| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $14,400 |
| 2 | Clearing and grubbing (201-01) | LS | 1 | $9,690.95 |
| 3 | Removal of pipe ( 18", sta. 111+33) (202-01.13) | LF | 2 | $3,743.28 |
| 4 | Removal of pipe (18", sta. 111+50) (202-01.14) | LF | 2 | $3,743.28 |
| 5 | Removal of structures & obstructions (endwall & ditch lining) (202-01.56) | LS | 1 | $9,714.62 |
| 6 | Removal of rigid pavement, sidewalk, etc. (202-03) | SY | 71 | $134.98 |
| 7 | Removal of curb (LT bus ent, 116+43.35) (202-08.10) | LF | 75 | $127.78 |
| 8 | Removal of curb and gutter (between 7TH and 8TH street) (202-08.15) | LF | 412 | $57.22 |
| 9 | Road & drainage excavation (unclassified) (203-01) | CY | 32 | $1,135.50 |
| 10 | Borrow excavation (unclassified) (203-03) | CY | 348 | $275.97 |
| 11 | Placing and spreading topsoil (203-04) | CY | 32 | $489.03 |
| 12 | Furnishing & spreading topsoil (203-07) | CY | 32 | $1,070.42 |
| 13 | Bedding material (pipe) class B (204-07) | CY | 2 | $2,869.87 |
| 14 | Brooming & degrassing shoulders (208-01.05) | LM | 1 | $2,533.06 |
| 15 | Sediment removal (209-05) | CY | 10 | $371.71 |
| 16 | Temporary silt fence (without backing) (209-08.03) | LF | 206 | $6.00 |
| 17 | Enhanced silt fence check (trapezoidal) (209-08.06) | EACH | 1 | $3,000.00 |
| 18 | Rock check dam (209-08.07) | EACH | 4 | $1,200.00 |
| 19 | Enhanced rock check dam (209-08.08) | EACH | 4 | $1,800.00 |
| 20 | Curb inlet protection (type 2) (209-09.41) | EACH | 1 | $1,500.00 |
| 21 | Catch basin protection (type D) (209-40.33) | EACH | 7 | $450.00 |
| 22 | Catch basin filter assembly(type 2) (209-40.42) | EACH | 1 | $1,674.00 |
| 23 | Catch basin filter assembly(type 4) (209-40.44) | EACH | 3 | $2,160.00 |
| 24 | Mineral aggregate, type A base, grading D (303-01) | TON | 160 | $84.82 |
| 25 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08) | TON | 34.60 | $600.00 |
| 26 | Bituminous material for prime coat (PC) (402-01) | TON | 0.20 | $7,200.00 |
| 27 | Aggregate for cover material (PC) (402-02) | TON | 0.70 | $1,188.00 |
| 28 | Bituminous material for tack coat (TC) (403-01) | TON | 9.20 | $1,048.80 |
| 29 | Trackless tack coat (403-02.01) | TON | 12 | $1,048.80 |
| 30 | Saw cutting asphalt pavement (407-20.05) | LF | 442 | $9.60 |
| 31 | Longitudinal joint sealant (411-01.21) | LM | 4.10 | $3,420.00 |
| 32 | Acs mix(PG70-22) grading D (411-02.10) | TON | 3,006.60 | $180.00 |
| 33 | Cold planing bituminous pavement (415-01.01) | TON | 3,001.60 | $34.80 |
| 34 | Portland cement concrete pavement (plain) 12" fast track (501-01.15) | SY | 10 | $967.93 |
| 35 | Sealing random cracks (silicone sealant) (502-08.07) | LF | 250 | $24.00 |
| 36 | Sawing & resealing joints (silicone sealant) (502-08.10) | LF | 4,180 | $24.00 |
| 37 | 18" concrete pipe culvert (class III) (607-03.02) | LF | 20 | $675.08 |
| 38 | Concrete combined curb & gutter (702-03) | CY | 4.60 | $2,549.22 |
| 39 | Machined rip-rap (class A-3) (709-05.05) | TON | 50 | $144.78 |
| 40 | Traffic control (712-01) | LS | 1 | $44,312 |
| 41 | Flexible drums (channelizing) (712-04.01) | EACH | 102 | $35.70 |
| 42 | Warning lights (type A) (712-05.01) | EACH | 20 | $36.00 |
| 43 | Warning lights (type C) (712-05.03) | EACH | 15 | $36.00 |
| 44 | Signs (construction) (712-06) | SF | 1,123 | $10.20 |
| 45 | Temporary barricades (type III) (712-07.03) | LF | 216 | $39.00 |
| 46 | Arrow board (type C) (712-08.03) | EACH | 3 | $1,500.00 |
| 47 | Delineators (all) (713-02.34) | EACH | 19 | $61.20 |
| 48 | Perforated/knockout square tube post (713-11.02) | LB | 778 | $4.98 |
| 49 | P post slip base (713-11.21) | EACH | 1 | $1,819.20 |
| 50 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 40 | $18.14 |
| 51 | Flat sheet aluminum signs (0.100" thick) (713-13.03) | SF | 81 | $18.74 |
| 52 | Removal of signs, posts and footings (713-15) | LS | 1 | $676.80 |
| 53 | Mile post sign (713-15.06) | EACH | 2 | $331.20 |
| 54 | Changeable message sign unit (713-16.01) | EACH | 4 | $8,220.00 |
| 55 | Raised PVMT markers (BI-directional) (1 color lens) (716-01.11) | EACH | 34 | $14.40 |
| 56 | Raised pavement marker removal (716-01.14) | EACH | 48 | $6.00 |
| 57 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 174 | $48.00 |
| 58 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 228 | $48.00 |
| 59 | Removal of snowplowable reflective marker (716-01.30) | EACH | 136 | $14.40 |
| 60 | Plastic pavement marking (cross-walk) (716-02.03) | LF | 1,293 | $12.00 |
| 61 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 521 | $23.70 |
| 62 | Plastic pavement marking (stop line) (716-02.05) | LF | 660 | $14.40 |
| 63 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 41 | $210.00 |
| 64 | Plastic pavement marking (8" dotted line) (716-02.08) | LF | 295 | $3.30 |
| 65 | Plastic pavement marking (longitudinal cross-walk) (716-02.09) | LF | 1,379 | $33.60 |
| 66 | Plastic pavement marking (8IN line) (716-02.12) | LM | 0.39 | $15,000 |
| 67 | Plastic pavement marking (straight arrow) (716-04.05) | EACH | 1 | $210.00 |
| 68 | Painted pavement marking (4" line) (716-05.01) | LM | 3.90 | $1,800.00 |
| 69 | Painted pavement marking (8" barrier line) (716-05.02) | LF | 5,240 | $0.54 |
| 70 | Painted pavement marking (stop line) (716-05.05) | LF | 552 | $6.00 |
| 71 | Painted pavement marking (turn lane arrow) (716-05.06) | EACH | 7 | $60.00 |
| 72 | Painted pavement marking (6" line) (716-05.20) | LM | 2.01 | $2,160.00 |
| 73 | Hydroblast removal of pavement marking (line) (716-08.30) | LM | 0.30 | $15,000 |
| 74 | Wet reflective pavement marking(6" line) (716-09.03) | LM | 0.30 | $42,000 |
| 75 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 4.91 | $9,000.00 |
| 76 | Mobilization (717-01) | LS | 1 | $273,341 |
| 77 | Geotextile (type III)(erosion control) (740-10.03) | SY | 86 | $37.39 |
| 78 | Temporary sediment tube 12IN (740-11.02) | LF | 1,223 | $7.80 |
| 79 | Temporary seeding (with mulch) (801-01.07) | UNIT | 6 | $114.60 |
| 80 | Water (seeding & sodding) (801-03) | MG | 8 | $180.00 |
| 81 | Sodding (new sod) (803-01) | SY | 421 | $10.20 |