,140.00$1,550.00$1,550.00
93Removal of ground mounted sign and disposal (630E84900)EACH23$25.00$17.00$25.00$25.00
94Removal of ground mounted sign and reerection (630E85100)EACH1$1,750.00$75.00$1,750.00$1,750.00
95Removal of ground mounted major sign and disposal (630E85400)EACH5$225.00$235.00$225.00$225.00
96Removal of ground mounted post support and disposal (630E86002)EACH17$50.00$22.00$50.00$50.00
97Removal of ground mounted structural beam support (630E86102)EACH10$175.00$496.00$175.00$175.00
98Edge line, 6" (644E00104)MI0.31$4,805.00$7,195.00$4,805.00$4,805.00
99Center line (644E00300)MI0.20$7,390.00$8,555.00$7,390.00$7,390.00
100Channelizing line, 12" (644E00404)FT733$2.75$1.90$2.75$2.75
101Stop line (644E00500)FT134$9.25$5.50$9.25$9.25
102Transverse/diagonal line (644E00700)FT358$9.25$5.25$9.25$9.25
103Chevron marking (644E00720)FT85$9.25$5.25$9.25$9.25
104Island marking (644E00900)SF284$5.50$5.00$5.50$5.50
105Lane arrow (644E01300)EACH2$156.00$200.00$156.00$156.00
106Dotted line, 6" (644E01510)FT504$3.70$1.85$3.70$3.70
107Edge line, 6" (646E10010)MI0.44$3,600.00$8,170.00$3,600.00$3,600.00
108Lane line, 6" (646E10110)MI0.15$2,000.00$3,915.00$2,000.00$2,000.00
109Center line (646E10200)MI0.10$7,000.00$10,320$7,000.00$7,000.00
110Channelizing line, 12" (646E10310)FT1,118$2.70$2.00$2.70$2.70
111Stop line (646E10400)FT144$8.80$13.50$8.80$8.80
112Crosswalk line, 24" (646E10520)FT136$4.45$12.50$4.45$4.45
113Transverse/diagonal line (646E10600)FT75$8.80$13.00$8.80$8.80
114Chevron marking (646E10620)FT70$8.80$13.00$8.80$8.80
115Lane arrow (646E20300)EACH19$150.00$250.00$150.00$150.00
116Wrong way arrow (646E20320)EACH3$220.00$450.00$220.00$220.00
117Lane reduction arrow (646E20350)EACH2$290.00$550.00$290.00$290.00
118Dotted line (646E20500)FT185$3.50$1.75$3.50$3.50
119Bracket arm, 20', as per plan (625E18401)EACH4$1,282.00$1,350.00$1,282.00$1,282.00
120No. 8 AWG 600 volt distribution cable (625E23304)FT465$2.80$2.50$2.80$2.80
121Conduit, 2", 725.051 (625E25408)FT203$6.20$14.00$6.20$6.20
122Conduit, 4", 725.051 (625E25604)FT80$12.65$24.00$12.65$12.65
123Conduit, jacked or drilled, 725.052, 4" (625E25908)FT661$42.40$41.00$42.40$42.40
124Luminaire, conventional, solid state (LED), as per plan (625E26253)EACH4$435.00$525.00$435.00$435.00
125Pull box, 725.08, 24" (625E30706)EACH10$1,135.00$1,600.00$1,135.00$1,135.00
126Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate (632E05006)EACH21$1,124.00$1,050.00$1,124.00$1,124.00
127Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate (632E05086)EACH1$1,807.00$1,700.00$1,807.00$1,807.00
128Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731)EACH4$689.00$800.00$689.00$689.00
129Accessible pedestrian pushbutton (632E20750)EACH4$845.50$1,200.00$845.50$845.50
130Covering of vehicular signal head (632E25000)EACH22$37.25$40.00$37.25$37.25
131Covering of pedestrian signal head (632E25010)EACH4$37.25$35.00$37.25$37.25
132Signal cable, 5 conductor, no. 14 AWG (632E40500)FT323$2.70$3.00$2.70$2.70
133Signal cable, 7 conductor, no. 14 AWG (632E40700)FT2,318$3.10$3.50$3.10$3.10
134Signal support foundation, as per plan (632E64011)EACH4$7,733.00$12,000$7,733.00$7,733.00
135Pedestal foundation (632E64020)EACH7$1,435.00$1,600.00$1,435.00$1,435.00
136Loop detector lead-in cable, 2 conductor, no. 14 AWG (632E65300)FT303$2.10$2.25$2.10$2.10
137Power cable, 3 conductor, no. 6 AWG (632E68300)FT152$4.95$6.00$4.95$4.95
138Service cable, 3 conductor, no. 6 AWG (632E69800)FT299$4.95$6.00$4.95$4.95
139Power service, as per plan (632E70001)EACH1$5,600.00$4,500.00$5,600.00$5,600.00
140Power service, as per plan (632E70001)EACH1$4,430.00$3,100.00$4,430.00$4,430.00
141Combination signal support, type TC-81.22, design 13 (632E79140)EACH2$21,660$20,400$21,660$21,660
142Combination signal support, misc.:type TC-12.31 DE (632E81700)EACH1$39,145$40,200$39,145$39,145
143Combination signal support, misc.:type TC-12.31 DE (632E81700)EACH1$46,460$43,400$46,460$46,460
144Pedestal, 8', transformer base (632E89900)EACH3$838.00$1,050.00$838.00$838.00
145Pedestal, misc.: pedestal, 15', transformer base, (632E90010)EACH4$2,170.00$1,900.00$2,170.00$2,170.00
146Removal of traffic signal installation, as per plan (632E90101)EACH2$5,260.00$3,600.00$5,260.00$5,260.00
147Signalization, misc.: vacuum excavation of foundat (632E90400)EACH2$3,170.00$6,100.00$3,170.00$3,170.00
148Cabinet, type 332, as per plan (633E65521)EACH2$9,453.00$18,500$9,453.00$9,453.00
149Cabinet foundation, as per plan (633E67101)EACH2$1,600.00$4,200.00$1,600.00$1,600.00
150Controller work pad (633E67200)EACH2$1,115.00$2,000.00$1,115.00$1,115.00
151Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001)EACH2$7,990.00$7,900.00$7,990.00$7,990.00
152CCTV IP-camera system, dome-type (809E60000)EACH2$7,780.00$7,800.00$7,780.00$7,780.00
153Advance radar detection, as per plan (809E69001)EACH2$9,200.00$8,500.00$9,200.00$9,200.00
154Stop line radar detection, as per plan (809E69101)EACH4$8,870.00$7,500.00$8,870.00$8,870.00
155Atc controller, as per plan (809E69123)EACH2$1,225.00$800.00$1,225.00$1,225.00
156Law enforcement officer with patrol car for assistance (614E11110)HR40$150.00$95.00$85.00$95.00
157Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380)EACH4$2,193.00$2,200.00$2,192.99$2,425.00
158Detour signing (614E12420)LS1$12,500$12,750$12,755$25,000
159Barrier reflector, type 3, one way (614E13314)EACH22$15.00$11.63$11.63$11.63
160Object marker, one way (614E13350)EACH22$20.00$19.14$19.14$19.14
161Portable changeable message sign, as per plan (614E18601)SNMT12$700.00$909.00$908.65$1,500.00
162Work zone lane line, class I, 4" (614E20000)MI0.30$340.00$275.00$340.00$275.00
163Work zone lane line, class III, 4", 642 paint (614E20550)MI0.15$340.00$275.00$340.00$275.00
164Work zone center line, class I (614E21000)MI0.60$760.00$1,045.00$760.00$1,045.00
165Work zone center line, class III, 642 paint (614E21550)MI0.30$760.00$1,045.00$760.00$1,045.00
166Work zone edge line, class I, 4", 642 paint (614E22100)MI2.08$505.00$605.00$505.00$605.00
167Work zone edge line, class III, 4", 642 paint (614E22350)MI1.04$505.00$605.00$505.00$605.00
168Work zone channelizing line, class I, 8" (614E23000)FT3,702$0.65$0.55$0.65$0.55
169Work zone channelizing line, class III, 8", 642 paint (614E23680)FT1,851$0.65$0.55$0.65$0.55
170Work zone dotted line, class I (614E24000)FT1,382$1.25$0.45$1.25$0.45
171Work zone dotted line, class III, 4", 642 paint (614E24610)FT691$1.25$0.45$1.25$0.45
172Work zone transverse/diagonal line, class I (614E25000)FT1,176$1.50$3.25$1.50$3.25
173Work zone transverse/diagonal line, class III, 642 paint (614E25620)FT588$1.50$3.25$1.50$3.25
174Work zone stop line, class I (614E26000)FT556$2.10$3.50$2.10$3.50
175Work zone stop line, class III, 642 paint (614E26610)FT278$2.10$3.50$2.10$3.50
176Work zone crosswalk line, class I, 12" (614E27010)FT240$1.05$3.00$1.05$3.00
177Work zone crosswalk line, class III, 12", 642 paint (614E27250)FT120$1.05$3.00$1.05$3.00
178Work zone arrow, class I (614E30000)EACH52$25.00$75.00$25.00$75.00
179Work zone arrow, class III, 642 paint (614E30650)EACH26$25.00$75.00$25.00$75.00
180Work zone island marking, class I (614E32700)SF568$0.85$3.00$0.85$3.00
181Work zone island marking, class III, 642 paint (614E32800)SF284$0.85$3.00$0.85$3.00
182Water (616E10000)MGAL81$10.00$100.00$14.08$14.00
183Portable barrier, unanchored (622E41100)FT1,245$30.00$36.68$36.68$37.25
184Portable barrier, anchored (622E41110)FT300$45.00$42.15$42.15$44.00
185Portions of structure removed, over 20 foot span, as per plan (202E11203)LS1$225,000$200,000$240,236$325,000
186Approach slab removed (202E22900)SY133$45.00$55.00$34.10$42.75
187Wearing course removed (202E23500)SY133$11.00$15.00$6.31$5.00
188Removal misc.: portions of structure removed, bulb (202E98200)FT499$45.00$22.00$1.81$33.00
189Cofferdams and excavation bracing, as per plan (503E11101)LS1$75,000$95,000$1.41$125,000
190Unclassified excavation (503E21300)LS1$75,000$100,000$150,987$135,000
191Pile driving equipment mobilization (505E11100)LS1$40,000$25,000$24,681$85,000
19212" cast-in-place reinforced concrete piles, driven (507E00500)FT1,760$6.00$10.00$41.63$72.50
19312" cast-in-place reinforced concrete piles, furnished (507E00550)FT2,140$100.00$80.00$60.69$40.00
194Epoxy coated steel reinforcement (509E10000)LB223,132$1.40$1.40$1.48$1.40
195Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001)LB500$1.00$1.44$5.75$1.25
196Galvanized steel reinforcement (509E26000)LB4,763$2.00$2.09$2.36$2.00
197No. 4 deformed GFRP reinforcement (509E30020)FT4,256$1.90$1.63$1.76$0.95
198Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001)EACH238$35.00$16.00$20.05$35.00
199Semi-integral diaphragm guide (511E33500)EACH2$6,500.00$3,500.00$4,075.51$4,600.00
200Class QC2 concrete with QC/QA, bridge deck (511E34446)CY631$940.00$1,000.00$1,371.07$1,125.00
201Class QC2 concrete with QC/QA, bridge deck (parapet) (511E34450)CY45$825.00$950.00$939.73$715.00
202Class QC1 concrete with QC/QA, pier above footings (511E41012)CY158$1,250.00$1,100.00$1,986.83$1,725.00
203Class QC1 concrete with QC/QA, abutment not including footing (511E44112)CY67$1,250.00$1,300.00$1,102.28$1,525.00
204Class QC1 concrete with QC/QA, footing (511E46512)CY130$750.00$600.00$923.82$1,025.00
205Class QC2 concrete with QC/QA, sidewalk (511E51512)CY57$700.00$550.00$700.84$660.00
206Sealing of concrete surfaces (non-epoxy) (512E10050)SY222$16.00$16.00$16.00$16.00
207Sealing of concrete surfaces (epoxy-urethane) (512E10100)SY1,059$25.50$25.50$25.50$25.50
208Concrete repair by epoxy injection (512E10600)FT100$65.00$85.00$60.00$85.00
209Structural steel members, level 3 (513E10260)LB268,700$3.10$2.90$3.85$3.25
210Welded stud shear connectors (513E20000)EACH8,952$4.40$4.70$4.70$4.40
211Surface preparation of existing structural steel (514E00050)SF4,400$25.00$30.00$30.26$32.00
212Field painting of existing structural steel, prime coat (514E00056)SF4,400$18.00$14.00$14.12$10.00
213Field painting structural steel, intermediate coat (514E00060)SF19,680$10.00$8.00$8.07$5.00
214Field painting structural steel, finish coat (514E00066)SF19,680$7.50$5.50$5.55$5.00
215Grinding fins, tears, slivers on existing structural steel (514E00504)MNHR10$200.00$200.00$201.76$170.00
216Final inspection repair (514E10000)EACH9$200.00$200.00$201.76$250.00
217Field painting of damaged structural steel, as per plan (514E20001)SF56$250.00$250.00$252.20$145.00
218Field painting, misc.: coating of beam ends (514E27700)SF251$140.00$140.00$141.23$110.00
219Armorless preformed joint seal (516E10010)FT148$50.00$85.00$45.51$38.00
2201" preformed expansion joint filler (516E13600)SF13$8.00$16.00$7.33$9.00
2212" preformed expansion joint filler (516E13900)SF86$15.00$15.00$10.80$13.00
222Semi-integral abutment expansion joint seal (516E14020)FT171$45.00$48.00$53.90$63.25
223Elastomeric bearing with internal laminates and load plate, as per plan (516E44201)EACH18$2,100.00$1,700.00$2,308.52$1,850.00
224Elastomeric bearing with internal laminates and load plate, as per plan (516E44201)EACH27$1,675.00$1,300.00$1,717.56$1,425.00
225Jacking and temporary support of superstructure, as per plan (516E47001)LS1$75,000$60,310$70,680$60,000
226Railing (concrete parapet with twin steel tube railing and vandal protection fence) (517E75122)FT300$300.00$485.00$377.46$313.25
227Porous backfill with geotextile fabric (518E21200)CY288$125.00$130.00$90.59$160.00
2286" perforated corrugated plastic pipe (518E40000)FT180$14.00$12.00$2.23$9.75
2296" non-perforated corrugated plastic pipe, including specials (518E40010)FT100$40.00$30.00$43.66$34.75
230Patching concrete structure, as per plan (519E11101)SF100$140.00$185.00$185.00$185.00
231Reinforced concrete approach slabs with QC/QA (T=1 (526E25010)SY411$350.00$360.00$340.59$370.00
232Type C installation (526E90030)FT148$250.00$265.00$220.04$340.00
233Crushed aggregate slope protection (601E20000)SY271$35.00$100.00$37.93$87.00
234Vandal protection fence, 6' straight, coated fabric (607E39900)FT249$137.50$137.50$137.50$137.50
235Vandal protection fence, 12' curved, coated fabric (607E39930)FT249$170.00$170.00$170.00$170.00
236Structure grounding system (625E33000)EACH1$8,800.00$18,000$8,800.00$8,800.00
237Premium for contract performance bond and for payment bond (103E05000)LS1$70,000$43,000$40,439$43,000
238Maintaining traffic (614E11000)LS1$75,000$155,000$70,261$594,994
239Field office, type C, as per plan (619E16021)MNTH18$3,750.00$4,300.00$1,987.78$5,575.00
240Construction layout stakes and surveying (623E10000)LS1$30,000$44,000$103,750$175,000
241Mobilization (624E10000)LS1$270,000$260,000$171,385$200,000
300Dynamic load testing (523E20000)EACH2$5,000.00$5,800.00$6,650.42$6,800.00
ODOT contract 250557: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of December 18, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy