| 0005 | Mobilization (0101-1) | LS | 1 | $1,174,124 |
| 0010 | Mobilization (0101-1) | LS | 1 | $1,995,524 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $306,686 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $363,333 |
| 0025 | Special detour- temporary pavement (0102-2200) | SY | 1 | $84,631 |
| 0030 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $55,334 |
| 0035 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $6,018.42 |
| 0040 | Traffic control officer (0102-14) | HR | 296 | $125.20 |
| 0045 | Work zone sign (0102-60) | ED | 131,264 | $0.28 |
| 0050 | Business sign (0102-61) | EACH | 5 | $69.56 |
| 0055 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 4,568 | $62.61 |
| 0060 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 1,863 | $48.69 |
| 0065 | Temporary barrier, F&I, free standing (0102-71-16) | LF | 200 | $34.78 |
| 0070 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 911 | $13.91 |
| 0075 | Temporary barrier, relocate, anchored (0102-71-25) | LF | 1,154 | $20.87 |
| 0080 | Temporary barrier, relocate, free standing (0102-71-26) | LF | 2,200 | $27.83 |
| 0085 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 799,392 | $0.14 |
| 0090 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 66,340 | $0.06 |
| 0095 | Arrow board / advance warning arrow panel (0102-76) | ED | 17,106 | $6.96 |
| 0100 | Temporary crash cushion, redirective option (0102-89-1) | LO | 25 | $3,689.44 |
| 0105 | Portable changeable message sign, temporary (0102-99) | ED | 5,952 | $13.91 |
| 0110 | Temporary signalization and maintenance, intersection (0102-104) | ED | 4,580 | $29.52 |
| 0115 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 4,580 | $29.52 |
| 0120 | Type III barricade (0102-115) | ED | 4,400 | $0.35 |
| 0125 | Sediment barrier (0104-10-3) | LF | 25,641 | $4.15 |
| 0130 | Staked turbidity barrier- nylon reinforced PVC (0104-12) | LF | 1,108 | $5.57 |
| 0135 | Inlet protection system (0104-18) | EACH | 47 | $180.85 |
| 0140 | Litter removal (0107-1) | ACRE | 1,371.96 | $173.90 |
| 0145 | Mowing (0107-2) | ACRE | 1,219.78 | $69.56 |
| 0150 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $109,043 |
| 0155 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $461,472 |
| 0160 | Removal of existing concrete (0110-4-10) | SY | 2,839 | $52.92 |
| 0165 | Regular excavation (0120-1) | CY | 13,398.10 | $19.04 |
| 0170 | Borrow excavation, truck measure (0120-2-2) | CY | 359.70 | $39.16 |
| 0175 | Subsoil excavation (0120-4) | CY | 962.20 | $36.47 |
| 0180 | Embankment (0120-6) | CY | 16,103 | $22.87 |
| 0185 | Type B stabilization (0160-4) | SY | 32,395 | $3.25 |
| 0190 | Optional base, base group 01 (0285-701) | SY | 2,589 | $59.72 |
| 0192 | Optional base, base group 09 (0285-709) | SY | 508 | $72.88 |
| 0195 | Optional base, base group 09 (0285-709) | SY | 24,036 | $28.44 |
| 0200 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 40,680 | $4.63 |
| 0205 | Milling existing asphalt pavement, 4" avg depth (0327-70-7) | SY | 82,937 | $5.67 |
| 0210 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 14,753.10 | $172.31 |
| 0215 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 12,405.40 | $179.69 |
| 0220 | Miscellaneous asphalt (0339-1) | TN | 18.40 | $575.71 |
| 0225 | Inlets, curb, type P-1, <10' (0425-1311) | EACH | 19 | $13,356 |
| 0230 | Inlets, curb type P-1, >10' (0425-1312) | EACH | 2 | $15,443 |
| 0235 | Inlets, curb, type P-2, <10' (0425-1321) | EACH | 5 | $13,356 |
| 0240 | Inlets, curb, type P-3, <10' (0425-1331) | EACH | 1 | $13,356 |
| 0245 | Inlets, curb, type P-5, <10' (0425-1351) | EACH | 4 | $13,356 |
| 0250 | Inlets, curb, type P-5, >10' (0425-1352) | EACH | 1 | $15,443 |
| 0255 | Inlets, curb, type J-1, >10' (0425-1412) | EACH | 1 | $15,443 |
| 0260 | Inlets, curb, type 7, >10' (0425-1472) | EACH | 1 | $15,443 |
| 0265 | Inlets, DT bot, type C,<10' (0425-1521) | EACH | 1 | $13,356 |
| 0270 | Inlets, ditch bottom, type C modified- back of sidewalk, <10' (0425-1531) | EACH | 1 | $13,356 |
| 0275 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 1 | $13,356 |
| 0280 | Inlets, DT bot, type E, <10' (0425-1551) | EACH | 3 | $13,356 |
| 0285 | Inlets, gutter, type S, <10' (0425-1701) | EACH | 1 | $13,356 |
| 0290 | Inlets, gutter, type S, >10' (0425-1702) | EACH | 1 | $15,443 |
| 0295 | Inlets, closed flume (0425-1910) | EACH | 4 | $13,356 |
| 0300 | Manholes, P-7, <10' (0425-2-41) | EACH | 1 | $13,356 |
| 0305 | Manholes, P-8, <10' (0425-2-61) | EACH | 1 | $13,356 |
| 0310 | Manholes, J-8, <10' (0425-2-91) | EACH | 3 | $13,356 |
| 0315 | Manholes, J-8, partial (0425-2-93) | EACH | 1 | $13,356 |
| 0320 | Manhole, adjust (0425-5) | EACH | 1 | $2,086.80 |
| 0325 | Manhole, adjust, utilities (0425-5-1) | EACH | 11 | $2,782.39 |
| 0330 | Valve boxes, adjust (0425-6) | EACH | 9 | $2,086.80 |
| 0335 | Meter boxes, adjust (0425-6-1) | EACH | 2 | $2,086.80 |
| 0340 | Modify existing drainage structure (0425-11) | EACH | 2 | $9,878.15 |
| 0345 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 1,294 | $120.71 |
| 0350 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 2,239 | $145.25 |
| 0355 | Pipe culvert, opt material, round, 30"S/CD (0430-175130) | LF | 104 | $210.97 |
| 0360 | Pipe culvert, opt material, round, 36"S/CD (0430-175136) | LF | 16 | $445.07 |
| 0365 | Pipe culvert,optional material,other-elip/arch, (0430-175218) | LF | 227 | $151.87 |
| 0370 | Straight concrete endwalls, single, 0 degrees, round (0430-524100) | EACH | 5 | $11,199 |
| 0375 | Straight concrete endwalls, single, 0 degrees, round (0430-530100) | EACH | 1 | $15,373 |
| 0380 | Straight concrete endwalls, single, 0 degrees, round (0430-536100) | EACH | 1 | $18,155 |
| 0385 | Mitered end section, optional round, 18" CD (0430-982125) | EACH | 2 | $4,310.67 |
| 0390 | Mitered end section, optional round, 24" CD (0430-982129) | EACH | 2 | $4,235.14 |
| 0395 | Mitered end section, optional round, 18" SD (0430-984125) | EACH | 2 | $4,310.67 |
| 0400 | Underdrain, type II (0440-1-20) | LF | 487 | $83.48 |
| 0405 | Underdrain outlet pipe, 4" (0440-73-1) | LF | 869 | $55.65 |
| 0410 | Pipe handrail - guiderail, steel (0515-1-1) | LF | 9 | $186.06 |
| 0415 | Pedestrian / bicycle railing, steel, 42" type 1 (0515-2211) | LF | 488 | $231.73 |
| 0417 | Concrete curb & gutter, type E (0520-1-7) | LF | 424 | $90.43 |
| 0420 | Concrete curb & gutter, type E (0520-1-7) | LF | 5,416 | $45.22 |
| 0425 | Concrete curb & gutter, type F (0520-1-10) | LF | 6,785 | $41.87 |
| 0430 | Concrete curb, type B (0520-2-2) | LF | 180 | $38.26 |
| 0435 | Concrete curb, type D (0520-2-4) | LF | 269 | $38.26 |
| 0440 | Traffic separator concrete- type I, 6' wide (0520-5-12) | LF | 156 | $137.73 |
| 0445 | Shoulder gutter- concrete (0520-6) | LF | 406 | $90.43 |
| 0450 | Concrete traffic separator, special- variable width (0520-70) | SY | 224 | $112.68 |
| 0455 | Shoulder concrete barrier, retaining section (0521-72-41) | LF | 494 | $535.61 |
| 0460 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 2,774 | $102.42 |
| 0465 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 542 | $138.43 |
| 0470 | Concrete ditch pavement, non reinforced, 4" (0524-1-2) | SY | 1,601 | $118.94 |
| 0475 | Concrete slope pavement,non reinforced, 4" (0524-2-2) | SY | 472 | $173.90 |
| 0480 | Concrete slope pavement,non reinforced, 6" (0524-2-4) | SY | 19 | $201.72 |
| 0485 | Pavers, architectural, remove existing and reinstall (0526-1101) | SY | 167 | $68.08 |
| 0490 | Detectable warnings (0527-2) | SF | 1,396 | $62.61 |
| 0495 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 13.80 | $544.72 |
| 0500 | Guardrail -roadway, general (0536-1-1) | LF | 534 | $32.89 |
| 0505 | Special guardrail post- special steel post for concrete structure mount (0536-7-2) | EACH | 2 | $510.65 |
| 0510 | Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-3 (0536-8112) | EACH | 2 | $5,290.02 |
| 0515 | Guardrail removal (0536-73) | LF | 305 | $3.70 |
| 0520 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 1 | $2,416.13 |
| 0525 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 2 | $5,652.08 |
| 0530 | Performance turf, sod (0570-1-2) | SY | 44,297 | $7.88 |
| 0535 | Raised pavement marker, type B (0706-1-3) | EACH | 6,659 | $7.65 |
| 0540 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 20.05 | $2,295.48 |
| 0545 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.57 | $3,234.53 |
| 0550 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 7,607 | $2.78 |
| 0555 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 4,029 | $4.17 |
| 0560 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 2,992 | $5.57 |
| 0565 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 2.61 | $1,182.51 |
| 0570 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 1.94 | $1,739.00 |
| 0575 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 81 | $104.33 |
| 0580 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 182 | $62.61 |
| 0585 | Painted pavement markings, standard, white, yield line (0710-11180) | LF | 244 | $6.61 |
| 0590 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 7.91 | $2,295.48 |
| 0595 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 1,272 | $4.17 |
| 0600 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 5.30 | $1,182.51 |
| 0605 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.42 | $1,739.00 |
| 0610 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $51,750 |
| 0615 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $98,250 |
| 0620 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 149 | $831.94 |
| 0625 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 17 | $2,934.03 |
| 0630 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 17 | $2,717.00 |
| 0635 | Single column ground sign assembly, relocate (0700-1500) | EACH | 33 | $251.81 |
| 0640 | Single column ground sign assembly, remove (0700-1600) | EACH | 72 | $55.65 |
| 0645 | Single column ground sign assembly, F&I cantilever mount, 12.0-20.0 SF (0700-1912) | EACH | 2 | $7,213.34 |
| 0650 | Multi-column ground sign assembly, F&I ground mount, 1-200.0 SF (0700-2116) | EACH | 2 | $28,897 |
| 0655 | Multi-column ground sign assembly, relocate (0700-2500) | EACH | 13 | $13,271 |
| 0660 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 3 | $41.74 |
| 0665 | Retroreflective sign strip- furnish and install, 2' (0700-13-12) | EACH | 37 | $118.25 |
| 0670 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 28 | $122.42 |
| 0675 | Enhanced hwy sign assembly, powered, F&I ground mount, W/highlighted sign <12 SF, UP to 12 SF of static sign panels (0700-141141) | EACH | 4 | $13,093 |
| 0680 | Tubular marker, 36" yellow (0704-1-4) | EACH | 21 | $300.49 |
| 0685 | Object marker, type 1 (0705-10-1) | EACH | 18 | $338.06 |
| 0690 | Object marker, type 2 (0705-10-2) | EACH | 5 | $182.25 |
| 0695 | Delineator, flexible tubular (0705-11-1) | EACH | 6 | $150.25 |
| 0700 | Delineator, non-flexible (0705-11-2) | EACH | 25 | $176.68 |
| 0705 | Raised pavement marker, type B (0706-1-3) | EACH | 3,729 | $7.65 |
| 0710 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 194 | $6.61 |
| 0715 | Painted pavement markings, removal of non-conflicting (0710-17-1) | SF | 536 | $4.52 |
| 0720 | Painted pavement markings, surface (0710-90) | LS | 1 | $148,598 |
| 0725 | Painted pavement markings, surface (0710-90) | LS | 1 | $92,225 |
| 0730 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.26 | $25,042 |
| 0735 | Thermoplastic, standard, solid, 12" for interchange markings (0711-11103) | GM | 0.10 | $30,606 |
| 0740 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 6,443 | $5.91 |
| 0745 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 3,467 | $7.30 |
| 0750 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 1,685 | $12.17 |
| 0755 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 1.19 | $4,034.47 |
| 0760 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 38 | $236.50 |
| 0765 | Thermoplastic, standard, arrow (0711-11170) | EACH | 208 | $125.20 |
| 0770 | Thermoplastic, standard, yield line (0711-11180) | LF | 36 | $15.65 |
| 0775 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 731 | $9.04 |
| 0780 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.59 | $3,895.35 |
| 0785 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 2,607 | $20.87 |
| 0790 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 23 | $375.62 |
| 0795 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 23 | $278.24 |
| 0800 | Thermoplastic, preformed, 6" white, railroad dynamic envelope (0711-14191) | LF | 58 | $12.52 |
| 0805 | Thermoplastic, preformed, 12" white on asphalt pavement, railroad dynamic envelope (0711-14193) | LF | 167 | $25.04 |
| 0810 | Thermoplastic, preformed, color route shield (0711-14660) | EACH | 4 | $2,225.91 |
| 0815 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 9.21 | $5,982.14 |
| 0820 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.21 | $30,606 |
| 0825 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 5.31 | $2,086.80 |
| 0830 | Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133) | GM | 0.10 | $25,042 |
| 0835 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 6.86 | $5,982.14 |
| 0840 | Green-colored pavement markings, bike lane (0714-10) | SF | 3,689 | $14.26 |
| 0845 | Conduit, furnish & install, open trench (0630-2-11) | LF | 1,601 | $20.23 |
| 0850 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 806 | $40.07 |
| 0855 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 38 | $2,371.68 |
| 0860 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $6,606.64 |
| 0865 | Electrical service wire, & install (0639-2-1) | LF | 4 | $19.91 |
| 0870 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 1 | $3,372.27 |
| 0875 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $2,781.51 |
| 0880 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 19,001 | $2.76 |
| 0885 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 11,280 | $1.11 |
| 0890 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 1 | $30,760 |
| 0895 | Load center, rework, voltage (0715-7-21) | EACH | 1 | $3,125.09 |
| 0900 | Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 0' arm length (0715-61200) | EACH | 3 | $12,697 |
| 0905 | Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 15' arm length (0715-61252) | EACH | 2 | $11,917 |
| 0910 | Light pole complete, F&I, standard pole standard foundation, 50' mounting height, 0' arm length (0715-61500) | EACH | 2 | $14,403 |
| 0915 | Light pole complete, F&I, standard pole standard foundation, 50' mounting height, 15' arm length (0715-61552) | EACH | 8 | $15,758 |
| 0920 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 15 | $1,057.63 |
| 0925 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 1.76 | $4,715.99 |
| 0930 | Itsfm location documentation- intersection (0611-2-1) | EACH | 3 | $3,430.87 |
| 0935 | Conduit, furnish & install, open trench (0630-2-11) | LF | 3,614 | $37.33 |
| 0940 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 2,495 | $56.61 |
| 0945 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 270 | $51.52 |
| 0950 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 7 | $13,953 |
| 0955 | Signal cable, adjust (0632-7-4) | PI | 2 | $4,163.72 |
| 0960 | Signal cable, remove- intersection (0632-7-6) | PI | 4 | $2,670.40 |
| 0965 | Fiber optic cable, F&I, underground,2-12 fibers (0633-1121) | LF | 701 | $5.96 |
| 0970 | Fiber optic cable, F&I, underground,13-48 fibers (0633-1122) | LF | 2,888 | $7.16 |
| 0975 | Fiber optic connection, install, splice (0633-2-31) | EACH | 24 | $68.95 |
| 0980 | Fiber optic connection, install, termination (0633-2-32) | EACH | 48 | $113.51 |
| 0985 | Fiber optic connection hardware, F&I, splice (0633-3-11) | EACH | 4 | $1,918.59 |
| 0990 | Fiber optic connection hardware, F&I, splice tray (0633-3-12) | EACH | 4 | $80.58 |
| 0995 | Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14) | EACH | 4 | $131.86 |
| 1000 | Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16) | EACH | 3 | $1,948.94 |
| 1005 | Fiber optic cable locator (0633-6) | DA | 730 | $463.40 |
| 1010 | Span wire assembly, F&I, two point, box or drop box (0634-4153) | PI | 1 | $14,091 |
| 1015 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 135 | $2,222.80 |
| 1020 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 19 | $3,637.81 |
| 1025 | Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13) | EACH | 3 | $8,012.39 |
| 1030 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 2 | $6,046.74 |
| 1035 | Electrical service wire, & install (0639-2-1) | LF | 4,624 | $7.21 |
| 1040 | Electrical service wire, (0639-2-6) | LF | 498 | $1.02 |
| 1045 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 6 | $4,442.63 |
| 1050 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 6 | $2,778.41 |
| 1055 | Prestressed concrete pole, type P-VII (0641-2-17) | EACH | 4 | $39,889 |
| 1060 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 4 | $1,389.47 |
| 1065 | Aluminum signals pole, (0646-1-11) | EACH | 38 | $4,424.08 |
| 1070 | Aluminum signals pole, furnish install pedestrian detector post (0646-1-12) | EACH | 4 | $2,387.31 |
| 1075 | Aluminum signals pole, remove (0646-1-60) | EACH | 6 | $1,270.86 |
| 1080 | Aluminum pole- index 695-001, furnish & install, 35' (0646-2135) | EACH | 2 | $6,063.84 |
| 1085 | Steel mast arm assembly, and install, double arm 50'-40' (0649-21-8) | EACH | 1 | $115,552 |
| 1090 | Steel mast arm assembly, and install, double arm 60'-30' (0649-21-11) | EACH | 1 | $116,971 |
| 1095 | Steel mast arm assembly, and install, single arm 70' (0649-21-15) | EACH | 2 | $106,841 |
| 1100 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 28 | $2,336.03 |
| 1105 | Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16) | AS | 3 | $2,874.04 |
| 1110 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 50 | $1,658.29 |
| 1115 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 1 | $2,679.25 |
| 1120 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 19 | $260.45 |
| 1125 | Loop detector inductive, remove- cabinet to remain (0660-1600) | EACH | 28 | $63.85 |
| 1130 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 11 | $35,054 |
| 1135 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 25 | $14,745 |
| 1140 | Vehicle detection system- wrong way for exit ramp, 3 or more lanes, AC powered (0660-7-22) | EACH | 2 | $70,757 |
| 1145 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 45 | $468.11 |
| 1150 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 3 | $132.19 |
| 1155 | Traffic controller assembly, F&I, NEMA (0670-5110) | AS | 3 | $64,381 |
| 1160 | Traffic controller, modify (0671-2-40) | EACH | 5 | $8,393.79 |
| 1165 | Traffic signal controller cabinet, adjust/modify (0676-1500) | EACH | 5 | $2,778.91 |
| 1170 | ITS cabinet, furnish & install, base mount, 334, 24" W X 66" H X 30" D (0676-2143) | EACH | 2 | $21,458 |
| 1175 | ITS CCTV camera, F&I, dome PTZ enclosure - pressurized, IP, definition (0682-1113) | EACH | 3 | $11,405 |
| 1180 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 3 | $6,045.87 |
| 1185 | Uninterruptible power supply, furnish and install, line interactive (0685-1-11) | EACH | 3 | $9,860.83 |
| 1190 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 11 | $1,285.03 |
| 1195 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 9 | $1,623.89 |
| 1200 | Sign panel, relocate, 12-20 SF (0700-3502) | EACH | 1 | $1,088.27 |
| 1205 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 15 | $277.90 |
| 1210 | Internally illuminated sign, furnish & install overhead mount, UP to 12 SF (0700-5-21) | EACH | 4 | $6,472.75 |
| 1215 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 3 | $9,872.32 |
| 1220 | Enhanced highway sign AC powered, F&I overhead blank out sign <12 SF (0700-141360) | EACH | 1 | $9,898.56 |