FAI-US 33-02.64 (INTERCHANGE). Let by Ohio DOT on May 15, 2025, FAI. 4 bids received; low bid $51,269,955 by Shelly & Sands Inc, -11% against the engineer's estimate of $57,356,000.
- Owner
- Ohio DOT
- Letting
- 15 MAY 2025
- Pay items
- 542
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly & Sands Inc | $51,269,955 | Low | -11% |
| 2 | Ruhlin Company | $52,464,742 | +2.0% | -9.0% |
| 3 | Kokosing Construction Company Inc | $54,358,589 | +6.0% | -5.0% |
| 4 | Complete General Construction Company | $54,771,818 | +7.0% | -5.0% |
Engineer's estimate: $57,356,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly & Sands Inc | 2. Ruhlin Company | 3. Kokosing Construction Company Inc | 4. Complete General Construction Company |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $305,000 | $398,950 | $200,000 | $173,500 |
| 6 | Headwall removed (202E20010) | EACH | 4 | $300.00 | $907.77 | $600.00 | $300.00 |
| 7 | Pavement removed (202E23000) | SY | 31,953 | $7.50 | $9.17 | $7.00 | $13.00 |
| 8 | Walk removed (202E30000) | SF | 5,246 | $0.60 | $0.61 | $2.50 | $3.00 |
| 9 | Pipe removed, 24" and under (202E35100) | FT | 2,330 | $30.00 | $24.19 | $19.00 | $26.00 |
| 10 | Pipe removed, over 24" diameter (202E35200) | FT | 92 | $120.00 | $108.83 | $120.00 | $110.00 |
| 11 | Guardrail removed (202E38000) | FT | 1,477 | $2.50 | $2.50 | $2.50 | $2.40 |
| 12 | Mailbox removed (202E53100) | EACH | 28 | $100.00 | $100.00 | $50.00 | $100.00 |
| 13 | Manhole removed (202E58000) | EACH | 3 | $725.00 | $1,623.97 | $2,000.00 | $1,000.00 |
| 14 | Catch basin removed (202E58100) | EACH | 7 | $225.00 | $1,695.72 | $1,200.00 | $500.00 |
| 15 | Septic tank removed (202E62700) | EACH | 1 | $1,800.00 | $1,836.73 | $2,800.00 | $2,550.00 |
| 16 | Fence removed (202E75000) | FT | 8,014 | $2.50 | $2.55 | $4.00 | $3.00 |
| 17 | Gate removed (202E75250) | EACH | 1 | $800.00 | $816.33 | $500.00 | $320.00 |
| 18 | Removal misc.: concrete block headwall (202E98100) | EACH | 2 | $250.00 | $935.96 | $1,400.00 | $900.00 |
| 19 | Removal misc.: inspection well (202E98100) | EACH | 1 | $400.00 | $3,206.65 | $350.00 | $800.00 |
| 20 | Removal misc.: large rock (202E98100) | EACH | 5 | $25.00 | $76.53 | $175.00 | $100.00 |
| 21 | Removal misc.: private bridge (202E98100) | EACH | 1 | $2,500.00 | $3,571.43 | $3,200.00 | $4,000.00 |
| 22 | Removal misc.: stone mailbox (202E98100) | EACH | 1 | $100.00 | $102.04 | $550.00 | $300.00 |
| 23 | Removal misc.: conduit (202E98200) | FT | 100 | $10.00 | $73.57 | $65.00 | $16.00 |
| 24 | Removal misc.: decorative fence with concrete pill (202E98200) | FT | 1,898 | $4.00 | $4.08 | $15.00 | $8.00 |
| 25 | Removal misc.:slotted drain (202E98200) | FT | 860 | $18.00 | $7.99 | $25.00 | $27.00 |
| 26 | Excavation (203E10000) | CY | 96,357 | $10.00 | $10.29 | $12.00 | $8.00 |
| 27 | Embankment (203E20000) | CY | 257,753 | $10.50 | $15.33 | $13.50 | $17.00 |
| 28 | Embankment, as per plan (203E20001) | CY | 100 | $40.00 | $27.17 | $50.00 | $40.00 |
| 29 | Subgrade compaction (204E10000) | SY | 47,138 | $2.50 | $2.58 | $2.50 | $3.00 |
| 30 | Proof rolling (204E45000) | HR | 44 | $525.00 | $417.28 | $225.00 | $360.00 |
| 31 | Cement (206E10500) | TON | 1,432 | $222.00 | $223.65 | $223.65 | $223.65 |
| 32 | Curing coat (206E11000) | SY | 54,522 | $1.27 | $1.27 | $1.27 | $1.27 |
| 33 | Cement stabilized subgrade, 12 inches deep (206E15010) | SY | 29,888 | $2.64 | $5.83 | $3.50 | $2.65 |
| 34 | Cement stabilized subgrade, 14 inches deep (206E15020) | SY | 24,634 | $2.64 | $3.27 | $3.50 | $2.65 |
| 35 | Mixture design for chemically stabilized soils (206E30000) | LS | 1 | $24,675 | $24,675 | $25,000 | $24,675 |
| 36 | Guardrail, type MGS (606E15050) | FT | 7,348 | $21.00 | $21.00 | $21.00 | $23.00 |
| 37 | Anchor assembly, MGS type B (606E26050) | EACH | 4 | $2,450.00 | $2,450.00 | $2,450.00 | $2,680.00 |
| 38 | Anchor assembly, MGS type E, MASH 2016 (606E26150) | EACH | 6 | $2,500.00 | $2,500.00 | $2,500.00 | $2,740.00 |
| 39 | Anchor assembly, MGS type T (606E26550) | EACH | 7 | $1,200.00 | $1,200.00 | $1,200.00 | $1,420.00 |
| 40 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 10 | $2,550.00 | $2,550.00 | $2,550.00 | $2,950.00 |
| 41 | MGS bridge terminal assembly, type 2 (606E35102) | EACH | 4 | $500.00 | $500.00 | $500.00 | $650.00 |
| 42 | Impact attenuator, type 1 (unidirectional) (606E60002) | EACH | 1 | $8,000.00 | $8,000.00 | $8,000.00 | $9,160.00 |
| 43 | Impact attenuator, type 2 (bidirectional) 70 MPH, (606E60028) | EACH | 2 | $28,500 | $28,500 | $28,500 | $36,500 |
| 44 | Fence, type 47 (607E15000) | FT | 621 | $22.50 | $22.50 | $22.50 | $18.00 |
| 45 | Fence, type CLT (607E23000) | FT | 4,897 | $22.50 | $22.50 | $22.50 | $26.00 |
| 46 | Fenceline seeding and mulching (607E70000) | FT | 5,518 | $0.53 | $1.25 | $1.25 | $1.50 |
| 47 | Concrete barrier, single slope, type B1 (622E10100) | FT | 156 | $480.00 | $463.78 | $450.00 | $650.00 |
| 48 | Concrete barrier, single slope, type D (622E10160) | FT | 2,040 | $90.00 | $79.77 | $100.00 | $83.00 |
| 49 | Concrete barrier, single slope, 81" (622E10180) | FT | 1,159 | $270.00 | $213.59 | $300.00 | $220.00 |
| 50 | Concrete barrier end section, 81" to 57" (622E24834) | EACH | 1 | $16,100 | $11,254 | $10,700 | $14,500 |
| 51 | Concrete barrier end section, type B1 (622E24850) | EACH | 3 | $8,800.00 | $6,366.75 | $8,900.00 | $10,000 |
| 52 | Concrete barrier end section, type D (622E25000) | EACH | 1 | $6,750.00 | $5,916.51 | $3,900.00 | $5,200.00 |
| 53 | Concrete barrier, end anchorage, reinforced, type D (622E25050) | EACH | 5 | $5,450.00 | $4,773.28 | $4,500.00 | $4,500.00 |
| 54 | Concrete barrier, end anchorage, reinforced, 81" (622E25080) | EACH | 3 | $9,700.00 | $9,451.77 | $6,300.00 | $7,950.00 |
| 55 | Reference monument, type A (623E40500) | EACH | 14 | $950.00 | $676.71 | $750.00 | $590.00 |
| 56 | Right-of-way monument, type B (623E40520) | EACH | 12 | $250.00 | $676.71 | $440.00 | $330.00 |
| 57 | Special - mailbox support system, single (690E50100) | EACH | 15 | $125.00 | $175.00 | $250.00 | $250.00 |
| 58 | Riprap, type D (601E11000) | SY | 50 | $285.00 | $116.73 | $240.00 | $445.00 |
| 59 | Crushed aggregate slope protection (601E20000) | SY | 448 | $40.00 | $16.18 | $55.00 | $56.00 |
| 60 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 35 | $165.00 | $256.07 | $200.00 | $150.00 |
| 61 | Tied concrete block mat with type 2 underlayment (601E21060) | SY | 103 | $82.00 | $161.88 | $100.00 | $105.00 |
| 62 | Rock channel protection, type A with filter (601E32000) | CY | 28 | $165.00 | $139.10 | $190.00 | $165.00 |
| 63 | Rock channel protection, type B with filter (601E32100) | CY | 74 | $160.00 | $127.59 | $230.00 | $145.00 |
| 64 | Rock channel protection, type C with filter (601E32200) | CY | 26 | $255.00 | $370.85 | $200.00 | $300.00 |
| 65 | Rock channel protection, type C with geotextile fabric (601E32204) | CY | 64 | $135.00 | $181.02 | $175.00 | $135.00 |
| 66 | Soil analysis test (659E00100) | EACH | 2 | $75.00 | $2.00 | $25.00 | $75.00 |
| 67 | Topsoil (659E00300) | CY | 34,736 | $16.00 | $6.48 | $13.00 | $30.00 |
| 68 | Seeding and mulching, class 2 (659E00510) | SY | 250,538 | $0.53 | $0.60 | $0.60 | $0.60 |
| 69 | Repair seeding and mulching (659E14000) | SY | 12,487 | $0.53 | $0.60 | $0.60 | $0.60 |
| 70 | Inter-seeding (659E15000) | SY | 12,487 | $0.20 | $0.01 | $0.01 | $0.20 |
| 71 | Commercial fertilizer (659E20000) | TON | 34.79 | $400.00 | $250.00 | $250.00 | $500.00 |
| 72 | Lime (659E31000) | ACRE | 51.60 | $5.00 | $25.00 | $25.00 | $5.00 |
| 73 | Water (659E35000) | MGAL | 1,382 | $0.50 | $0.01 | $0.01 | $0.50 |
| 74 | Mowing (659E40000) | MSF | 562 | $4.50 | $1.00 | $1.00 | $7.50 |
| 75 | Sodding reinforced (660E20000) | SY | 1,689 | $10.50 | $18.75 | $18.75 | $15.00 |
| 76 | Slope erosion protection (670E00500) | SY | 61,188 | $1.65 | $1.15 | $1.15 | $1.85 |
| 77 | Ditch erosion protection (670E00700) | SY | 2,798 | $2.00 | $1.15 | $1.15 | $2.25 |
| 78 | Ditch erosion protection mat, type E (670E00750) | SY | 80 | $2.95 | $2.25 | $2.25 | $2.95 |
| 79 | Storm water pollution prevention plan (832E15000) | LS | 1 | $9,500.00 | $8,462.94 | $10,000 | $7,500.00 |
| 80 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $45,000 | $41,835 | $50,000 | $45,000 |
| 81 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $26,000 | $25,827 | $30,000 | $26,000 |
| 82 | Erosion control (832E30000) | EACH | 1,000,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 83 | Concrete masonry (602E20000) | CY | 28.20 | $2,750.00 | $3,657.73 | $2,500.00 | $3,000.00 |
| 84 | 6" shallow pipe underdrains (605E11100) | FT | 21,510 | $11.50 | $15.36 | $14.00 | $13.00 |
| 85 | 6" unclassified pipe underdrains (605E13300) | FT | 597 | $19.00 | $29.90 | $22.00 | $38.00 |
| 86 | 6" base pipe underdrains (605E14000) | FT | 13,272 | $10.25 | $15.13 | $10.00 | $11.00 |
| 87 | Aggregate drains (605E31100) | FT | 5,188 | $14.25 | $13.93 | $7.00 | $16.00 |
| 88 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 1,010 | $19.00 | $29.22 | $28.00 | $19.00 |
| 89 | 6" conduit, type B (611E00900) | FT | 100 | $20.00 | $58.29 | $38.00 | $25.00 |
| 90 | 6" conduit, type E (611E01400) | FT | 100 | $18.00 | $44.48 | $38.00 | $16.00 |
| 91 | 6" conduit, type F (611E01500) | FT | 150 | $19.00 | $44.01 | $38.00 | $16.00 |
| 92 | 8" conduit, type B (611E01800) | FT | 100 | $24.00 | $60.08 | $39.00 | $90.00 |
| 93 | 8" conduit, type E (611E02500) | FT | 100 | $22.00 | $46.27 | $39.00 | $66.00 |
| 94 | 8" conduit, type F (611E02600) | FT | 100 | $22.00 | $46.27 | $39.00 | $61.00 |
| 95 | 12" conduit, type C (611E04600) | FT | 6 | $210.00 | $253.36 | $250.00 | $207.00 |
| 96 | 12" conduit, type C (611E04600) | FT | 285 | $55.00 | $54.97 | $92.00 | $92.00 |
| 97 | 12" conduit, type D (611E04900) | FT | 84 | $77.00 | $110.70 | $110.00 | $96.00 |
| 98 | 12" conduit, type D (611E04900) | FT | 504 | $74.00 | $67.81 | $90.00 | $68.00 |
| 99 | 15" conduit, type A (611E05700) | FT | 146 | $113.00 | $170.43 | $130.00 | $136.00 |
| 100 | 15" conduit, type A (611E05700) | FT | 545 | $92.00 | $147.57 | $125.00 | $127.00 |
| 101 | 15" conduit, type B (611E05900) | FT | 353 | $108.00 | $127.48 | $115.00 | $147.00 |
| 102 | 15" conduit, type B (611E05900) | FT | 96 | $88.00 | $105.05 | $145.00 | $119.00 |
| 103 | 15" conduit, type C (611E06100) | FT | 566 | $81.00 | $102.72 | $115.00 | $103.00 |
| 104 | 15" conduit, type C (611E06100) | FT | 176 | $90.00 | $112.38 | $120.00 | $89.00 |
| 105 | 15" conduit, type D (611E06400) | FT | 61 | $90.00 | $144.62 | $115.00 | $111.00 |
| 106 | 15" conduit, type D (611E06400) | FT | 69 | $85.00 | $76.73 | $110.00 | $77.00 |
| 107 | 15" conduit, type F (611E06700) | FT | 52 | $81.00 | $60.49 | $230.00 | $141.00 |
| 108 | 18" conduit, type A (611E07200) | FT | 174 | $80.00 | $135.76 | $115.00 | $106.00 |
| 109 | 18" conduit, type B (611E07400) | FT | 81 | $255.00 | $133.60 | $190.00 | $133.00 |
| 110 | 18" conduit, type C (611E07600) | FT | 218 | $125.00 | $145.35 | $170.00 | $126.00 |
| 111 | 18" conduit, type D (611E07900) | FT | 166 | $130.00 | $111.06 | $130.00 | $85.00 |
| 112 | 21" conduit, type A (611E08700) | FT | 112 | $105.00 | $166.14 | $180.00 | $124.00 |
| 113 | 21" conduit, type B (611E08900) | FT | 44 | $150.00 | $167.03 | $280.00 | $221.00 |
| 114 | 21" conduit, type C (611E09100) | FT | 180 | $120.00 | $115.86 | $175.00 | $142.00 |
| 115 | 24" conduit, type B (611E10400) | FT | 98 | $135.00 | $139.44 | $235.00 | $163.00 |
| 116 | 24" conduit, type C (611E10600) | FT | 200 | $112.00 | $128.78 | $170.00 | $134.00 |
| 117 | 30" conduit, type B (611E13400) | FT | 198 | $139.00 | $140.69 | $200.00 | $200.00 |
| 118 | 30" conduit, type C (611E13600) | FT | 100 | $128.00 | $156.07 | $170.00 | $155.00 |
| 119 | 66" conduit, type B (611E25200) | FT | 38 | $740.00 | $991.81 | $780.00 | $939.00 |
| 120 | 78" conduit, type A, 706.02, 707.02 (aluminized) ( (611E27000) | FT | 140 | $645.00 | $1,340.80 | $1,100.00 | $740.00 |
| 121 | 19" X 30" conduit, type C, 706.04 (611E52304) | FT | 43 | $250.00 | $287.44 | $250.00 | $220.00 |
| 122 | 63" X 98" conduit, type A, 706.04 (611E53500) | FT | 248 | $1,150.00 | $1,521.01 | $1,200.00 | $1,100.00 |
| 123 | 6' X 4' conduit, type A, 706.05 (611E94700) | FT | 60 | $1,000.00 | $1,466.27 | $1,500.00 | $1,500.00 |
| 124 | Slotted drain, type 2, 15" (611E97010) | FT | 171 | $175.00 | $242.28 | $250.00 | $200.00 |
| 125 | Conduit, misc.: type B for drainage continuance (611E97400) | FT | 100 | $40.00 | $119.42 | $60.00 | $48.00 |
| 126 | Conduit, misc.: type C for drainage continuance (611E97400) | FT | 100 | $35.00 | $98.09 | $60.00 | $30.00 |
| 127 | Conduit, misc.: type E for drainage continuance (611E97400) | FT | 100 | $35.00 | $98.09 | $60.00 | $18.00 |
| 128 | Conduit, misc.: type F for drainage continuance (611E97400) | FT | 100 | $35.00 | $98.09 | $60.00 | $24.00 |
| 129 | Catch basin, no. 3A (611E98180) | EACH | 4 | $4,800.00 | $5,348.83 | $5,400.00 | $5,100.00 |
| 130 | Catch basin, no. 6 (611E98370) | EACH | 1 | $4,200.00 | $5,106.12 | $4,600.00 | $4,400.00 |
| 131 | Catch basin, no. 8 (611E98410) | EACH | 4 | $6,600.00 | $6,113.94 | $6,900.00 | $5,670.00 |
| 132 | Catch basin, no. 2-2B (611E98470) | EACH | 7 | $3,900.00 | $3,086.67 | $3,400.00 | $4,120.00 |
| 133 | Catch basin, no. 2-3 (611E98510) | EACH | 6 | $3,800.00 | $3,930.22 | $4,300.00 | $4,355.00 |
| 134 | Inlet, no. 3D (611E98820) | EACH | 1 | $13,500 | $14,104 | $16,000 | $17,670 |
| 135 | Manhole, no. 3 (611E99574) | EACH | 7 | $10,500 | $15,385 | $11,000 | $9,360.00 |
| 136 | Precast reinforced concrete outlet (611E99710) | EACH | 15 | $440.00 | $433.34 | $650.00 | $555.00 |
| 137 | Inspection well (611E99720) | EACH | 1 | $1,000.00 | $2,271.76 | $1,300.00 | $3,000.00 |
| 138 | Pavement planing, asphalt concrete (depth = 3 1/4" (254E01000) | SY | 113,456 | $4.50 | $3.30 | $3.30 | $3.30 |
| 139 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 15,100 | $150.00 | $155.75 | $195.00 | $155.75 |
| 140 | Asphalt concrete base, PG64-22, (449), (driveways) (301E56100) | CY | 157 | $290.00 | $198.00 | $470.00 | $198.00 |
| 141 | Aggregate base (304E20000) | CY | 15,840 | $69.50 | $79.53 | $70.00 | $76.00 |
| 142 | Non-tracking tack coat (407E20000) | GAL | 26,355 | $3.50 | $4.50 | $2.65 | $4.50 |
| 143 | Stabilized crushed aggregate (411E10000) | CY | 2,306 | $80.00 | $105.75 | $82.00 | $100.00 |
| 144 | Asphalt concrete surface course, type 1, (446), PG70-22M (441E10100) | CY | 1,880 | $208.00 | $227.75 | $235.00 | $227.75 |
| 145 | Asphalt concrete intermediate course, type 2, (446) (441E10200) | CY | 2,630 | $165.00 | $183.75 | $190.00 | $183.75 |
| 146 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 89 | $400.00 | $370.00 | $650.00 | $370.00 |
| 147 | Asphalt concrete intermediate course, type 2, (449), (driveways) (441E70700) | CY | 62 | $220.00 | $250.00 | $390.00 | $250.00 |
| 148 | Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000) | CY | 5,606 | $225.00 | $230.75 | $250.00 | $230.75 |
| 149 | Asphalt concrete intermediate course, 12.5 MM, type A (446) (442E10080) | CY | 6,544 | $207.00 | $205.75 | $215.00 | $205.75 |
| 150 | 6" reinforced concrete pavement, class QC 1P (451E10010) | SY | 81 | $105.00 | $111.77 | $110.00 | $148.00 |
| 151 | 8" non-reinforced concrete pavement, class QC 1P (452E12010) | SY | 95 | $155.00 | $130.11 | $105.00 | $125.00 |
| 152 | 9" non-reinforced concrete pavement, class QC 1P with QC/QA (452E13020) | SY | 13,515 | $101.00 | $124.63 | $100.00 | $90.00 |
| 153 | Curb, type 4-C (609E24510) | FT | 488 | $45.00 | $34.64 | $48.00 | $50.00 |
| 154 | 6" concrete traffic island (609E54000) | SY | 112 | $125.00 | $150.36 | $180.00 | $105.00 |
| 155 | 6" water main polyvinyl chloride pipe and fittings, AWWA C900, DR14 (638E01140) | FT | 299 | $110.00 | $158.57 | $400.00 | $146.00 |
| 156 | 8" water main polyvinyl chloride pipe and fittings, AWWA C900, DR14 (638E01710) | FT | 178 | $105.00 | $217.96 | $405.00 | $252.00 |
| 157 | 12" water main polyvinyl chloride pipe and fittings, AWWA C900, DR-14 (638E02750) | FT | 5,203 | $130.00 | $143.90 | $225.00 | $154.00 |
| 158 | 30" steel pipe encasement, bored or jacked (638E07314) | FT | 350 | $1,200.00 | $1,430.40 | $1,400.00 | $1,175.00 |
| 159 | 6" gate valve and valve box (638E07800) | EACH | 10 | $1,450.00 | $2,511.49 | $3,200.00 | $2,600.00 |
| 160 | 8" gate valve and valve box (638E07900) | EACH | 1 | $2,100.00 | $3,194.44 | $4,000.00 | $3,280.00 |
| 161 | 12" gate valve and valve box (638E08100) | EACH | 3 | $3,700.00 | $5,383.53 | $6,300.00 | $3,200.00 |
| 162 | 12" X 12" tapping sleeve, valve and valve box (638E09800) | EACH | 2 | $18,500 | $14,223 | $13,000 | $17,650 |
| 163 | 6" fire hydrant (638E10200) | EACH | 10 | $7,400.00 | $7,392.89 | $8,100.00 | $6,390.00 |
| 164 | Fire hydrant removed and disposed of (638E10700) | EACH | 11 | $1,200.00 | $1,051.01 | $870.00 | $1,300.00 |
| 165 | Meter and vault removed and reset (638E11102) | EACH | 1 | $6,500.00 | $5,365.77 | $3,800.00 | $3,080.00 |
| 166 | Special - 3/4" polyethylene water service line (FA (638E20768) | FT | 1,035 | $50.00 | $44.51 | $70.00 | $48.00 |
| 167 | Special - cut and plug existing 12" water line (FA (638E20884) | EACH | 2 | $1,300.00 | $10,579 | $2,100.00 | $1,420.00 |
| 168 | Special - service box (fairfield county) (638E20904) | EACH | 13 | $250.00 | $1,163.39 | $850.00 | $810.00 |
| 169 | 15" conduit, type B (611E05900) | FT | 88 | $300.00 | $332.73 | $500.00 | $358.00 |
| 170 | 15" conduit, type C (611E06100) | FT | 629 | $165.00 | $146.00 | $200.00 | $584.00 |
| 171 | Manhole, no. 1 (611E99550) | EACH | 3 | $7,200.00 | $8,773.88 | $8,500.00 | $12,000 |
| 172 | Manhole adjusted to grade (611E99654) | EACH | 6 | $1,300.00 | $1,795.05 | $1,000.00 | $1,850.00 |
| 173 | 4" conduit, type E (611E00400) | FT | 180 | $4.50 | $35.70 | $25.00 | $20.00 |
| 174 | Connection, unfused permanent (625E00480) | EACH | 27 | $105.00 | $196.29 | $175.00 | $130.00 |
| 175 | Light tower, BB70 (625E10990) | EACH | 2 | $26,900 | $25,447 | $28,000 | $25,500 |
| 176 | Light tower, BB100 (625E11200) | EACH | 5 | $33,600 | $30,587 | $36,000 | $28,500 |
| 177 | Light tower, BBB100 (625E12200) | EACH | 4 | $33,700 | $30,713 | $36,000 | $28,500 |
| 178 | Light tower foundation, 36" X 25' deep (625E15200) | EACH | 2 | $10,975 | $10,940 | $14,600 | $15,000 |
| 179 | Light tower foundation, 36" X 30' deep (625E15300) | EACH | 9 | $12,300 | $11,527 | $17,800 | $16,000 |
| 180 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 1,347 | $3.75 | $3.52 | $3.50 | $3.25 |
| 181 | 1-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320) | FT | 6,492 | $11.25 | $13.32 | $14.00 | $12.00 |
| 182 | Conduit, 2", 725.04 (625E25400) | FT | 311 | $36.00 | $24.26 | $36.50 | $32.00 |
| 183 | Conduit, 3", 725.04 (625E25500) | FT | 78 | $32.00 | $41.47 | $70.00 | $38.00 |
| 184 | Luminaire, high mast, solid state (LED), as per plan (625E26263) | EACH | 14 | $1,025.00 | $1,422.00 | $1,750.00 | $1,325.00 |
| 185 | Luminaire, high mast, solid state (LED), as per plan (625E26263) | EACH | 12 | $1,025.00 | $1,422.00 | $1,700.00 | $1,275.00 |
| 186 | Trench (625E29000) | FT | 6,373 | $12.00 | $6.11 | $6.20 | $7.00 |
| 187 | Barrier junction box (625E29940) | EACH | 2 | $2,625.00 | $2,669.01 | $2,800.00 | $2,700.00 |
| 188 | Pull box, 725.08, 18" (625E30700) | EACH | 8 | $1,000.00 | $1,267.93 | $1,700.00 | $1,025.00 |
| 189 | Pull box, 725.08, 24" (625E30706) | EACH | 1 | $1,250.00 | $1,360.07 | $2,150.00 | $1,350.00 |
| 190 | Ground rod (625E32000) | EACH | 22 | $275.00 | $243.88 | $330.00 | $300.00 |
| 191 | Structure grounding system (625E33000) | EACH | 3 | $7,750.00 | $5,335.33 | $9,700.00 | $15,000 |
| 192 | Power service, as per plan (625E34001) | EACH | 1 | $9,600.00 | $12,290 | $14,500 | $12,000 |
| 193 | Underground warning marking tape (625E36010) | FT | 6,373 | $3.00 | $2.17 | $1.50 | $1.50 |
| 194 | Arc flash calculations and label, (PS-'1') (625E76000) | EACH | 1 | $3,500.00 | $1,496.82 | $875.00 | $4,000.00 |
| 195 | RPM (621E00100) | EACH | 583 | $36.75 | $36.75 | $36.75 | $40.95 |
| 196 | Raised pavement marker removed (621E54000) | EACH | 100 | $12.00 | $36.50 | $40.00 | $19.15 |
| 197 | Ground rod (625E32000) | EACH | 3 | $425.00 | $243.88 | $330.00 | $300.00 |
| 198 | Barrier reflector, type 1, birectional (626E00102) | EACH | 10 | $12.50 | $12.50 | $12.50 | $13.80 |
| 199 | Barrier reflector, type 1, one-way (626E00102) | EACH | 75 | $12.50 | $12.50 | $12.50 | $13.00 |
| 200 | Barrier reflector, type 2, birectional (626E00110) | EACH | 32 | $12.00 | $12.00 | $12.00 | $15.10 |
| 201 | Barrier reflector, type 2, one-way (626E00110) | EACH | 75 | $11.50 | $11.50 | $11.50 | $15.00 |
| 202 | Ground mounted support, no. 3 post (630E03100) | FT | 1,260 | $12.50 | $12.50 | $12.50 | $15.40 |
| 203 | Ground mounted structural beam support, S4X7.7 (630E06400) | FT | 98 | $17.00 | $17.00 | $17.00 | $35.50 |
| 204 | Ground mounted structural beam support, W6X9 (630E06500) | FT | 188 | $18.50 | $18.50 | $18.50 | $38.00 |
| 205 | Ground mounted structural beam support, W8X18 (630E07000) | FT | 199 | $32.00 | $32.00 | $32.00 | $50.00 |
| 206 | Ground mounted structural beam support, W10X12 (630E07600) | FT | 173 | $23.50 | $23.50 | $23.50 | $42.00 |
| 207 | Street name sign support, no. 3 post (630E08520) | FT | 90 | $20.00 | $20.00 | $20.00 | $16.20 |
| 208 | Sign post reflector (630E08600) | EACH | 25 | $45.00 | $45.00 | $45.00 | $45.00 |
| 209 | Breakaway structural beam connection (630E09000) | EACH | 32 | $500.00 | $500.00 | $500.00 | $625.00 |
| 210 | Overhead sign support, type TC-12.31, design 6 (630E72320) | EACH | 2 | $22,000 | $22,000 | $22,000 | $28,600 |
| 211 | Overhead sign support, type TC-12.31, design 12 (630E72340) | EACH | 1 | $23,000 | $32,000 | $32,000 | $48,300 |
| 212 | Sign attachment assembly, mast arm (630E79200) | EACH | 4 | $550.00 | $550.00 | $550.00 | $1,020.00 |
| 213 | Sign support assembly, pole mounted (630E79500) | EACH | 9 | $225.00 | $225.00 | $225.00 | $185.00 |
| 214 | Sign support assembly, bridge mounted, type 2 (630E79604) | EACH | 11 | $1,800.00 | $1,800.00 | $1,800.00 | $2,480.00 |
| 215 | Sign, flat sheet (630E80100) | SF | 770.20 | $20.00 | $20.00 | $20.00 | $16.00 |
| 216 | Sign, ground mounted extrusheet (630E80200) | SF | 1,054 | $23.00 | $23.00 | $23.00 | $23.20 |
| 217 | Sign, overhead extrusheet (630E80224) | SF | 252 | $25.00 | $25.00 | $25.00 | $24.00 |
| 218 | Sign, double faced, street name (630E80500) | EACH | 17 | $150.00 | $150.00 | $150.00 | $195.00 |
| 219 | Sign, street name (630E80510) | EACH | 1 | $150.00 | $150.00 | $150.00 | $165.00 |
| 220 | Ground mounted structural beam support foundation (630E84500) | EACH | 32 | $825.00 | $825.00 | $825.00 | $950.00 |
| 221 | Rigid overhead sign support foundation (630E84510) | EACH | 3 | $8,250.00 | $8,250.00 | $8,250.00 | $8,450.00 |
| 222 | Removal of ground mounted sign and disposal (630E84900) | EACH | 235 | $15.00 | $15.00 | $15.00 | $15.00 |
| 223 | Removal of ground mounted sign and reerection (630E85100) | EACH | 5 | $130.00 | $130.00 | $130.00 | $65.00 |
| 224 | Removal of ground mounted major sign and disposal (630E85400) | EACH | 8 | $150.00 | $150.00 | $150.00 | $185.00 |
| 225 | Removal of ground mounted post support and disposal (630E86002) | EACH | 251 | $15.00 | $15.00 | $15.00 | $20.00 |
| 226 | Removal of ground mounted structural beam support (630E86102) | EACH | 12 | $350.00 | $350.00 | $350.00 | $240.00 |
| 227 | Edge line, 4" (644E00100) | MI | 4.80 | $3,965.00 | $2,645.00 | $2,645.00 | $2,645.00 |
| 228 | Edge line, 6" (644E00104) | MI | 8.78 | $4,415.00 | $3,870.00 | $3,870.00 | $3,870.00 |
| 229 | Lane line, 6" (644E00204) | MI | 4.32 | $2,200.00 | $1,670.00 | $1,670.00 | $1,670.00 |
| 230 | Center line (644E00300) | MI | 2.78 | $7,465.00 | $4,940.00 | $4,940.00 | $4,940.00 |
| 231 | Channelizing line, 8" (644E00400) | FT | 1,152 | $2.15 | $2.95 | $2.95 | $2.95 |
| 232 | Channelizing line, 12" (644E00404) | FT | 4,661 | $2.50 | $3.25 | $3.25 | $3.25 |
| 233 | Stop line (644E00500) | FT | 249 | $9.50 | $7.05 | $7.05 | $7.05 |
| 234 | Transverse/diagonal line (644E00700) | FT | 1,101 | $9.50 | $6.65 | $6.65 | $6.65 |
| 235 | Lane arrow (644E01300) | EACH | 14 | $120.00 | $175.00 | $175.00 | $175.00 |
| 236 | Dotted line, 6" (644E01510) | FT | 3,814 | $0.95 | $2.75 | $2.75 | $2.75 |
| 237 | Edge line, 4" (646E10000) | MI | 0.12 | $12,500 | $4,800.00 | $4,800.00 | $4,800.00 |
| 238 | Edge line, 6" (646E10010) | MI | 2.08 | $9,000.00 | $6,265.00 | $6,265.00 | $6,265.00 |
| 239 | Lane line, 6" (646E10110) | MI | 0.07 | $9,000.00 | $2,810.00 | $2,810.00 | $2,810.00 |
| 240 | Center line (646E10200) | MI | 0.10 | $18,350 | $8,900.00 | $8,900.00 | $8,900.00 |
| 241 | Channelizing line, 8" (646E10300) | FT | 159 | $3.50 | $3.25 | $3.25 | $3.25 |
| 242 | Channelizing line, 12" (646E10310) | FT | 720 | $3.50 | $3.50 | $3.50 | $3.50 |
| 243 | Stop line (646E10400) | FT | 140 | $10.00 | $14.50 | $14.50 | $14.50 |
| 244 | Transverse/diagonal line (646E10600) | FT | 300 | $10.00 | $12.25 | $12.25 | $12.25 |
| 245 | Lane arrow (646E20300) | EACH | 17 | $180.00 | $250.00 | $250.00 | $250.00 |
| 246 | Wrong way arrow (646E20320) | EACH | 2 | $250.00 | $400.00 | $400.00 | $400.00 |
| 247 | Word on pavement, 96" (646E20410) | EACH | 3 | $200.00 | $275.00 | $275.00 | $275.00 |
| 248 | Dotted line, 6" (646E20504) | FT | 184 | $2.00 | $3.00 | $3.00 | $3.00 |
| 249 | No. 4 AWG 600 volt distribution cable (625E23000) | FT | 288 | $3.40 | $3.58 | $3.25 | $3.00 |
| 250 | Conduit, 2", 725.052, as per plan (625E25411) | FT | 314 | $14.00 | $6.18 | $7.10 | $15.00 |
| 251 | Conduit, 3", 725.051 (625E25504) | FT | 10 | $16.50 | $12.72 | $18.00 | $20.00 |
| 252 | Trench, 30" deep (625E29010) | FT | 1,235 | $12.50 | $7.78 | $8.75 | $12.25 |
| 253 | Pull box, 725.08, 18", as per plan (625E30701) | EACH | 2 | $1,025.00 | $1,242.58 | $1,700.00 | $1,025.00 |
| 254 | Ground rod, as per plan (625E32001) | EACH | 5 | $275.00 | $243.88 | $330.00 | $300.00 |
| 255 | Underground warning marking tape (625E36010) | FT | 903 | $3.00 | $2.18 | $1.50 | $1.50 |
| 256 | Arc flash calculations and label, (ITS) (625E76000) | EACH | 1 | $3,500.00 | $1,496.82 | $875.00 | $4,000.00 |
| 257 | Power service, as per plan (632E70001) | EACH | 1 | $8,675.00 | $8,685.49 | $12,000 | $5,000.00 |
| 258 | Cabinet foundation, as per plan (633E67101) | EACH | 1 | $5,300.00 | $1,333.94 | $6,000.00 | $4,500.00 |
| 259 | Fiber optic cable, 24 fiber (804E15010) | FT | 1,805 | $6.86 | $4.79 | $7.75 | $15.00 |
| 260 | 32" ITS pull box with pad and standard lid assembly, type 2 (809E02000) | EACH | 4 | $3,900.00 | $3,035.26 | $5,800.00 | $4,000.00 |
| 261 | 32" ITS pull box with pad and hinged lid assembly, type 2 (809E02002) | EACH | 3 | $5,125.00 | $4,471.35 | $7,300.00 | $5,200.00 |
| 262 | Conduit, 4", multicell, HDPE with 4 - 1" innerducts (809E24500) | FT | 1,154 | $34.00 | $10.81 | $38.00 | $40.00 |
| 263 | CCTV IP-camera system, quad multi-view fixed with PTZ (809E60040) | EACH | 1 | $7,700.00 | $7,268.37 | $8,800.00 | $8,000.00 |
| 264 | CCTV concrete pole, 70 feet (809E61002) | EACH | 1 | $67,500 | $62,378 | $76,000 | $70,000 |
| 265 | CCTV lowering unit (809E61090) | EACH | 1 | $12,250 | $12,020 | $16,000 | $10,500 |
| 266 | ITS cabinet - ground mounted (809E65000) | EACH | 1 | $11,500 | $14,522 | $24,000 | $9,000.00 |
| 267 | Bracket arm, 20' (625E18400) | EACH | 2 | $1,750.00 | $1,424.81 | $1,300.00 | $2,300.00 |
| 268 | No. 6 AWG 600 volt distribution cable (625E22990) | FT | 1,134 | $3.00 | $2.63 | $2.35 | $2.00 |
| 269 | Conduit, 2", 725.04 (625E25400) | FT | 29 | $24.00 | $24.73 | $44.00 | $35.00 |
| 270 | Conduit, 3", 725.04 (625E25500) | FT | 688 | $32.00 | $31.90 | $47.00 | $50.00 |
| 271 | Conduit, 3", 725.051 (625E25504) | FT | 155 | $16.50 | $8.58 | $18.00 | $15.00 |
| 272 | Conduit, 4", 725.04 (625E25600) | FT | 464 | $50.00 | $44.29 | $56.00 | $50.00 |
| 273 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 2 | $400.00 | $404.14 | $580.00 | $525.00 |
| 274 | Trench (625E29000) | FT | 650 | $12.00 | $7.78 | $16.00 | $17.25 |
| 275 | Pull box, 725.06, size 4 (625E30510) | EACH | 5 | $1,000.00 | $1,154.28 | $1,800.00 | $800.00 |
| 276 | Pull box, 725.06, size 7 (625E30520) | EACH | 3 | $1,225.00 | $1,263.72 | $1,890.00 | $1,225.00 |
| 277 | Pull box, 725.08, 24" (625E30706) | EACH | 7 | $1,200.00 | $1,350.73 | $2,150.00 | $1,275.00 |
| 278 | Ground rod (625E32000) | EACH | 10 | $275.00 | $243.88 | $330.00 | $300.00 |
| 279 | Underground warning marking tape (625E36010) | FT | 1,197 | $3.00 | $2.09 | $1.50 | $1.50 |
| 280 | Arc flash calculations and label (pickerington RD/ (625E76000) | EACH | 1 | $3,500.00 | $1,496.82 | $875.00 | $4,000.00 |
| 281 | Arc flash calculations and label (pickerington RD/ (625E76000) | EACH | 1 | $3,500.00 | $1,496.82 | $875.00 | $4,000.00 |
| 282 | Arc flash calculations and label (pickerington RD/ (625E76000) | EACH | 1 | $3,500.00 | $1,496.82 | $875.00 | $4,000.00 |
| 283 | Sign hanger assembly, span wire (630E79000) | EACH | 4 | $625.00 | $279.57 | $625.00 | $575.00 |
| 284 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate (632E05006) | EACH | 20 | $1,350.00 | $1,175.33 | $1,200.00 | $1,050.00 |
