TDOT contract CNZ085 bid tabulation

The construction of a small drainage structure on s.r. 113 at l.m. 3.68. Let by Tennessee DOT on March 21, 2025, Jefferson County. 3 bids received; low bid $1,135,190 by King General Contractors, Inc..

Owner
Tennessee DOT
Letting
21 MAR 2025
Pay items
64
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1King General Contractors, Inc.$1,135,190Low
2Southern Constructors, Inc.$1,149,634+1.0%
3APAC-Atlantic, Inc.$2,115,912+86%
TDOT contract CNZ085: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. King General Contractors, Inc.2. Southern Constructors, Inc.3. APAC-Atlantic, Inc.
1Construction stakes, lines and grades (105-01)LS1$24,048$35,000$55,250
2Removal of pipe (4 - 36" plastic, sta. 110+68) (202-02.01)LF160$93.52$40.00$205.00
3Removal of structures (catch basin & 15" plastic pipe, sta. 108+54) (202-04.01)LS1$5,611.18$15,000$25,750
4Removal of structures (fencing and posts, 587 LF, sta. 110+68) (202-04.02)LS1$6,679.98$3,750.00$8,450.00
5Removal of buildings (tract no. 5, shop / shed, 1860 LF) (202-06.01)LS1$26,720$17,000$26,750
6Roadway approaches (203-30.01)LS1$100,200$170,000$465,000
7Brooming & degrassing shoulders (208-01.05)LM0.40$4,675.99$2,500.00$6,750.00
818" temporary slope drain (209-02.07)LF530$61.46$45.00$10.00
9Sediment removal (209-05)CY52$13.36$60.00$25.00
10Temporary silt fence (with backing) (209-08.02)LF483$8.02$7.00$6.50
11Temporary enhanced silt fence (209-08.04)LF115$12.02$20.00$19.25
12Rock check dam (209-08.07)EACH4$668.00$1,250.00$1,200.00
13Enhanced rock check dam (209-08.08)EACH4$1,002.00$1,600.00$1,550.00
14Sediment filter bag (15' X 15') (209-09.03)EACH2$935.20$1,300.00$4,050.00
15Catch basin protection (type D) (209-40.33)EACH1$801.60$1,300.00$1,275.00
16Temporary in stream diversion (209-65.04)LF247$133.60$270.00$400.00
17Mineral aggregate, type A base, grading D (303-01)TON501$93.52$75.00$70.00
18Granular backfill (roadway) (303-01.01)TON131$93.52$80.00$135.00
19Mineral aggregate (size 57) (303-10.01)TON15$100.20$80.00$75.00
20Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01)TON112$347.36$230.00$295.00
21Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08)TON73$347.36$230.00$290.00
22Bituminous material for prime coat (PC) (402-01)TON2$2,003.99$1,150.00$350.00
23Aggregate for cover material (PC) (402-02)TON5$133.60$105.00$75.00
24Bituminous material for tack coat (TC) (403-01)TON2$2,003.99$1,200.00$1,400.00
25Acs mix(PG64-22) grading D (411-01.10)TON351$434.20$150.00$225.00
26Cold planing bituminous pavement (415-01.01)TON181$16.03$100.00$125.00
27Class A concrete (roadway) (604-01.01)CY48$1,870.39$2,800.00$4,500.00
28Steel bar reinforcement (roadway) (604-01.02)LB10,405$5.74$2.60$4.00
2918" pipe culvert (side drain) (607-39.02)LF100$100.20$210.00$145.00
30Class A concrete (pipe endwalls) (611-07.01)CY1$3,941.19$2,500.00$4,500.00
31Steel bar reinforcement (pipe endwalls) (611-07.02)LB45$5.61$8.00$10.00
32Catch basins, type 42, 0' - 4' depth (611-42.01)EACH1$5,811.58$7,100.00$15,000
33Metal beam guard fence (705-01.04)LF37.50$113.56$140.00$217.00
34W beam GR (type 2) MASH TL-3 (long post) (705-06.02)LF917.43$45.42$44.00$41.00
35GR terminal (in-inline) MASH TL-3 (705-06.11)EACH5$1,937.19$1,800.00$1,800.00
36Tangent energy absorbing term MASH TL-3 (705-06.20)EACH1$4,943.19$5,500.00$4,500.00
37Guardrail removed (706-01)LF272.49$6.68$10.00$5.00
38Radius rail (706-06.03)LF60$68.14$45.00$45.00
39Rounded end element (706-10.26)EACH3$2,003.99$250.00$415.00
40Markers (concrete R.O.W. posts) (708-02.01)EACH15$601.20$600.00$1,900.00
41Machined rip-rap (class A-3) (709-05.05)TON100$100.20$80.00$95.00
42Machined rip-rap (class A-1) (709-05.06)TON248$100.20$80.00$230.00
43Machined rip-rap (class B) (709-05.08)TON23$106.88$90.00$270.00
44Traffic control (712-01)LS1$13,360$40,000$120,000
45Portable barrier rail, reduced deflection (MASH TL-3) (712-02.12)LF280$133.60$190.00$300.00
46Temporary work zone crash cushion (MASH TL-3) (712-02.60)EACH2$14,028$12,000$14,000
47Flexible drums (channelizing) (712-04.01)EACH20$53.44$45.00$48.00
48Barrier rail delineator (712-04.50)EACH11$26.72$40.00$25.00
49Warning lights (type A) (712-05.01)EACH8$53.44$35.00$30.00
50Signs (construction) (712-06)SF1,310.38$33.40$15.00$12.00
51Removable pavement marking (stop line) (712-09.04)LF52$33.40$25.00$25.00
52Removal of signs, posts and footings (713-15)LS1$2,003.99$2,000.00$1,725.00
53Changeable message sign unit (713-16.01)EACH2$8,683.97$10,000$8,000.00
54Signs (W1-7) (713-16.20)EACH1$534.40$100.00$495.00
55Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH12$133.60$275.00$250.00
56Removal of snowplowable reflective marker (716-01.30)EACH12$100.20$75.00$65.00
57Plastic pavement marking (stop line) (716-02.05)LF30$33.40$30.00$25.00
58Painted pavement marking (4" line) (716-05.01)LM1$3,339.99$2,000.00$2,250.00
59Removal of pavement marking (line) (716-08.01)LF5,280$1.00$1.50$1.30
60Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM1$5,343.98$12,000$12,200
61Mobilization (717-01)LS1$86,840$75,000$290,000
62Temporary traffic signal system (730-40)EACH1$40,080$48,000$105,000
63Geotextile (type III)(erosion control) (740-10.03)SY357$9.35$19.00$11.75
64Erosion control blanket (type II) (805-12.02)SY1,108$2.67$2.50$2.60
TDOT contract CNZ085: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of March 21, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy