ODOT contract 250077 bid tabulation
ROS-SR 159-00.41 (MAJOR RECONSTRUCTION). Let by Ohio DOT on February 13, 2025, ROS. 3 bids received; low bid $19,286,684 by Complete General Construction Company, +0.9% against the engineer's estimate of $19,110,000.
- Owner
- Ohio DOT
- Letting
- 13 FEB 2025
- Pay items
- 355
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Complete General Construction Company | $19,286,684 | Low | +1.0% |
| 2 | Sunesis Construction Co | $20,048,215 | +4.0% | +5.0% |
| 3 | Shelly & Sands Inc | $22,122,034 | +15% | +16% |
Engineer's estimate: $19,110,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Complete General Construction Company | 2. Sunesis Construction Co | 3. Shelly & Sands Inc |
|---|---|---|---|---|---|---|
| 1 | Pavement removed (202E23000) | SY | 40,697 | $17.00 | $14.22 | $20.00 |
| 2 | Walk removed (202E30000) | SF | 2,950 | $3.00 | $3.27 | $3.00 |
| 3 | Concrete median removed (202E30600) | SY | 28 | $45.00 | $75.62 | $60.00 |
| 4 | Concrete barrier removed (202E30700) | FT | 467 | $57.00 | $71.16 | $150.00 |
| 5 | Curb removed (202E32000) | FT | 3,546 | $8.00 | $7.18 | $6.00 |
| 6 | Curb and gutter removed (202E32500) | FT | 1,784 | $11.00 | $8.31 | $6.00 |
| 7 | Gutter removed (202E32700) | SY | 20 | $31.00 | $126.89 | $60.00 |
| 8 | Guardrail removed (202E38000) | FT | 3,863 | $2.00 | $2.50 | $2.50 |
| 9 | Impact attenuator removed (202E47800) | EACH | 2 | $185.00 | $750.00 | $750.00 |
| 10 | Mailbox removed (202E53100) | EACH | 1 | $365.00 | $152.75 | $75.00 |
| 11 | Fence removed (202E75000) | FT | 240 | $3.90 | $5.00 | $5.00 |
| 12 | Removal misc.: bench removed (202E98100) | EACH | 16 | $200.00 | $104.48 | $135.00 |
| 13 | Excavation (203E10000) | CY | 18,977 | $25.00 | $28.69 | $33.00 |
| 14 | Embankment (203E20000) | CY | 20,052 | $8.00 | $17.44 | $21.00 |
| 15 | Subgrade compaction (204E10000) | SY | 42,102 | $3.25 | $4.22 | $7.50 |
| 16 | Excavation of subgrade (204E13000) | CY | 1,824 | $32.00 | $35.28 | $30.00 |
| 17 | Granular material, type C (204E30020) | CY | 1,824 | $50.00 | $98.85 | $74.00 |
| 18 | Proof rolling (204E45000) | HR | 18 | $360.00 | $297.06 | $275.00 |
| 19 | Geotextile fabric (204E50000) | SY | 4,329 | $2.00 | $1.47 | $1.00 |
| 20 | Ditch cleanout, as per plan (209E10001) | FT | 170 | $14.00 | $10.91 | $16.00 |
| 21 | Sealing of concrete surfaces (non-epoxy), as per plan (512E10051) | SY | 125 | $35.00 | $99.88 | $35.00 |
| 22 | Guardrail, type MGS (606E15050) | FT | 1,700 | $18.60 | $21.00 | $21.00 |
| 23 | Anchor assembly, MGS type A (606E25550) | EACH | 2 | $1,560.00 | $1,700.00 | $1,700.00 |
| 24 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 5 | $2,640.00 | $2,600.00 | $2,600.00 |
| 25 | Anchor assembly, type T (606E26500) | EACH | 4 | $1,380.00 | $1,200.00 | $1,200.00 |
| 26 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 2 | $2,570.00 | $2,550.00 | $2,550.00 |
| 27 | Impact attenuator, type 2 (bidirectional) (40 MPH, (606E60028) | EACH | 2 | $27,850 | $33,796 | $30,000 |
| 28 | Fence, misc.: 4-rail steel board fencing (607E98000) | FT | 861 | $69.00 | $75.00 | $75.00 |
| 29 | 4" concrete walk (608E10000) | SF | 49,727 | $7.00 | $7.86 | $9.50 |
| 30 | Curb ramp (608E52000) | SF | 11,383 | $15.00 | $21.31 | $42.00 |
| 31 | Detectable warning (608E53020) | SF | 1,320 | $30.00 | $22.17 | $50.00 |
| 32 | Concrete barrier, single slope, type B, as per plan (622E10061) | FT | 115 | $420.00 | $274.43 | $575.00 |
| 33 | Concrete barrier, single slope, type D, as per plan (622E10161) | FT | 200 | $185.00 | $212.22 | $425.00 |
| 34 | Concrete barrier end section, type B, as per plan (622E24841) | EACH | 2 | $11,265 | $10,830 | $4,500.00 |
| 35 | Concrete barrier, end anchorage, reinforced, type D, as per plan (622E25051) | EACH | 6 | $4,215.00 | $5,159.64 | $5,500.00 |
| 36 | Crushed aggregate slope protection (601E20000) | SY | 845 | $19.00 | $30.35 | $35.00 |
| 37 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 37 | $150.00 | $265.12 | $170.00 |
| 38 | Rock channel protection, type C with filter (601E32200) | CY | 6 | $290.00 | $376.48 | $330.00 |
| 39 | Paved gutter, type 1-2 (601E37500) | FT | 53 | $105.00 | $100.00 | $135.00 |
| 40 | Soil analysis test (659E00100) | EACH | 2 | $150.00 | $54.67 | $125.00 |
| 41 | Topsoil (659E00300) | CY | 3,639 | $30.00 | $65.00 | $55.00 |
| 42 | Seeding and mulching (659E10000) | SY | 32,749 | $0.70 | $3.69 | $0.85 |
| 43 | Repair seeding and mulching (659E14000) | SY | 1,639 | $0.70 | $2.00 | $0.80 |
| 44 | Inter-seeding (659E15000) | SY | 1,639 | $0.70 | $2.00 | $0.80 |
| 45 | Commercial fertilizer (659E20000) | TON | 4.42 | $1,250.00 | $1,400.00 | $900.00 |
| 46 | Lime (659E31000) | ACRE | 6.77 | $150.00 | $450.00 | $156.00 |
| 47 | Water (659E35000) | MGAL | 177 | $1.00 | $1.39 | $1.00 |
| 48 | Mowing (659E40000) | MSF | 53 | $10.00 | $15.00 | $11.00 |
| 49 | Storm water pollution prevention plan (832E15000) | LS | 1 | $5,000.00 | $3,985.00 | $8,000.00 |
| 50 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $35,000 | $35,280 | $55,000 |
| 51 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $21,000 | $21,057 | $22,500 |
| 52 | Erosion control (832E30000) | EACH | 180,000 | $1.00 | $1.00 | $1.00 |
| 53 | Headwall removed (202E20010) | EACH | 6 | $430.00 | $407.10 | $300.00 |
| 54 | Pipe removed, 24" and under (202E35100) | FT | 1,227 | $55.00 | $22.23 | $27.00 |
| 55 | Pipe removed, over 24" diameter (202E35200) | FT | 924 | $110.00 | $30.68 | $25.00 |
| 56 | Manhole removed (202E58000) | EACH | 9 | $950.00 | $810.45 | $450.00 |
| 57 | Catch basin removed (202E58100) | EACH | 28 | $490.00 | $553.63 | $300.00 |
| 58 | Special - pipe cleanout, 24" and under (202E70110) | FT | 100 | $92.00 | $150.00 | $17.50 |
| 59 | Special - pipe cleanout, 27" to 48" (202E70120) | FT | 100 | $138.00 | $175.00 | $21.00 |
| 60 | Removal misc.: inspection well (202E98100) | EACH | 1 | $925.00 | $163.57 | $400.00 |
| 61 | Removal misc.: conduit (202E98200) | FT | 35 | $56.00 | $40.79 | $25.00 |
| 62 | Embankment, as per plan (203E20001) | CY | 50 | $16.00 | $88.34 | $65.00 |
| 63 | Concrete masonry (602E20000) | CY | 3.40 | $1,905.00 | $4,749.87 | $3,200.00 |
| 64 | 6" unclassified pipe underdrains (605E13300) | FT | 964 | $18.00 | $19.41 | $23.00 |
| 65 | 6" base pipe underdrains (605E14000) | FT | 16,601 | $14.00 | $19.93 | $15.50 |
| 66 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 1,232 | $25.00 | $62.11 | $35.00 |
| 67 | 6" conduit, type F (611E01500) | FT | 50 | $45.00 | $30.22 | $22.00 |
| 68 | 8" conduit, type D (611E02400) | FT | 30 | $59.00 | $43.48 | $45.00 |
| 69 | 12" conduit, type B (611E04400) | FT | 2,372 | $110.00 | $115.03 | $125.00 |
| 70 | 12" conduit, type C (611E04600) | FT | 45 | $110.00 | $91.14 | $110.00 |
| 71 | 15" conduit, type B (611E05900) | FT | 401 | $130.00 | $127.52 | $120.00 |
| 72 | 15" conduit, type C (611E06100) | FT | 47 | $121.00 | $104.70 | $112.00 |
| 73 | 18" conduit, type B (611E07400) | FT | 224 | $152.00 | $135.19 | $135.00 |
| 74 | 18" conduit, type C (611E07600) | FT | 35 | $156.00 | $116.70 | $123.00 |
| 75 | 21" conduit, type B (611E08900) | FT | 45 | $254.00 | $189.37 | $235.00 |
| 76 | 24" conduit, type B (611E10400) | FT | 702 | $160.00 | $165.90 | $170.00 |
| 77 | 24" conduit, type C (611E10600) | FT | 309 | $182.00 | $141.85 | $140.00 |
| 78 | 27" conduit, type B (611E11900) | FT | 696 | $250.00 | $272.13 | $270.00 |
| 79 | 30" conduit, type C (611E13600) | FT | 39 | $203.00 | $192.70 | $190.00 |
| 80 | 36" conduit, type B (611E16400) | FT | 349 | $365.00 | $410.74 | $335.00 |
| 81 | 36" conduit, type C (611E16600) | FT | 801 | $235.00 | $277.14 | $210.00 |
| 82 | Conduit, misc.: type B for drainage dischage conti (611E97400) | FT | 35 | $250.00 | $73.16 | $70.00 |
| 83 | Conduit, misc.: type C for drainage dischage conti (611E97400) | FT | 35 | $215.00 | $73.16 | $65.00 |
| 84 | Conduit, misc.: type E for drainage dischage conti (611E97400) | FT | 35 | $215.00 | $73.16 | $65.00 |
| 85 | Conduit, misc.: type F for drainage dischage conti (611E97400) | FT | 35 | $215.00 | $93.08 | $65.00 |
| 86 | Catch basin, no. 3 (611E98150) | EACH | 20 | $5,500.00 | $4,969.34 | $6,000.00 |
| 87 | Catch basin, no. 3A (611E98180) | EACH | 30 | $4,425.00 | $3,964.75 | $5,200.00 |
| 88 | Catch basin, no. 6 (611E98370) | EACH | 5 | $4,350.00 | $3,641.44 | $5,600.00 |
| 89 | Catch basin, no. 2-2B (611E98470) | EACH | 1 | $3,470.00 | $2,190.73 | $2,900.00 |
| 90 | Catch basin, no. 2-3 (611E98510) | EACH | 1 | $4,530.00 | $3,865.97 | $4,500.00 |
| 91 | Inlet, no. 3D (611E98820) | EACH | 1 | $5,780.00 | $15,659 | $13,500 |
| 92 | Inlet reconstructed to grade (611E99154) | EACH | 1 | $2,125.00 | $2,796.86 | $3,300.00 |
| 93 | Manhole, no. 3 (611E99574) | EACH | 24 | $6,000.00 | $5,921.41 | $5,800.00 |
| 94 | Manhole, no. 3 with 108" base I.D. and 12" weir (611E99586) | EACH | 2 | $18,000 | $16,289 | $29,000 |
| 95 | Manhole adjusted to grade (611E99654) | EACH | 6 | $1,250.00 | $736.74 | $650.00 |
| 96 | Precast reinforced concrete outlet (611E99710) | EACH | 11 | $525.00 | $459.44 | $500.00 |
| 97 | Inspection well (611E99720) | EACH | 2 | $2,000.00 | $1,858.86 | $700.00 |
| 98 | Manufactured water quality structure, type 2 (895E10020) | EACH | 2 | $26,000 | $34,481 | $43,000 |
| 99 | Pavement planing, asphalt concrete, 1-1/2" (254E01000) | SY | 30,915 | $7.50 | $8.16 | $7.50 |
| 100 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 2,749 | $215.00 | $219.07 | $215.00 |
| 101 | Aggregate base (304E20000) | CY | 7,806 | $85.00 | $126.96 | $89.50 |
| 102 | Tack coat (407E10000) | GAL | 100 | $3.50 | $3.50 | $3.50 |
| 103 | Tack coat, 702.13 (407E13900) | GAL | 50 | $3.50 | $3.50 | $3.50 |
| 104 | Non-tracking tack coat (407E20000) | GAL | 7,953 | $3.50 | $3.50 | $3.50 |
| 105 | Asphalt concrete surface course, type 1, (448), PG64-22 (441E50000) | CY | 564 | $280.00 | $280.00 | $280.00 |
| 106 | Asphalt concrete intermediate course, type 1, (448) (441E50200) | CY | 326 | $275.00 | $275.00 | $275.00 |
| 107 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 48 | $685.00 | $685.00 | $685.00 |
| 108 | Asphalt concrete intermediate course, type 1, (449), (driveways) (441E70600) | CY | 67 | $600.00 | $600.00 | $600.00 |
| 109 | Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000) | CY | 1,113 | $300.00 | $300.00 | $300.00 |
| 110 | Asphalt concrete surface course, 12.5 MM, type A (446), as per plan (442E10001) | CY | 167 | $305.00 | $305.00 | $305.00 |
| 111 | Asphalt concrete intermediate course, 19 MM, type A (446) (442E10100) | CY | 317 | $275.00 | $275.00 | $275.00 |
| 112 | 8" non-reinforced concrete pavement, class QC 1P (452E12010) | SY | 1,109 | $115.00 | $107.18 | $145.00 |
| 113 | 8" non-reinforced concrete pavement, class QC 1P with QC/QA (452E12020) | SY | 5,625 | $107.00 | $107.49 | $120.00 |
| 114 | 9" non-reinforced concrete pavement, class QC 1P with QC/QA (452E13020) | SY | 18,401 | $98.00 | $109.47 | $130.00 |
| 115 | 8" non-reinforced concrete pavement, class QC MS, as per plan (452E12051) | SY | 180 | $155.00 | $212.00 | $175.00 |
| 116 | Combination curb and gutter, type 2 (609E12000) | FT | 10,162 | $34.00 | $30.12 | $48.50 |
| 117 | Curb, type 6 (609E26000) | FT | 4,277 | $47.00 | $25.19 | $48.00 |
| 118 | Curb, type 6, as per plan (609E26001) | FT | 39 | $80.00 | $70.89 | $80.00 |
| 119 | Curb, type 7 (609E28000) | FT | 43 | $75.00 | $79.52 | $70.00 |
| 120 | Combination curb and gutter, type 9 (609E31000) | FT | 358 | $52.00 | $33.27 | $82.00 |
| 121 | Concrete median (609E71000) | SF | 2,411 | $13.25 | $21.86 | $25.00 |
| 122 | Concrete median, as per plan (609E71001) | SF | 272 | $14.50 | $21.09 | $21.00 |
| 123 | 7" non-reinforced concrete pavement, class QC 1P (452E11010) | SY | 601 | $75.00 | $104.85 | $94.00 |
| 125 | 3" water main ductile iron pipe ansi class 52, boltless-restrained joints and fittings (638E00090) | FT | 74 | $685.00 | $465.66 | $370.00 |
| 126 | 6" water main ductile iron pipe ansi class 52, mechanical joints and fittings (638E00700) | FT | 6 | $715.00 | $705.44 | $535.00 |
| 127 | 8" water main ductile iron pipe ansi class 52, mechanical joints and fittings (638E01300) | FT | 4 | $1,410.00 | $997.07 | $1,000.00 |
| 128 | 4" gate valve and valve box, as per plan (638E07701) | EACH | 2 | $1,270.00 | $2,290.77 | $1,895.00 |
| 129 | 6" fire hydrant, as per plan (638E10201) | EACH | 1 | $7,685.00 | $8,618.96 | $6,500.00 |
| 130 | Fire hydrant removed, as per plan (638E10481) | EACH | 1 | $3,700.00 | $896.11 | $1,050.00 |
| 131 | Valve box adjusted to grade, as per plan (638E10801) | EACH | 9 | $370.00 | $163.56 | $950.00 |
| 132 | Meter and chamber removed and reset, as per plan (638E11101) | EACH | 6 | $1,075.00 | $2,927.35 | $1,850.00 |
| 133 | Manhole removed (202E58000) | EACH | 2 | $950.00 | $808.58 | $900.00 |
| 134 | 4" conduit, type E (611E00400) | FT | 20 | $310.00 | $187.41 | $235.00 |
| 135 | 8" conduit, type B (611E01800) | FT | 10 | $360.00 | $175.61 | $275.00 |
| 136 | Manhole, no. 3 (611E99574) | EACH | 1 | $6,400.00 | $6,195.60 | $5,500.00 |
| 137 | Connection, fused pull apart (625E00450) | EACH | 203 | $140.00 | $110.00 | $139.00 |
| 138 | Connection, unfused bolted (625E00470) | EACH | 1 | $130.00 | $110.00 | $127.00 |
| 139 | Connection, unfused permanent (625E00480) | EACH | 168 | $130.00 | $110.00 | $111.00 |
| 140 | Transformer base, type at-A, as per plan (625E02501) | EACH | 61 | $50.00 | $150.00 | $110.00 |
| 141 | Light pole, misc.: (pocket parks, 15' MTG HT), as (625E10500) | EACH | 8 | $5,000.00 | $5,600.00 | $5,706.00 |
| 142 | Light pole (installation only), as per plan (625E10503) | EACH | 99 | $500.00 | $950.00 | $464.00 |
| 143 | Light tower, misc.: installation only, as per plan (625E13500) | EACH | 1 | $5,000.00 | $7,000.00 | $15,000 |
| 144 | Light pole foundation, 24" X 6' deep (625E14000) | EACH | 75 | $2,400.00 | $1,750.00 | $1,992.00 |
| 145 | Light tower foundation, 36" X 25' deep (625E15200) | EACH | 1 | $18,000 | $11,000 | $14,240 |
| 146 | Bracket arm, as per plan (625E17901) | EACH | 22 | $30.00 | $125.00 | $110.00 |
| 147 | Bracket arm, 8', as per plan (625E17961) | EACH | 28 | $30.00 | $175.00 | $110.00 |
| 148 | Bracket arm, 12', as per plan (625E18101) | EACH | 37 | $300.00 | $175.00 | $110.00 |
| 149 | No. 10 AWG pole and bracket cable (625E23400) | FT | 4,847 | $3.00 | $2.00 | $2.85 |
| 150 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 52,530 | $3.25 | $3.70 | $2.70 |
| 151 | Conduit, 2", 725.04 (625E25400) | FT | 566 | $35.00 | $18.00 | $23.00 |
| 152 | Conduit, 3", 725.04 (625E25500) | FT | 11,297 | $23.75 | $24.00 | $33.00 |
| 153 | Conduit, jacked or drilled, 725.04, (3") (625E25902) | FT | 3,322 | $55.00 | $46.00 | $42.50 |
| 154 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 87 | $375.00 | $450.00 | $501.00 |
| 155 | Luminaire, post top, solid state (LED), as per plan (625E27403) | EACH | 32 | $1,500.00 | $1,500.00 | $1,557.00 |
| 156 | Luminaire, post top, solid state (LED), as per plan (625E27403) | EACH | 8 | $1,500.00 | $1,450.00 | $1,509.00 |
| 157 | Luminaire, post top, solid state (LED), as per plan (625E27403) | EACH | 6 | $1,500.00 | $1,475.00 | $1,600.00 |
| 158 | Luminaire, underpass, solid state (LED), as per plan (625E27503) | EACH | 14 | $600.00 | $575.00 | $677.00 |
| 159 | Trench, 24" deep (625E29002) | FT | 11,167 | $10.00 | $9.00 | $7.50 |
| 160 | Junction box (625E29900) | EACH | 30 | $1,600.00 | $700.00 | $822.00 |
| 161 | Pull box, 725.08, 18" (625E30700) | EACH | 134 | $850.00 | $900.00 | $1,120.00 |
| 162 | Pull box, 725.08, 24" (625E30706) | EACH | 5 | $1,400.00 | $1,150.00 | $1,168.00 |
| 163 | Power service, as per plan (625E34001) | EACH | 3 | $9,000.00 | $9,300.00 | $14,500 |
| 164 | Luminaire removed (625E75506) | EACH | 18 | $100.00 | $40.00 | $220.00 |
| 165 | RPM (621E00100) | EACH | 611 | $39.00 | $37.00 | $37.00 |
| 166 | Raised pavement marker removed (621E54000) | EACH | 600 | $16.00 | $6.91 | $15.00 |
| 167 | Ground mounted support, no. 2 post (630E02100) | FT | 898.50 | $12.00 | $15.00 | $15.00 |
| 168 | Ground mounted support, no. 3 post (630E03100) | FT | 1,066.30 | $15.00 | $16.00 | $16.00 |
| 169 | Ground mounted support, no. 4 post (630E04100) | FT | 287 | $16.50 | $20.00 | $20.00 |
| 170 | Ground mounted structural beam support, S4X7.7 (630E06400) | FT | 31 | $35.00 | $18.00 | $18.00 |
| 171 | Ground mounted structural beam support, W8X18 (630E07000) | FT | 114 | $50.00 | $32.00 | $32.00 |
| 172 | Ground mounted structural beam support, W10X12 (630E07600) | FT | 149 | $42.00 | $22.50 | $22.50 |
| 173 | Sign post reflector (630E08600) | EACH | 4 | $45.00 | $48.00 | $48.00 |
| 174 | Breakaway structural beam connection (630E09000) | EACH | 19 | $695.00 | $550.00 | $550.00 |
| 175 | Overhead sign support, type TC-15.116, design 2 (630E72420) | EACH | 1 | $76,550 | $75,000 | $75,000 |
| 176 | Sign, flat sheet (630E80100) | SF | 1,432 | $16.00 | $19.50 | $19.50 |
| 177 | Sign, ground mounted extrusheet (630E80200) | SF | 478 | $22.50 | $23.50 | $23.50 |
| 178 | Sign, overhead extrusheet (630E80224) | SF | 630 | $23.00 | $23.50 | $23.50 |
| 179 | Ground mounted structural beam support foundation (630E84500) | EACH | 19 | $875.00 | $1,750.00 | $1,750.00 |
| 180 | Rigid overhead sign support foundation (630E84510) | EACH | 4 | $5,150.00 | $10,500 | $10,500 |
| 181 | Removal of ground mounted sign and disposal (630E84900) | EACH | 161 | $10.00 | $20.00 | $20.00 |
| 182 | Removal of ground mounted sign and reerection (630E85100) | EACH | 8 | $65.00 | $106.00 | $106.00 |
| 183 | Removal of ground mounted major sign and disposal (630E85400) | EACH | 14 | $185.00 | $200.00 | $200.00 |
| 184 | Removal of ground mounted post support and disposal (630E86002) | EACH | 142 | $20.00 | $20.00 | $20.00 |
| 185 | Removal of ground mounted structural beam support (630E86102) | EACH | 19 | $285.00 | $400.00 | $400.00 |
| 186 | Removal of structure mounted sign and disposal (630E86310) | EACH | 10 | $395.00 | $400.00 | $400.00 |
| 187 | Removal of overhead mounted sign and disposal (630E87400) | EACH | 21 | $220.00 | $320.00 | $320.00 |
| 188 | Removal of pole mounted sign and disposal (630E87500) | EACH | 10 | $35.00 | $20.00 | $20.00 |
| 189 | Removal of overhead sign support and disposal (630E89702) | EACH | 8 | $1,250.00 | $1,250.00 | $1,250.00 |
| 190 | Lane line, 4", type 1 (642E00200) | MI | 0.25 | $3,400.00 | $3,400.00 | $3,400.00 |
| 191 | Edge line, 6" (644E00104) | MI | 2.63 | $8,100.00 | $8,100.00 | $8,100.00 |
| 192 | Lane line, 6" (644E00204) | MI | 1.59 | $3,400.00 | $3,400.00 | $3,400.00 |
| 193 | Center line (644E00300) | MI | 1.04 | $5,700.00 | $5,700.00 | $5,700.00 |
| 194 | Channelizing line, 12" (644E00404) | FT | 4,657 | $2.80 | $2.80 | $2.80 |
| 195 | Stop line (644E00500) | FT | 920 | $7.00 | $7.00 | $7.00 |
| 196 | Crosswalk line, 12" (644E00620) | FT | 288 | $5.00 | $5.00 | $5.00 |
| 197 | Crosswalk line, 24" (644E00630) | FT | 1,712 | $6.50 | $6.50 | $6.50 |
| 198 | Transverse/diagonal line (644E00700) | FT | 935 | $8.00 | $8.00 | $8.00 |
| 199 | Chevron marking (644E00720) | FT | 23 | $8.00 | $8.00 | $8.00 |
| 200 | Lane arrow (644E01300) | EACH | 85 | $110.00 | $110.00 | $110.00 |
| 201 | Dotted line, 6" (644E01510) | FT | 465 | $1.00 | $1.00 | $1.00 |
| 202 | Yield line (644E20800) | FT | 69 | $3.00 | $3.00 | $3.00 |
| 203 | Edge line, 6" (646E10010) | MI | 1.80 | $4,500.00 | $4,500.00 | $4,500.00 |
| 204 | Lane line, 6" (646E10110) | MI | 1.61 | $1,900.00 | $1,900.00 | $1,900.00 |
| 205 | Center line (646E10200) | MI | 1.24 | $3,900.00 | $3,900.00 | $3,900.00 |
| 206 | Channelizing line, 12" (646E10310) | FT | 4,462 | $1.65 | $1.65 | $1.65 |
| 207 | Stop line (646E10400) | FT | 346 | $12.00 | $12.00 | $12.00 |
| 208 | Crosswalk line, 24" (646E10520) | FT | 1,136 | $13.00 | $13.00 | $13.00 |
| 209 | Transverse/diagonal line (646E10600) | FT | 1,023 | $9.00 | $9.00 | $9.00 |
| 210 | Chevron marking (646E10620) | FT | 61 | $9.00 | $9.00 | $9.00 |
| 211 | Lane arrow (646E20300) | EACH | 76 | $155.00 | $155.00 | $155.00 |
| 212 | Wrong way arrow (646E20320) | EACH | 65 | $125.00 | $125.00 | $125.00 |
| 213 | Dotted line, 6" (646E20504) | FT | 153 | $5.00 | $5.00 | $5.00 |
| 214 | Conduit, 2", 725.04 (625E25400) | FT | 1,462 | $20.00 | $18.00 | $18.00 |
| 215 | Conduit, 3", 725.04 (625E25500) | FT | 1,002 | $32.00 | $24.00 | $24.00 |
| 216 | Conduit, 4", 725.04 (625E25600) | FT | 117 | $45.00 | $45.00 | $45.00 |
| 217 | Conduit, jacked or drilled, 725.04, 2" (625E25902) | FT | 229 | $44.00 | $34.00 | $34.00 |
| 218 | Conduit, jacked or drilled, 725.04, 3" (625E25902) | FT | 2,192 | $57.00 | $46.00 | $46.00 |
| 219 | Trench (625E29000) | FT | 2,561 | $16.00 | $9.00 | $9.00 |
| 220 | Pull box, 725.06, size 1.5 (625E30500) | EACH | 14 | $700.00 | $750.00 | $750.00 |
| 221 | Pull box, 725.08, 24" (625E30706) | EACH | 30 | $1,400.00 | $1,150.00 | $1,150.00 |
| 222 | Ground rod (625E32000) | EACH | 66 | $250.00 | $330.00 | $330.00 |
| 223 | Sign hanger assembly, mast arm (630E79100) | EACH | 26 | $360.00 | $600.00 | $600.00 |
| 224 | Sign, flat sheet (630E80100) | SF | 388 | $16.00 | $30.00 | $30.00 |
| 225 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate, as per plan (632E05007) | EACH | 60 | $1,050.00 | $1,250.00 | $1,250.00 |
| 226 | Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate, as per plan (632E05087) | EACH | 12 | $1,800.00 | $1,900.00 | $1,900.00 |
| 227 | Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731) | EACH | 54 | $650.00 | $775.00 | $775.00 |
| 228 | Covering of vehicular signal head (632E25000) | EACH | 72 | $40.00 | $40.00 | $40.00 |
| 229 | Covering of pedestrian signal head (632E25010) | EACH | 54 | $30.00 | $30.00 | $30.00 |
| 230 | Pedestrian pushbutton (632E26000) | EACH | 54 | $315.00 | $250.00 | $250.00 |
| 231 | Signal cable, 3 conductor, no. 14 AWG (632E40300) | FT | 6,039 | $2.50 | $2.20 | $2.20 |
| 232 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 14,261 | $3.00 | $2.80 | $2.80 |
| 233 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 2,698 | $3.40 | $2.90 | $2.90 |
| 234 | Signal support foundation (632E64010) | EACH | 27 | $11,750 | $6,900.00 | $6,900.00 |
| 235 | Pedestal foundation (632E64020) | EACH | 32 | $1,750.00 | $1,200.00 | $1,200.00 |
| 236 | Test hole performed (632E64950) | EACH | 7 | $4,000.00 | $190.00 | $190.00 |
| 237 | Loop detector lead-in cable (632E65200) | FT | 8,985 | $2.00 | $2.00 | $2.00 |
| 238 | Power cable, 2 conductor, no. 6 AWG (632E68200) | FT | 1,979 | $5.00 | $5.30 | $5.30 |
| 239 | Power service, as per plan (632E70001) | EACH | 7 | $3,000.00 | $1,225.00 | $1,225.00 |
| 240 | Conduit riser, 2" diameter (632E70400) | EACH | 8 | $1,200.00 | $600.00 | $600.00 |
| 241 | Signal support, type TC-81.22, design 2, as per plan (632E72101) | EACH | 1 | $3,000.00 | $1,200.00 | $1,200.00 |
| 242 | Combination signal support, type TC-81.22, design 2, as per plan (632E79101) | EACH | 4 | $3,000.00 | $1,200.00 | $1,200.00 |
| 243 | Combination signal support, type TC-81.22, design 4, as per plan (632E79111) | EACH | 6 | $3,000.00 | $1,600.00 | $1,600.00 |
| 244 | Combination signal support, type TC-81.22, design 12, as per plan (632E79131) | EACH | 6 | $3,500.00 | $1,650.00 | $1,650.00 |
| 245 | Combination signal support, type TC-81.22, design 13, as per plan (632E79141) | EACH | 8 | $3,500.00 | $1,650.00 | $1,650.00 |
| 246 | Combination signal support, type TC-81.22, design 14, as per plan (632E79151) | EACH | 2 | $3,500.00 | $1,925.00 | $1,925.00 |
| 247 | Pedestal, 8', transformer base, as per plan (632E89901) | EACH | 32 | $500.00 | $175.00 | $175.00 |
| 248 | Removal of traffic signal installation (632E90100) | EACH | 7 | $7,500.00 | $1,700.00 | $1,700.00 |
| 249 | Signalization, misc.: cellular modem (632E90400) | EACH | 7 | $8,200.00 | $8,100.00 | $8,100.00 |
| 250 | Signalization, misc.: queue warning detection syst (632E90400) | EACH | 1 | $66,000 | $79,500 | $49,500 |
| 251 | Cabinet, type TS-2, as per plan (633E65511) | EACH | 7 | $19,000 | $17,750 | $17,750 |
| 252 | Cabinet foundation (633E67100) | EACH | 7 | $5,500.00 | $3,100.00 | $3,100.00 |
| 253 | Controller work pad (633E67200) | EACH | 7 | $3,000.00 | $500.00 | $500.00 |
| 254 | Uninterruptible power supply (UPS), 1000 watt (633E75000) | EACH | 7 | $6,000.00 | $6,500.00 | $6,500.00 |
| 255 | Advance radar detection, as per plan (809E69001) | EACH | 15 | $9,000.00 | $9,850.00 | $9,850.00 |
| 256 | Stop line radar detection, as per plan (809E69101) | EACH | 25 | $8,750.00 | $9,550.00 | $9,580.00 |
| 257 | Atc controller, as per plan (809E69123) | EACH | 7 | $5,000.00 | $5,600.00 | $5,600.00 |
| 258 | Emergency vehicle preemption, as per plan (809E69201) | EACH | 7 | $1,000.00 | $800.00 | $800.00 |
| 259 | Preempt receiving unit, as per plan (809E69211) | EACH | 27 | $1,200.00 | $1,250.00 | $1,250.00 |
| 260 | Preempt receiving unit, as per plan (809E69211) | EACH | 7 | $5,000.00 | $4,700.00 | $4,700.00 |
| 261 | Preempt detector cable, as per plan (809E69221) | FT | 7,119 | $3.75 | $3.50 | $3.50 |
| 262 | Preempt phase selector, as per plan (809E69231) | EACH | 7 | $5,000.00 | $5,000.00 | $5,000.00 |
| 263 | Preempt confirmation light, as per plan (809E69241) | EACH | 27 | $500.00 | $565.00 | $565.00 |
| 264 | Excavation, as per plan (203E10001) | CY | 50 | $65.00 | $45.87 | $100.00 |
| 265 | Embankment, as per plan (203E20001) | CY | 100 | $45.00 | $42.13 | $75.00 |
| 266 | Dumped rock fill, misc.: large river rock (601E30000) | TON | 30 | $350.00 | $231.16 | $300.00 |
| 267 | Mulch, as per plan (661E00501) | CY | 11 | $155.00 | $81.95 | $82.00 |
| 268 | Deciduous shrub, 18" height, as per plan; spiraea (661E20021) | EACH | 28 | $175.00 | $115.33 | $115.50 |
| 269 | Deciduous shrub, 30" height, as per plan; viburnum (661E20071) | EACH | 7 | $200.00 | $153.77 | $154.00 |
| 270 | Evergreen shrub, 2' height, as per plan; thuja occ (661E30061) | EACH | 14 | $175.00 | $115.33 | $115.50 |
| 271 | Deciduous tree, 2-1/2" caliper; zelkova serrata "J (661E40100) | EACH | 12 | $1,000.00 | $964.66 | $965.00 |
| 272 | Special - pocket park with bench (690E98000) | EACH | 4 | $6,775.00 | $6,530.58 | $5,000.00 |
| 273 | Special - pocket park without bench (690E98000) | EACH | 3 | $4,400.00 | $1,605.16 | $3,000.00 |
| 274 | Excavation (203E10000) | CY | 100 | $39.00 | $72.11 | $140.00 |
| 275 | Embankment (203E20000) | CY | 200 | $26.00 | $110.89 | $110.00 |
| 276 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 200 | $125.00 | $70.00 | $87.00 |
| 277 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 9 | $2,520.00 | $2,200.00 | $2,200.00 |
| 278 | Detour signing (614E12420) | LS | 1 | $30,000 | $16,672 | $8,000.00 |
| 279 | Replacement sign (614E12500) | EACH | 10 | $150.00 | $200.00 | $150.00 |
| 280 | Replacement drum (614E12600) | EACH | 40 | $80.00 | $45.00 | $80.00 |
| 281 | Asphalt concrete for maintaining traffic (614E13000) | CY | 250 | $500.00 | $350.00 | $350.00 |
| 282 | Barrier reflector, type 1, one-way (614E13310) | EACH | 109 | $25.00 | $12.00 | $12.00 |
| 283 | Barrier reflector, type 5, one-way (614E13318) | EACH | 28 | $45.00 | $12.00 | $18.00 |
| 284 | Object marker, one way (614E13350) | EACH | 137 | $28.00 | $18.00 | $17.00 |
| 285 | Portable changeable message sign, as per plan (614E18601) | SNMT | 80 | $1,500.00 | $900.00 | $1,500.00 |
| 286 | Work zone lane line, class I, 6", 807 paint (614E20056) | MI | 6.56 | $2,025.00 | $1,300.00 | $2,025.00 |
| 287 | Work zone center line, class I, 807 paint (614E21050) | MI | 3.86 | $1,950.00 | $3,300.00 | $1,950.00 |
| 288 | Work zone edge line, class I, 6", 807 paint (614E22056) | MI | 10.84 | $4,775.00 | $2,400.00 | $7,445.00 |
| 289 | Work zone channelizing line, class I, 12", 807 paint (614E23110) | FT | 12,261 | $2.00 | $3.00 | $2.00 |
| 290 | Work zone dotted line, class I, 6", 807 paint (614E24102) | FT | 3,333 | $1.75 | $2.00 | $1.75 |
| 291 | Work zone transverse/diagonal line, class I, 642 paint (614E25200) | FT | 448 | $12.00 | $10.00 | $12.00 |
| 292 | Work zone stop line, class I, 642 paint (614E26200) | FT | 1,896 | $6.25 | $8.00 | $6.25 |
| 293 | Work zone arrow, class I, 642 paint (614E30200) | EACH | 218 | $165.00 | $100.00 | $165.00 |
| 294 | Business entrance sign (614E40050) | EACH | 20 | $100.00 | $200.00 | $100.00 |
| 295 | Pavement for maintaining traffic, class B (615E25000) | SY | 2,265 | $85.00 | $97.66 | $87.00 |
| 296 | Water (616E10000) | MGAL | 50 | $95.00 | $4.07 | $130.00 |
| 297 | Portable barrier, unanchored (622E41100) | FT | 2,869 | $21.00 | $28.00 | $25.00 |
| 298 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $500.00 | $118,107 | $6,500.00 |
| 299 | Porous backfill with geotextile fabric, as per plan (518E21201) | CY | 212 | $137.00 | $167.46 | $265.00 |
| 300 | Prefabricated modular retaining wall, as per plan (870E10001) | SF | 2,070 | $115.00 | $114.29 | $110.00 |
| 301 | Wall excavation (870E11000) | CY | 350 | $52.00 | $60.37 | $70.00 |
| 302 | 6" drainage pipe, perforated (870E12000) | FT | 269 | $11.00 | $3.90 | $6.00 |
| 303 | 6" drainage pipe, non-perforated (870E12100) | FT | 100 | $16.00 | $22.15 | $25.00 |
| 304 | On-site assistance (870E14000) | DAY | 2 | $500.00 | $1.69 | $1,000.00 |
| 305 | PMRW inspection and compaction testing (870E15000) | LS | 1 | $6,000.00 | $2,907.00 | $5,000.00 |
| 306 | Unclassified excavation (503E21100) | CY | 783 | $60.00 | $61.76 | $35.00 |
| 307 | Epoxy coated steel reinforcement (509E10000) | LB | 63,731 | $1.88 | $1.98 | $2.20 |
| 308 | Class QC1 concrete with QC/QA, retaining/wingwall not including footing (511E46012) | CY | 120 | $875.00 | $2,161.28 | $2,550.00 |
| 309 | Class QC1 concrete with QC/QA, footing (511E46512) | CY | 171 | $475.00 | $770.18 | $500.00 |
| 310 | Sealing of concrete surfaces (non-epoxy), as per plan (512E10051) | SY | 431 | $35.00 | $70.00 | $35.00 |
| 311 | Type 2 waterproofing (512E33000) | SY | 28 | $28.00 | $75.00 | $48.00 |
| 312 | 1" preformed expansion joint filler, as per plan (516E13601) | SF | 64 | $28.00 | $28.30 | $8.00 |
| 313 | Railing (concrete parapet with twin steel tube railing), as per plan (517E75121) | FT | 342 | $335.00 | $385.33 | $412.00 |
| 314 | Prefabricated geocomposite drain (518E20000) | SY | 190 | $18.00 | $28.43 | $30.00 |
| 315 | Porous backfill with geotextile fabric (518E21200) | CY | 27 | $160.00 | $155.46 | $230.00 |
| 316 | 6" perforated corrugated plastic pipe (518E40000) | FT | 359 | $8.00 | $3.86 | $8.00 |
| 317 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 18 | $25.00 | $55.99 | $30.00 |
| 318 | 6" non-perforated corrugated plastic pipe, including specials, as per plan (518E40011) | FT | 24 | $25.00 | $42.88 | $25.00 |
| 319 | Special - form liner (530E13000) | SF | 3,186 | $20.00 | $21.47 | $18.00 |
| 320 | Special - misc: protection of utilities (690E98400) | LS | 1 | $3,000.00 | $7,389.55 | $10,000 |
| 321 | Portions of structure removed, as per plan (202E11501) | EACH | 11 | $3,100.00 | $752.94 | $2,000.00 |
| 322 | Dowel holes with cement grout, as per plan (510E09951) | EACH | 2,290 | $16.00 | $21.94 | $32.00 |
| 323 | Class QC2 concrete with QC/QA, sidewalk (511E51512) | CY | 609 | $375.00 | $607.28 | $400.00 |
| 324 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 2,533 | $12.00 | $27.00 | $12.00 |
| 325 | Field painting, misc.: overcoat painting of existi (514E27710) | FT | 3,381 | $85.00 | $28.00 | $28.00 |
| 326 | Elastomeric strip seal without steel extrusions, as per plan (516E01301) | FT | 311 | $200.00 | $230.41 | $100.00 |
| 327 | Structural steel expansion joint, as per plan (516E12201) | FT | 51 | $2,000.00 | $1,877.41 | $1,098.55 |
| 328 | Scuppers, including supports, as per plan (518E12301) | EACH | 15 | $3,850.00 | $4,909.83 | $3,800.00 |
| 329 | Concrete slope protection removed (202E32800) | SY | 1,289 | $24.00 | $20.10 | $15.00 |
| 330 | Scupper, misc.: plug existing scupper (518E12500) | EACH | 22 | $2,100.00 | $1,003.44 | $1,200.00 |
| 331 | Scupper, misc.: scupper replacement (518E12500) | EACH | 2 | $3,200.00 | $6,081.81 | $3,700.00 |
| 332 | 8" pipe downspout, including specials, as per plan (518E51101) | FT | 40 | $500.00 | $1,093.94 | $425.00 |
| 333 | Crushed aggregate slope protection (601E20000) | SY | 930 | $45.00 | $59.65 | $45.00 |
| 334 | Department'S share of the dispute resolution advisor (100E51200) | EACH | 30,000 | $1.00 | $1.00 | $1.00 |
| 335 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $93,000 | $88,767 | $125,000 |
| 336 | CPM progress schedule (108E10000) | LS | 1 | $10,000 | $16,060 | $75,000 |
| 337 | Maintaining traffic (614E11000) | LS | 1 | $450,000 | $234,379 | $930,000 |
| 338 | Field office, type B (619E16010) | MNTH | 28 | $2,000.00 | $1,179.64 | $3,650.00 |
| 339 | Construction layout stakes and surveying (623E10000) | LS | 1 | $200,000 | $200,000 | $338,025 |
| 340 | Mobilization (624E10000) | LS | 1 | $950,000 | $751,500 | $1,000,000 |
| 400 | Overhead sign support, type TC-12.31, design 6 (630E72320) | EACH | 2 | $27,650 | $20,750 | $20,750 |
| 401 | Concrete barrier median overhead sign support foundation, type TC-21.50 (630E84010) | EACH | 1 | $17,300 | $4,200.00 | $7,000.00 |
| 403 | Manhole removed, as per plan (202E58001) | EACH | 4 | $1,100.00 | $711.42 | $1,300.00 |
| 404 | Manhole abandoned, as per plan (202E58701) | EACH | 4 | $730.00 | $902.11 | $1,100.00 |
| 405 | Junction box removed, as per plan (202E62001) | EACH | 4 | $520.00 | $275.00 | $1,000.00 |
| 406 | Concrete, misc.:' concrete, class RRCM (511E71300) | SY | 8 | $500.00 | $234.46 | $575.00 |
| 407 | Low strength mortar backfill (type 2) (613E41300) | CY | 8 | $245.00 | $279.10 | $305.00 |
| 408 | Training, as per plan (633E72001) | LS | 1 | $10,000 | $17,010 | $12,000 |
| 409 | Work zone lane line, class III, 4", 642 paint (614E20550) | MI | 4.20 | $775.00 | $775.00 | $775.00 |
| 410 | Work zone center line, class III, 642 paint (614E21550) | MI | 3.10 | $1,450.00 | $990.00 | $1,450.00 |
| 411 | Work zone edge line, class III, 4", 642 paint (614E22350) | MI | 6.20 | $875.00 | $880.00 | $875.00 |
| 412 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 10,444 | $0.50 | $0.55 | $0.50 |
| 413 | Work zone dotted line, class III, 4", 642 paint (614E24610) | FT | 1,053 | $1.50 | $0.40 | $1.50 |
| 414 | Work zone stop line, class III, 642 paint (614E26610) | FT | 1,219 | $4.50 | $6.00 | $4.50 |
| 415 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 50 | $125.00 | $75.00 | $125.00 |
| 416 | Special - fill and plug existing conduit (202E70000) | FT | 135 | $90.00 | $577.58 | $85.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of February 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.