TDOT contract CNZ058 bid tabulation

The construction of a concrete bulb-tee beam bridge on kidd lane over the elk river (l.m. 2.00), including grading, drainage, and paving. Let by Tennessee DOT on February 7, 2025, Lincoln County. 3 bids received; low bid $13,810,007 by Jones Bros. Contractors, LLC.

Owner
Tennessee DOT
Letting
07 FEB 2025
Pay items
121
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Jones Bros. Contractors, LLC$13,810,007Low
2Dement Construction Group, LLC$14,690,101+6.0%
3Bell & Associates Construction, LLC$16,484,838+19%
TDOT contract CNZ058: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Jones Bros. Contractors, LLC2. Dement Construction Group, LLC3. Bell & Associates Construction, LLC
1Construction stakes, lines and grades (105-01)LS1$50,000$50,000$136,500
2Trainee (109-10.01)HR2,280$0.80$0.80$0.80
3Clearing and grubbing (201-01)LS1$95,000$211,000$95,000
4Removal of structures and obstructions (202-01)LS1$500.00$6,000.00$9,700.00
5Removal of pipe (30" , sta. 124+50) (202-02.01)LF31$15.00$25.00$116.00
6Removal of pipe (unknown size ,sta. 110+50) (202-02.02)LF26$18.00$30.00$135.00
7Removal of pipe (10" ,sta. 120+20) (202-02.03)LF21$21.00$35.00$57.00
8Removal of pipe (24" ,sta. 126+50) (202-02.04)LF17$26.00$40.00$75.00
9Road & drainage excavation (unclassified) (203-01)CY11,635$22.00$20.00$15.00
10Road & drainage excavation (stream mitigation) (203-01.13)CY24,400$25.00$20.00$42.50
11Borrow excavation (graded solid rock) (203-02.01)TON93,156$19.00$28.50$37.00
12Placing and spreading topsoil (203-04)CY3,374$18.00$21.50$27.00
13Undercutting (203-05)CY10,922$20.00$18.00$23.50
14Water (203-06)MG146$30.00$12.00$139.00
15Furnishing & spreading topsoil (203-07)CY176$20.00$50.00$66.00
16Construction of haul road (203-50)LS1$800,000$860,000$498,000
17Ditch (riprap, sand & plastic sheeting) (208-02.01)LF104$95.00$35.00$187.00
1812" temporary slope drain (209-02.05)LF56$35.00$40.00$98.00
19Stream mitigation - live brush layering (209-03.42)LF830$150.00$125.00$159.50
20Stream mitigation – wood toe W/reinforced earth (209-03.67)LF510$185.00$96.00$399.00
21Stream mitigation – boulder toe (209-03.68)LF321$315.00$147.00$399.00
22Protected area marker (white with decal) (209-03.99)EACH49$100.00$132.50$319.00
23Sediment removal (209-05)CY610$30.00$25.00$23.75
24Temporary silt fence (with backing) (209-08.02)LF15,582$4.90$4.90$5.60
25Rock check dam (209-08.07)EACH31$1,250.00$1,250.00$637.00
26Enhanced rock check dam (209-08.08)EACH13$1,450.00$1,450.00$637.00
27Sediment filter bag (15' X 15') (209-09.03)EACH6$1,000.00$380.00$542.00
28Temporary stream diversion (STR-3 mitigation) (209-65.01)LS1$20,000$2,425.00$10,635
29Mineral aggregate, type A base, grading D (303-01)TON6,805$27.20$27.20$29.00
30Mineral aggregate (size 57) (303-10.01)TON2,099$50.00$50.00$59.00
31Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08)TON1,113$108.00$108.00$115.00
32Bituminous material for prime coat (PC) (402-01)TON15$500.00$500.00$531.50
33Aggregate for cover material (PC) (402-02)TON52$40.00$40.00$42.50
34Bituminous material for tack coat (TC) (403-01)TON3.30$1,250.00$1,250.00$1,329.00
35Acs mix(PG64-22) grading D (411-01.10)TON701$135.00$135.00$143.50
3648" pipe culvert (607-09.30)LF77$200.00$250.00$458.00
3718" pipe culvert (side drain) (607-39.02)LF105$40.00$100.00$180.00
38Class A concrete (pipe endwalls) (611-07.01)CY12.20$2,500.00$2,000.00$2,992.00
39Steel bar reinforcement (pipe endwalls) (611-07.02)LB464$2.00$5.00$1.80
4018" temporary drainage pipe (621-03.02)LF300$40.00$55.00$125.00
41W beam GR (type 2) MASH TL-3 (705-06.01)LF1,597$36.00$35.00$37.20
42Thrie beam bridge transition MASH TL-2 (705-06.26)EACH4$2,500.00$1,800.00$1,914.00
43GR terminal (energy absorbing) MASH TL-2 (705-06.30)EACH4$3,400.00$4,000.00$4,250.00
44High-visibility construction fence (707-08.11)LF16,380$3.40$3.40$2.10
45Machined rip-rap (class A-3) (709-05.05)TON352$58.00$60.00$69.00
46Machined rip-rap (class A-1) (709-05.06)TON3,022$55.00$57.00$59.00
47Rock riffles (709-05.81)LS1$35,000$75,000$53,158
48Traffic control (712-01)LS1$20,000$15,000$11,200
49Flexible drums (channelizing) (712-04.01)EACH30$35.00$31.00$33.00
50Warning lights (type A) (712-05.01)EACH8$52.00$35.00$37.00
51Signs (construction) (712-06)SF383$8.40$8.50$9.00
52Temporary barricades (type III) (712-07.03)LF140$18.00$30.00$32.00
53Signs (mutcd no. R1-1, stop sign) (713-16.20)EACH1$270.00$450.00$478.50
54Plastic pavement marking (stop line) (716-02.05)LF15$25.00$25.00$26.60
55Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM3.30$8,500.00$8,500.00$9,037.00
56Mobilization (717-01)LS1$1,000,000$1,400,000$1,600,000
57Geo grid reinforcement (740-07.01)SY218$4.00$17.50$12.00
58Geogrid reinforcement type 2 (740-07.04)SY1,364$3.00$7.00$7.25
59Geotextile (type I)(subsurface drainage) (740-10.01)SY289$3.50$6.00$4.50
60Geotextile (type III)(erosion control) (740-10.03)SY862$3.20$5.00$4.67
61Geotextile (type IV)(stabilization) (740-10.04)SY19,136$3.40$2.00$3.70
62Temporary sediment tube 18IN (740-11.03)LF36,225$3.90$3.90$3.50
63Crown vetch mixture (with mulch) (801-01.02)UNIT305$48.00$48.00$90.40
64Temporary seeding (with mulch) (801-01.07)UNIT221$36.00$36.00$63.80
65Seeding (special mixture) with mulch (801-01.08)UNIT494$112.00$112.00$133.00
66Grass seed mix (ripzn/FLPL) (801-01.34)UNIT16$156.00$156.00$106.00
67Temporary mulch (801-01.65)UNIT16$100.00$100.00$53.20
68Water (seeding & sodding) (801-03)MG52.60$100.00$100.00$79.75
69Cuttings: salix nigra (18IN-24IN length) (802-02.30)EACH182$8.00$8.00$17.00
70Cuttings: salix sericea (18IN-24IN) (802-02.31)EACH182$8.00$8.00$17.00
71Cuttings: cornus amomum (18IN-24IN) (802-02.32)EACH182$8.00$8.00$17.00
72Cuttings: sambucus canadensis (18IN-24IN) (802-02.33)EACH182$8.00$8.00$17.00
73Cuttings: cephalanthus occidentalis (18IN-24IN) (802-02.35)EACH1,100$8.00$8.00$15.25
74Cuttings: cornus amomum (24-48IN) (802-02.42)EACH977$9.00$9.00$13.90
75Cuttings: sambucus canadensis (24-48IN) (802-02.43)EACH977$9.00$9.00$13.90
76Betula nigra (river birch seedlng B.R.) (802-12.07)EACH299$10.00$10.00$21.30
77Cercis canadensis (redbud seedlng B.R.) (802-12.11)EACH52$10.00$10.00$21.30
78Liriodendron tulipifera (tulip poplar seedlng B.R.) (802-12.19)EACH78$10.00$10.00$21.30
79Nyssa sylvatica (blckgum seedlng B.R.) (802-12.21)EACH120$10.00$10.00$26.50
80Ostrya virginiana (ironwood seedlng B.R.) (802-12.22)EACH52$10.00$10.00$26.50
81Platanus occidentalis (sycamore seedlng B.R.) (802-12.26)EACH257$10.00$10.00$21.50
