ODOT contract 260003 bid tabulation
MAH-IR 680-04.58 (PART 1 AND PART 2). Let by Ohio DOT on February 5, 2026, MAH. 4 bids received; low bid $55,750,420 by Shelly & Sands Inc.
- Owner
- Ohio DOT
- Letting
- 05 FEB 2026
- Pay items
- 459
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Shelly & Sands Inc | $55,750,420 | Low |
| 2 | Karvo Companies Inc | $64,896,569 | +16% |
| 3 | Ruhlin Company | $68,322,610 | +23% |
| 4 | Shelly Company | $73,564,707 | +32% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly & Sands Inc | 2. Karvo Companies Inc | 3. Ruhlin Company | 4. Shelly Company |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $400,000 | $500,000 | $285,000 | $400,000 |
| 2 | Pavement removed (202E23000) | SY | 215,714 | $6.00 | $14.00 | $12.50 | $20.00 |
| 3 | Wearing course removed (202E23500) | SY | 467 | $25.00 | $2.00 | $10.00 | $35.00 |
| 4 | Walk removed (202E30000) | SF | 5,660 | $1.30 | $2.50 | $2.00 | $8.00 |
| 5 | Concrete median removed (202E30600) | SY | 312 | $12.00 | $35.00 | $31.00 | $24.00 |
| 6 | Concrete barrier removed (202E30700) | FT | 16,019 | $17.00 | $25.00 | $23.00 | $50.00 |
| 7 | Curb removed (202E32000) | FT | 8,073 | $4.00 | $3.00 | $5.00 | $5.00 |
| 8 | Pipe removed, 24" and under (202E35100) | FT | 10,681 | $20.00 | $50.00 | $25.00 | $50.00 |
| 9 | Pipe removed, over 24" diameter (202E35200) | FT | 1,093 | $19.00 | $75.00 | $65.00 | $75.00 |
| 10 | Guardrail removed (202E38000) | FT | 25,159 | $2.20 | $2.20 | $3.00 | $3.00 |
| 11 | Impact attenuator removed (202E47800) | EACH | 1 | $245.00 | $245.00 | $375.00 | $375.00 |
| 12 | Manhole removed (202E58000) | EACH | 25 | $1,000.00 | $1,000.00 | $1,090.00 | $2,450.00 |
| 13 | Catch basin removed (202E58100) | EACH | 63 | $520.00 | $600.00 | $810.00 | $1,000.00 |
| 14 | Inlet removed (202E58200) | EACH | 41 | $1,250.00 | $1,450.00 | $830.00 | $1,000.00 |
| 15 | Inlet abandoned (202E58400) | EACH | 3 | $1,900.00 | $875.00 | $540.00 | $3,500.00 |
| 16 | Inlet abandoned, as per plan (202E58401) | EACH | 5 | $12,000 | $875.00 | $2,000.00 | $5,000.00 |
| 17 | Manhole abandoned, as per plan (202E58701) | EACH | 1 | $2,350.00 | $1,000.00 | $5,500.00 | $8,000.00 |
| 18 | Special - fill and plug existing conduit (202E70000) | FT | 315 | $46.00 | $18.00 | $70.00 | $95.00 |
| 19 | Fence removed (202E75000) | FT | 31,841 | $3.00 | $3.00 | $3.00 | $3.00 |
| 20 | Removal misc.: inspection well (202E98100) | EACH | 2 | $200.00 | $675.00 | $3,500.00 | $3,800.00 |
| 21 | Removal misc.: conduit (202E98200) | FT | 15 | $30.00 | $50.00 | $130.00 | $200.00 |
| 22 | Excavation (203E10000) | CY | 42,609 | $17.00 | $26.00 | $28.00 | $42.00 |
| 23 | Embankment (203E20000) | CY | 11,662 | $23.00 | $12.00 | $33.50 | $20.00 |
| 24 | Embankment, as per plan (203E20001) | CY | 19 | $44.00 | $60.00 | $120.00 | $100.00 |
| 25 | Subgrade compaction (204E10000) | SY | 72,634 | $2.40 | $0.50 | $2.00 | $1.00 |
| 26 | Excavation of subgrade (204E13000) | CY | 22,480 | $24.00 | $26.00 | $38.00 | $40.00 |
| 27 | Granular material, type B (204E30010) | CY | 7,965 | $62.00 | $65.00 | $74.00 | $65.00 |
| 28 | Proof rolling (204E45000) | HR | 114 | $490.00 | $250.00 | $425.00 | $135.00 |
| 29 | Geotextile fabric (204E50000) | SY | 13,409 | $0.90 | $2.25 | $3.00 | $6.00 |
| 30 | Cement (206E10500) | TON | 4,695 | $200.00 | $226.00 | $205.00 | $200.00 |
| 31 | Curing coat (206E11000) | SY | 155,525 | $1.20 | $1.00 | $1.25 | $1.20 |
| 32 | Cement stabilized subgrade, 14 inches deep (206E15020) | SY | 155,525 | $3.00 | $3.50 | $6.01 | $3.00 |
| 33 | Linear grading, as per plan (209E60201) | STA | 283 | $135.00 | $40.00 | $363.80 | $300.00 |
| 34 | Guardrail, type MGS (606E15050) | FT | 13,538 | $20.40 | $22.40 | $21.00 | $21.00 |
| 35 | Guardrail, type MGS with long posts (606E15100) | FT | 7,926 | $23.80 | $25.80 | $23.00 | $23.00 |
| 36 | Guardrail, type MGS half post spacing (606E15150) | FT | 138 | $31.40 | $33.40 | $23.50 | $23.50 |
| 37 | Guardrail, type MGS quarter post spacing (606E15250) | FT | 25 | $44.00 | $46.00 | $24.75 | $24.75 |
| 38 | Anchor assembly, type B (606E26000) | EACH | 1 | $2,630.00 | $2,630.00 | $2,050.00 | $2,050.00 |
| 39 | Anchor assembly, MGS type E (606E26150) | EACH | 16 | $2,440.00 | $2,440.00 | $2,450.00 | $2,450.00 |
| 40 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 23 | $2,475.00 | $2,475.00 | $2,450.00 | $2,450.00 |
| 41 | Anchor assembly, MGS type T (606E26550) | EACH | 27 | $1,380.00 | $1,380.00 | $1,400.00 | $1,400.00 |
| 42 | Anchor assembly, MGS type T, as per plan (606E26551) | EACH | 1 | $1,470.00 | $1,470.00 | $1,400.00 | $1,400.00 |
| 43 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 36 | $2,520.00 | $2,520.00 | $2,250.00 | $2,250.00 |
| 44 | MGS bridge terminal assembly, type 2 (606E35102) | EACH | 26 | $595.00 | $595.00 | $725.00 | $725.00 |
| 45 | Impact attenuator, type 2 (unidirectional), 50 MPH (606E60022) | EACH | 1 | $37,530 | $35,450 | $43,150 | $43,150 |
| 46 | Fence, type CLT (607E23000) | FT | 31,741 | $25.20 | $25.50 | $25.50 | $25.50 |
| 47 | Fence, type CLT, as per plan (607E23001) | FT | 91 | $97.80 | $80.00 | $80.00 | $80.00 |
| 48 | 4" concrete walk (608E10000) | SF | 4,793 | $8.00 | $6.00 | $13.00 | $12.00 |
| 49 | 6" concrete walk (608E13000) | SF | 172 | $10.00 | $8.00 | $17.00 | $19.00 |
| 50 | Curb ramp (608E52000) | SF | 1,161 | $27.00 | $15.00 | $18.00 | $18.00 |
| 51 | Concrete barrier, single slope, type B1 (622E10100) | FT | 2,152 | $175.00 | $155.00 | $187.00 | $187.00 |
| 52 | Concrete barrier, single slope, type C (622E10120) | FT | 386 | $182.00 | $175.00 | $255.00 | $250.00 |
| 53 | Concrete barrier, single slope, type C, as per plan (622E10121) | FT | 99 | $330.00 | $225.00 | $420.00 | $420.00 |
| 54 | Concrete barrier, single slope, type C1 (622E10140) | FT | 9,487 | $150.00 | $200.00 | $203.00 | $203.00 |
| 55 | Concrete barrier, single slope, type D (622E10160) | FT | 2,523 | $87.00 | $75.00 | $120.00 | $120.00 |
| 56 | Concrete barrier end section, type B, as per plan (622E24841) | EACH | 2 | $14,350 | $8,750.00 | $14,875 | $16,000 |
| 57 | Concrete barrier end section, type D (622E25000) | EACH | 21 | $6,300.00 | $10,000 | $5,600.00 | $5,500.00 |
| 58 | Concrete barrier, end anchorage, reinforced, type B1 (622E25006) | EACH | 14 | $5,800.00 | $5,000.00 | $8,500.00 | $8,500.00 |
| 59 | Concrete barrier, end anchorage, reinforced, type C (622E25008) | EACH | 4 | $5,000.00 | $5,000.00 | $7,715.00 | $8,000.00 |
| 60 | Concrete barrier, end anchorage, reinforced, type C, as per plan (622E25009) | EACH | 1 | $12,000 | $8,500.00 | $32,915 | $32,000 |
| 61 | Concrete barrier, end anchorage, reinforced, type C1 (622E25014) | EACH | 46 | $5,600.00 | $5,000.00 | $8,725.00 | $8,750.00 |
| 62 | Concrete barrier, end anchorage, reinforced, type D (622E25050) | EACH | 11 | $5,400.00 | $5,500.00 | $8,385.00 | $8,250.00 |
| 63 | Barrier, misc.: new barrier matching existing shap (622E90000) | FT | 350 | $250.00 | $200.00 | $190.00 | $180.00 |
| 64 | Providing electronic instrumentation (623E11000) | LS | 1 | $40,000 | $50,000 | $35,000 | $25,000 |
| 65 | Monument assembly adjusted to grade (623E39500) | EACH | 25 | $490.00 | $750.00 | $550.00 | $2,100.00 |
| 66 | Reference monument, type A (623E40500) | EACH | 4 | $1,000.00 | $500.00 | $1,300.00 | $2,100.00 |
| 67 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $5,800.00 | $10,000 | $25,000 | $18,000 |
| 68 | Special - as-built construction plans (690E91000) | LS | 1 | $8,000.00 | $25,000 | $10,000 | $60,000 |
| 69 | Special - vertical clearance (690E98000) | EACH | 6 | $350.00 | $300.00 | $708.94 | $16,400 |
| 70 | Longitudinal channelizing device (831E00100) | FT | 323 | $120.00 | $118.00 | $117.50 | $117.50 |
| 71 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 88 | $178.00 | $150.00 | $160.00 | $95.00 |
| 72 | Rock channel protection, type A with filter (601E32000) | CY | 142 | $110.00 | $195.00 | $175.00 | $175.00 |
| 73 | Rock channel protection, type B with filter (601E32100) | CY | 186 | $51.00 | $260.00 | $195.00 | $198.00 |
| 74 | Rock channel protection, type C with filter (601E32200) | CY | 8 | $800.00 | $400.00 | $385.00 | $580.00 |
| 75 | Soil analysis test (659E00100) | EACH | 3 | $100.00 | $100.00 | $100.00 | $350.00 |
| 76 | Topsoil (659E00300) | CY | 25,442 | $8.00 | $15.00 | $39.00 | $45.00 |
| 77 | Seeding and mulching (659E10000) | SY | 229,203 | $0.80 | $0.75 | $0.75 | $1.10 |
| 78 | Repair seeding and mulching (659E14000) | SY | 11,460 | $0.80 | $0.75 | $0.75 | $1.50 |
| 79 | Inter-seeding (659E15000) | SY | 11,460 | $0.50 | $0.50 | $0.50 | $0.05 |
| 80 | Commercial fertilizer (659E20000) | TON | 31.96 | $800.00 | $800.00 | $800.00 | $1,200.00 |
| 81 | Lime (659E31000) | ACRE | 47.36 | $5.00 | $5.00 | $5.00 | $0.05 |
| 82 | Water (659E35000) | MGAL | 1,269 | $0.80 | $0.75 | $0.75 | $50.00 |
| 83 | Mowing (659E40000) | MSF | 515.71 | $2.00 | $2.00 | $2.00 | $3.00 |
| 84 | Sodding staked (660E25000) | SY | 10,836 | $4.00 | $4.00 | $3.80 | $15.00 |
| 85 | Ditch erosion protection mat, type B (670E00720) | SY | 13,864 | $2.00 | $2.00 | $1.95 | $3.00 |
| 86 | Storm water pollution prevention plan (832E15000) | LS | 1 | $11,000 | $50,000 | $2,897.00 | $11,000 |
| 87 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $40,000 | $50,000 | $35,008 | $34,500 |
| 88 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $25,000 | $35,000 | $21,739 | $23,000 |
| 89 | Erosion control (832E30000) | EACH | 350,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 90 | Seeding and erosion control with turf reinforcing mat, type 1 (836E10000) | SY | 1,540 | $2.00 | $2.00 | $2.00 | $12.00 |
| 91 | Special - work involving petroleum contaminated soil (690E65016) | TON | 210 | $186.00 | $95.00 | $260.00 | $110.00 |
| 92 | Special - work involving non-regulated water (690E65022) | GAL | 100 | $0.35 | $35.00 | $55.00 | $40.00 |
| 93 | Special - work involving regulated water (690E65024) | GAL | 100 | $0.35 | $85.00 | $55.00 | $40.00 |
| 94 | Concrete masonry (602E20000) | CY | 3.90 | $3,300.00 | $7,500.00 | $5,550.00 | $3,500.00 |
| 95 | 6" shallow pipe underdrains with geotextile fabric (605E11110) | FT | 80,824 | $13.00 | $13.00 | $15.00 | $15.00 |
| 96 | 6" unclassified pipe underdrains (605E13300) | FT | 25 | $15.00 | $35.00 | $47.00 | $15.00 |
| 97 | 6" base pipe underdrains with geotextile fabric (605E14020) | FT | 47,144 | $10.00 | $13.00 | $12.75 | $12.65 |
| 98 | 6" conduit, type F (611E01500) | FT | 3,056 | $37.00 | $55.00 | $33.00 | $25.00 |
| 99 | 12" conduit, type B (611E04400) | FT | 309 | $123.00 | $275.00 | $197.50 | $212.00 |
| 100 | 12" conduit, type B (611E04400) | FT | 65 | $185.00 | $300.00 | $353.00 | $375.00 |
| 101 | 12" conduit, type B (611E04400) | FT | 9 | $198.00 | $300.00 | $415.00 | $445.00 |
| 102 | 12" conduit, type C (611E04600) | FT | 46 | $140.00 | $375.00 | $330.00 | $347.00 |
| 103 | 12" conduit, type F, as per plan, 707.33 (611E05201) | FT | 46 | $114.00 | $375.00 | $270.00 | $290.00 |
| 104 | 15" conduit, type B (611E05900) | FT | 6,453 | $123.00 | $150.00 | $155.00 | $172.00 |
| 105 | 15" conduit, type C (611E06100) | FT | 1,889 | $127.00 | $100.00 | $140.00 | $155.00 |
| 106 | 15" conduit, type C (611E06100) | FT | 18 | $195.00 | $175.00 | $700.00 | $745.00 |
| 107 | 15" conduit, type C (611E06100) | FT | 43 | $128.00 | $100.00 | $200.00 | $215.00 |
| 108 | 15" conduit, type C (611E06100) | FT | 5 | $456.00 | $325.00 | $615.00 | $655.00 |
| 109 | 18" conduit, type B (611E07400) | FT | 1,127 | $142.00 | $165.00 | $200.00 | $224.00 |
| 110 | 18" conduit, type B (611E07400) | FT | 14 | $302.00 | $300.00 | $555.00 | $600.00 |
| 111 | 18" conduit, type C (611E07600) | FT | 65 | $165.00 | $125.00 | $274.00 | $285.00 |
| 112 | 18" conduit, type F, as per plan, 707.33 (611E08201) | FT | 227 | $154.00 | $110.00 | $200.00 | $215.00 |
| 113 | 24" conduit, type B (611E10400) | FT | 2,274 | $172.00 | $195.00 | $379.00 | $430.00 |
| 114 | 24" conduit, type C (611E10600) | FT | 273 | $152.00 | $125.00 | $270.00 | $290.00 |
| 115 | 27" conduit, type B (611E11900) | FT | 10 | $324.00 | $1,350.00 | $2,005.00 | $2,225.00 |
| 116 | 30" conduit, type B (611E13400) | FT | 99 | $185.00 | $275.00 | $415.00 | $452.00 |
| 117 | 36" conduit, type B (611E16400) | FT | 485 | $200.00 | $475.00 | $459.00 | $400.00 |
| 118 | Conduit, bored or jacked, 30" type B (611E96600) | FT | 318 | $890.00 | $425.00 | $1,070.00 | $1,735.00 |
| 119 | Conduit, misc.: type C for drainage discharge cont (611E97400) | FT | 10 | $98.00 | $250.00 | $329.00 | $345.00 |
| 120 | Conduit, misc.: type F for drainage discharge cont (611E97400) | FT | 5 | $135.00 | $285.00 | $650.00 | $680.00 |
| 121 | Conduit, misc.: 33" type C, 706.02 (611E97400) | FT | 5 | $715.00 | $1,200.00 | $1,730.00 | $1,835.00 |
| 122 | Catch basin, no. 3 (611E98150) | EACH | 1 | $5,200.00 | $5,000.00 | $8,265.00 | $8,700.00 |
| 123 | Catch basin, no. 3A (611E98180) | EACH | 21 | $4,700.00 | $4,500.00 | $7,445.00 | $7,800.00 |
| 124 | Catch basin, no. 4 (611E98230) | EACH | 1 | $5,800.00 | $6,500.00 | $9,405.00 | $9,800.00 |
| 125 | Catch basin, no. 6 (611E98370) | EACH | 8 | $4,600.00 | $4,250.00 | $6,990.00 | $7,300.00 |
| 126 | Catch basin, no. 8 (611E98410) | EACH | 33 | $6,000.00 | $5,250.00 | $10,485 | $12,000 |
| 127 | Catch basin, no. 8A (611E98434) | EACH | 2 | $7,200.00 | $6,250.00 | $11,055 | $11,500 |
| 128 | Catch basin, no. 2-2A (611E98450) | EACH | 2 | $3,200.00 | $2,500.00 | $6,005.00 | $6,400.00 |
| 129 | Inlet, no. 2-A-6 (611E98840) | EACH | 4 | $8,400.00 | $7,500.00 | $9,370.00 | $10,000 |
| 130 | Inlet, no. 3 for single slope barrier, type C1 (611E99110) | EACH | 1 | $18,000 | $15,000 | $20,560 | $21,500 |
| 131 | Inlet, no. 3 for single slope barrier, type C1, as per plan (611E99111) | EACH | 34 | $17,000 | $15,000 | $31,120 | $35,250 |
| 132 | Inlet, no. 3 for single slope barrier, type D (611E99114) | EACH | 5 | $14,000 | $14,000 | $17,755 | $18,635 |
| 133 | Manhole, no. 3 (611E99574) | EACH | 7 | $6,500.00 | $10,000 | $14,615 | $15,526 |
| 134 | Manhole, no. 3, as per plan (611E99575) | EACH | 38 | $7,800.00 | $10,000 | $12,445 | $13,500 |
| 135 | Precast reinforced concrete outlet (611E99710) | EACH | 44 | $390.00 | $450.00 | $510.00 | $275.00 |
| 136 | Inspection well (611E99720) | EACH | 2 | $1,400.00 | $2,275.00 | $2,150.00 | $2,250.00 |
| 137 | Partial depth pavement repair (442) (251E01020) | SY | 281 | $122.00 | $85.00 | $110.00 | $110.00 |
| 138 | Pavement repair (253E01000) | SY | 281 | $250.00 | $125.00 | $130.00 | $130.00 |
| 139 | Pavement planing, asphalt concrete, (1.5") (254E01000) | SY | 1,121 | $24.00 | $12.00 | $15.00 | $15.00 |
| 140 | Asphalt concrete base, PG64-22, (449) (302E56000) | CY | 48,186 | $142.00 | $200.00 | $175.00 | $175.00 |
| 141 | Aggregate base (304E20000) | CY | 37,804 | $53.00 | $70.00 | $100.00 | $65.00 |
| 142 | Non-tracking tack coat (407E20000) | GAL | 38,250 | $3.05 | $2.30 | $3.00 | $3.00 |
| 143 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 50 | $32.00 | $50.00 | $5.32 | $3.00 |
| 144 | Asphalt concrete intermediate course, type 1, (449), (under guardrail) (441E70800) | CY | 1,100 | $335.00 | $300.00 | $450.00 | $450.00 |
| 145 | Asphalt concrete intermediate course, 12.5 MM, type A (446) (442E10080) | CY | 10,363 | $193.00 | $225.00 | $210.00 | $210.00 |
| 146 | Asphalt concrete surface course, 12.5 MM, type A (447) (442E10300) | CY | 8,643 | $248.00 | $278.00 | $270.00 | $270.00 |
| 147 | Asphalt concrete surface course, 12.5 MM, type A (449) (442E22100) | CY | 49 | $309.00 | $500.00 | $610.00 | $610.00 |
| 148 | Asphalt concrete intermediate course, 12.5 MM, type A (449) (442E22300) | CY | 12 | $1,022.00 | $650.00 | $745.00 | $745.00 |
| 149 | 10" non-reinforced concrete pavement, class QC 1P (452E14010) | SY | 4,093 | $102.00 | $100.00 | $130.00 | $135.00 |
| 150 | Curb, type 4-C (609E24510) | FT | 643 | $40.00 | $65.00 | $58.00 | $50.00 |
| 151 | Curb, type 6 (609E26000) | FT | 6,388 | $18.00 | $38.00 | $30.00 | $30.00 |
| 152 | Concrete median (609E72000) | SY | 369 | $126.00 | $135.00 | $105.00 | $105.00 |
| 153 | Rumble strips, shoulder (asphalt concrete) (618E40600) | MI | 9.73 | $2,500.00 | $1,700.00 | $1,375.00 | $1,375.00 |
| 154 | Connection, fused pull apart (625E00450) | EACH | 156 | $150.00 | $150.00 | $200.00 | $150.00 |
| 155 | Connection, unfused pull apart (625E00460) | EACH | 78 | $150.00 | $150.00 | $189.00 | $150.00 |
| 156 | Connection, unfused bolted (625E00470) | EACH | 51 | $150.00 | $150.00 | $175.00 | $150.00 |
| 157 | Connection, unfused permanent (625E00480) | EACH | 114 | $125.00 | $125.00 | $160.00 | $125.00 |
| 158 | Light pole, low mast, 50' (625E10494) | EACH | 78 | $3,600.00 | $3,600.00 | $3,820.00 | $3,600.00 |
| 159 | Light pole (installation only), as per plan (625E10503) | EACH | 2 | $4,000.00 | $4,000.00 | $750.00 | $4,000.00 |
| 160 | Light tower, BBB100 (625E12200) | EACH | 4 | $26,000 | $26,000 | $31,925 | $26,000 |
| 161 | Light pole foundation, 24" X 10' deep (625E14200) | EACH | 29 | $1,600.00 | $1,600.00 | $2,050.00 | $1,600.00 |
| 162 | Median light pole foundation, 10' deep (625E14306) | EACH | 51 | $6,300.00 | $4,500.00 | $6,150.00 | $4,500.00 |
| 163 | Light tower foundation, 36" X 25' deep (625E15200) | EACH | 4 | $9,500.00 | $9,500.00 | $13,195 | $9,500.00 |
| 164 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 49,599 | $3.10 | $3.10 | $4.00 | $3.10 |
| 165 | No. 10 AWG pole and bracket cable (625E23400) | FT | 14,478 | $1.80 | $1.75 | $2.00 | $1.75 |
| 166 | 1-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320) | FT | 6,623 | $10.00 | $10.00 | $15.00 | $10.00 |
| 167 | Conduit, 2", 725.04 (625E25400) | FT | 1,370 | $15.00 | $15.00 | $24.00 | $15.00 |
| 168 | Conduit, 2", 725.051 (625E25408) | FT | 12,445 | $4.00 | $5.00 | $5.00 | $5.00 |
| 169 | Conduit, 3", 725.04 (625E25500) | FT | 2,858 | $35.00 | $35.00 | $37.00 | $35.00 |
| 170 | Conduit, jacked or drilled, 725.051, 3" (625E25906) | FT | 417 | $60.00 | $60.00 | $50.00 | $60.00 |
| 171 | Conduit cleaned and cables removed, as per plan (625E25911) | FT | 606 | $1.00 | $1.00 | $1.00 | $1.00 |
| 172 | Luminaire, high mast, solid state (LED)447-480W, T (625E26262) | EACH | 12 | $1,200.00 | $1,200.00 | $1,845.00 | $1,200.00 |
| 173 | Luminaire, low mast, solid state (LED)330-381W, TY (625E26272) | EACH | 29 | $1,150.00 | $1,150.00 | $1,078.00 | $1,150.00 |
| 174 | Luminaire, low mast, solid state (LED)308-330W, TY (625E26272) | EACH | 51 | $1,150.00 | $1,150.00 | $1,078.00 | $1,150.00 |
| 175 | Luminaire, installation only, as per plan (625E27561) | EACH | 2 | $100.00 | $100.00 | $125.00 | $100.00 |
| 176 | Trench (625E29000) | FT | 8,931 | $7.00 | $8.00 | $10.00 | $8.00 |
| 177 | Junction box (625E29900) | EACH | 1 | $2,800.00 | $2,800.00 | $3,250.00 | $2,800.00 |
| 178 | Median junction box (625E29930) | EACH | 16 | $4,500.00 | $2,800.00 | $3,330.00 | $2,800.00 |
| 179 | Pull box, 725.08, 18" (625E30700) | EACH | 32 | $1,200.00 | $1,200.00 | $1,400.00 | $1,200.00 |
| 180 | Pull box, 725.08, 24" (625E30706) | EACH | 6 | $1,500.00 | $1,500.00 | $1,600.00 | $1,500.00 |
| 181 | Pull box removed (625E31510) | EACH | 15 | $200.00 | $200.00 | $240.00 | $200.00 |
| 182 | Ground rod (625E32000) | EACH | 115 | $200.00 | $200.00 | $260.00 | $200.00 |
| 183 | Structure grounding system (625E33000) | EACH | 1 | $15,000 | $15,000 | $9,195.00 | $15,000 |
| 184 | Power service, as per plan (625E34001) | EACH | 4 | $10,000 | $10,000 | $8,450.00 | $10,000 |
| 185 | Control center cabinet, complete (625E34450) | EACH | 4 | $6,000.00 | $6,000.00 | $5,485.00 | $6,000.00 |
| 186 | Underground warning/marking tape, as per plan (625E36011) | FT | 8,246 | $1.00 | $1.00 | $2.00 | $1.00 |
| 187 | Pull box cleaned (625E39520) | EACH | 3 | $150.00 | $150.00 | $240.00 | $150.00 |
| 188 | Special - maintain existing lighting (625E40000) | LS | 1 | $200,000 | $225,000 | $266,850 | $225,000 |
| 189 | Special - replacement of existing lighting unit (625E40010) | EACH | 10 | $250.00 | $250.00 | $275.00 | $250.00 |
| 190 | Light tower removed (625E75350) | EACH | 8 | $1,200.00 | $1,200.00 | $2,235.00 | $1,200.00 |
| 191 | Light pole removed (625E75400) | EACH | 82 | $250.00 | $250.00 | $350.00 | $250.00 |
| 192 | Light pole removed for reuse (625E75410) | EACH | 2 | $500.00 | $500.00 | $450.00 | $500.00 |
| 193 | Light pole foundation removed (625E75500) | EACH | 82 | $200.00 | $200.00 | $240.00 | $200.00 |
| 194 | Light tower foundation removed (625E75540) | EACH | 8 | $1,000.00 | $1,000.00 | $825.00 | $1,000.00 |
| 195 | Disconnect circuit (625E75800) | EACH | 1 | $100.00 | $100.00 | $150.00 | $100.00 |
| 196 | Arc flash calculations and label, control centers (625E76000) | EACH | 4 | $500.00 | $500.00 | $740.00 | $500.00 |
| 198 | ITS JUNCTION BOX, 17x24x6 INCHES (809E00530) | EACH | 33 | $3,000.00 | $3,000.00 | $2,190.00 | $3,000.00 |
| 199 | ITS pull box with pad and standard lid assembly, 3 (809E01900) | EACH | 11 | $4,000.00 | $4,000.00 | $3,280.00 | $4,000.00 |
| 201 | Delineator, post ground mounted (620E00500) | EACH | 354 | $75.00 | $75.00 | $100.00 | $75.00 |
| 202 | Delineator, post ground mounted, as per plan (620E00501) | EACH | 40 | $85.00 | $85.00 | $100.00 | $125.00 |
| 203 | RPM (621E00100) | EACH | 659 | $39.00 | $41.50 | $43.75 | $38.45 |
| 204 | RPM, as per plan (621E00101) | EACH | 1,103 | $39.00 | $40.50 | $39.85 | $38.45 |
| 205 | Raised pavement marker removed (621E54000) | EACH | 1,161 | $9.00 | $1.00 | $10.50 | $6.00 |
| 206 | Barrier reflector, type 1, 1 way (626E00102) | EACH | 27 | $15.00 | $14.00 | $11.00 | $11.00 |
| 207 | Barrier reflector, type 1, bidirectional (626E00102) | EACH | 295 | $13.00 | $12.00 | $11.00 | $11.00 |
| 208 | Barrier reflector, type 2, 1 way (626E00110) | EACH | 116 | $15.00 | $14.00 | $11.00 | $11.00 |
| 209 | Barrier reflector, type 2, bidirectional (626E00110) | EACH | 274 | $14.00 | $14.00 | $11.00 | $11.00 |
| 210 | Ground mounted support, no. 2 post (630E02100) | FT | 220 | $16.00 | $16.00 | $16.00 | $16.00 |
| 211 | Ground mounted support, no. 3 post, as per plan (630E03101) | FT | 2,783 | $17.00 | $17.00 | $17.00 | $17.00 |
| 212 | Ground mounted support, no. 4 post (630E04100) | FT | 519 | $20.00 | $20.00 | $20.00 | $20.00 |
| 213 | Ground mounted support, no. 6 post (630E06100) | FT | 50 | $25.00 | $25.00 | $25.00 | $25.00 |
| 214 | Ground mounted structural beam support, S4X7.7 (630E06400) | FT | 257 | $32.00 | $32.00 | $32.00 | $32.00 |
| 215 | Ground mounted structural beam support, W6X9 (630E06500) | FT | 306 | $35.00 | $35.00 | $35.00 | $35.00 |
| 216 | Ground mounted structural beam support, W8X18 (630E07000) | FT | 137 | $60.00 | $60.00 | $60.00 | $60.00 |
| 217 | Ground mounted structural beam support, W10X22 (630E07500) | FT | 51 | $70.00 | $70.00 | $70.00 | $70.00 |
| 218 | Ground mounted structural beam support, W10X12 (630E07600) | FT | 168 | $42.00 | $42.00 | $42.00 | $42.00 |
| 219 | One way support, no. 3 post (630E08004) | FT | 371 | $17.00 | $17.00 | $17.00 | $17.00 |
| 220 | Sign post reflector (630E08600) | EACH | 194 | $45.00 | $45.00 | $45.00 | $45.00 |
| 221 | Breakaway structural beam connection (630E09000) | EACH | 46 | $595.00 | $595.00 | $595.00 | $595.00 |
| 222 | Overhead sign support, type TC-12.31, design 6 (630E72320) | EACH | 3 | $27,350 | $27,350 | $27,350 | $27,350 |
| 223 | Overhead sign support, type TC-12.31, design 10 (630E72330) | EACH | 2 | $41,250 | $41,250 | $41,250 | $41,250 |
| 224 | Overhead sign support, type TC-15.116, design 1 (630E72410) | EACH | 7 | $65,500 | $65,500 | $65,500 | $65,500 |
| 225 | Overhead sign support, type TC-15.116, design 2 (630E72420) | EACH | 3 | $89,550 | $89,550 | $89,550 | $89,550 |
| 226 | Sign attachment assembly (630E75000) | EACH | 64 | $740.00 | $740.00 | $740.00 | $740.00 |
| 227 | Sign support assembly, barrier mounted, as per plan (630E79611) | EACH | 22 | $920.00 | $920.00 | $920.00 | $920.00 |
| 228 | Sign, flat sheet (630E80100) | SF | 2,631 | $16.00 | $16.00 | $16.00 | $16.00 |
| 229 | Sign, ground mounted extrusheet (630E80200) | SF | 1,234 | $25.00 | $25.00 | $25.00 | $25.00 |
| 230 | Sign, overhead extrusheet (630E80224) | SF | 8,072 | $24.50 | $24.50 | $24.50 | $24.50 |
| 231 | Sign, temporary overlay (630E80300) | SF | 522 | $24.50 | $24.50 | $24.50 | $24.50 |
| 232 | Covering of sign (630E83000) | SF | 102 | $23.00 | $23.00 | $23.00 | $23.00 |
| 233 | Concrete barrier median overhead sign support foundation, type TC-21.50 (630E84010) | EACH | 8 | $16,900 | $15,800 | $13,800 | $5,500.00 |
| 234 | Ground mounted structural beam support foundation (630E84500) | EACH | 48 | $720.00 | $720.00 | $720.00 | $720.00 |
| 235 | Rigid overhead sign support foundation (630E84510) | EACH | 18 | $10,750 | $10,750 | $10,750 | $10,750 |
| 236 | Removal of ground mounted sign and disposal (630E84900) | EACH | 243 | $15.00 | $15.00 | $15.00 | $15.00 |
| 237 | Removal of ground mounted major sign and disposal (630E85400) | EACH | 33 | $245.00 | $245.00 | $245.00 | $245.00 |
| 238 | Removal of ground mounted post support and disposal (630E86002) | EACH | 249 | $20.00 | $20.00 | $20.00 | $20.00 |
| 239 | Removal of ground mounted structural beam support (630E86102) | EACH | 48 | $235.00 | $235.00 | $235.00 | $235.00 |
| 240 | Removal of overhead mounted sign and disposal (630E87400) | EACH | 76 | $220.00 | $220.00 | $220.00 | $220.00 |
| 241 | Removal of pole mounted sign and disposal (630E87500) | EACH | 5 | $35.00 | $35.00 | $35.00 | $35.00 |
| 242 | Removal of pole mounted sign and reerection (630E87520) | EACH | 1 | $285.00 | $285.00 | $285.00 | $285.00 |
| 243 | Removal of overhead sign support and disposal, type TC-12.30 (630E89706) | EACH | 6 | $1,680.00 | $1,680.00 | $1,680.00 | $1,680.00 |
| 244 | Removal of overhead sign support and disposal, type TC-7.65 (630E89802) | EACH | 10 | $2,740.00 | $2,740.00 | $2,740.00 | $2,740.00 |
| 245 | Removal of temporary overlay sign and disposal (630E89894) | EACH | 40 | $475.00 | $475.00 | $475.00 | $475.00 |
| 246 | Removal of miscellaneous traffic control item, bea (630E89902) | EACH | 48 | $345.00 | $345.00 | $345.00 | $345.00 |
| 247 | Stop line (646E10400) | FT | 178 | $12.25 | $12.25 | $12.25 | $12.25 |
| 248 | Crosswalk line, 12" (646E10510) | FT | 475 | $7.50 | $7.50 | $7.50 | $7.50 |
| 249 | Transverse/diagonal line (646E10600) | FT | 68 | $13.25 | $13.25 | $13.25 | $13.25 |
| 250 | Island marking (646E10800) | SF | 281 | $7.50 | $7.50 | $7.50 | $7.50 |
| 251 | Lane arrow (646E20300) | EACH | 12 | $175.00 | $175.00 | $175.00 | $175.00 |
| 252 | Wrong way arrow (646E20320) | EACH | 16 | $225.00 | $225.00 | $225.00 | $225.00 |
| 253 | Wet reflective epoxy pavement marking, edge line, 6" (807E12010) | MI | 22 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 |
| 254 | Wet reflective epoxy pavement marking, lane line, 6" (807E12110) | MI | 11 | $1,800.00 | $1,800.00 | $1,800.00 | $1,800.00 |
| 255 | Wet reflective epoxy pavement marking, channelizing line, 12" (807E12310) | FT | 14,943 | $2.75 | $2.75 | $2.75 | $2.75 |
| 256 | Wet reflective epoxy pavement marking, dotted line, 6" (807E12410) | FT | 8,908 | $1.25 | $1.25 | $1.25 | $1.25 |
| 257 | Grooving for 6" recessed pavement marking, (asphalt) (850E10010) | MI | 30 | $1,100.00 | $1,100.00 | $1,100.00 | $1,100.00 |
| 258 | Grooving for 6" recessed pavement marking, (asphalt) (850E10110) | FT | 8,201 | $1.00 | $1.00 | $1.00 | $1.00 |
| 259 | Grooving for 12" recessed pavement marking, (asphalt) (850E10130) | FT | 14,471 | $1.50 | $1.50 | $1.50 | $1.50 |
| 260 | Grooving for 6" recessed pavement marking, (concrete) (850E20010) | MI | 3 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 261 | Grooving for 6" recessed pavement marking, (concrete) (850E20110) | FT | 707 | $1.50 | $1.50 | $1.50 | $1.50 |
| 262 | Grooving for 12" recessed pavement marking, (concrete) (850E20130) | FT | 472 | $2.00 | $2.00 | $2.00 | $2.00 |
| 263 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $750,000 | $1,000,000 | $1,500,000 | $1,300,000 |
| 264 | Approach slab removed (202E22900) | SY | 423 | $40.00 | $55.00 | $48.00 | $55.00 |
| 265 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $235,000 | $55,000 | $47,700 | $60,000 |
| 266 | Unclassified excavation, as per plan (503E21301) | LS | 1 | $130,000 | $200,000 | $143,990 | $175,000 |
| 267 | Epoxy coated steel reinforcement (509E10000) | LB | 625,057 | $1.59 | $1.75 | $1.65 | $1.80 |
| 268 | Galvanized steel reinforcement (509E26000) | LB | 6,664 | $2.00 | $2.00 | $1.90 | $2.15 |
| 269 | No. 4 deformed GFRP reinforcement (509E30020) | FT | 37,159 | $1.78 | $1.75 | $1.70 | $2.00 |
| 270 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 651 | $27.00 | $30.00 | $27.00 | $30.00 |
| 271 | Class QC2 concrete with QC/QA, bridge deck, as per plan (511E34447) | CY | 1,747 | $1,175.00 | $1,025.00 | $1,000.00 | $1,050.00 |
| 272 | Class QC2 concrete with QC/QA, bridge deck (parapet) (511E34450) | CY | 509 | $425.00 | $550.00 | $527.00 | $575.00 |
| 273 | Class QC1 concrete with QC/QA, abutment (511E45712) | CY | 268 | $1,500.00 | $1,300.00 | $1,134.00 | $1,300.00 |
| 274 | Sealing of concrete surfaces, as per plan (512E10001) | SY | 194 | $43.00 | $45.00 | $50.00 | $45.00 |
| 275 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 6,240 | $36.00 | $36.00 | $36.00 | $55.00 |
| 276 | Concrete repair by epoxy injection, as per plan (512E10601) | FT | 100 | $198.00 | $185.00 | $75.00 | $185.00 |
| 277 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 194 | $42.00 | $35.00 | $40.00 | $45.00 |
| 278 | Structural steel members, level UF, as per plan (513E10201) | LB | 13,450 | $20.00 | $10.00 | $8.75 | $10.00 |
| 280 | Welded stud shear connectors (513E20000) | EACH | 18,195 | $5.00 | $4.00 | $4.00 | $4.00 |
| 281 | Surface preparation of existing structural steel (514E00050) | SF | 14,280 | $40.00 | $33.20 | $16.00 | $43.00 |
| 282 | Field painting of existing structural steel, prime coat (514E00056) | SF | 14,280 | $25.00 | $9.75 | $10.00 | $25.00 |
| 283 | Field painting structural steel, intermediate coat (514E00060) | SF | 15,667 | $25.00 | $10.75 | $10.00 | $20.00 |
| 284 | Field painting structural steel, finish coat (514E00066) | SF | 15,667 | $22.00 | $10.75 | $9.00 | $10.00 |
| 285 | Grinding fins, tears, slivers on existing structural steel (514E00504) | MNHR | 120 | $375.00 | $10.00 | $150.00 | $190.00 |
| 286 | Final inspection repair (514E10000) | EACH | 48 | $1,260.00 | $10.00 | $500.00 | $150.00 |
| 287 | Structural expansion joint including elastomeric strip seal (516E11210) | FT | 199 | $965.00 | $900.00 | $940.00 | $1,000.00 |
| 288 | 1" preformed expansion joint filler (516E13600) | SF | 377 | $11.00 | $10.00 | $10.00 | $11.00 |
| 289 | 2" preformed expansion joint filler (516E13900) | SF | 48 | $13.00 | $15.00 | $15.00 | $17.00 |
| 290 | Elastomeric bearing with internal laminates and load plate (516E44100) | EACH | 12 | $4,150.00 | $3,800.00 | $5,335.00 | $5,800.00 |
| 291 | Elastomeric bearing with internal laminates and load plate (516E44200) | EACH | 48 | $3,500.00 | $3,100.00 | $4,649.00 | $5,000.00 |
| 292 | Elastomeric bearing with internal laminates and load plate (516E44300) | EACH | 24 | $4,000.00 | $2,900.00 | $4,490.00 | $4,800.00 |
| 293 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $210,000 | $250,000 | $220,500 | $300,000 |
| 294 | Porous backfill with geotextile fabric (518E21200) | CY | 103 | $125.00 | $150.00 | $125.00 | $150.00 |
| 295 | Patching concrete structure, as per plan (519E11101) | SF | 100 | $250.00 | $250.00 | $150.00 | $225.00 |
| 296 | Reinforced concrete approach slabs with QC/QA (T=1 (526E30010) | SY | 676 | $460.00 | $450.00 | $445.00 | $450.00 |
| 297 | Type B installation (526E90020) | SY | 113 | $48.00 | $120.00 | $114.00 | $125.00 |
| 298 | Special - structures, removal of asbestos containi (530E00600) | SF | 40 | $160.00 | $250.00 | $250.00 | $250.00 |
| 299 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 550 | $100.00 | $135.00 | $90.00 | $120.00 |
| 300 | Increased barrier delineation (614E11630) | FT | 16,119 | $1.50 | $1.00 | $1.00 | $1.00 |
| 301 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 30 | $2,600.00 | $2,420.00 | $2,800.00 | $2,800.00 |
| 302 | Detour signing (614E12420) | LS | 1 | $175,000 | $150,000 | $150,000 | $175,000 |
| 303 | Work zone increased penalties sign (614E12484) | EACH | 75 | $178.00 | $175.00 | $175.00 | $175.00 |
| 304 | Replacement sign (614E12500) | EACH | 50 | $178.00 | $175.00 | $175.00 | $175.00 |
| 305 | Replacement drum (614E12600) | EACH | 100 | $53.00 | $52.50 | $52.50 | $52.50 |
| 306 | Work zone crossover lighting system (614E12756) | EACH | 1 | $35,000 | $35,000 | $49,450 | $35,000 |
| 307 | Work zone raised pavement marker, as per plan (614E12801) | EACH | 10,257 | $12.00 | $17.24 | $9.80 | $19.00 |
| 308 | Asphalt concrete for maintaining traffic (614E13000) | CY | 500 | $200.00 | $300.00 | $574.93 | $150.00 |
| 309 | Barrier reflector, type 1, one-way (614E13310) | EACH | 6,723 | $6.00 | $7.25 | $7.25 | $7.25 |
| 310 | Barrier reflector, type 2, one-way (614E13312) | EACH | 292 | $15.00 | $15.00 | $15.00 | $15.00 |
| 311 | Object marker, one way (614E13350) | EACH | 2,073 | $18.00 | $18.25 | $18.25 | $18.25 |
| 312 | Object marker, two way (614E13360) | EACH | 705 | $20.00 | $22.50 | $22.50 | $22.50 |
| 313 | Maintaining traffic, misc.: bridge deck and paveme (614E18000) | EACH | 50,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 314 | Maintaining traffic, misc.: safety repairs (614E18000) | EACH | 50,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 315 | Portable changeable message sign, as per plan (614E18601) | SNMT | 72 | $850.00 | $675.00 | $675.00 | $675.00 |
| 316 | Work zone lane line, class I, 6", 807 paint (614E20056) | MI | 13.76 | $1,450.00 | $1,450.00 | $1,450.00 | $1,450.00 |
| 317 | Work zone lane line, class I, 6", 648 (614E20366) | MI | 6.37 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 318 | Work zone edge line, class I, 6", 807 paint (614E22056) | MI | 38.99 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 319 | Work zone edge line, class I, 6", 648 (614E22336) | MI | 13.92 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 320 | Work zone channelizing line, class I, 12", 807 paint (614E23110) | FT | 49,115 | $2.00 | $2.00 | $2.00 | $2.00 |
| 321 | Work zone channelizing line, class I, 12", 648 (614E23150) | FT | 10,702 | $1.40 | $1.35 | $1.35 | $1.35 |
| 322 | Work zone dotted line, class I, 6", 807 paint (614E24102) | FT | 14,034 | $1.30 | $1.25 | $1.25 | $1.25 |
| 323 | Work zone dotted line, class I, 6", 648 (614E24142) | FT | 5,859 | $0.75 | $0.75 | $0.75 | $0.75 |
| 324 | Work zone transverse/diagonal line, class I, 648 (614E25120) | FT | 123 | $7.50 | $7.50 | $7.50 | $7.50 |
| 325 | Work zone stop line, class I, 648 (614E26120) | FT | 106 | $7.50 | $7.50 | $7.50 | $7.50 |
| 326 | Work zone crosswalk line, class I, 12" (614E27010) | FT | 203 | $2.75 | $2.75 | $2.75 | $2.75 |
| 327 | Work zone arrow, class I, 648 (614E30120) | EACH | 12 | $100.00 | $100.00 | $100.00 | $100.00 |
| 328 | Work zone arrow, class I, 648, as per plan (614E30121) | EACH | 9 | $200.00 | $200.00 | $200.00 | $200.00 |
| 329 | Roads for maintaining traffic (615E10000) | LS | 1 | $200,000 | $400,000 | $515,000 | $450,000 |
| 330 | Pavement for maintaining traffic, class A, as per plan (615E20001) | SY | 8,557 | $70.00 | $65.00 | $90.00 | $90.00 |
| 331 | Pavement for maintaining traffic, class B, as per plan (615E25001) | SY | 1,000 | $66.00 | $68.00 | $82.00 | $82.00 |
| 332 | Pavement for maintaining traffic, class B, as per plan (615E25001) | SY | 1,000 | $90.00 | $55.00 | $65.00 | $65.00 |
| 333 | Pavement for maintaining traffic, class B, as per plan (615E25001) | SY | 1,000 | $75.00 | $100.00 | $140.00 | $140.00 |
| 334 | Pavement for maintaining traffic, class B, as per plan (615E25001) | SY | 1,000 | $70.00 | $85.00 | $95.00 | $95.00 |
| 335 | Water (616E10000) | MGAL | 160 | $95.00 | $5.00 | $24.00 | $10.00 |
| 336 | Portable barrier, 50", as per plan (622E41011) | FT | 17,590 | $12.00 | $17.27 | $27.50 | $40.00 |
| 337 | Portable barrier, 50", as per plan (622E41011) | FT | 1,053 | $45.00 | $69.61 | $86.00 | $118.00 |
| 338 | Portable barrier, unanchored (622E41100) | FT | 36,883 | $5.50 | $17.66 | $17.75 | $15.00 |
| 339 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 36 | $540.00 | $500.00 | $500.00 | $500.00 |
| 340 | Special - as-built construction plans (690E91000) | LS | 1 | $3,500.00 | $24,512 | $8,250.00 | $100,000 |
| 341 | Erosion control (832E30000) | EACH | 3,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 342 | Ground mounted support, no. 2 post (630E02100) | FT | 907 | $16.00 | $17.50 | $16.00 | $17.50 |
| 343 | Sign, flat sheet (630E80100) | SF | 186 | $18.00 | $18.00 | $18.00 | $50.00 |
| 344 | Sign, flat sheet (630E80100) | SF | 79 | $18.00 | $50.00 | $18.00 | $50.00 |
| 345 | Removal of ground mounted sign and disposal (630E84900) | EACH | 60 | $15.00 | $37.50 | $15.00 | $37.50 |
| 346 | Removal of ground mounted post support and disposal (630E86002) | EACH | 48 | $20.00 | $37.50 | $20.00 | $37.50 |
| 347 | Edge line, 6" (646E10010) | MI | 0.18 | $10,000 | $10,000 | $10,000 | $10,000 |
| 348 | Lane line, 6" (646E10110) | MI | 0.22 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 |
| 349 | Center line (646E10200) | MI | 0.27 | $20,000 | $20,000 | $20,000 | $20,000 |
| 350 | Channelizing line, 8" (646E10300) | FT | 289 | $2.80 | $2.75 | $2.75 | $2.75 |
| 351 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 17 | $85.00 | $85.00 | $85.00 | $85.00 |
| 352 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,317 | $12.50 | $12.50 | $12.50 | $12.50 |
| 353 | Removal of existing pavement marking (512E74500) | FT | 247 | $4.00 | $4.00 | $4.00 | $4.00 |
| 354 | Patching concrete structure, as per plan (519E11101) | SF | 150 | $225.00 | $225.00 | $225.00 | $225.00 |
| 355 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 354 | $45.00 | $45.00 | $45.00 | $45.00 |
| 356 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,171 | $12.50 | $12.50 | $12.50 | $12.50 |
| 357 | Removal of existing pavement marking (512E74500) | FT | 625 | $4.00 | $4.00 | $4.00 | $4.00 |
| 359 | Patching concrete bridge deck overlay with micro-silica modified concrete (519E10000) | SY | 7 | $850.00 | $850.00 | $850.00 | $850.00 |
| 360 | Patching concrete structure, as per plan (519E11101) | SF | 100 | $225.00 | $225.00 | $225.00 | $225.00 |
| 361 | Special - structures: concrete spall removal (530E00800) | SY | 5 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 362 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 23 | $85.00 | $85.00 | $85.00 | $85.00 |
| 363 | Refurbish bearing device, as per plan (516E45305) | EACH | 16 | $3,200.00 | $3,200.00 | $3,004.35 | $3,200.00 |
| 364 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $57,000 | $75,000 | $44,250 | $57,000 |
| 365 | Patching concrete bridge deck overlay with micro-silica modified concrete (519E10000) | SY | 10 | $850.00 | $850.00 | $850.00 | $850.00 |
| 366 | Patching concrete structure, as per plan (519E11101) | SF | 205 | $225.00 | $225.00 | $225.00 | $225.00 |
| 367 | Special - structures: concrete spall removal (530E00800) | SY | 5 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 368 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 9 | $115.00 | $115.00 | $115.00 | $115.00 |
| 369 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,707 | $12.50 | $12.50 | $12.50 | $12.50 |
| 370 | Removal of existing pavement marking (512E74500) | FT | 1,477 | $4.00 | $4.00 | $4.00 | $4.00 |
| 371 | Armorless preformed joint seal (516E10010) | FT | 192 | $132.00 | $132.00 | $132.00 | $132.00 |
| 372 | Refurbish bearing device, as per plan (516E45305) | EACH | 28 | $3,200.00 | $3,200.00 | $3,004.35 | $3,200.00 |
| 373 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $36,000 | $50,000 | $44,250 | $36,000 |
| 374 | Patching concrete structure, as per plan (519E11101) | SF | 75 | $225.00 | $225.00 | $225.00 | $225.00 |
| 375 | Special - structures: concrete spall removal (530E00800) | SY | 5 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 376 | Micro silica modified concrete overlay using hydrodemolition (848E10000) | SY | 532 | $80.00 | $80.00 | $80.00 | $80.00 |
| 377 | Surface preparation using hydrodemolition (848E20000) | SY | 532 | $240.00 | $240.00 | $240.00 | $240.00 |
| 378 | Micro silica modified concrete overlay (variable thickness), material only (848E30000) | CY | 9 | $500.00 | $500.00 | $500.00 | $500.00 |
| 379 | Hand chipping (848E50000) | SY | 16 | $100.00 | $100.00 | $100.00 | $100.00 |
| 380 | Test slab (848E50100) | LS | 1 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 381 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 30 | $85.00 | $85.00 | $85.00 | $85.00 |
| 382 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 2,141 | $12.50 | $12.50 | $12.50 | $12.50 |
| 383 | Removal of existing pavement marking (512E74500) | FT | 1,386 | $4.00 | $4.00 | $4.00 | $4.00 |
| 384 | Refurbish bearing device, as per plan (516E45305) | EACH | 24 | $3,200.00 | $3,200.00 | $3,004.35 | $3,200.00 |
| 385 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $34,000 | $34,000 | $44,250 | $34,000 |
| 386 | Patching concrete bridge deck overlay with micro-silica modified concrete (519E10000) | SY | 23 | $850.00 | $850.00 | $850.00 | $850.00 |
| 387 | Patching concrete structure, as per plan (519E11101) | SF | 265 | $225.00 | $225.00 | $225.00 | $225.00 |
| 388 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 292 | $15.00 | $15.00 | $15.00 | $15.00 |
| 389 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 845 | $15.00 | $15.00 | $15.00 | $15.00 |
| 390 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 9 | $115.00 | $115.00 | $115.00 | $115.00 |
| 391 | Patching concrete structure, as per plan (519E11101) | SF | 75 | $225.00 | $225.00 | $225.00 | $225.00 |
| 392 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 1,352 | $15.00 | $15.00 | $15.00 | $15.00 |
| 393 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 6 | $170.00 | $170.00 | $170.00 | $170.00 |
| 394 | Patching concrete structure, as per plan (519E11101) | SF | 50 | $225.00 | $225.00 | $225.00 | $225.00 |
| 395 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 25 | $85.00 | $85.00 | $85.00 | $85.00 |
| 396 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,551 | $12.50 | $12.50 | $12.50 | $12.50 |
| 397 | Removal of existing pavement marking (512E74500) | FT | 1,001 | $4.00 | $4.00 | $4.00 | $4.00 |
| 398 | Special - composite fiber wrap system (519E00100) | SF | 454 | $75.00 | $75.00 | $75.00 | $75.00 |
| 399 | Patching concrete structure, as per plan (519E11101) | SF | 220 | $225.00 | $225.00 | $225.00 | $225.00 |
| 400 | Galvanic anode protection (844E20000) | EACH | 440 | $50.00 | $50.00 | $50.00 | $50.00 |
| 401 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 23 | $85.00 | $85.00 | $85.00 | $85.00 |
| 402 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 2,643 | $12.50 | $12.50 | $12.50 | $12.50 |
| 403 | Removal of existing pavement marking (512E74500) | FT | 1,566 | $4.00 | $4.00 | $4.00 | $4.00 |
| 404 | Patching concrete structure, as per plan (519E11101) | SF | 200 | $225.00 | $225.00 | $225.00 | $225.00 |
| 405 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 23 | $85.00 | $85.00 | $85.00 | $85.00 |
| 406 | Patching concrete structure, as per plan (519E11101) | SF | 200 | $225.00 | $225.00 | $225.00 | $225.00 |
| 407 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 329 | $45.00 | $45.00 | $45.00 | $45.00 |
| 408 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 2,401 | $12.50 | $12.50 | $12.50 | $12.50 |
| 409 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 329 | $45.00 | $45.00 | $45.00 | $45.00 |
| 410 | Removal of existing pavement marking (512E74500) | FT | 1,674 | $4.00 | $4.00 | $4.00 | $4.00 |
| 411 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 349 | $45.00 | $45.00 | $45.00 | $45.00 |
| 412 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 2,586 | $12.50 | $12.50 | $12.50 | $12.50 |
| 413 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 349 | $45.00 | $45.00 | $45.00 | $45.00 |
| 414 | Removal of existing pavement marking (512E74500) | FT | 1,861 | $4.00 | $4.00 | $4.00 | $4.00 |
| 415 | Portions of structure removed, as per plan (202E11201) | LS | 1 | $250,000 | $275,000 | $250,000 | $300,000 |
| 416 | Epoxy coated steel reinforcement (509E10000) | LB | 4,088 | $3.25 | $3.25 | $3.25 | $3.25 |
| 417 | Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001) | LB | 100 | $10.00 | $10.00 | $10.00 | $10.00 |
| 418 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 12 | $85.00 | $85.00 | $85.00 | $85.00 |
| 419 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,413 | $12.50 | $12.50 | $12.50 | $12.50 |
| 420 | Removal of existing pavement marking (512E74500) | FT | 965 | $4.00 | $4.00 | $4.00 | $4.00 |
| 421 | Armorless preformed joint seal (516E10010) | FT | 128 | $85.00 | $85.00 | $85.00 | $85.00 |
| 422 | Structural joint or joint sealer, misc.: centerlin (516E14600) | FT | 133 | $1,900.00 | $1,900.00 | $1,900.00 | $3,500.00 |
| 423 | Refurbish bearing device, as per plan (516E45305) | EACH | 24 | $2,450.00 | $2,450.00 | $3,004.35 | $2,450.00 |
| 424 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $50,000 | $50,000 | $44,250 | $50,000 |
| 425 | Patching concrete bridge deck overlay with micro-silica modified concrete (519E10000) | SY | 9 | $850.00 | $850.00 | $850.00 | $850.00 |
| 426 | Patching concrete structure, as per plan (519E11101) | SF | 100 | $225.00 | $225.00 | $225.00 | $225.00 |
| 427 | Special - patching concrete structure: ves-LMC (VE (519E11900) | CY | 26 | $7,000.00 | $7,000.00 | $7,000.00 | $7,000.00 |
| 428 | Special - patching concrete structure: trial batch (519E60000) | LS | 1 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 |
| 429 | Special - structures: removal of asbestos containi (530E00600) | SF | 40 | $625.00 | $625.00 | $250.00 | $625.00 |
| 430 | Galvanic anode protection (844E20000) | EACH | 582 | $50.00 | $50.00 | $50.00 | $50.00 |
| 431 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 6 | $1,700.00 | $1,700.00 | $1,700.00 | $1,700.00 |
| 432 | Patching concrete structure, as per plan (519E11101) | SF | 50 | $225.00 | $225.00 | $225.00 | $225.00 |
| 433 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 20 | $100.00 | $135.00 | $90.00 | $100.00 |
| 434 | Work zone marking sign (614E12460) | EACH | 6 | $102.00 | $100.00 | $100.00 | $100.00 |
| 435 | Portable changeable message sign, as per plan (614E18601) | SNMT | 4 | $850.00 | $675.00 | $675.00 | $675.00 |
| 436 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 0.64 | $750.00 | $750.00 | $750.00 | $750.00 |
| 437 | Work zone center line, class III, 642 paint (614E21550) | MI | 0.14 | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 |
| 438 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 1.30 | $850.00 | $850.00 | $850.00 | $850.00 |
| 439 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 386 | $0.75 | $0.75 | $0.75 | $0.75 |
| 440 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 300 | $1.00 | $1.00 | $1.00 | $1.00 |
| 441 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $283,000 | $350,000 | $296,874 | $500,000 |
| 442 | CPM progress schedule (108E10000) | LS | 1 | $4,400.00 | $100,000 | $9,750.00 | $75,000 |
| 443 | Maintaining traffic (614E11000) | LS | 1 | $1,964,000 | $1,750,000 | $2,248,500 | $3,510,000 |
| 444 | Field office, type C, as per plan (619E16021) | MNTH | 28 | $6,000.00 | $6,000.00 | $6,000.00 | $15,000 |
| 445 | Construction layout stakes and surveying (623E10000) | LS | 1 | $600,000 | $750,000 | $550,000 | $1,750,000 |
| 446 | Mobilization (624E10000) | LS | 1 | $2,800,000 | $4,000,000 | $3,195,000 | $1,600,000 |
| 500 | Bracket arm, 10' (625E18000) | EACH | 2 | $1,000.00 | $1,000.00 | $975.00 | $1,000.00 |
| 501 | Conduit riser, 1" diameter (632E70200) | EACH | 2 | $600.00 | $600.00 | $720.00 | $600.00 |
| 502 | Wood pole (632E89300) | EACH | 2 | $1,500.00 | $1,500.00 | $1,650.00 | $1,500.00 |
| 503 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 2 | $2,420.00 | $3,500.00 | $2,800.00 | $2,800.00 |
| 504 | Barrier reflector, type 1(one-way) (614E13310) | EACH | 14 | $8.00 | $8.00 | $7.25 | $8.00 |
| 505 | Object marker, one way (614E13350) | EACH | 14 | $15.00 | $15.00 | $18.25 | $15.00 |
| 506 | Portable barrier, unanchored (622E41100) | FT | 680 | $18.00 | $4.29 | $44.00 | $18.00 |
| 507 | Class QC2 concrete, misc.:moment slab and parapet (511E53012) | CY | 34 | $1,200.00 | $1,000.00 | $970.00 | $1,000.00 |
| 508 | Barrier, misc.:median barrier transitions (622E90000) | FT | 265 | $270.00 | $225.00 | $430.00 | $425.00 |
| 509 | Conduit, 2", multicell, with 4 - 10/8MM innerducts (809E24510) | FT | 1,370 | $12.00 | $12.00 | $11.00 | $12.00 |
| 511 | Anti-segregation equipment (442E00100) | CY | 19,006 | $11.50 | $8.00 | $10.00 | $10.00 |
| 512 | Embankment (204E20000) | CY | 14,515 | $9.00 | $30.00 | $5.25 | $30.00 |
| 513 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 11.15 | $725.00 | $725.00 | $725.00 | $725.00 |
| 514 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 21.77 | $850.00 | $850.00 | $850.00 | $850.00 |
| 515 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 14,943 | $1.00 | $1.00 | $1.00 | $1.00 |
| 516 | Work zone dotted line, class III, 6", 642 paint (614E24612) | FT | 8,908 | $0.75 | $0.75 | $0.75 | $0.75 |
| 517 | Work zone stop line, class III, 642 paint (614E26610) | FT | 178 | $3.50 | $3.50 | $3.50 | $3.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of February 5, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.