ODOT contract 250151 bid tabulation
FRA-IR 71/IR 270-28.27/25.99A (INTERCHANGE). Let by Ohio DOT on April 17, 2025, FRA. 4 bids received; low bid $41,431,734 by Complete General Construction Company, -14% against the engineer's estimate of $48,000,000.
- Owner
- Ohio DOT
- Letting
- 17 APR 2025
- Pay items
- 407
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Complete General Construction Company | $41,431,734 | Low | -14% |
| 2 | Ruhlin Company | $41,739,180 | +1.0% | -13% |
| 3 | Kokosing Construction Company Inc | $42,998,893 | +4.0% | -10% |
| 4 | Shelly & Sands Inc | $52,626,869 | +27% | +10% |
Engineer's estimate: $48,000,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Complete General Construction Company | 2. Ruhlin Company | 3. Kokosing Construction Company Inc | 4. Shelly & Sands Inc |
|---|---|---|---|---|---|---|---|
| 1 | Headwall removed (202E20010) | EACH | 2 | $350.00 | $600.00 | $535.00 | $500.00 |
| 2 | Pavement removed (202E23000) | SY | 61,954 | $13.00 | $18.00 | $15.25 | $20.00 |
| 3 | Concrete barrier removed (202E30700) | FT | 1,663 | $28.00 | $20.00 | $34.00 | $26.00 |
| 4 | Curb removed (202E32000) | FT | 267 | $7.00 | $9.00 | $16.25 | $10.00 |
| 5 | Pipe removed, 24" and under (202E35100) | FT | 144 | $18.00 | $20.00 | $28.25 | $30.00 |
| 6 | Pipe removed, over 24" diameter (202E35200) | FT | 11 | $40.00 | $200.00 | $101.00 | $32.00 |
| 7 | Guardrail removed (202E38000) | FT | 8,759 | $2.00 | $2.00 | $2.00 | $2.00 |
| 8 | Anchor assembly removed, type E (202E42010) | EACH | 23 | $145.00 | $200.00 | $200.00 | $214.00 |
| 9 | Anchor assembly removed, type T (202E42040) | EACH | 16 | $95.00 | $125.00 | $125.00 | $134.00 |
| 10 | Bridge terminal assembly removed (202E47000) | EACH | 23 | $75.00 | $125.00 | $125.00 | $134.00 |
| 11 | Catch basin removed (202E58100) | EACH | 3 | $450.00 | $615.00 | $900.00 | $400.00 |
| 12 | Special - pipe cleanout, 24" and under (202E70110) | FT | 1,400 | $10.00 | $20.00 | $12.50 | $30.00 |
| 13 | Fence removed (202E75000) | FT | 402 | $3.50 | $4.00 | $4.00 | $5.00 |
| 14 | Removal misc.: noise barrier post and foundation R (202E98100) | EACH | 47 | $450.00 | $270.00 | $300.00 | $500.00 |
| 15 | Removal misc.: noise barrier panel removal and dis (202E98400) | SF | 13,545 | $3.80 | $3.00 | $5.00 | $2.00 |
| 16 | Excavation (203E10000) | CY | 34,729 | $19.00 | $18.00 | $20.50 | $19.00 |
| 17 | Embankment (203E20000) | CY | 43,399 | $8.00 | $12.00 | $15.00 | $12.00 |
| 18 | Subgrade compaction (204E10000) | SY | 803 | $5.00 | $9.50 | $7.50 | $20.00 |
| 19 | Excavation of subgrade (204E13000) | CY | 9,725 | $28.00 | $33.00 | $31.50 | $24.00 |
| 20 | Granular material, type B (204E30010) | CY | 9,725 | $54.00 | $65.00 | $70.00 | $54.00 |
| 21 | Proof rolling (204E45000) | HR | 41 | $225.00 | $500.00 | $211.00 | $385.00 |
| 22 | Geotextile fabric (204E50000) | SY | 29,174 | $2.75 | $1.00 | $1.60 | $0.50 |
| 23 | Cement (206E10500) | TON | 1,940 | $219.45 | $219.45 | $219.45 | $235.00 |
| 24 | Curing coat (206E11000) | SY | 74,993 | $1.11 | $1.11 | $1.11 | $1.20 |
| 25 | Cement stabilized subgrade, 12 inches deep (206E15010) | SY | 74,993 | $4.24 | $4.00 | $4.85 | $3.00 |
| 26 | Mixture design for chemically stabilized soils (206E30000) | LS | 1 | $33,000 | $29,925 | $29,925 | $32,000 |
| 27 | Guardrail, type MGS (606E15050) | FT | 7,576 | $22.80 | $20.00 | $20.00 | $22.00 |
| 28 | Anchor assembly, MGS type E [MASH 2016] (606E26150) | EACH | 15 | $2,885.00 | $2,500.00 | $2,500.00 | $2,600.00 |
| 29 | Anchor assembly, MGS type T (606E26550) | EACH | 14 | $1,480.00 | $1,250.00 | $1,250.00 | $1,300.00 |
| 30 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 16 | $2,795.00 | $2,500.00 | $2,500.00 | $2,600.00 |
| 31 | MGS bridge terminal assembly, type 2 (606E35102) | EACH | 15 | $580.00 | $500.00 | $500.00 | $530.00 |
| 32 | Fence, type CLT (607E23000) | FT | 415 | $34.20 | $45.00 | $45.00 | $48.00 |
| 33 | Curb, type 4-C (609E24510) | FT | 815 | $70.00 | $34.00 | $44.00 | $55.00 |
| 34 | Concrete barrier, single slope, type B1 (622E10100) | FT | 307 | $340.00 | $325.00 | $359.00 | $272.00 |
| 35 | Concrete barrier, single slope, type B1, as per plan (622E10101) | FT | 113 | $440.00 | $300.00 | $430.00 | $380.00 |
| 36 | Concrete barrier, single slope, type D (622E10160) | FT | 2,824 | $93.00 | $90.00 | $85.00 | $85.00 |
| 37 | Concrete barrier, single slope, 81" (622E10180) | FT | 4,595 | $200.00 | $260.00 | $210.00 | $200.00 |
| 38 | Barrier transition (622E10200) | EACH | 2 | $9,000.00 | $7,000.00 | $9,250.00 | $12,000 |
| 39 | Concrete barrier end section, type B1 (622E24850) | EACH | 1 | $9,500.00 | $4,500.00 | $8,200.00 | $12,900 |
| 40 | Concrete barrier end section, type D (622E25000) | EACH | 14 | $4,500.00 | $4,000.00 | $3,575.00 | $6,500.00 |
| 41 | Concrete barrier, end anchorage, reinforced, type B1 (622E25006) | EACH | 12 | $5,400.00 | $4,500.00 | $6,850.00 | $7,000.00 |
| 42 | Concrete barrier, end anchorage, reinforced, type D (622E25050) | EACH | 15 | $4,450.00 | $4,500.00 | $3,050.00 | $6,000.00 |
| 43 | Concrete barrier, end anchorage, reinforced, 81" (622E25080) | EACH | 38 | $9,000.00 | $8,000.00 | $5,400.00 | $7,000.00 |
| 44 | Barrier, misc.:concrete barrier end section, 81" T (622E90200) | EACH | 2 | $17,000 | $23,000 | $12,650 | $8,000.00 |
| 45 | Barrier, misc.:concrete barrier end section, 81" T (622E90200) | EACH | 1 | $20,000 | $22,000 | $11,225 | $7,500.00 |
| 46 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 32 | $100.00 | $235.00 | $150.00 | $175.00 |
| 47 | Tied concrete block mat with type 2 underlayment (601E21060) | SY | 163 | $92.00 | $75.00 | $88.00 | $82.00 |
| 48 | Rock channel protection, type C with geotextile fabric (601E32204) | CY | 9 | $125.00 | $225.00 | $408.00 | $450.00 |
| 49 | Commercial fertilizer (654E11000) | TON | 9.07 | $700.00 | $500.00 | $868.94 | $500.00 |
| 50 | Soil analysis test (659E00100) | EACH | 2 | $100.00 | $200.00 | $125.00 | $200.00 |
| 51 | Topsoil (659E00300) | CY | 7,216 | $22.00 | $28.00 | $23.00 | $23.00 |
| 52 | Seeding and mulching (659E10000) | SY | 65,012 | $0.80 | $0.58 | $0.73 | $0.80 |
| 53 | Repair seeding and mulching (659E14000) | SY | 3,251 | $0.80 | $0.50 | $0.80 | $0.50 |
| 54 | Inter-seeding (659E15000) | SY | 3,251 | $0.50 | $0.01 | $0.80 | $0.60 |
| 55 | Lime (659E31000) | ACRE | 13.43 | $10.00 | $50.00 | $154.77 | $12.00 |
| 56 | Water (659E35000) | MGAL | 360 | $1.00 | $1.00 | $1.00 | $1.00 |
| 57 | Mowing (659E40000) | MSF | 146 | $10.25 | $1.00 | $10.00 | $1.00 |
| 58 | Vegetated swale erosion protection (670E00200) | SY | 12,911 | $2.25 | $1.65 | $1.23 | $2.00 |
| 59 | Ditch erosion protection mat, type B (670E00720) | SY | 924 | $2.25 | $1.65 | $1.29 | $2.00 |
| 60 | Storm water pollution prevention plan (832E15000) | LS | 1 | $10,000 | $5,250.00 | $5,250.00 | $10,000 |
| 61 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $37,440 | $32,000 | $32,773 | $30,000 |
| 62 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $22,000 | $22,000 | $25,000 | $25,000 |
| 63 | Erosion control (832E30000) | EACH | 356,639 | $1.00 | $1.00 | $1.00 | $1.00 |
| 64 | Seeding and erosion control with turf reinforcing mat, type 1 (836E10000) | SY | 33 | $7.00 | $10.00 | $5.41 | $8.00 |
| 65 | Seeding and erosion control with turf reinforcing mat, type 2 (836E10020) | SY | 4 | $6.00 | $10.00 | $5.41 | $7.00 |
| 66 | Concrete masonry (602E20000) | CY | 4.50 | $2,800.00 | $3,000.00 | $5,050.00 | $3,500.00 |
| 67 | 6" unclassified pipe underdrains (605E13300) | FT | 800 | $15.00 | $23.00 | $21.50 | $25.00 |
| 68 | 6" base pipe underdrains (605E14000) | FT | 43,033 | $10.00 | $11.00 | $8.75 | $15.00 |
| 69 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 933 | $18.00 | $22.00 | $31.50 | $25.00 |
| 70 | 6" conduit, type B (611E00900) | FT | 24 | $25.00 | $53.00 | $109.75 | $50.00 |
| 71 | 6" conduit, type F (611E01500) | FT | 200 | $14.00 | $20.00 | $58.00 | $21.00 |
| 72 | 15" conduit, type B (611E05900) | FT | 2,801 | $114.00 | $77.00 | $159.75 | $96.00 |
| 73 | 15" conduit, type C (611E06100) | FT | 397 | $100.00 | $72.00 | $126.75 | $105.00 |
| 74 | 15" conduit, type F (611E06700) | FT | 206 | $120.00 | $108.00 | $132.00 | $120.00 |
| 75 | 18" conduit, type A (611E07200) | FT | 10 | $210.00 | $128.00 | $309.00 | $290.00 |
| 76 | 18" conduit, type B (611E07400) | FT | 485 | $145.00 | $97.00 | $188.00 | $112.00 |
| 77 | 18" conduit, type C (611E07600) | FT | 64 | $132.00 | $181.00 | $198.00 | $135.00 |
| 78 | 24" conduit, type C (611E10600) | FT | 20 | $206.00 | $198.00 | $262.00 | $200.00 |
| 79 | 42" conduit, type C (611E19600) | FT | 10 | $425.00 | $680.00 | $975.00 | $420.00 |
| 80 | Catch basin, no. 3A (611E98180) | EACH | 3 | $3,500.00 | $4,400.00 | $5,050.00 | $3,800.00 |
| 81 | Catch basin, no. 4 (611E98230) | EACH | 1 | $10,000 | $11,000 | $10,650 | $12,000 |
| 82 | Catch basin, no. 5 (611E98300) | EACH | 2 | $6,000.00 | $5,000.00 | $9,350.00 | $7,800.00 |
| 83 | Catch basin, no. 6 (611E98370) | EACH | 1 | $3,400.00 | $4,200.00 | $4,950.00 | $3,500.00 |
| 84 | Catch basin adjusted to grade (611E98630) | EACH | 4 | $900.00 | $1,200.00 | $1,500.00 | $1,700.00 |
| 85 | Catch basin adjusted to grade, as per plan (611E98631) | EACH | 1 | $2,000.00 | $2,000.00 | $2,500.00 | $1,900.00 |
| 86 | Barrier inlet, single slope, 81" (611E99080) | EACH | 16 | $14,000 | $20,000 | $16,750 | $15,000 |
| 87 | Inlet, no. 3 for single slope barrier, type D (611E99114) | EACH | 12 | $15,000 | $12,000 | $13,000 | $14,000 |
| 88 | Manhole, no. 3 (611E99574) | EACH | 3 | $4,500.00 | $4,000.00 | $4,900.00 | $3,800.00 |
| 89 | Precast reinforced concrete outlet (611E99710) | EACH | 16 | $350.00 | $350.00 | $815.00 | $415.00 |
| 90 | Trench drain, type A with standard grate (839E29000) | FT | 375 | $230.00 | $166.00 | $256.50 | $300.00 |
| 91 | Pavement planing, asphalt concrete, (1.5" deep) (254E01000) | SY | 218,406 | $3.20 | $3.20 | $2.90 | $4.50 |
| 92 | Asphalt concrete base, PG64-22, (449) (302E56000) | CY | 27,020 | $149.50 | $149.50 | $170.00 | $190.50 |
| 93 | Aggregate base (304E20000) | CY | 13,332 | $85.00 | $76.00 | $85.00 | $75.00 |
| 94 | Non-tracking tack coat (407E20000) | GAL | 32,747 | $4.25 | $4.25 | $2.65 | $3.50 |
| 95 | Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000) | CY | 12,072 | $257.00 | $257.00 | $310.00 | $310.00 |
| 96 | Asphalt concrete intermediate course, 19 MM, type A (446) (442E10100) | CY | 3,570 | $188.00 | $188.00 | $270.00 | $225.00 |
| 97 | 9" non-reinforced concrete pavement, class QC 1P (452E13010) | SY | 624 | $86.00 | $100.00 | $109.00 | $90.00 |
| 98 | 10" non-reinforced concrete pavement, class QC 1P (452E14010) | SY | 398 | $148.00 | $140.00 | $115.00 | $100.00 |
| 99 | 12" non-reinforced concrete pavement, class QC 1P (452E15010) | SY | 1,752 | $123.00 | $128.00 | $154.25 | $125.00 |
| 100 | Connection, fused pull apart (625E00450) | EACH | 30 | $115.00 | $200.00 | $248.00 | $123.00 |
| 101 | Connection, unfused permanent (625E00480) | EACH | 42 | $105.00 | $140.00 | $176.00 | $112.00 |
| 102 | Light tower, BBBB100 (625E13200) | EACH | 1 | $35,500 | $30,600 | $26,850 | $37,500 |
| 103 | Light pole foundation, 24" X 10' deep (625E14200) | EACH | 3 | $3,550.00 | $2,045.00 | $4,100.00 | $3,800.00 |
| 104 | Light tower foundation, 36" X 25' deep (625E15200) | EACH | 7 | $27,500 | $11,350 | $17,500 | $25,000 |
| 105 | Light tower maintenance platform, misc. remove pla (625E21400) | EACH | 1 | $1,000.00 | $1,100.00 | $2,900.00 | $1,100.00 |
| 106 | No. 8 AWG 600 volt distribution cable (625E23304) | FT | 1,002 | $2.25 | $2.29 | $1.30 | $2.40 |
| 107 | 1-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320) | FT | 9,825 | $14.00 | $12.00 | $13.00 | $13.00 |
| 108 | Conduit, 1-1/4", 725.04 (625E25200) | FT | 316 | $23.00 | $16.00 | $47.00 | $25.00 |
| 109 | Conduit, jacked or drilled, 725.04, HDPE (3") (625E25902) | FT | 927 | $41.00 | $29.00 | $42.75 | $42.00 |
| 110 | Luminaire, high mast, solid state (LED), as per plan (625E26263) | EACH | 4 | $2,150.00 | $1,450.00 | $2,725.00 | $2,300.00 |
| 111 | Luminaire, underpass, solid state (LED), as per plan (625E27503) | EACH | 8 | $625.00 | $741.00 | $1,275.00 | $670.00 |
| 112 | Trench (625E29000) | FT | 9,563 | $8.50 | $7.00 | $6.00 | $9.00 |
| 113 | Structure junction box (625E29920) | EACH | 10 | $1,400.00 | $675.00 | $2,800.00 | $1,500.00 |
| 114 | Pull box, 725.08, 24" (625E30706) | EACH | 8 | $1,600.00 | $1,250.00 | $2,275.00 | $1,700.00 |
| 115 | Pull box removed and replaced (625E31506) | EACH | 2 | $1,600.00 | $650.00 | $2,300.00 | $1,700.00 |
| 116 | Pull box removed (625E31510) | EACH | 3 | $250.00 | $223.00 | $335.00 | $267.00 |
| 117 | Ground rod (625E32000) | EACH | 20 | $350.00 | $250.00 | $330.00 | $375.00 |
| 118 | Structure grounding system (625E33000) | EACH | 2 | $12,000 | $3,664.00 | $8,750.00 | $12,800 |
| 119 | Remove and reerect existing light pole (625E35010) | EACH | 3 | $850.00 | $475.00 | $2,850.00 | $909.00 |
| 120 | RE-erect existing light tower (625E35020) | EACH | 6 | $5,250.00 | $1,010.00 | $4,650.00 | $5,600.00 |
| 121 | Underground warning marking tape (625E36010) | FT | 9,369 | $1.00 | $2.15 | $1.60 | $1.00 |
| 122 | Service to underpass lighting (625E37000) | LS | 1 | $7,000.00 | $5,210.00 | $20,500 | $7,500.00 |
| 123 | Special - maintain existing lighting (625E40000) | LS | 1 | $20,000 | $15,750 | $76,000 | $21,000 |
| 124 | Light tower removed (625E75350) | EACH | 1 | $3,000.00 | $672.00 | $1,850.00 | $3,200.00 |
| 125 | Light pole foundation removed (625E75500) | EACH | 3 | $350.00 | $223.00 | $600.00 | $375.00 |
| 126 | Light tower foundation removed (625E75540) | EACH | 7 | $750.00 | $445.00 | $1,150.00 | $800.00 |
| 127 | Distribution cable removed (625E75550) | FT | 6,706 | $0.85 | $0.60 | $2.75 | $0.90 |
| 128 | Disconnect circuit (625E75800) | EACH | 4 | $375.00 | $162.00 | $135.50 | $400.00 |
| 129 | Disconnect switch, 60 amp (631E85010) | EACH | 2 | $2,200.00 | $1,458.00 | $3,250.00 | $2,300.00 |
| 130 | Object marker, one way (614E13350) | EACH | 246 | $16.00 | $20.52 | $20.00 | $20.00 |
| 131 | RPM (621E00100) | EACH | 1,130 | $47.00 | $37.00 | $45.65 | $50.00 |
| 132 | Raised pavement marker removed (621E54000) | EACH | 1,199 | $5.25 | $5.25 | $24.00 | $10.00 |
| 133 | Ground rod (625E32000) | EACH | 8 | $350.00 | $250.00 | $315.00 | $375.00 |
| 134 | Barrier reflector, type 1 (one-way) (626E00102) | EACH | 212 | $11.85 | $12.00 | $12.00 | $13.00 |
| 135 | Barrier reflector, type 2 (one-way) (626E00110) | EACH | 394 | $13.00 | $12.00 | $12.00 | $13.00 |
| 136 | Ground mounted support, no. 3 post (630E03100) | FT | 504.80 | $15.00 | $13.50 | $13.50 | $14.00 |
| 137 | Ground mounted structural beam support, S4X7.7 (630E06400) | FT | 23 | $42.00 | $22.00 | $22.00 | $23.00 |
| 138 | Ground mounted structural beam support, W10X22 (630E07500) | FT | 50 | $65.00 | $45.00 | $45.00 | $48.00 |
| 139 | Breakaway structural beam connection (630E09000) | EACH | 4 | $720.00 | $600.00 | $600.00 | $640.00 |
| 140 | Overhead sign support, type TC-12.31, design 12 (630E72340) | EACH | 2 | $48,500 | $35,000 | $35,000 | $37,000 |
| 141 | Overhead sign support, type TC-15.116, design 2 (630E72420) | EACH | 1 | $98,650 | $68,000 | $68,000 | $73,000 |
| 142 | Overhead sign support, type TC-15.116, design 3 (630E72430) | EACH | 2 | $122,450 | $100,000 | $100,000 | $107,000 |
| 143 | Sign support assembly, barrier mounted (630E79610) | EACH | 1 | $16,000 | $650.00 | $650.00 | $700.00 |
| 144 | Sign, flat sheet (630E80100) | SF | 242.25 | $16.00 | $20.00 | $20.00 | $21.00 |
| 145 | Sign, ground mounted extrusheet (630E80200) | SF | 104 | $24.00 | $22.00 | $22.00 | $24.00 |
| 146 | Sign, overhead extrusheet (630E80224) | SF | 2,838 | $25.00 | $22.00 | $22.00 | $24.00 |
| 147 | Ground mounted structural beam support foundation (630E84500) | EACH | 4 | $820.00 | $815.00 | $700.00 | $2,100.00 |
| 148 | Rigid overhead sign support foundation (630E84510) | EACH | 6 | $13,150 | $11,000 | $11,000 | $11,700 |
| 149 | Removal of ground mounted sign and disposal (630E84900) | EACH | 16 | $20.00 | $15.00 | $15.00 | $16.00 |
| 150 | Removal of ground mounted sign and reerection (630E85100) | EACH | 1 | $65.00 | $100.00 | $100.00 | $107.00 |
| 151 | Removal of ground mounted major sign and disposal (630E85400) | EACH | 2 | $295.00 | $250.00 | $250.00 | $269.00 |
| 152 | Removal of ground mounted major sign and reerection (630E85600) | EACH | 1 | $885.00 | $1,000.00 | $1,000.00 | $1,070.00 |
| 153 | Removal of ground mounted post support and disposal (630E86002) | EACH | 17 | $25.00 | $15.00 | $15.00 | $16.00 |
| 154 | Removal of ground mounted structural beam support (630E86102) | EACH | 2 | $320.00 | $650.00 | $650.00 | $700.00 |
| 155 | Removal of overhead mounted sign and disposal (630E87400) | EACH | 25 | $250.00 | $350.00 | $350.00 | $375.00 |
| 156 | Removal of overhead sign support and disposal, type TC-12.30 (630E89706) | EACH | 4 | $2,450.00 | $2,000.00 | $2,000.00 | $2,100.00 |
| 157 | Removal of overhead sign support and disposal, type TC-15.115 (630E89804) | EACH | 2 | $3,220.00 | $3,500.00 | $3,500.00 | $3,700.00 |
| 158 | Chevron marking (644E00720) | FT | 1,351 | $7.50 | $10.00 | $7.50 | $8.00 |
| 159 | Lane reduction arrow (644E01350) | EACH | 4 | $220.00 | $220.00 | $220.00 | $235.00 |
| 160 | Wet reflective epoxy pavement marking, edge line, 6" (807E12010) | MI | 1.56 | $8,350.00 | $9,600.00 | $8,350.00 | $8,900.00 |
| 161 | Wet reflective epoxy pavement marking, lane line, 6" (807E12110) | MI | 0.80 | $4,690.00 | $6,000.00 | $4,690.00 | $5,000.00 |
| 162 | Wet reflective epoxy pavement marking, dotted line, 12" (807E12430) | FT | 476 | $2.50 | $2.50 | $2.50 | $2.60 |
| 163 | Wet reflective thermoplastic pavement marking, edge line, 6" (807E14010) | MI | 14.50 | $5,625.00 | $5,200.00 | $5,625.00 | $6,000.00 |
| 164 | Wet reflective thermoplastic pavement marking, lane line, 6" (807E14110) | MI | 16.06 | $2,050.00 | $2,200.00 | $2,050.00 | $2,200.00 |
| 165 | Wet reflective thermoplastic pavement marking, channelizing line, 12" (807E14310) | FT | 17,514 | $2.50 | $2.90 | $2.50 | $2.70 |
| 166 | Wet reflective thermoplastic pavement marking, dotted line, 6" (807E14410) | FT | 15,056 | $0.90 | $1.20 | $0.90 | $1.00 |
| 167 | Wet reflective thermoplastic pavement marking, dotted line, 12" (807E14430) | FT | 1,976 | $1.50 | $1.50 | $1.50 | $1.60 |
| 168 | Grooving for 6" recessed pavement marking, (asphalt) (850E10010) | MI | 32.58 | $1,869.00 | $1,950.00 | $1,869.00 | $2,000.00 |
| 169 | Grooving for 12" recessed pavement marking, (asphalt) (850E10030) | MI | 3.59 | $5,000.00 | $2,950.00 | $5,000.00 | $5,300.00 |
| 170 | Grooving for 6" recessed pavement marking, (concrete) (850E20010) | MI | 2.46 | $3,562.00 | $2,900.00 | $3,562.00 | $3,800.00 |
| 171 | Grooving for 12" recessed pavement marking, (concrete) (850E20030) | MI | 0.09 | $12,000 | $13,992 | $12,000 | $12,800 |
| 172 | Conduit, 2", 725.04 (625E25400) | FT | 149 | $25.00 | $20.00 | $46.00 | $27.00 |
| 173 | Conduit, 3", 725.04 (625E25500) | FT | 20 | $38.00 | $55.00 | $78.00 | $40.00 |
| 174 | Conduit, 4", 725.04 (625E25600) | FT | 526 | $44.00 | $43.00 | $56.00 | $52.00 |
| 175 | Conduit, jacked or drilled, 725.04, 4 inch (625E25902) | FT | 980 | $61.00 | $64.00 | $77.00 | $61.00 |
| 176 | Trench, 30" deep (625E29010) | FT | 572 | $11.00 | $8.00 | $8.00 | $12.00 |
| 177 | Pull box, 725.08, 18" (625E30700) | EACH | 1 | $1,325.00 | $1,190.00 | $1,700.00 | $1,400.00 |
| 178 | Pull box removed (625E31510) | EACH | 4 | $250.00 | $225.00 | $316.50 | $267.00 |
| 179 | Ground rod (625E32000) | EACH | 6 | $350.00 | $250.00 | $330.00 | $375.00 |
| 180 | Light pole removed (625E75400) | EACH | 1 | $350.00 | $325.00 | $700.00 | $375.00 |
| 181 | Interconnect cable, misc.: relocation of interconn (632E62810) | FT | 4,265 | $5.10 | $5.10 | $23.25 | $5.50 |
| 182 | Power cable, 3 conductor, no. 6 AWG (632E68300) | FT | 200 | $4.75 | $8.60 | $8.50 | $5.00 |
| 183 | Power cable, 3 conductor, no. 2 AWG (632E69320) | FT | 100 | $10.00 | $15.00 | $14.75 | $11.00 |
| 184 | Conduit riser, 2" diameter (632E70400) | EACH | 2 | $975.00 | $1,095.00 | $1,650.00 | $1,050.00 |
| 185 | Wood pole (632E89300) | EACH | 1 | $1,600.00 | $1,050.00 | $1,725.00 | $1,700.00 |
| 186 | Cabinet foundation (633E67100) | EACH | 1 | $4,550.00 | $24,950 | $5,550.00 | $4,800.00 |
| 187 | Controller work pad, as per plan (633E67201) | EACH | 5 | $3,675.00 | $810.00 | $7,850.00 | $3,900.00 |
| 188 | Fiber optic cable, 24 fiber (804E15010) | FT | 2,300 | $4.50 | $4.50 | $7.50 | $5.00 |
| 189 | Fiber optic cable, 48 fiber (804E15020) | FT | 2,300 | $6.75 | $6.70 | $7.50 | $7.00 |
| 190 | Fiber optic cable, 72 fiber, as per plan (804E15031) | FT | 1,047 | $10.00 | $9.70 | $8.25 | $11.00 |
| 191 | Fiber optic cable, 288 fiber (804E15050) | FT | 7,066 | $9.00 | $8.80 | $8.75 | $10.00 |
| 192 | Fiber optic cable, 288 fiber, as per plan (804E15051) | FT | 1,483 | $9.00 | $8.80 | $9.50 | $10.00 |
| 193 | Splice enclosure, butt style (804E37000) | EACH | 12 | $3,165.00 | $3,135.00 | $21,750 | $3,400.00 |
| 194 | Fiber optic cable, misc.: fiber optic cable remova (804E98000) | FT | 7,474 | $3.00 | $3.05 | $2.75 | $3.00 |
| 195 | 32" ITS pull box with pad and standard lid assembly, type 2 (809E02000) | EACH | 6 | $2,900.00 | $2,880.00 | $4,930.00 | $3,100.00 |
| 196 | 32" ITS pull box with pad and hinged lid assembly, type 2 (809E02002) | EACH | 3 | $4,050.00 | $4,250.00 | $6,450.00 | $4,300.00 |
| 197 | 48" ITS pull box with pad and hinged lid assembly, type 2 (809E02010) | EACH | 1 | $4,850.00 | $6,925.00 | $10,600 | $5,200.00 |
| 198 | Conduit, 2", multicell, with 4 - 10/8MM innerducts (809E24510) | FT | 24 | $60.00 | $20.00 | $94.00 | $65.00 |
| 199 | Conduit, multicell, misc.: 4" (809E25000) | FT | 30 | $40.00 | $21.00 | $61.00 | $42.00 |
| 200 | ITS power service, ground mounted, 120/240V, 100 amp (809E51100) | EACH | 1 | $6,600.00 | $6,875.00 | $14,100 | $7,000.00 |
| 201 | CCTV IP-camera system, dome-type (809E60000) | EACH | 1 | $6,600.00 | $5,615.00 | $8,400.00 | $7,000.00 |
| 202 | CCTV concrete pole, 70 feet (809E61002) | EACH | 1 | $86,000 | $59,255 | $77,000 | $90,000 |
| 203 | CCTV lowering unit (809E61090) | EACH | 1 | $11,200 | $12,015 | $16,000 | $12,000 |
| 204 | ITS cabinet - ground mounted (809E65000) | EACH | 1 | $10,000 | $8,200.00 | $23,500 | $11,000 |
| 205 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 1,000 | $120.00 | $90.00 | $145.00 | $110.00 |
| 206 | Increased barrier delineation (614E11630) | FT | 9,862 | $2.10 | $2.47 | $0.45 | $0.60 |
| 207 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 34 | $2,320.00 | $1,896.47 | $2,390.96 | $2,400.00 |
| 208 | Detour signing (614E12420) | LS | 1 | $65,000 | $175,000 | $125,000 | $250,000 |
| 209 | Work zone increased penalties sign (614E12484) | EACH | 4 | $275.00 | $251.42 | $800.00 | $700.00 |
| 210 | Replacement sign (614E12500) | EACH | 20 | $195.00 | $150.00 | $500.00 | $500.00 |
| 211 | Replacement drum (614E12600) | EACH | 1,000 | $65.00 | $55.00 | $76.00 | $55.00 |
| 212 | Work zone crossover lighting system (614E12756) | EACH | 3 | $28,000 | $15,440 | $51,000 | $30,000 |
| 213 | Work zone raised pavement marker, as per plan (614E12801) | EACH | 6,802 | $18.00 | $46.25 | $17.50 | $32.00 |
| 214 | Barrier reflector, type 1 (one way) (614E13310) | EACH | 1,441 | $9.00 | $11.55 | $6.00 | $10.00 |
| 215 | Barrier reflector, type 2 (one way) (614E13312) | EACH | 152 | $12.00 | $11.55 | $15.25 | $19.00 |
| 216 | Object marker, one way (614E13350) | EACH | 1,585 | $16.00 | $20.52 | $20.00 | $17.00 |
| 217 | Portable changeable message sign, as per plan (614E18601) | SNMT | 48 | $1,000.00 | $750.00 | $600.00 | $850.00 |
| 218 | Work zone lane line, class I, 6", 642 paint (614E20110) | MI | 26.41 | $600.00 | $775.00 | $600.00 | $640.00 |
| 219 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 16.26 | $750.00 | $910.00 | $750.00 | $800.00 |
| 220 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 37.94 | $880.00 | $990.00 | $880.00 | $940.00 |
| 221 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 16.06 | $965.00 | $970.00 | $965.00 | $1,000.00 |
| 222 | Work zone channelizing line, class I, 8", 642 paint (614E23200) | FT | 97,883 | $0.75 | $1.10 | $0.75 | $0.80 |
| 223 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 17,128 | $0.90 | $1.50 | $0.90 | $0.90 |
| 224 | Work zone dotted line, class I, 8", 642 paint (614E24204) | FT | 18,646 | $0.60 | $0.90 | $0.60 | $0.60 |
| 225 | Work zone dotted line, class III, 6", 642 paint (614E24612) | FT | 18,578 | $0.70 | $1.30 | $0.70 | $0.75 |
| 226 | Work zone gore marking, class II, 642 paint (614E28200) | FT | 1,571 | $3.00 | $2.50 | $3.00 | $3.00 |
| 227 | Roads for maintaining traffic (615E10000) | LS | 1 | $600,000 | $650,000 | $350,000 | $1,000,000 |
| 228 | Pavement for maintaining traffic, class A (615E20000) | SY | 9,970 | $50.00 | $50.00 | $90.00 | $90.00 |
| 229 | Pavement for maintaining traffic, class A, as per plan (615E20001) | SY | 32,325 | $59.50 | $59.50 | $60.00 | $86.30 |
| 230 | Water (616E10000) | MGAL | 500 | $75.00 | $70.00 | $90.00 | $75.00 |
| 231 | Dual portable barrier transition/termination (622E41060) | EACH | 3 | $5,000.00 | $3,500.00 | $2,775.00 | $3,800.00 |
| 232 | Portable barrier, unanchored (622E41100) | FT | 28,423 | $18.00 | $13.00 | $12.00 | $18.00 |
| 233 | Portable barrier, anchored (622E41110) | FT | 38,045 | $29.00 | $22.00 | $31.50 | $35.00 |
| 234 | Barrier, misc.: temporary barrier, anchored, as PE (622E90000) | FT | 955 | $34.00 | $66.00 | $77.00 | $55.00 |
| 235 | Portable non-intrusive traffic sensor, class I (896E00010) | SNMT | 48 | $1,200.00 | $1,026.87 | $1,160.00 | $1,300.00 |
| 236 | Portable changeable message sign (896E00020) | SNMT | 24 | $945.00 | $1,123.24 | $900.00 | $850.00 |
| 237 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $300,000 | $160,000 | $300,000 | $400,000 |
| 238 | Approach slab removed (202E22900) | SY | 134 | $50.00 | $50.00 | $60.00 | $60.00 |
| 239 | Wearing course removed (202E23500) | SY | 1,041 | $10.00 | $9.00 | $9.50 | $12.00 |
| 240 | Granular material, type B (203E35110) | CY | 78 | $125.00 | $65.00 | $80.00 | $200.00 |
| 241 | Special - settlement platform (203E65000) | EACH | 2 | $1,700.00 | $1,350.00 | $1,150.00 | $500.00 |
| 242 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $425,000 | $125,000 | $90,000 | $500,000 |
| 243 | Unclassified excavation (503E21100) | CY | 186 | $60.00 | $105.00 | $133.50 | $68.00 |
| 244 | Pile driving equipment mobilization (505E11100) | LS | 1 | $20,000 | $70,000 | $25,000 | $17,500 |
| 245 | 12" cast-in-place reinforced concrete piles, driven (507E00500) | FT | 4,290 | $10.00 | $15.00 | $22.00 | $32.00 |
| 246 | 12" cast-in-place reinforced concrete piles, furnished (507E00550) | FT | 4,510 | $58.00 | $48.00 | $37.00 | $40.00 |
| 247 | 16" cast-in-place reinforced concrete piles, driven (507E00700) | FT | 1,050 | $15.00 | $16.00 | $28.00 | $43.00 |
| 248 | 16" cast-in-place reinforced concrete piles, furnished (507E00750) | FT | 1,125 | $73.00 | $63.00 | $49.00 | $48.00 |
| 249 | Epoxy coated steel reinforcement (509E10000) | LB | 95,964 | $2.28 | $1.44 | $1.45 | $1.70 |
| 250 | No. 4 deformed GFRP reinforcement (509E30020) | FT | 7,486 | $1.50 | $1.00 | $1.30 | $1.62 |
| 251 | Semi-integral diaphragm guide (511E33500) | EACH | 2 | $3,500.00 | $4,000.00 | $3,000.00 | $3,500.00 |
| 252 | Class QC2 concrete with QC/QA, bridge deck (511E34446) | CY | 253 | $1,100.00 | $950.00 | $1,100.00 | $1,400.00 |
| 253 | Class QC2 concrete with QC/QA, bridge deck (parapet) (511E34450) | CY | 74 | $900.00 | $650.00 | $700.00 | $500.00 |
| 254 | Class QC1 concrete with QC/QA, pier above footings (511E41012) | CY | 31 | $1,800.00 | $1,200.00 | $1,100.00 | $2,500.00 |
| 255 | Class QC1 concrete with QC/QA, abutment not including footing (511E44112) | CY | 80 | $1,100.00 | $900.00 | $1,000.00 | $1,750.00 |
| 256 | Class QC1 concrete with QC/QA, footing (511E46512) | CY | 149 | $550.00 | $600.00 | $600.00 | $850.00 |
| 257 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 1,038 | $28.75 | $27.00 | $27.00 | $30.00 |
| 258 | Type 2 waterproofing (512E33000) | SY | 34 | $40.00 | $45.00 | $34.00 | $31.00 |
| 259 | Structural steel members, level 5 (513E10300) | LB | 231,000 | $3.23 | $3.50 | $2.60 | $3.63 |
| 260 | Welded stud shear connectors (513E20000) | EACH | 2,835 | $5.00 | $4.70 | $6.00 | $6.00 |
| 261 | Field painting structural steel, intermediate coat (514E00060) | SF | 11,000 | $11.00 | $9.00 | $9.00 | $12.00 |
| 262 | Field painting structural steel, finish coat (514E00066) | SF | 11,000 | $8.00 | $7.00 | $7.00 | $8.70 |
| 263 | Armorless preformed joint seal (516E10010) | FT | 76 | $125.00 | $45.00 | $56.00 | $75.00 |
| 264 | 1" preformed expansion joint filler (516E13600) | SF | 165 | $11.00 | $9.00 | $11.00 | $13.00 |
| 265 | 2" preformed expansion joint filler (516E13900) | SF | 156 | $14.00 | $12.00 | $15.50 | $15.00 |
| 266 | Semi-integral abutment expansion joint seal (516E14020) | FT | 76 | $52.00 | $40.00 | $39.50 | $65.00 |
| 267 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44201) | EACH | 8 | $2,300.00 | $3,600.00 | $2,950.00 | $2,300.00 |
| 268 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44201) | EACH | 4 | $1,900.00 | $4,000.00 | $3,200.00 | $2,000.00 |
| 269 | Prefabricated geocomposite drain (518E20000) | SY | 59 | $52.00 | $24.00 | $34.00 | $28.00 |
| 270 | Porous backfill with geotextile fabric (518E21200) | CY | 12 | $230.00 | $125.00 | $155.00 | $200.00 |
| 271 | 6" perforated corrugated plastic pipe (518E40000) | FT | 147 | $10.00 | $28.00 | $12.50 | $12.00 |
| 272 | Dynamic load testing, as per plan (523E20001) | EACH | 3 | $5,400.00 | $4,500.00 | $4,500.00 | $7,000.00 |
| 273 | Restrike, as per plan (523E20501) | EACH | 3 | $4,400.00 | $4,500.00 | $3,750.00 | $800.00 |
| 274 | Reinforced concrete approach slabs with QC/QA (T=1 (526E30010) | SY | 249 | $400.00 | $375.00 | $300.00 | $500.00 |
| 275 | Type C installation (526E90030) | FT | 71 | $380.00 | $275.00 | $297.00 | $300.00 |
| 276 | Concrete slope protection (601E21000) | SY | 51 | $240.00 | $100.00 | $206.00 | $140.00 |
| 277 | Mechanically stabilized earth wall (840E20000) | SF | 4,301 | $65.00 | $60.00 | $58.00 | $60.00 |
| 278 | Wall excavation (840E21000) | CY | 1,505 | $27.00 | $15.00 | $23.75 | $20.00 |
| 279 | Foundation preparation (840E22000) | SY | 890 | $45.00 | $33.00 | $28.00 | $32.00 |
| 280 | Select granular backfill (840E23000) | CY | 3,312 | $77.00 | $64.00 | $65.00 | $150.00 |
| 281 | Select granular backfill, as per plan (840E23001) | CY | 481 | $120.00 | $70.00 | $136.00 | $130.00 |
| 282 | Natural soil (840E23050) | CY | 336 | $60.00 | $9.00 | $13.50 | $22.00 |
| 283 | 6" drainage pipe, perforated (840E25010) | FT | 753 | $10.00 | $15.00 | $10.50 | $11.00 |
| 284 | 6" drainage pipe, non-perforated (840E25020) | FT | 23 | $25.00 | $44.00 | $77.00 | $90.00 |
| 285 | Concrete coping (840E26000) | FT | 286 | $315.00 | $175.00 | $225.00 | $200.00 |
| 286 | Aesthetic surface treatment (840E26050) | SF | 4,301 | $4.00 | $1.00 | $1.00 | $1.00 |
| 287 | On-site assistance (840E27000) | DAY | 5 | $1,000.00 | $500.00 | $500.00 | $900.00 |
| 288 | SGB inspection and compaction testing (840E28000) | LS | 1 | $19,500 | $20,000 | $11,092 | $17,500 |
| 289 | Geogrid, type P1 (863E00100) | SY | 2,421 | $6.00 | $20.00 | $8.00 | $0.50 |
| 290 | Temporary wire faced mechanically stabilized earth wall (867E00100) | LS | 1 | $70,000 | $145,000 | $75,000 | $35,000 |
| 291 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $300,000 | $160,000 | $300,000 | $400,000 |
| 292 | Approach slab removed (202E22900) | SY | 135 | $50.00 | $50.00 | $60.00 | $60.00 |
| 293 | Wearing course removed (202E23500) | SY | 1,031 | $10.00 | $9.00 | $9.50 | $10.00 |
| 294 | Granular material, type B (203E35110) | CY | 78 | $125.00 | $65.00 | $80.00 | $200.00 |
| 295 | Special - settlement platform (203E65000) | EACH | 2 | $1,700.00 | $1,350.00 | $1,150.00 | $500.00 |
| 296 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $500,000 | $145,000 | $90,000 | $600,000 |
| 297 | Unclassified excavation (503E21100) | CY | 160 | $60.00 | $110.00 | $133.50 | $80.00 |
| 298 | Pile driving equipment mobilization (505E11100) | LS | 1 | $20,000 | $70,000 | $25,000 | $17,500 |
| 299 | 12" cast-in-place reinforced concrete piles, driven (507E00500) | FT | 3,850 | $10.00 | $15.00 | $22.00 | $35.00 |
| 300 | 12" cast-in-place reinforced concrete piles, furnished (507E00550) | FT | 4,070 | $58.00 | $48.00 | $37.00 | $40.00 |
| 301 | 16" cast-in-place reinforced concrete piles, driven (507E00700) | FT | 1,050 | $15.00 | $16.00 | $28.00 | $45.00 |
| 302 | 16" cast-in-place reinforced concrete piles, furnished (507E00750) | FT | 1,125 | $73.00 | $63.00 | $49.00 | $50.00 |
| 303 | Epoxy coated steel reinforcement (509E10000) | LB | 96,438 | $1.55 | $1.44 | $1.45 | $1.70 |
| 304 | No. 4 deformed GFRP reinforcement (509E30020) | FT | 7,498 | $1.50 | $1.00 | $1.30 | $1.62 |
| 305 | Semi-integral diaphragm guide (511E33500) | EACH | 2 | $3,500.00 | $4,000.00 | $3,000.00 | $3,500.00 |
| 306 | Class QC2 concrete with QC/QA, bridge deck (511E34446) | CY | 250 | $1,100.00 | $955.00 | $1,100.00 | $1,400.00 |
| 307 | Class QC2 concrete with QC/QA, bridge deck (parapet) (511E34450) | CY | 73 | $900.00 | $700.00 | $700.00 | $500.00 |
| 308 | Class QC1 concrete with QC/QA, pier above footings (511E41012) | CY | 30 | $1,800.00 | $1,250.00 | $1,100.00 | $2,600.00 |
| 309 | Class QC1 concrete with QC/QA, abutment not including footing (511E44112) | CY | 85 | $1,000.00 | $900.00 | $1,000.00 | $1,600.00 |
| 310 | Class QC1 concrete with QC/QA, footing (511E46512) | CY | 154 | $550.00 | $600.00 | $600.00 | $900.00 |
| 311 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 1,072 | $28.75 | $27.00 | $27.00 | $29.00 |
| 312 | Type 2 waterproofing (512E33000) | SY | 34 | $40.00 | $45.00 | $34.00 | $31.00 |
| 313 | Structural steel members, level 5 (513E10300) | LB | 227,000 | $3.22 | $3.45 | $2.60 | $3.65 |
| 314 | Welded stud shear connectors (513E20000) | EACH | 2,862 | $5.00 | $4.70 | $6.00 | $6.00 |
| 315 | Field painting structural steel, intermediate coat (514E00060) | SF | 11,000 | $11.00 | $9.00 | $9.00 | $12.00 |
| 316 | Field painting structural steel, finish coat (514E00066) | SF | 11,000 | $8.00 | $7.00 | $7.00 | $8.70 |
| 317 | Armorless preformed joint seal (516E10010) | FT | 75 | $125.00 | $45.00 | $56.00 | $95.00 |
| 318 | 1" preformed expansion joint filler (516E13600) | SF | 172 | $11.00 | $9.00 | $11.00 | $12.00 |
| 319 | 2" preformed expansion joint filler (516E13900) | SF | 154 | $14.00 | $12.00 | $15.50 | $14.00 |
| 320 | Semi-integral abutment expansion joint seal (516E14020) | FT | 76 | $52.00 | $40.00 | $39.50 | $56.00 |
| 321 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44201) | EACH | 8 | $2,300.00 | $3,600.00 | $2,950.00 | $2,000.00 |
| 322 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44201) | EACH | 4 | $1,900.00 | $3,750.00 | $3,200.00 | $1,900.00 |
| 323 | Prefabricated geocomposite drain (518E20000) | SY | 65 | $52.00 | $22.00 | $34.00 | $1.00 |
| 324 | Porous backfill with geotextile fabric (518E21200) | CY | 12 | $230.00 | $125.00 | $155.00 | $250.00 |
| 325 | 6" perforated corrugated plastic pipe (518E40000) | FT | 157 | $10.00 | $26.00 | $12.50 | $16.00 |
| 326 | Dynamic load testing, as per plan (523E20001) | EACH | 3 | $5,400.00 | $4,500.00 | $4,500.00 | $7,000.00 |
| 327 | Restrike, as per plan (523E20501) | EACH | 3 | $4,400.00 | $4,500.00 | $3,750.00 | $800.00 |
| 328 | Reinforced concrete approach slabs with QC/QA (T=1 (526E30010) | SY | 249 | $400.00 | $375.00 | $300.00 | $500.00 |
| 329 | Type C installation (526E90030) | FT | 75 | $380.00 | $275.00 | $297.00 | $275.00 |
| 330 | Concrete slope protection (601E21000) | SY | 57 | $240.00 | $90.00 | $206.00 | $125.00 |
| 331 | Mechanically stabilized earth wall (840E20000) | SF | 4,175 | $65.00 | $60.00 | $58.00 | $60.00 |
| 332 | Wall excavation (840E21000) | CY | 1,255 | $27.00 | $15.00 | $23.75 | $22.00 |
| 333 | Foundation preparation (840E22000) | SY | 732 | $45.00 | $38.00 | $28.00 | $33.00 |
| 334 | Select granular backfill (840E23000) | CY | 3,036 | $77.00 | $64.00 | $65.00 | $155.00 |
| 335 | Select granular backfill, as per plan (840E23001) | CY | 488 | $120.00 | $70.00 | $136.00 | $130.00 |
| 336 | Natural soil (840E23050) | CY | 299 | $60.00 | $10.00 | $13.50 | $20.00 |
| 337 | 6" drainage pipe, perforated (840E25010) | FT | 753 | $10.00 | $15.00 | $10.50 | $11.00 |
| 338 | 6" drainage pipe, non-perforated (840E25020) | FT | 17 | $25.00 | $30.00 | $77.00 | $100.00 |
| 339 | Concrete coping (840E26000) | FT | 304 | $315.00 | $170.00 | $225.00 | $200.00 |
| 340 | Aesthetic surface treatment (840E26050) | SF | 4,175 | $4.00 | $1.00 | $1.00 | $1.00 |
| 341 | On-site assistance (840E27000) | DAY | 5 | $1,000.00 | $500.00 | $500.00 | $800.00 |
| 342 | SGB inspection and compaction testing (840E28000) | LS | 1 | $15,750 | $20,000 | $11,092 | $17,500 |
| 343 | Geogrid, type P1 (863E00100) | SY | 2,421 | $6.00 | $20.00 | $8.00 | $1.00 |
| 344 | Temporary wire faced mechanically stabilized earth wall (867E00100) | LS | 1 | $60,000 | $140,000 | $75,000 | $35,000 |
| 345 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $225,000 | $135,000 | $245,000 | $408,000 |
| 346 | Approach slab removed (202E22900) | SY | 134 | $60.00 | $60.00 | $46.50 | $60.00 |
| 347 | Wearing course removed (202E23500) | SY | 913 | $13.00 | $9.00 | $11.00 | $11.00 |
| 348 | Granular material, type B (203E35110) | CY | 25 | $135.00 | $100.00 | $90.00 | $170.00 |
| 349 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $125,000 | $100,000 | $75,000 | $35,000 |
| 350 | Unclassified excavation (503E21100) | CY | 578 | $120.00 | $105.00 | $109.00 | $28.00 |
| 351 | Pile driving equipment mobilization (505E11100) | LS | 1 | $20,000 | $35,000 | $20,000 | $17,500 |
| 352 | 12" cast-in-place reinforced concrete piles, driven (507E00500) | FT | 4,500 | $10.00 | $12.50 | $20.00 | $40.00 |
| 353 | 12" cast-in-place reinforced concrete piles, furnished (507E00550) | FT | 4,860 | $55.00 | $47.00 | $37.00 | $36.00 |
| 354 | Epoxy coated steel reinforcement (509E10000) | LB | 116,515 | $1.72 | $1.70 | $1.60 | $1.87 |
| 355 | No. 4 deformed GFRP reinforcement (509E30020) | FT | 7,592 | $1.50 | $1.00 | $1.30 | $1.60 |
| 356 | Semi-integral diaphragm guide (511E33500) | EACH | 2 | $3,500.00 | $4,000.00 | $3,000.00 | $3,500.00 |
| 357 | Class QC2 concrete with QC/QA, bridge deck (511E34446) | CY | 253 | $1,200.00 | $1,000.00 | $1,100.00 | $1,400.00 |
| 358 | Class QC2 concrete with QC/QA, bridge deck (parapet) (511E34450) | CY | 75 | $1,000.00 | $650.00 | $800.00 | $500.00 |
| 359 | Class QC1 concrete with QC/QA, pier above footings (511E41012) | CY | 33 | $2,300.00 | $1,500.00 | $2,000.00 | $1,800.00 |
| 360 | Class QC1 concrete with QC/QA, abutment not including footing (511E44112) | CY | 130 | $1,200.00 | $1,000.00 | $1,200.00 | $1,200.00 |
| 361 | Class QC1 concrete with QC/QA, footing (511E46512) | CY | 167 | $500.00 | $525.00 | $500.00 | $800.00 |
| 362 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 1,009 | $28.75 | $27.00 | $27.00 | $30.00 |
| 363 | Concrete repair by epoxy injection (512E10600) | FT | 50 | $120.00 | $120.00 | $110.00 | $130.00 |
| 364 | Type 2 waterproofing (512E33000) | SY | 72 | $40.00 | $45.00 | $33.00 | $30.00 |
| 365 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 114 | $30.00 | $30.00 | $30.00 | $30.00 |
| 366 | Structural steel members, level 3 (513E10260) | LB | 259,000 | $3.22 | $3.18 | $2.50 | $3.04 |
| 367 | Welded stud shear connectors (513E20000) | EACH | 6,165 | $5.00 | $4.80 | $6.00 | $6.00 |
| 368 | Field painting structural steel, intermediate coat (514E00060) | SF | 2,500 | $20.00 | $12.00 | $12.00 | $21.60 |
| 369 | Field painting structural steel, finish coat (514E00066) | SF | 2,500 | $12.00 | $10.00 | $10.00 | $13.00 |
| 370 | Armorless preformed joint seal (516E10010) | FT | 100 | $125.00 | $45.00 | $56.00 | $60.00 |
| 371 | 1" preformed expansion joint filler (516E13600) | SF | 17 | $10.00 | $9.00 | $17.50 | $40.00 |
| 372 | 2" preformed expansion joint filler (516E13900) | SF | 224 | $15.00 | $12.00 | $15.50 | $15.00 |
| 373 | Semi-integral abutment expansion joint seal (516E14020) | FT | 107 | $52.00 | $45.00 | $39.50 | $40.00 |
| 374 | Elastomeric bearing with internal laminates and load plate (516E44200) | EACH | 6 | $1,200.00 | $2,050.00 | $2,100.00 | $2,000.00 |
| 375 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44201) | EACH | 12 | $1,900.00 | $3,150.00 | $2,500.00 | $2,000.00 |
| 376 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44201) | EACH | 6 | $1,300.00 | $2,900.00 | $2,275.00 | $2,000.00 |
| 377 | Prefabricated geocomposite drain (518E20000) | SY | 78 | $50.00 | $20.00 | $32.00 | $18.00 |
| 378 | Porous backfill with geotextile fabric (518E21200) | CY | 16 | $190.00 | $130.00 | $155.00 | $200.00 |
| 379 | 6" perforated corrugated plastic pipe (518E40000) | FT | 142 | $10.00 | $27.00 | $13.75 | $15.00 |
| 380 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 71 | $24.00 | $40.00 | $32.00 | $50.00 |
| 381 | Special - composite fiber wrap system (519E00100) | SF | 850 | $35.00 | $31.00 | $36.00 | $33.00 |
| 382 | Patching concrete structure (519E11100) | SF | 24 | $300.00 | $250.00 | $185.00 | $200.00 |
| 383 | Dynamic load testing, as per plan (523E20001) | EACH | 2 | $5,500.00 | $4,500.00 | $4,000.00 | $7,500.00 |
| 384 | Restrike, as per plan (523E20501) | EACH | 2 | $4,400.00 | $4,500.00 | $3,750.00 | $800.00 |
| 385 | Reinforced concrete approach slabs with QC/QA (T=1 (526E30010) | SY | 250 | $425.00 | $450.00 | $300.00 | $550.00 |
| 386 | Type C installation (526E90030) | FT | 100 | $380.00 | $275.00 | $315.00 | $300.00 |
| 387 | Crushed aggregate slope protection (601E20000) | SY | 818 | $44.00 | $30.00 | $43.00 | $39.00 |
| 388 | Select granular backfill, as per plan (840E23001) | CY | 579 | $80.00 | $70.00 | $138.50 | $170.00 |
| 389 | Geogrid, type P1 (863E00100) | SY | 2,717 | $6.00 | $33.00 | $10.00 | $1.00 |
| 390 | Temporary wire faced mechanically stabilized earth wall (867E00100) | LS | 1 | $20,000 | $35,000 | $55,000 | $30,000 |
| 391 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $200,000 | $283,000 | $220,000 | $300,000 |
| 392 | CPM progress schedule (108E10000) | LS | 1 | $5,000.00 | $5,000.00 | $10,000 | $5,000.00 |
| 393 | Maintaining traffic (614E11000) | LS | 1 | $940,000 | $1,870,000 | $1,541,000 | $4,450,000 |
| 394 | Field office, type C (619E16020) | MNTH | 24 | $4,400.00 | $4,000.00 | $6,050.00 | $6,000.00 |
| 395 | Construction layout stakes and surveying (623E10000) | LS | 1 | $300,000 | $403,500 | $350,000 | $1,000,000 |
| 396 | Mobilization (624E10000) | LS | 1 | $2,000,000 | $2,086,000 | $2,100,000 | $2,600,000 |
| 400 | Clearing and grubbing (201E11000) | LS | 1 | $150,000 | $650,000 | $68,750 | $304,000 |
| 401 | Removal misc.:' trench drain (202E98200) | FT | 299 | $50.00 | $12.00 | $20.00 | $9.00 |
| 402 | Concrete barrier median overhead sign support foundation, type TC-21.50 (630E84010) | EACH | 2 | $19,850 | $10,000 | $15,000 | $18,000 |
| 403 | Ground mounted structural beam support foundation (630E84500) | EACH | 4 | $700.00 | $1,000.00 | $1,000.00 | $1,100.00 |
| 404 | Steel points or shoes (507E93300) | EACH | 59 | $350.00 | $355.00 | $535.00 | $350.00 |
| 405 | Steel points or shoes (507E93300) | EACH | 59 | $350.00 | $355.00 | $535.00 | $360.00 |
| 406 | Steel points or shoes (507E93300) | EACH | 72 | $350.00 | $320.00 | $455.00 | $375.00 |
| 407 | Conduit, jacked or drilled, 725.04' 3 inch (625E25902) | FT | 2,604 | $41.00 | $49.00 | $65.00 | $43.00 |
| 408 | Fiber optic cable, 72 fiber (804E15030) | FT | 6,996 | $7.70 | $7.70 | $7.00 | $8.00 |
| 409 | Fusion splice (804E35000) | EACH | 1 | $13,465 | $13,465 | $25,000 | $14,500 |
| 410 | Asphalt concrete for maintaining traffic (614E13000) | CY | 50 | $300.00 | $1,000.00 | $130.00 | $950.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of April 17, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.