| 285 | Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate (632E05086) | EACH | 2 | $2,075.00 | $1,754.56 | $2,100.00 | $1,700.00 |
| 286 | Covering of vehicular signal head (632E25000) | EACH | 22 | $40.00 | $68.43 | $160.00 | $35.00 |
| 287 | Messenger wire, 7 strand, 1/2" diameter with accessories (632E30400) | FT | 465 | $20.00 | $10.76 | $35.00 | $23.00 |
| 288 | Tether wire, with accessories (632E30600) | FT | 465 | $20.00 | $7.65 | $35.00 | $25.00 |
| 289 | Signal cable, 4 conductor, no. 14 AWG (632E40400) | FT | 2,037 | $2.60 | $3.07 | $4.00 | $3.00 |
| 290 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 2,495 | $3.15 | $3.60 | $3.30 | $3.50 |
| 291 | Strain pole foundation (632E64000) | EACH | 4 | $9,400.00 | $6,845.35 | $11,000 | $12,000 |
| 292 | Signal support foundation (632E64010) | EACH | 2 | $8,200.00 | $7,797.15 | $12,000 | $10,000 |
| 293 | Power cable, 2 conductor, no. 4 AWG (632E69200) | FT | 40 | $7.10 | $5.90 | $18.00 | $6.00 |
| 294 | Power cable, 3 conductor, no. 2 AWG (632E69320) | FT | 1,116 | $12.80 | $12.24 | $21.00 | $10.00 |
| 295 | Power service (632E70000) | EACH | 2 | $1,725.00 | $7,266.08 | $10,000 | $2,000.00 |
| 296 | Power service, as per plan (632E70001) | EACH | 1 | $3,800.00 | $10,967 | $13,000 | $5,000.00 |
| 297 | Signal support, type TC-12.31 design 10 pole, with (632E71369) | EACH | 1 | $33,100 | $35,069 | $36,000 | $36,000 |
| 298 | Signal support, type TC-81.22, design 13, as per plan (632E72141) | EACH | 1 | $19,600 | $20,453 | $22,000 | $20,500 |
| 299 | Combination signal support, type TC-12.31 design 1 (632E78385) | EACH | 1 | $34,200 | $34,745 | $37,500 | $35,500 |
| 300 | Combination signal support, type TC-81.22, design 13, as per plan (632E79141) | EACH | 1 | $20,400 | $20,453 | $23,000 | $22,000 |
| 301 | Signal support, misc.: anchor bolts (632E80700) | EACH | 10 | $350.00 | $401.59 | $1,600.00 | $600.00 |
| 302 | Strain pole, type TC-81.11, design 13 (632E86150) | EACH | 4 | $17,300 | $17,701 | $20,000 | $18,000 |
| 303 | Removal of traffic signal installation (632E90100) | EACH | 1 | $4,250.00 | $3,237.93 | $36,000 | $5,000.00 |
| 304 | Cabinet, type TS-2, as per plan (633E65511) | EACH | 1 | $21,000 | $22,317 | $20,000 | $22,000 |
| 305 | Cabinet, type 332, as per plan (633E65521) | EACH | 2 | $18,500 | $22,317 | $28,000 | $19,000 |
| 306 | Cabinet foundation (633E67100) | EACH | 2 | $2,750.00 | $1,912.53 | $3,900.00 | $4,000.00 |
| 307 | Cabinet foundation, as per plan (633E67101) | EACH | 1 | $2,850.00 | $2,579.50 | $5,200.00 | $4,400.00 |
| 308 | Controller work pad (633E67200) | EACH | 1 | $650.00 | $888.52 | $6,800.00 | $3,000.00 |
| 309 | Controller work pad, as per plan (633E67201) | EACH | 1 | $1,700.00 | $6,113.50 | $6,200.00 | $3,000.00 |
| 310 | Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001) | EACH | 3 | $8,775.00 | $7,628.81 | $7,900.00 | $8,000.00 |
| 311 | Controller item, misc.: controller unit, siemens M (633E99000) | EACH | 1 | $6,100.00 | $7,705.49 | $9,500.00 | $5,000.00 |
| 312 | Advance radar detection, as per plan (809E69001) | EACH | 10 | $10,300 | $9,745.19 | $10,000 | $8,050.00 |
| 313 | Stop line radar detection, as per plan (809E69101) | EACH | 10 | $9,900.00 | $9,611.06 | $9,700.00 | $8,400.00 |
| 314 | Atc controller, as per plan (809E69123) | EACH | 2 | $1,674.00 | $771.30 | $3,200.00 | $500.00 |
| 315 | Emergency vehicle preemption, as per plan (809E69201) | EACH | 3 | $1,850.00 | $5,384.16 | $1,300.00 | $1,000.00 |
| 316 | Preempt receiving unit, as per plan (809E69211) | EACH | 3 | $4,350.00 | $3,034.05 | $1,200.00 | $1,200.00 |
| 317 | Preempt detector cable (809E69220) | FT | 204 | $4.00 | $2.07 | $3.50 | $4.00 |
| 318 | Preempt phase selector (809E69230) | EACH | 3 | $5,300.00 | $1,095.21 | $4,300.00 | $4,500.00 |
| 319 | Preempt confirmation light (809E69240) | EACH | 10 | $600.00 | $453.39 | $660.00 | $500.00 |
| 320 | Spread spectrum radio, as per plan (815E30001) | EACH | 2 | $3,800.00 | $3,156.02 | $4,400.00 | $3,500.00 |
| 323 | Building demolished, parcel 36-WL, 1 1/2 story fra (202E56000) | LS | 1 | $23,000 | $26,071 | $9,750.00 | $28,000 |
| 324 | Building demolished, parcel 37-WL, 1 1/2 story fra (202E56000) | LS | 1 | $24,000 | $29,439 | $8,900.00 | $32,000 |
| 325 | Building demolished, parcel 38-WL, 1 1/2 story fra (202E56000) | LS | 1 | $39,000 | $56,224 | $10,900 | $60,000 |
| 326 | Building demolished, parcel 6-WDV, commercial buil (202E56000) | LS | 1 | $25,000 | $26,327 | $24,900 | $28,500 |
| 327 | Building demolished, parcel 8-WL, 2 story framed H (202E56000) | LS | 1 | $62,000 | $62,602 | $39,900 | $67,600 |
| 328 | Building demolished, parcel 9-WL, 1 story framed H (202E56000) | LS | 1 | $27,000 | $25,000 | $10,000 | $27,000 |
| 329 | Pipe removed, 24" and under (202E35100) | FT | 585 | $16.00 | $32.72 | $19.00 | $24.00 |
| 330 | Pavement planing, asphalt concrete (depth = 1.5") (254E01000) | SY | 1,922 | $6.50 | $4.75 | $20.00 | $4.75 |
| 331 | Non-tracking tack coat (407E20000) | GAL | 116 | $3.50 | $4.50 | $2.65 | $4.50 |
| 332 | Traffic compacted surface, type A or B (410E12000) | CY | 100 | $110.00 | $181.56 | $135.00 | $107.00 |
| 333 | Traffic compacted surface, type C (410E13000) | CY | 100 | $88.00 | $181.56 | $145.61 | $107.00 |
| 334 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 50 | $435.00 | $345.00 | $500.00 | $345.00 |
| 335 | Asphalt concrete surface course, 12.5 MM, type A (448) (442E20000) | CY | 80 | $325.00 | $270.00 | $650.00 | $270.00 |
| 336 | 12" conduit, type A (611E04200) | FT | 154 | $73.00 | $162.60 | $115.00 | $97.00 |
| 337 | 12" conduit, type D (611E04900) | FT | 318 | $61.00 | $71.91 | $83.00 | $71.00 |
| 338 | 15" conduit, type B (611E05900) | FT | 35 | $82.00 | $110.69 | $100.00 | $115.00 |
| 339 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 1,000 | $104.00 | $90.00 | $125.00 | $115.00 |
| 340 | Special - work zone traffic signal (614E11300) | EACH | 1 | $122,000 | $107,582 | $125,000 | $188,000 |
| 341 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 18 | $2,150.00 | $2,000.00 | $2,000.00 | $2,420.00 |
| 342 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 17 | $2,150.00 | $2,000.00 | $2,000.00 | $2,420.00 |
| 343 | Detour signing (614E12420) | LS | 1 | $16,000 | $14,270 | $40,000 | $20,000 |
| 344 | Replacement sign (614E12500) | EACH | 5 | $375.00 | $236.57 | $500.00 | $380.00 |
| 345 | Replacement drum (614E12600) | EACH | 25 | $55.00 | $55.26 | $77.00 | $80.00 |
| 346 | Work zone raised pavement marker (614E12800) | EACH | 2,116 | $37.00 | $7.65 | $60.00 | $10.00 |
| 347 | Asphalt concrete for maintaining traffic (614E13000) | CY | 100 | $345.00 | $676.13 | $400.00 | $500.00 |
| 348 | Barrier reflector, type 1, bidirectional (614E13310) | EACH | 76 | $7.00 | $12.87 | $7.25 | $11.00 |
| 349 | Barrier reflector, type 1, one way (614E13310) | EACH | 387 | $8.00 | $12.87 | $7.50 | $7.00 |
| 350 | Object marker, one way (614E13350) | EACH | 387 | $14.00 | $20.37 | $25.00 | $18.00 |
| 351 | Object marker, two way (614E13360) | EACH | 76 | $13.00 | $21.46 | $30.00 | $21.00 |
| 352 | Maintaining traffic, misc.: safety repairs (614E18000) | EACH | 100,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 353 | Portable changeable message sign, as per plan (614E18601) | SNMT | 36 | $550.00 | $880.69 | $630.00 | $1,200.00 |
| 354 | Work zone lane line, class I, 6", 807 paint (614E20056) | MI | 2.38 | $1,250.00 | $1,580.00 | $1,580.00 | $1,580.00 |
| 355 | Work zone center line, class I, 642 paint (614E21100) | MI | 4.30 | $1,450.00 | $1,030.00 | $1,030.00 | $1,030.00 |
| 356 | Work zone edge line, class I, 6", 807 paint (614E22056) | MI | 9.75 | $2,180.00 | $2,365.00 | $2,365.00 | $2,365.00 |
| 357 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 8.18 | $1,050.00 | $785.00 | $785.00 | $785.00 |
| 358 | Work zone channelizing line, class I, 12", 807 paint (614E23110) | FT | 17,555 | $1.15 | $1.10 | $1.10 | $1.10 |
| 359 | Work zone channelizing line, class I, 8", 642 paint (614E23200) | FT | 925 | $1.00 | $0.75 | $0.75 | $0.75 |
| 360 | Work zone dotted line, class I, 6", 807 paint (614E24102) | FT | 1,936 | $1.00 | $1.00 | $1.00 | $1.00 |
| 361 | Work zone transverse/diagonal line, class I, 642 paint (614E25200) | FT | 3,471 | $2.50 | $3.25 | $3.25 | $3.25 |
| 362 | Work zone stop line, class I, 642 paint (614E26200) | FT | 454 | $3.00 | $3.50 | $3.50 | $3.50 |
| 363 | Work zone arrow, class I, 642 paint (614E30200) | EACH | 34 | $80.00 | $75.00 | $75.00 | $75.00 |
| 364 | Work zone railroad symbol marking, class I, 642 paint (614E32200) | EACH | 2 | $350.00 | $350.00 | $350.00 | $350.00 |
| 365 | Roads for maintaining traffic (615E10000) | LS | 1 | $775,000 | $375,246 | $200,000 | $800,000 |
| 366 | Pavement for maintaining traffic, class A (615E20000) | SY | 12,502 | $47.00 | $60.75 | $53.00 | $54.00 |
| 367 | Water (616E10000) | MGAL | 1,100 | $105.00 | $36.99 | $80.00 | $95.00 |
| 368 | Compacted aggregate (617E10100) | CY | 50 | $270.00 | $205.00 | $250.00 | $205.00 |
| 369 | Water (617E25000) | MGAL | 10 | $55.00 | $1.00 | $80.00 | $1.00 |
| 370 | Rumble strips, shoulder (asphalt concrete) (618E40100) | FT | 8,650 | $0.75 | $0.75 | $0.75 | $1.50 |
| 371 | Portable barrier, unanchored (622E41100) | FT | 21,810 | $19.00 | $19.95 | $13.00 | $18.00 |
| 372 | Center line, type 1 (642E00300) | MI | 1 | $7,465.00 | $4,345.00 | $4,345.00 | $4,345.00 |
| 373 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 144 | $500.00 | $587.69 | $470.00 | $950.00 |
| 374 | Embankment (203E20000) | CY | 1,573 | $31.00 | $35.86 | $13.00 | $52.00 |
| 375 | Roadway, misc.: low density cellular concrete fill (203E98000) | CY | 30,597 | $78.00 | $73.92 | $75.00 | $78.00 |
| 376 | Roadway, misc.: low density cellular concrete fill (203E98000) | CY | 3,275 | $92.00 | $78.72 | $80.00 | $84.00 |
| 377 | Unclassified excavation (503E21100) | CY | 8,874 | $12.00 | $27.03 | $28.00 | $24.00 |
| 378 | Pile driving equipment mobilization (505E11100) | LS | 1 | $25,000 | $19,145 | $20,000 | $18,000 |
| 379 | 12" cast-in-place reinforced concrete piles, driven (507E00500) | FT | 240 | $100.00 | $30.31 | $36.00 | $10.00 |
| 380 | 12" cast-in-place reinforced concrete piles, furnished (507E00550) | FT | 300 | $32.00 | $48.05 | $40.00 | $90.00 |
| 381 | Galvanized steel reinforcement (509E26000) | LB | 536,316 | $2.01 | $2.00 | $2.25 | $2.33 |
| 382 | No. 4 deformed GFRP reinforcement (509E30020) | FT | 38,122 | $1.37 | $1.22 | $2.00 | $1.58 |
| 383 | Class QC2 concrete with QC/QA, bridge deck (parapet) (511E34450) | CY | 401 | $515.00 | $402.31 | $620.00 | $650.00 |
| 384 | Class QC1 concrete with QC/QA, footing (511E46512) | CY | 4,365 | $370.00 | $477.42 | $425.00 | $475.00 |
| 385 | Concrete, misc.: wall slab (511E71100) | CY | 33 | $700.00 | $855.27 | $625.00 | $845.00 |
| 386 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 7,229 | $11.50 | $12.50 | $12.50 | $10.75 |
| 387 | Type 2 waterproofing (512E33000) | SY | 3,096 | $27.00 | $27.63 | $15.00 | $25.50 |
| 388 | 1" preformed expansion joint filler, as per plan (516E13601) | SF | 10,363 | $12.00 | $15.87 | $12.00 | $19.00 |
| 389 | 2" preformed expansion joint filler, as per plan (516E13901) | SF | 83 | $25.00 | $38.57 | $25.00 | $25.00 |
| 390 | 2" deep joint sealer (516E31010) | FT | 2,641 | $11.00 | $4.32 | $10.00 | $23.00 |
| 391 | Porous backfill with geotextile fabric (518E21200) | CY | 168 | $100.00 | $115.67 | $100.00 | $115.00 |
| 392 | 6" perforated corrugated plastic pipe (518E40000) | FT | 315 | $8.00 | $25.63 | $7.00 | $15.00 |
| 393 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 83 | $28.00 | $25.33 | $25.00 | $23.00 |
| 394 | Dynamic load testing (523E20000) | EACH | 1 | $3,900.00 | $4,294.82 | $4,000.00 | $5,500.00 |
| 395 | Special - structures: aesthetic treatment (concret (530E00600) | SF | 44,210 | $0.10 | $3.48 | $4.00 | $3.00 |
| 396 | Special - structures: precast wall panels (530E00600) | SF | 55,713 | $65.00 | $56.44 | $55.00 | $53.00 |
| 397 | Vandal protection fence, 6' straight, coated fabric, as per plan (607E39901) | FT | 33 | $150.00 | $161.09 | $140.00 | $297.00 |
| 398 | Concrete coping (840E26000) | FT | 2,641 | $175.00 | $158.09 | $200.00 | $288.00 |
| 399 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $80,000 | $70,135 | $200,000 | $125,000 |
| 400 | Approach slab removed, as per plan (202E22901) | SY | 30 | $1,450.00 | $1,233.04 | $400.00 | $500.00 |
| 401 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $83,000 | $126,960 | $150,000 | $120,000 |
| 402 | Unclassified excavation (503E21300) | LS | 1 | $4,515.00 | $17,888 | $40,000 | $25,000 |
| 403 | Pile driving equipment mobilization (505E11100) | LS | 1 | $14,000 | $19,145 | $75,000 | $18,000 |
| 404 | 12" cast-in-place reinforced concrete piles, driven (507E00500) | FT | 590 | $55.00 | $32.63 | $27.00 | $10.00 |
| 405 | 12" cast-in-place reinforced concrete piles, furnished (507E00550) | FT | 650 | $28.00 | $45.59 | $35.00 | $65.00 |
| 406 | Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001) | LB | 966 | $1.48 | $2.05 | $2.50 | $2.46 |
| 407 | Galvanized steel reinforcement (509E26000) | LB | 24,151 | $2.18 | $2.06 | $2.25 | $2.09 |
| 408 | No. 4 deformed GFRP reinforcement (509E30020) | FT | 1,924 | $1.40 | $1.22 | $2.00 | $1.58 |
| 409 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 44 | $50.00 | $39.97 | $50.00 | $20.00 |
| 410 | Class QC2 concrete, bridge deck (511E34444) | CY | 54 | $2,500.00 | $1,297.00 | $1,800.00 | $1,700.00 |
| 411 | Class QC2 concrete, bridge deck (parapet) (511E34448) | CY | 20 | $1,350.00 | $1,049.42 | $1,000.00 | $1,500.00 |
| 412 | Class QC1 concrete, pier above footings (511E41010) | CY | 13 | $4,800.00 | $3,535.95 | $2,000.00 | $2,000.00 |
| 413 | Class QC1 concrete, abutment including footing (511E43510) | CY | 25 | $2,280.00 | $950.78 | $1,100.00 | $800.00 |
| 414 | Class QC1 concrete, footing (511E46510) | CY | 13 | $1,900.00 | $1,093.10 | $950.00 | $700.00 |
| 415 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 237 | $12.00 | $14.00 | $14.00 | $11.75 |
| 416 | Type 2 waterproofing (512E33000) | SY | 3 | $188.00 | $58.32 | $50.00 | $100.00 |
| 417 | Structural steel members, level 2 (513E10240) | LB | 19,700 | $5.00 | $3.40 | $4.50 | $7.79 |
| 418 | Field painting structural steel, intermediate coat (514E00060) | SF | 1,338 | $44.00 | $40.00 | $40.00 | $40.00 |
| 419 | Field painting structural steel, finish coat (514E00066) | SF | 1,338 | $27.00 | $24.50 | $24.50 | $24.50 |
| 420 | Final inspection repair (514E10000) | EACH | 2 | $1.00 | $1.00 | $1.00 | $1.00 |
| 421 | 1" preformed expansion joint filler (516E13600) | SF | 44 | $19.00 | $13.34 | $10.00 | $13.00 |
| 422 | 2" preformed expansion joint filler, as per plan (516E13901) | SF | 40 | $26.00 | $37.02 | $35.00 | $20.00 |
| 423 | Semi-integral abutment expansion joint seal (516E14020) | FT | 26 | $43.00 | $20.04 | $50.00 | $46.50 |
| 424 | Elastomeric bearing with internal laminates and load plate (516E44100) | EACH | 2 | $1,700.00 | $1,954.20 | $1,800.00 | $1,348.00 |
| 425 | Elastomeric bearing with internal laminates and load plate (516E44100) | EACH | 2 | $1,060.00 | $1,458.84 | $1,200.00 | $762.00 |
| 426 | Porous backfill with geotextile fabric (518E21200) | CY | 5 | $125.00 | $140.34 | $200.00 | $275.00 |
| 427 | 6" perforated corrugated plastic pipe (518E40000) | FT | 23 | $6.00 | $24.22 | $20.00 | $20.00 |
| 428 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 8 | $13.00 | $40.15 | $90.00 | $50.00 |
| 429 | Patching concrete bridge deck - type B (519E12300) | SY | 7 | $1,000.00 | $1,290.00 | $600.00 | $995.00 |
| 430 | Dynamic load testing (523E20000) | EACH | 2 | $3,900.00 | $4,294.83 | $4,500.00 | $5,500.00 |
| 431 | Reinforced concrete approach slabs (T=15"), as per plan (526E25001) | SY | 63 | $450.00 | $513.61 | $425.00 | $500.00 |
| 433 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $125,000 | $264,849 | $300,000 | $200,000 |
| 434 | Unclassified excavation (503E21300) | LS | 1 | $23,000 | $101,172 | $150,000 | $75,000 |
| 435 | Pile driving equipment mobilization (505E11100) | LS | 1 | $14,000 | $26,157 | $50,000 | $18,000 |
| 436 | 12" cast-in-place reinforced concrete piles, driven (507E00500) | FT | 2,070 | $50.00 | $15.63 | $27.00 | $10.00 |
| 437 | 12" cast-in-place reinforced concrete piles, furnished (507E00550) | FT | 2,250 | $41.00 | $63.04 | $50.00 | $65.00 |
| 438 | Galvanized steel reinforcement (509E26000) | LB | 93,510 | $1.81 | $1.93 | $2.25 | $2.18 |
| 439 | No. 4 deformed GFRP reinforcement (509E30020) | FT | 4,779 | $1.45 | $1.22 | $2.00 | $1.58 |
| 440 | Class QC2 concrete with QC/QA, superstructure (511E32212) | CY | 295 | $1,000.00 | $991.25 | $950.00 | $1,400.00 |
| 441 | Class QC2 concrete with QC/QA, bridge deck (parapet) (511E34450) | CY | 51 | $850.00 | $882.61 | $1,000.00 | $1,100.00 |
| 442 | Class QC1 concrete with QC/QA, pier above footings (511E41012) | CY | 56 | $2,390.00 | $1,694.77 | $1,200.00 | $1,000.00 |
| 443 | Class QC1 concrete with QC/QA, abutment including footing (511E43512) | CY | 67 | $1,500.00 | $1,315.10 | $1,100.00 | $950.00 |
| 444 | Class QC1 concrete with QC/QA, footing (511E46512) | CY | 48 | $1,135.00 | $1,008.06 | $900.00 | $645.00 |
| 445 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 525 | $12.00 | $13.00 | $13.00 | $11.00 |
| 446 | 1/2" preformed expansion joint filler, as per plan (516E13201) | SF | 48 | $12.00 | $14.74 | $30.00 | $15.00 |
| 447 | 1" preformed expansion joint filler, as per plan (516E13601) | SF | 69 | $19.00 | $23.35 | $30.00 | $16.00 |
| 448 | 2" preformed expansion joint filler, as per plan (516E13901) | SF | 42 | $39.00 | $37.07 | $35.00 | $22.00 |
| 449 | Integral abutment expansion joint seal (516E14014) | FT | 87 | $46.00 | $47.88 | $50.00 | $46.50 |
| 450 | Structural joint or joint sealer, misc.: emseal WI (516E14600) | FT | 54 | $487.00 | $346.44 | $500.00 | $480.00 |
| 451 | 2" deep joint sealer (516E31010) | FT | 54 | $60.00 | $9.21 | $18.00 | $20.55 |
| 452 | Porous backfill with geotextile fabric (518E21200) | CY | 59 | $125.00 | $112.55 | $150.00 | $135.00 |
| 453 | 6" perforated corrugated plastic pipe (518E40000) | FT | 87 | $10.00 | $25.47 | $18.00 | $14.00 |
| 454 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 27 | $19.00 | $22.78 | $40.00 | $34.00 |
| 455 | Dynamic load testing (523E20000) | EACH | 2 | $3,800.00 | $4,294.83 | $4,500.00 | $5,500.00 |
| 456 | Reinforced concrete approach slabs with QC/QA (T=1 (526E15011) | SY | 130 | $430.00 | $425.76 | $400.00 | $440.00 |
| 457 | Unclassified excavation (503E21300) | LS | 1 | $265,000 | $52,735 | $100,000 | $50,000 |
| 458 | Pile driving equipment mobilization (505E11100) | LS | 1 | $14,000 | $24,862 | $15,000 | $18,000 |
| 459 | 16" cast-in-place reinforced concrete piles, driven (507E00700) | FT | 8,280 | $60.00 | $17.85 | $24.00 | $15.00 |
| 460 | 16" cast-in-place reinforced concrete piles, furnished (507E00750) | FT | 8,970 | $38.00 | $54.73 | $45.00 | $85.00 |
| 461 | Galvanized steel reinforcement (509E26000) | LB | 128,276 | $1.82 | $1.86 | $2.25 | $2.08 |
| 462 | No. 4 deformed GFRP reinforcement (509E30020) | FT | 2,422 | $1.50 | $1.22 | $2.00 | $1.58 |
| 463 | Class QC2 concrete with QC/QA, bridge deck, as per plan (511E34447) | CY | 158 | $1,120.00 | $930.46 | $1,000.00 | $1,000.00 |
| 464 | Class QC2 concrete with QC/QA, bridge deck (parapet) (511E34450) | CY | 26 | $1,343.00 | $1,221.66 | $1,500.00 | $1,700.00 |
| 465 | Class QC SCC concrete with QC/QA, abutment, as per plan (511E45723) | CY | 696 | $800.00 | $907.38 | $860.00 | $950.00 |
| 466 | Class QC1 concrete with QC/QA, footing (511E46512) | CY | 519 | $390.00 | $428.80 | $450.00 | $450.00 |
| 467 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 990 | $12.00 | $12.00 | $12.50 | $11.50 |
| 468 | Type 2 waterproofing (512E33000) | SY | 111 | $27.00 | $32.81 | $20.00 | $25.50 |
| 469 | Prestressed concrete composite box beam bridge members, level 1, CB21-48 (515E12050) | EACH | 26 | $14,000 | $15,179 | $20,000 | $14,000 |
| 470 | 1" preformed expansion joint filler, as per plan (516E13601) | SF | 17 | $35.00 | $26.89 | $40.00 | $19.00 |
| 471 | 2" preformed expansion joint filler (516E13900) | SF | 42 | $25.00 | $21.98 | $15.00 | $16.00 |
| 472 | 2" preformed expansion joint filler, as per plan (516E13901) | SF | 137 | $25.00 | $36.56 | $30.00 | $22.00 |
| 473 | Semi-integral abutment expansion joint seal (516E14020) | FT | 255 | $40.00 | $49.39 | $50.00 | $46.50 |
| 474 | Structural joint or joint sealer, misc.: emseal WI (516E14600) | FT | 106 | $390.00 | $349.13 | $450.00 | $460.00 |
| 475 | 2" deep joint sealer (516E31010) | FT | 106 | $30.00 | $5.15 | $18.00 | $23.00 |
| 476 | 1/8" preformed bearing pad, type CDP (516E41100) | EACH | 52 | $53.00 | $90.69 | $150.00 | $90.00 |
| 477 | Elastomeric bearing with internal laminates only (neoprene) (516E43200) | EACH | 104 | $132.00 | $160.49 | $300.00 | $174.00 |
| 478 | Porous backfill with geotextile fabric (518E21200) | CY | 346 | $100.00 | $108.90 | $100.00 | $120.00 |
| 479 | 6" perforated corrugated plastic pipe (518E40000) | FT | 197 | $8.00 | $21.54 | $12.00 | $10.00 |
| 480 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 64 | $38.00 | $25.47 | $35.00 | $20.00 |
| 481 | Dynamic load testing (523E20000) | EACH | 2 | $3,880.00 | $4,294.83 | $5,000.00 | $5,500.00 |
| 482 | Reinforced concrete approach slabs with QC/QA (T=1 (526E30011) | SY | 729 | $430.00 | $434.41 | $450.00 | $430.00 |
| 483 | Special - structures: aesthetic treatment (concret (530E00600) | SF | 6,867 | $7.50 | $11.10 | $12.00 | $3.00 |
| 484 | Special - structures: precast wall panels (530E00600) | SF | 1,985 | $80.00 | $52.27 | $60.00 | $61.00 |
| 485 | Vandal protection fence, 6' straight, coated fabric, as per plan (607E39901) | FT | 100 | $160.00 | $163.92 | $150.00 | $208.50 |
| 486 | Concrete coping (840E26000) | FT | 81 | $250.00 | $217.50 | $275.00 | $325.00 |
| 487 | Unclassified excavation (503E21300) | LS | 1 | $300,000 | $77,246 | $150,000 | $65,000 |
| 488 | Pile driving equipment mobilization (505E11100) | LS | 1 | $14,000 | $44,974 | $20,000 | $18,000 |
| 489 | 16" cast-in-place reinforced concrete piles, driven (507E00700) | FT | 7,690 | $62.00 | $16.64 | $25.00 | $15.00 |
| 490 | 16" cast-in-place reinforced concrete piles, furnished (507E00750) | FT | 8,430 | $38.00 | $54.71 | $45.00 | $75.00 |
| 491 | Galvanized steel reinforcement (509E26000) | LB | 268,590 | $1.89 | $1.88 | $2.25 | $2.11 |
| 492 | No. 4 deformed GFRP reinforcement (509E30020) | FT | 5,424 | $1.40 | $1.22 | $2.00 | $1.58 |
| 493 | Semi-integral diaphragm guide (511E33500) | EACH | 2 | $4,300.00 | $4,661.39 | $3,400.00 | $4,500.00 |
| 494 | Class QC2 concrete with QC/QA, bridge deck, as per plan (511E34447) | CY | 573 | $1,150.00 | $796.27 | $1,000.00 | $1,100.00 |
| 495 | Class QC2 concrete with QC/QA, bridge deck (parapet) (511E34450) | CY | 9 | $2,600.00 | $1,359.07 | $1,900.00 | $1,800.00 |
| 496 | Class QC SCC concrete with QC/QA, bridge deck (parapet), as per plan (511E34463) | CY | 51 | $2,000.00 | $1,214.05 | $1,700.00 | $2,000.00 |
| 497 | Class QC1 concrete with QC/QA, pier above footings (511E41012) | CY | 103 | $1,380.00 | $1,033.23 | $1,500.00 | $1,300.00 |
| 498 | Class QC SCC concrete with QC/QA, abutment, as per plan (511E45723) | CY | 831 | $625.00 | $804.93 | $800.00 | $830.00 |
| 499 | Class QC1 concrete with QC/QA, footing (511E46512) | CY | 538 | $500.00 | $437.88 | $490.00 | $460.00 |
| 500 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 623 | $12.00 | $13.00 | $14.00 | $11.50 |
| 501 | Type 2 waterproofing (512E33000) | SY | 102 | $28.00 | $34.59 | $20.00 | $25.50 |
| 502 | Draped strand prestressed concrete bridge I-beam members, level 3, type 4 (515E15020) | EACH | 10 | $48,000 | $47,100 | $65,000 | $45,000 |
| 503 | Draped strand prestressed concrete bridge I-beam members, level 3, type 4 (515E15020) | EACH | 10 | $48,000 | $47,185 | $65,000 | $45,000 |
| 504 | Intermediate diaphragms (515E20000) | EACH | 36 | $3,300.00 | $3,059.40 | $2,300.00 | $3,500.00 |
| 505 | 1" preformed expansion joint filler, as per plan (516E13601) | SF | 17 | $30.00 | $26.89 | $40.00 | $20.00 |
| 506 | 2" preformed expansion joint filler (516E13900) | SF | 51 | $30.00 | $21.92 | $15.00 | $16.00 |
| 507 | 2" preformed expansion joint filler, as per plan (516E13901) | SF | 238 | $27.00 | $37.42 | $30.00 | $22.00 |
| 508 | Semi-integral abutment expansion joint seal (516E14020) | FT | 220 | $40.00 | $14.92 | $50.00 | $46.50 |
| 509 | Structural joint or joint sealer, misc.: emseal WI (516E14600) | FT | 88 | $360.00 | $356.90 | $450.00 | $460.00 |
| 510 | Structural joint or joint sealer, misc.: emseal WI (516E14600) | FT | 92 | $350.00 | $350.56 | $350.00 | $460.00 |
| 511 | 2" deep joint sealer (516E31010) | FT | 88 | $25.00 | $4.74 | $18.00 | $24.00 |
| 512 | Elastomeric bearing with internal laminates and load plate (516E44100) | EACH | 10 | $2,020.00 | $2,002.38 | $2,800.00 | $1,705.00 |
| 513 | Elastomeric bearing with internal laminates and load plate (516E44100) | EACH | 20 | $1,460.00 | $1,360.91 | $2,100.00 | $1,160.00 |
| 514 | Elastomeric bearing with internal laminates and load plate (516E44100) | EACH | 10 | $2,600.00 | $2,571.45 | $3,700.00 | $2,190.00 |
| 515 | Porous backfill with geotextile fabric (518E21200) | CY | 348 | $100.00 | $103.62 | $100.00 | $125.00 |
| 516 | 6" perforated corrugated plastic pipe (518E40000) | FT | 184 | $6.00 | $23.06 | $12.00 | $10.00 |
| 517 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 55 | $26.00 | $20.64 | $35.00 | $20.00 |
| 518 | Dynamic load testing (523E20000) | EACH | 3 | $3,900.00 | $4,270.22 | $5,000.00 | $5,500.00 |
| 519 | Reinforced concrete approach slabs with QC/QA (T=1 (526E30011) | SY | 556 | $450.00 | $456.07 | $450.00 | $440.00 |
| 521 | Special - structures: precast wall panels (530E00600) | SF | 1,994 | $76.00 | $52.10 | $60.00 | $61.00 |
| 522 | Vandal protection fence, 6' straight, coated fabric, as per plan (607E39901) | FT | 301 | $122.00 | $127.87 | $114.00 | $130.00 |
| 523 | Concrete coping (840E26000) | FT | 89 | $265.00 | $206.20 | $275.00 | $325.00 |
| 524 | Premium on railroads' protective public liability and property damage liability insurance (100E00300) | LS | 1 | $104,000 | $26,439 | $35,000 | $30,000 |
| 525 | Department'S share of the dispute resolution board (100E51100) | EACH | 115,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 526 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $295,451 | $319,656 | $250,000 | $260,000 |
| 527 | CPM progress schedule (108E10000) | LS | 1 | $38,000 | $3,525.16 | $5,000.00 | $10,000 |
| 528 | Special - departments share facilitated partnering costs (111E10100) | EACH | 8,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 529 | Maintaining traffic (614E11000) | LS | 1 | $725,000 | $929,604 | $735,493 | $450,000 |
| 530 | Field office, type C (619E16020) | MNTH | 36 | $3,870.00 | $3,700.00 | $2,500.00 | $3,375.00 |
| 531 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $485,000 | $420,554 | $450,000 | $425,000 |
| 532 | Mobilization (624E10000) | LS | 1 | $2,500,000 | $2,357,495 | $2,721,551 | $2,700,000 |
| 600 | Seeding and erosion control with turf reinforcing mat, type 1 (836E10000) | SY | 463 | $7.50 | $5.00 | $5.00 | $7.50 |
| 601 | 18" conduit, type A (611E07200) | FT | 78 | $84.00 | $286.94 | $110.00 | $118.00 |
| 602 | Patching concrete structure, as per plan (519E11101) | SF | 20 | $230.00 | $293.96 | $325.00 | $216.00 |
| 603 | Concrete patching with galvanic anode protection, as per plan (844E10001) | SF | 14 | $277.00 | $293.96 | $100.00 | $260.00 |
| 604 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 4.39 | $700.00 | $310.00 | $310.00 | $310.00 |
| 605 | Work zone center line, class III, 642 paint (614E21550) | MI | 2.88 | $1,290.00 | $965.00 | $965.00 | $965.00 |
| 606 | Work zone edge line, class III, 4", 642 paint (614E22350) | MI | 4.92 | $965.00 | $560.00 | $560.00 | $560.00 |
| 607 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 10.86 | $965.00 | $760.00 | $760.00 | $760.00 |
| 608 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 1,311 | $0.95 | $0.70 | $0.70 | $0.70 |
| 609 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 5,381 | $0.95 | $0.85 | $0.85 | $0.85 |
| 610 | Work zone stop line, class III, 642 paint (614E26610) | FT | 389 | $3.50 | $3.45 | $3.45 | $3.45 |
| 611 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 31 | $75.00 | $75.00 | $75.00 | $75.00 |
| 612 | Embankment, using natural soils, 703.16.A (203E22000) | CY | 890 | $28.00 | $55.82 | $40.00 | $30.00 |
| 613 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $48,000 | $116,277 | $50,000 | $120,000 |
| 614 | Special - settlement platform (203E65000) | EACH | 2 | $1,000.00 | $1,078.71 | $1,500.00 | $2,500.00 |
| 616 | Special - structures' aesthetic treatment (concret (530E00600) | SF | 708 | $14.00 | $20.30 | $60.00 | $26.00 |
| 617 | Special - structures' aesthetic treatment (concret (530E00600) | SF | 4,335 | $8.00 | $7.66 | $18.00 | $3.00 |
| 619 | Special -' rail item, misc.: ballast (900E19000) | CY | 40 | $250.00 | $265.25 | $400.00 | $160.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 15, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.