TDOT contract CNZ140 bid tabulation
The construction of a concrete bulb-tee beam bridge on easley ford road over the conasauga river (l.m. 1.53), including grading, drainage, and paving. Let by Tennessee DOT on May 9, 2025, Polk County. 2 bids received; low bid $4,551,599 by Wright Brothers Civil Construction, LLC.
- Owner
- Tennessee DOT
- Letting
- 09 MAY 2025
- Pay items
- 99
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Wright Brothers Civil Construction, LLC | $4,551,599 | Low |
| 2 | Summers-Taylor, Inc. | $4,689,256 | +3.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Wright Brothers Civil Construction, LLC | 2. Summers-Taylor, Inc. |
|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $26,500 | $27,000 |
| 2 | CPM project schedule (108-03) | LS | 1 | $31,500 | $32,500 |
| 3 | Trainee (109-10.01) | HR | 1,100 | $0.80 | $0.80 |
| 4 | Clearing and grubbing (201-01) | LS | 1 | $200,000 | $43,800 |
| 5 | Removal of asphalt pavement (202-03.01) | SY | 2,065 | $11.10 | $18.50 |
| 6 | Road & drainage excavation (unclassified) (203-01) | CY | 10,430 | $31.00 | $62.50 |
| 7 | Borrow excavation (graded solid rock) (203-02.01) | TON | 3,530 | $49.50 | $64.00 |
| 8 | Borrow excavation (unclassified) (203-03) | CY | 892 | $22.00 | $65.00 |
| 9 | Placing and spreading topsoil (203-04) | CY | 1,145 | $12.00 | $41.50 |
| 10 | Undercutting (203-05) | CY | 520 | $22.00 | $69.50 |
| 11 | Water (203-06) | MG | 47 | $22.00 | $16.00 |
| 12 | Construction of haul road (203-50) | LS | 1 | $285,000 | $199,700 |
| 13 | Sediment removal (209-05) | CY | 111 | $22.00 | $47.50 |
| 14 | Temporary silt fence (with backing) (209-08.02) | LF | 2,190 | $6.30 | $6.50 |
| 15 | Rock check dam (209-08.07) | EACH | 10 | $1,300.00 | $800.00 |
| 16 | Enhanced rock check dam (209-08.08) | EACH | 5 | $1,900.00 | $1,400.00 |
| 17 | Sediment filter bag(15' X 10') (209-09.04) | EACH | 4 | $620.00 | $1,340.00 |
| 18 | Turbidity curtain(15FT depth) (209-13.04) | LF | 100 | $76.00 | $46.50 |
| 19 | Temporary in stream diversion (209-65.04) | LF | 75 | $177.00 | $176.00 |
| 20 | Mineral aggregate, type A base, grading D (303-01) | TON | 1,318 | $59.25 | $79.00 |
| 21 | Mineral aggregate (size 57) (303-10.01) | TON | 909 | $63.00 | $71.50 |
| 22 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 312 | $236.00 | $259.00 |
| 23 | Bituminous material for prime coat (PC) (402-01) | TON | 5 | $1,800.00 | $2,650.00 |
| 24 | Aggregate for cover material (PC) (402-02) | TON | 16 | $146.00 | $138.00 |
| 25 | Bituminous material for tack coat (TC) (403-01) | TON | 3 | $1,100.00 | $2,880.00 |
| 26 | Acs mix(PG64-22) grading D (411-01.10) | TON | 227 | $259.00 | $276.00 |
| 27 | Cold planing bituminous pavement (415-01.02) | SY | 252 | $56.25 | $41.00 |
| 28 | 18" concrete pipe culvert (class III) (607-03.02) | LF | 26 | $143.00 | $269.00 |
| 29 | Class A concrete (pipe endwalls) (611-07.01) | CY | 2 | $7,000.00 | $6,810.00 |
| 30 | Steel bar reinforcement (pipe endwalls) (611-07.02) | LB | 90 | $7.40 | $0.75 |
| 31 | Temporary shoring (621-05.02) | LS | 1 | $16,700 | $60,700 |
| 32 | Earth pad for guard rail end treatment (705-04.10) | EACH | 4 | $2,800.00 | $2,880.00 |
| 33 | W beam GR (type 2) MASH TL-3 (long post) (705-06.02) | LF | 600 | $37.50 | $38.00 |
| 34 | GR terminaltrailing end (type 13) MASH TL-3 (705-06.10) | EACH | 2 | $1,600.00 | $1,610.00 |
| 35 | GR terminal (in-inline) MASH TL-3 (705-06.11) | EACH | 2 | $1,800.00 | $1,840.00 |
| 36 | Thrie beam bridge transition MASH TL-2 (705-06.26) | EACH | 4 | $2,700.00 | $2,760.00 |
| 37 | GR terminal (energy absorbing) MASH TL-2 (705-06.30) | EACH | 4 | $3,700.00 | $3,800.00 |
| 38 | Guardrail removed (706-01) | LF | 45 | $5.70 | $5.80 |
| 39 | Radius rail (706-06.03) | LF | 106 | $39.80 | $40.50 |
| 40 | Removal of fence (chain link with barbed wire) (707-06.01) | LF | 400 | $5.25 | $8.00 |
| 41 | High-visibility construction fence (707-08.11) | LF | 745 | $3.35 | $3.45 |
| 42 | Machined rip-rap (class A-3) (709-05.05) | TON | 200 | $72.50 | $84.00 |
| 43 | Machined rip-rap (class A-1) (709-05.06) | TON | 30 | $77.00 | $87.00 |
| 44 | Machined rip-rap (class B) (709-05.08) | TON | 1,070 | $79.50 | $91.00 |
| 45 | Traffic control (712-01) | LS | 1 | $20,700 | $26,700 |
| 46 | Flexible drums (channelizing) (712-04.01) | EACH | 102 | $44.70 | $34.50 |
| 47 | Warning lights (type A) (712-05.01) | EACH | 4 | $31.70 | $23.00 |
| 48 | Signs (construction) (712-06) | SF | 366 | $10.10 | $8.60 |
| 49 | Temporary barricades (type III) (712-07.03) | LF | 32 | $24.30 | $34.50 |
| 50 | Removal of signs, posts and footings (713-15) | LS | 1 | $170.00 | $2,300.00 |
| 51 | Changeable message sign unit (713-16.01) | EACH | 3 | $9,600.00 | $6,340.00 |
| 52 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 15 | $111.00 | $115.00 |
| 53 | Painted pavement marking (4" line) (716-05.01) | LM | 0.85 | $4,500.00 | $4,607.84 |
| 54 | Mobilization (717-01) | LS | 1 | $455,000 | $450,000 |
| 55 | Geogrid reinforcement type 2 (740-07.04) | SY | 1,280 | $4.30 | $7.90 |
| 56 | Geotextile (type III)(erosion control) (740-10.03) | SY | 345 | $4.45 | $4.05 |
| 57 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 3,109 | $4.60 | $5.30 |
| 58 | Temporary sediment tube 12IN (740-11.02) | LF | 866 | $4.60 | $4.80 |
| 59 | Seeding (with mulch) (801-01) | UNIT | 8 | $89.00 | $92.00 |
| 60 | Temporary seeding (with mulch) (801-01.07) | UNIT | 35 | $61.25 | $63.50 |
| 61 | Grass seed mix (ripzn/FLPL) W/mulch (801-01.35) | UNIT | 8 | $111.00 | $115.00 |
| 62 | Natve seed MX final stablizatn of slopes (801-01.38) | UNIT | 25 | $111.00 | $115.00 |
| 63 | Temporary mulch (801-01.65) | UNIT | 10 | $30.60 | $31.50 |
| 64 | Seeding (without mulch) (801-02) | UNIT | 78 | $61.25 | $63.50 |
| 65 | Water (seeding & sodding) (801-03) | MG | 12 | $167.00 | $173.00 |
| 66 | Cuttings: cornus amomum (18IN-24IN) (802-02.32) | EACH | 101 | $6.65 | $6.90 |
| 67 | Cuttings: sambucus canadensis (18IN-24IN) (802-02.33) | EACH | 101 | $7.75 | $8.10 |
| 68 | Cuttings: salix interior (18IN-24IN) (802-02.34) | EACH | 101 | $6.65 | $6.90 |
| 69 | Carya ovata (shagbark hickory 2-5FT CNTNR GRWN) (802-11.09) | EACH | 9 | $90.00 | $93.50 |
| 70 | Fraxinus pennsylvanica (green ash 2-5FT CNTNR GRWN) (802-11.16) | EACH | 12 | $90.00 | $93.50 |
| 71 | Platanus occidentalis (sycamore 2-5FT CNTNR GRWN) (802-11.26) | EACH | 4 | $90.00 | $93.50 |
| 72 | Quercus nigra (water oak 2-5FT CNTNR GRWN) (802-11.35) | EACH | 4 | $90.00 | $93.50 |
| 73 | Oxydendrum arboreum (sourwood 2-5FT C.G.) (802-11.58) | EACH | 9 | $110.00 | $115.00 |
| 74 | Sodding (new sod) (803-01) | SY | 6,867.56 | $6.95 | $7.20 |
| 75 | Removal of structures (exist. BR. no. 70-0A840-1.53) (202-04.01) | LS | 1 | $455,000 | $250,000 |
| 76 | Dry excavation (bridges) (204-02.01) | CY | 118 | $64.50 | $57.00 |
| 77 | Rock excavation (bridges) (204-04.01) | CY | 160 | $130.00 | $200.00 |
| 78 | Rock drilling (bridges) (204-05) | LF | 24 | $380.00 | $85.00 |
| 79 | Core drilling and sampling (204-05.01) | LF | 78 | $139.00 | $151.00 |
| 80 | Granular backfill (bridges) (303-01.02) | TON | 46 | $108.00 | $82.00 |
| 81 | Class A concrete (leveling) (604-01.32) | CY | 26 | $1,155.00 | $440.00 |
| 82 | Epoxy coated reinforcing steel (604-02.03) | LB | 62,059 | $1.65 | $1.60 |
| 83 | Class A concrete (bridges) (604-03.01) | CY | 137 | $1,500.00 | $1,680.00 |
| 84 | Steel bar reinforcement (bridges) (604-03.02) | LB | 19,262 | $1.50 | $1.60 |
| 85 | Pavement @ bridge ends (604-03.04) | SY | 157 | $394.00 | $475.50 |
| 86 | Class D concrete (bridge deck) (604-03.09) | CY | 239 | $1,850.00 | $1,370.00 |
| 87 | Applied texture finish (new structures) (604-04.01) | SY | 1,898 | $20.10 | $21.00 |
| 88 | Steel piles (12 inch) (606-03.03) | LF | 532 | $97.00 | $84.50 |
| 89 | Pile tips (steel piles, 12 inch) (606-03.06) | EACH | 11 | $198.00 | $200.00 |
| 90 | Prestressed concrete bulb tee beam (6" web)(BT-72) (615-01.12) | LF | 982 | $510.00 | $606.00 |
| 91 | Conc parapet single slope (STD-1-1SS) (620-05.01) | LF | 576 | $119.00 | $160.00 |
| 92 | Camera inspection - drilled shaft (dry) (625-01.10) | EACH | 2 | $1,125.00 | $3,200.00 |
| 93 | Drilled shaft-soil (5'-0" diameter) (625-02.01) | VF | 32 | $2,335.00 | $1,850.00 |
| 94 | Drilled shaft-rock (5'-0"/4'-6" inside diameter) (625-02.13) | VF | 27 | $2,255.00 | $2,000.00 |
| 95 | Drilled shaft casing-permanent (6'-0" diameter) (625-02.25) | VF | 38 | $760.00 | $600.00 |
| 96 | Drilled shaft (SH-SCC) concrete (625-02.40) | CY | 40 | $820.00 | $470.00 |
| 97 | Drilled shaft reinforcing steel (625-02.44) | LB | 6,275 | $1.75 | $1.75 |
| 98 | 6" perforated pipe with vertical drain system (710-09.01) | LF | 128 | $50.00 | $38.50 |
| 99 | 6" pipe underdrain (710-09.02) | LF | 52 | $19.00 | $32.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of May 9, 2025. Compiled by Mirage Metrics.