82Quercus michauxii (SWMP CHSTNT oak seedlng B.R.) (802-12.33)EACH299$10.00$10.00$21.50
83Quercus phellos (willow oak seedlng B.R.) (802-12.38)EACH257$10.00$10.00$21.50
84Cephalanthus occidentalis (buttonbush SDLNG bare root) (802-13.53)EACH502$10.00$10.00$16.00
85Cornus amomum (silky dogwood SDLNG bare root) (802-13.54)EACH502$10.00$10.00$16.00
86Itea virginica (virginia sweetspire SDLNG bare root) (802-13.58)EACH73$10.00$10.00$21.25
87Lindera benzoin (spicebush SDLNG bare root) (802-13.59)EACH429$10.00$10.00$21.25
88Viburnum nudum (possumhaw viburnum sdling B.R.) (802-13.74)EACH73$10.00$10.00$21.25
89Sodding (new sod) (803-01)SY1,200$7.20$7.20$5.90
90Erosion control blanket (type I) (805-12.01)SY27,093$0.95$0.95$1.00
91Erosion control blanket (type II) (805-12.02)SY2,788$1.00$1.00$1.00
92700 gram coir fiber erosion blanket (805-12.08)SY1,718$5.90$5.90$15.60
93Dry excavation (bridges) (204-02.01)CY160$45.00$30.00$50.00
94Core drilling and sampling (204-05.01)LF789$115.00$115.00$124.50
95Granular backfill (bridges) (303-01.02)TON54$65.00$40.00$48.00
96Steel structures (602-03)LS1$1,000,000$750,000$1,250,000
97Bearing device (1 7/8" reinforced elastomeric bearing pad) (602-10.60)EACH16$470.00$3,000.00$108.00
98Bearing device (2 1/2" reinforced elastomeric bearing pad) (602-10.61)EACH8$580.00$4,000.00$108.00
99Bearing device (3 3/4" reinforced elastomeric bearing pad) (602-10.62)EACH4$4,500.00$15,000$3,500.00
100Bearing device (5" reinforced elastomeric bearing pad) (602-10.63)EACH4$1,700.00$12,500$175.00
101Epoxy coated reinforcing steel (604-02.03)LB305,008$1.30$1.69$1.45
102Class A concrete (bridges) (604-03.01)CY471$1,250.00$1,250.00$1,500.00
103Steel bar reinforcement (bridges) (604-03.02)LB63,797$1.18$1.55$1.10
104Pavement @ bridge ends (604-03.04)SY151$320.00$450.00$518.00
105Class D concrete (bridge deck) (604-03.09)CY1,191$1,200.00$1,000.00$700.00
106Applied texture finish (new structures) (604-04.01)SY6,060$12.00$16.00$13.30
107Bridge deck grooving (mechanical) (604-05.31)SY3,959$4.00$3.70$4.00
108Expansion device (4" strip seal) (604-11.01)LF64$1,200.00$1,000.00$830.00
109Steel piles (10 inch) (606-02.03)LF530$85.00$50.00$77.00
110Pile tips (steel piles, 10 inch) (606-02.06)EACH20$150.00$325.00$265.00
111Prestressed concrete bulb tee beam (6" web)(BT-72) (615-01.12)LF4,266$400.00$300.00$325.00
112Conc parapet single slope (STD-1-1SS) (620-05.01)LF2,634$95.00$150.00$109.00
113Camera inspection - drilled shaft (dry) (625-01.10)EACH12$1,600.00$1,000.00$1,500.00
114Camera inspection - drilled shaft (underwater) (625-01.11)EACH4$1,850.00$1,500.00$2,000.00
115Drilled shaft-soil (5'-0" dia.) (625-02.01)VF290$1,133.00$900.00$1,475.00
116Drilled shaft-rock (4'-6"/5'-0" dia.) (625-02.13)VF340$1,133.00$1,215.00$1,440.00
117Drilled shaft casing-permanent (5'-0" I.D.) (625-02.25)VF340$440.00$575.00$493.00
118Drilled shaft (SH-SCC) concrete (625-02.40)CY406$485.00$700.00$523.00
119Drilled shaft reinforcing steel (625-02.44)LB67,109$1.10$1.86$1.70
1206" perforated pipe with vertical drain system (710-09.01)LF86$80.00$150.00$62.00
1216" pipe underdrain (710-09.02)LF54$20.00$20.00$26.50
TDOT contract CNZ058: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of February 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy