ODOT contract 250404 bid tabulation
HAM-IR 75-01.05 (MAJOR RECONSTRUCTION). Let by Ohio DOT on October 9, 2025, HAM. 3 bids received; low bid $46,773,940 by Great Lakes Construction Co, +22% against the engineer's estimate of $38,479,000.
- Owner
- Ohio DOT
- Letting
- 09 OCT 2025
- Pay items
- 408
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Great Lakes Construction Co | $46,773,940 | Low | +22% |
| 2 | Sunesis Construction Co | $48,182,235 | +3.0% | +25% |
| 3 | Beaty Construction Inc | $50,264,245 | +7.0% | +31% |
Engineer's estimate: $38,479,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Great Lakes Construction Co | 2. Sunesis Construction Co | 3. Beaty Construction Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $100,000 | $61,500 | $225,000 |
| 2 | Pavement removed (202E23000) | SY | 9,999 | $22.50 | $17.84 | $16.25 |
| 3 | Walk removed (202E30000) | SF | 8,059 | $1.60 | $1.31 | $1.35 |
| 4 | Curb removed (202E32000) | FT | 3,551 | $1.75 | $4.76 | $3.15 |
| 5 | Pipe removed, 24" and under (202E35100) | FT | 776 | $70.00 | $19.40 | $82.50 |
| 6 | Guardrail removed (202E38000) | FT | 2,363 | $5.00 | $5.00 | $2.80 |
| 7 | Anchor assembly removed, type A, as per plan (202E42001) | EACH | 1 | $125.00 | $125.00 | $375.00 |
| 8 | Manhole removed (202E58000) | EACH | 1 | $900.00 | $689.60 | $2,375.00 |
| 9 | Catch basin removed (202E58100) | EACH | 11 | $750.00 | $482.16 | $1,705.00 |
| 13 | Fence removed (202E75000) | FT | 1,705 | $6.00 | $6.00 | $4.00 |
| 14 | Removal misc.: retaining wall (202E98200) | FT | 440 | $285.00 | $236.69 | $450.00 |
| 15 | Excavation (203E10000) | CY | 16,726 | $32.00 | $31.36 | $31.35 |
| 16 | Embankment (203E20000) | CY | 2,106 | $9.00 | $13.52 | $12.50 |
| 17 | Embankment, as per plan (203E20001) | CY | 653 | $20.00 | $19.72 | $17.35 |
| 18 | Excavation of subgrade (204E13000) | CY | 1,409 | $43.00 | $45.03 | $43.35 |
| 19 | Granular material, type C (204E30020) | CY | 1,409 | $80.00 | $81.66 | $96.75 |
| 20 | Proof rolling (204E45000) | HR | 5 | $350.00 | $259.19 | $585.00 |
| 21 | Geotextile fabric (204E50000) | SY | 4,225 | $2.00 | $1.64 | $3.00 |
| 22 | Cement (206E10500) | TON | 199 | $210.00 | $210.00 | $240.00 |
| 23 | Curing coat (206E11000) | SY | 6,643 | $1.40 | $1.25 | $1.40 |
| 24 | Cement stabilized subgrade, 14 inches deep (206E15020) | SY | 6,643 | $6.25 | $24.07 | $7.34 |
| 25 | Mixture design for chemically stabilized soils (206E30000) | LS | 1 | $6,100.00 | $9,016.00 | $10,016 |
| 26 | Guardrail, type MGS (606E15050) | FT | 550 | $26.00 | $26.00 | $27.80 |
| 27 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 2 | $2,500.00 | $2,500.00 | $3,650.00 |
| 28 | Anchor assembly, MGS type T (606E26550) | EACH | 1 | $1,150.00 | $1,110.00 | $1,880.00 |
| 29 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 1 | $2,400.00 | $2,400.00 | $3,720.00 |
| 30 | Impact attenuator, type 2 (unidirectional) (35 MPH (606E60022) | EACH | 1 | $18,850 | $18,850 | $26,400 |
| 31 | Fence, misc.: wood fence (607E98000) | FT | 104 | $80.00 | $126.00 | $74.00 |
| 32 | 5" concrete walk (608E12000) | SF | 31,812 | $10.00 | $10.58 | $10.00 |
| 33 | Curb ramp (608E52000) | SF | 754 | $30.00 | $22.26 | $25.75 |
| 34 | Walkway, misc.: 12" concretewalk (608E98000) | SF | 54 | $55.00 | $23.26 | $69.25 |
| 35 | Concrete barrier, single slope, type C (622E10120) | FT | 194 | $185.00 | $230.00 | $126.50 |
| 36 | Concrete barrier, single slope, type D (622E10160) | FT | 20 | $290.00 | $300.00 | $295.00 |
| 37 | Concrete barrier end section, type D (622E25000) | EACH | 1 | $8,000.00 | $6,000.00 | $7,365.00 |
| 38 | Concrete barrier, end anchorage, reinforced, type C (622E25008) | EACH | 1 | $8,000.00 | $6,905.76 | $7,005.00 |
| 39 | Concrete barrier, end anchorage, reinforced, type D (622E25050) | EACH | 1 | $9,000.00 | $6,905.76 | $6,575.00 |
| 40 | Portable barrier, unanchored, as per plan (622E41101) | FT | 276 | $55.00 | $101.02 | $74.49 |
| 41 | Special - consultant for concrete quality control (690E98400) | LS | 1 | $253,000 | $83,000 | $80,000 |
| 42 | Soil analysis test (659E00100) | EACH | 2 | $200.00 | $75.00 | $200.00 |
| 43 | Topsoil (659E00300) | CY | 985 | $55.00 | $92.88 | $55.00 |
| 44 | Seeding and mulching (659E10000) | SY | 8,873 | $1.95 | $5.16 | $1.95 |
| 45 | Repair seeding and mulching (659E14000) | SY | 444 | $1.00 | $1.70 | $1.00 |
| 46 | Inter-seeding (659E15000) | SY | 444 | $0.50 | $1.70 | $0.01 |
| 47 | Commercial fertilizer (659E20000) | TON | 1.31 | $1,500.00 | $760.00 | $1,500.00 |
| 48 | Lime (659E31000) | ACRE | 1.83 | $200.00 | $50.00 | $200.00 |
| 49 | Water (659E35000) | MGAL | 49 | $1.00 | $50.00 | $1.00 |
| 50 | Storm water pollution prevention plan (832E15000) | LS | 1 | $5,000.00 | $3,635.00 | $5,000.00 |
| 51 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $50,000 | $32,099 | $75,000 |
| 52 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $30,000 | $29,676 | $50,500 |
| 53 | Erosion control (832E30000) | EACH | 55,000 | $1.00 | $1.00 | $1.00 |
| 54 | 6" shallow pipe underdrains (605E11100) | FT | 2,245 | $22.00 | $10.95 | $36.50 |
| 55 | 6" unclassified pipe underdrains (605E13300) | FT | 100 | $27.00 | $12.85 | $31.50 |
| 56 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 340 | $33.00 | $45.61 | $59.50 |
| 57 | 12" conduit, type B, as per plan (611E04401) | FT | 425 | $135.00 | $84.20 | $126.45 |
| 58 | 12" conduit, type C, as per plan (611E04601) | FT | 78 | $140.00 | $84.24 | $189.00 |
| 59 | 15" conduit, type B, as per plan (611E05901) | FT | 287 | $150.00 | $90.82 | $152.25 |
| 60 | 15" conduit, type C, as per plan (611E06101) | FT | 49 | $160.00 | $230.21 | $214.25 |
| 61 | 18" conduit, type B, as per plan (611E07401) | FT | 339 | $200.00 | $158.69 | $236.00 |
| 62 | 18" conduit, type C, as per plan (611E07601) | FT | 50 | $340.00 | $159.76 | $326.00 |
| 63 | 24" conduit, type B, as per plan (611E10401) | FT | 53 | $225.00 | $175.60 | $270.75 |
| 64 | Catch basin, no. 3 (611E98150) | EACH | 4 | $7,100.00 | $4,796.11 | $9,090.00 |
| 65 | Catch basin, no. 3A (611E98180) | EACH | 16 | $5,500.00 | $3,278.66 | $8,085.00 |
| 66 | Catch basin, no. 6 (611E98370) | EACH | 5 | $4,000.00 | $3,267.61 | $8,025.00 |
| 67 | Catch basin, no. 2-2B (611E98470) | EACH | 2 | $2,350.00 | $2,043.43 | $5,450.00 |
| 68 | Catch basin, no. 2-3 (611E98510) | EACH | 1 | $3,000.00 | $3,427.52 | $6,165.00 |
| 69 | Catch basin, misc.: combination inlet (CI) (cincin (611E98690) | EACH | 9 | $6,900.00 | $4,810.82 | $9,020.00 |
| 70 | Catch basin, misc.: double gutter inlet manhole (D (611E98690) | EACH | 6 | $9,600.00 | $9,261.36 | $14,550 |
| 71 | Inlet, no. 3C (611E98810) | EACH | 1 | $13,500 | $17,942 | $9,950.00 |
| 72 | Inlet, misc.: ditch inlet (DI) (cincinnati) (611E99500) | EACH | 1 | $4,700.00 | $2,725.18 | $5,380.00 |
| 73 | Manhole, no. 3 (611E99574) | EACH | 3 | $7,300.00 | $7,032.29 | $7,700.00 |
| 74 | Manhole, misc.:standard manhole, type B (cincinnat (611E99690) | EACH | 3 | $6,800.00 | $9,839.61 | $7,700.00 |
| 76 | Diamond grinding portland cement concrete pavement (257E10000) | SY | 5,537 | $6.20 | $3.75 | $6.15 |
| 77 | Asphalt concrete base, PG64-22, (449) (302E56000) | CY | 2,227 | $240.00 | $240.00 | $240.00 |
| 78 | Aggregate base (304E20000) | CY | 1,199 | $100.00 | $88.02 | $102.25 |
| 79 | Non-tracking tack coat (407E20000) | GAL | 1,148 | $5.00 | $5.00 | $5.00 |
| 81 | Asphalt concrete surface course, 12.5 MM, type A (448) (442E20000) | CY | 485 | $450.00 | $450.00 | $450.00 |
| 82 | Asphalt concrete intermediate course, 12.5 MM, type B (448) (442E20180) | CY | 497 | $425.00 | $425.00 | $425.00 |
| 83 | Asphalt concrete, misc.: full-deph 448 type 1 hot- (442E90000) | CY | 52 | $825.00 | $825.00 | $825.00 |
| 84 | 7" non-reinforced concrete pavement, class QC 1P (452E11010) | SY | 121 | $210.00 | $150.36 | $118.75 |
| 85 | 10" non-reinforced concrete pavement, class QC 1P with QC/QA (452E14020) | SY | 197 | $185.00 | $203.66 | $172.50 |
| 86 | Concrete median (609E71000) | SF | 276 | $21.50 | $17.00 | $13.75 |
| 87 | Curb, misc.: type B-1 curb (cincinnati) (609E98000) | FT | 46 | $80.00 | $30.90 | $67.25 |
| 88 | Curb, misc.: type P-1 curb (cincinnati) (609E98000) | FT | 82 | $90.00 | $20.00 | $59.00 |
| 89 | Curb, misc.: type S-1 curb (cincinnati) (609E98000) | FT | 4,393 | $40.00 | $38.70 | $34.75 |
| 90 | Inspection and compaction testing of unbound materials (878E25000) | LS | 1 | $111,000 | $14,420 | $150,000 |
| 91 | Special - valve box adjusted to grade (GCWW) (638E20500) | EACH | 2 | $420.00 | $136.98 | $800.00 |
| 92 | Special - fire hydrant removed and disposed of (GC (638E20760) | EACH | 2 | $2,550.00 | $877.22 | $1,950.00 |
| 93 | Special - fire hydrant service line shortened and adjusted to grade (638E20764) | EACH | 1 | $5,250.00 | $8,054.04 | $2,665.00 |
| 94 | 12" conduit, type B (611E04400) | FT | 153 | $410.00 | $284.12 | $337.00 |
| 95 | Manhole adjusted to grade (611E99654) | EACH | 4 | $1,250.00 | $618.13 | $2,330.00 |
| 96 | Manhole, misc.: standard manhole, type B (sanitary (611E99690) | EACH | 3 | $9,400.00 | $13,300 | $13,200 |
| 97 | Connection, fused pull apart (625E00450) | EACH | 20 | $110.00 | $110.00 | $110.00 |
| 98 | Connection, unfused pull apart (625E00460) | EACH | 10 | $110.00 | $110.00 | $110.00 |
| 99 | Connection, unfused permanent (625E00480) | EACH | 15 | $110.00 | $110.00 | $110.00 |
| 100 | Light pole, decorative, as per plan (625E10481) | EACH | 4 | $2,800.00 | $2,800.00 | $2,800.00 |
| 101 | Light pole, conventional (AT15B40) (625E10490) | EACH | 1 | $3,900.00 | $3,900.00 | $3,900.00 |
| 102 | Light pole, conventional, as per plan (35') (625E10491) | EACH | 5 | $3,700.00 | $3,700.00 | $3,700.00 |
| 103 | Light pole anchor bolts on structure (625E10614) | EACH | 4 | $100.00 | $100.00 | $100.00 |
| 104 | Light pole foundation, 24" X 8' deep (625E14100) | EACH | 6 | $2,900.00 | $2,900.00 | $2,900.00 |
| 105 | Bracket arm, 8' (625E17960) | EACH | 5 | $1,000.00 | $1,000.00 | $1,000.00 |
| 106 | Bracket arm, 15' (625E18200) | EACH | 1 | $1,350.00 | $1,350.00 | $1,350.00 |
| 107 | No. 6 AWG 600 volt distribution cable (625E22990) | FT | 2,655 | $3.20 | $3.20 | $3.20 |
| 108 | No. 4 AWG 600 volt distribution cable (625E23000) | FT | 4,981 | $3.80 | $3.80 | $3.80 |
| 109 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 1,200 | $4.40 | $4.40 | $4.40 |
| 110 | No. 10 AWG pole and bracket cable (625E23400) | FT | 664 | $2.00 | $2.00 | $2.00 |
| 111 | 1-1/2" duct cable with two no. 4 AWG 2400 volt cables (625E24100) | FT | 672 | $9.80 | $9.80 | $9.80 |
| 112 | Conduit, 1-1/2", 725.04, as per plan (625E25301) | FT | 533 | $21.00 | $21.00 | $21.00 |
| 113 | Conduit, 2", 725.04 (625E25400) | FT | 922 | $26.00 | $26.00 | $26.00 |
| 114 | Conduit, 3", 725.04 (625E25500) | FT | 196 | $30.00 | $30.00 | $30.00 |
| 115 | Conduit, concrete encased (2") (625E25802) | FT | 54 | $34.00 | $34.00 | $34.00 |
| 116 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 3 | $450.00 | $450.00 | $450.00 |
| 117 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 3 | $450.00 | $450.00 | $450.00 |
| 118 | Luminaire, post top, solid state (LED), as per plan (625E27403) | EACH | 4 | $2,000.00 | $2,000.00 | $2,000.00 |
| 119 | Luminaire, underpass, solid state (LED), as per plan (625E27503) | EACH | 2 | $1,400.00 | $1,400.00 | $1,400.00 |
| 120 | Luminaire, underpass, solid state (LED), as per plan (625E27503) | EACH | 8 | $1,500.00 | $1,500.00 | $1,500.00 |
| 121 | Trench, 24" deep (625E29002) | FT | 1,807 | $12.00 | $12.00 | $12.00 |
| 122 | Junction box (625E29900) | EACH | 1 | $2,550.00 | $2,550.00 | $2,550.00 |
| 123 | Barrier junction box (625E29940) | EACH | 2 | $2,900.00 | $2,900.00 | $2,900.00 |
| 124 | Pull box, 725.08, 18" (625E30700) | EACH | 8 | $1,000.00 | $1,000.00 | $1,000.00 |
| 125 | Pull box, 725.08, 18", as per plan (625E30701) | EACH | 3 | $1,400.00 | $1,400.00 | $1,400.00 |
| 126 | Pull box, 725.08, 24", as per plan (625E30707) | EACH | 2 | $2,700.00 | $2,700.00 | $2,700.00 |
| 127 | Ground rod (625E32000) | EACH | 6 | $265.00 | $265.00 | $265.00 |
| 128 | Structure grounding system (625E33000) | EACH | 4 | $8,900.00 | $8,900.00 | $8,900.00 |
| 129 | Power service (625E34000) | EACH | 2 | $9,100.00 | $9,100.00 | $9,100.00 |
| 130 | Power service, as per plan (625E34001) | EACH | 1 | $9,200.00 | $9,200.00 | $9,000.00 |
| 131 | Service to underpass lighting (625E37100) | EACH | 1 | $9,500.00 | $9,500.00 | $9,500.00 |
| 132 | Disconnect circuit (625E75800) | EACH | 4 | $75.00 | $75.00 | $75.00 |
| 133 | RPM (621E00100) | EACH | 113 | $82.95 | $79.61 | $82.95 |
| 134 | Barrier reflector, type 1 (one-way) (626E00102) | EACH | 10 | $15.00 | $15.00 | $13.53 |
| 135 | Barrier reflector, type 2 (one-way) (626E00110) | EACH | 8 | $15.00 | $15.00 | $13.53 |
| 136 | Ground mounted support, no. 2 post (630E02100) | FT | 182.40 | $13.50 | $13.50 | $21.06 |
| 137 | Ground mounted support, no. 3 post (630E03100) | FT | 53.40 | $16.00 | $16.00 | $22.82 |
| 138 | Ground mounted support, no. 6 post (630E06100) | FT | 112.40 | $35.00 | $35.00 | $33.38 |
| 139 | Sign post reflector (630E08600) | EACH | 9 | $44.50 | $44.50 | $66.44 |
| 140 | Sign, flat sheet (630E80100) | SF | 203.41 | $21.00 | $21.00 | $24.58 |
| 141 | Removal of ground mounted sign and disposal (630E84900) | EACH | 18 | $15.00 | $15.00 | $22.39 |
| 142 | Removal of ground mounted post support and disposal (630E86002) | EACH | 11 | $50.00 | $50.00 | $29.85 |
| 143 | Removal of ground mounted post support and reerection (630E86010) | EACH | 1 | $1,850.00 | $1,850.00 | $101.91 |
| 144 | Removal of pole mounted sign and disposal (630E87500) | EACH | 1 | $25.00 | $25.00 | $22.39 |
| 145 | Signing, misc.: ground mounted sign support, steel (630E97700) | EACH | 1 | $4,300.00 | $4,300.00 | $512.69 |
| 146 | Edge line, 4" (644E00100) | MI | 0.74 | $9,065.00 | $9,065.00 | $9,065.00 |
| 147 | Lane line, 4" (644E00200) | MI | 0.30 | $2,375.00 | $2,375.00 | $2,375.00 |
| 148 | Center line (644E00300) | MI | 0.06 | $16,520 | $16,520 | $16,520 |
| 149 | Channelizing line, 8" (644E00400) | FT | 1,389 | $3.00 | $3.00 | $3.00 |
| 150 | Stop line (644E00500) | FT | 65 | $7.00 | $7.00 | $7.00 |
| 151 | Crosswalk line, 12" (644E00620) | FT | 85 | $6.50 | $6.50 | $6.50 |
| 152 | Crosswalk line, 24" (644E00630) | FT | 130 | $6.75 | $6.75 | $6.75 |
| 153 | Chevron marking (644E00720) | FT | 106 | $6.75 | $6.75 | $6.75 |
| 154 | Lane arrow (644E01300) | EACH | 10 | $210.00 | $210.00 | $210.00 |
| 155 | Dotted line, 4" (644E01500) | FT | 5 | $2.90 | $2.90 | $2.90 |
| 156 | Dotted line, 6" (644E01510) | FT | 137 | $2.95 | $2.95 | $2.95 |
| 157 | Removal of pavement marking (644E30000) | FT | 300 | $1.80 | $1.80 | $1.80 |
| 158 | Removal of pavement marking (644E30020) | EACH | 5 | $265.00 | $265.00 | $265.00 |
| 159 | Removal of pavement marking (644E30030) | MI | 0.45 | $6,350.00 | $6,350.00 | $6,350.00 |
| 160 | Edge line, 4" (646E10000) | MI | 0.30 | $4,105.00 | $4,105.00 | $4,105.00 |
| 161 | Edge line, 6" (646E10010) | MI | 0.04 | $6,150.00 | $6,150.00 | $6,150.00 |
| 162 | Lane line, 4" (646E10100) | MI | 0.10 | $1,535.00 | $1,535.00 | $1,535.00 |
| 163 | Center line (646E10200) | MI | 0.07 | $8,205.00 | $8,205.00 | $8,205.00 |
| 164 | Channelizing line, 8" (646E10300) | FT | 1,595 | $1.90 | $1.90 | $1.90 |
| 165 | Stop line (646E10400) | FT | 75 | $15.80 | $15.80 | $15.80 |
| 166 | Crosswalk line, 12" (646E10510) | FT | 357 | $7.50 | $7.50 | $7.50 |
| 167 | Transverse/diagonal line (646E10600) | FT | 255 | $14.50 | $14.50 | $14.50 |
| 168 | Transverse/diagonal line (646E10600) | FT | 125 | $14.50 | $14.50 | $14.50 |
| 169 | Chevron marking (646E10620) | FT | 277 | $14.50 | $14.50 | $14.50 |
| 170 | Lane arrow (646E20300) | EACH | 12 | $250.00 | $250.00 | $250.00 |
| 171 | Dotted line, 4" (646E20502) | FT | 237 | $1.80 | $1.80 | $1.80 |
| 172 | Special - noise barrier (reflective) (606E10210) | SF | 17,427 | $62.50 | $91.01 | $70.00 |
| 174 | Pavement repair, as per plan (253E02001) | CY | 600 | $455.00 | $455.00 | $455.00 |
| 175 | Pavement repair, as per plan (253E02001) | CY | 600 | $455.00 | $455.00 | $455.00 |
| 176 | Pavement repair, as per plan (253E02001) | CY | 200 | $455.00 | $455.00 | $455.00 |
| 177 | Temporary vandal fence, type B (607E39994) | FT | 360 | $35.00 | $35.00 | $48.00 |
| 178 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 1,500 | $120.00 | $117.33 | $95.00 |
| 179 | Increased barrier delineation (614E11630) | FT | 2,420 | $2.57 | $2.57 | $2.57 |
| 180 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 7 | $1,935.45 | $1,935.45 | $1,935.45 |
| 181 | Speed zone ahead symbol sign (614E12410) | EACH | 6 | $215.18 | $215.18 | $215.18 |
| 182 | Detour signing (614E12420) | LS | 1 | $47,609 | $47,609 | $47,609 |
| 183 | Work zone speed limit sign (614E12470) | EACH | 12 | $239.18 | $239.18 | $239.18 |
| 184 | Work zone increased penalties sign (614E12484) | EACH | 7 | $254.43 | $254.43 | $254.43 |
| 185 | Replacement sign (614E12500) | EACH | 10 | $239.36 | $239.36 | $239.36 |
| 186 | Replacement drum (614E12600) | EACH | 100 | $55.03 | $55.03 | $55.03 |
| 187 | Work zone raised pavement marker, as per plan (614E12801) | EACH | 1,594 | $39.55 | $93.52 | $6.39 |
| 188 | Barrier reflector, type 1, 1-way (614E13310) | EACH | 60 | $12.35 | $12.35 | $12.35 |
| 189 | Barrier reflector, type 1, 2-way (614E13310) | EACH | 9 | $12.35 | $12.35 | $12.35 |
| 190 | Object marker, one way (614E13350) | EACH | 60 | $19.85 | $19.85 | $19.85 |
| 191 | Object marker, two way (614E13360) | EACH | 9 | $20.79 | $20.79 | $20.79 |
| 192 | Maintaining traffic, misc.:, rumble strip milled/F (614E18030) | FT | 1,400 | $30.00 | $30.00 | $30.00 |
| 193 | Portable changeable message sign, as per plan (614E18601) | SNMT | 90 | $864.85 | $864.85 | $950.00 |
| 194 | Work zone edge line, class I, 6", 807 paint (614E22056) | MI | 3.54 | $3,955.00 | $3,995.00 | $3,955.00 |
| 195 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 1.54 | $3,595.00 | $3,595.00 | $3,595.00 |
| 196 | Work zone edge line, class I, 6", 648 (614E22336) | MI | 1.40 | $9,410.00 | $9,410.00 | $9,410.00 |
| 197 | Work zone channelizing line, class I, 12", 807 paint (614E23110) | FT | 18,748 | $1.50 | $1.50 | $1.50 |
| 198 | Work zone channelizing line, class I, 12", 648 (614E23150) | FT | 9,300 | $2.50 | $2.50 | $2.50 |
| 199 | Work zone channelizing line, class I, 12", 642 paint (614E23210) | FT | 2,126 | $1.35 | $1.35 | $1.35 |
| 200 | Work zone dotted line, class I, 6", 807 paint (614E24102) | FT | 2,827 | $1.40 | $1.40 | $1.40 |
| 201 | Work zone dotted line, class I, 6", 648 (614E24142) | FT | 690 | $2.40 | $2.40 | $2.40 |
| 202 | Work zone dotted line, class I, 6", 642 paint (614E24202) | FT | 1,026 | $1.30 | $1.30 | $1.30 |
| 203 | Work zone transverse/diagonal line, class I (614E25000) | FT | 507 | $7.50 | $7.50 | $7.50 |
| 204 | Work zone arrow, class I, 642 paint (614E30200) | EACH | 18 | $150.00 | $150.00 | $150.00 |
| 205 | Roads for maintaining traffic (615E10000) | LS | 1 | $25,000 | $9,669.91 | $23,500 |
| 206 | Pavement for maintaining traffic, class A (615E20000) | SY | 537 | $130.00 | $133.85 | $130.00 |
| 207 | Water (616E10000) | MGAL | 8 | $65.00 | $15.93 | $10.00 |
| 208 | Portable barrier, unanchored (622E41100) | FT | 2,470 | $30.50 | $41.79 | $40.16 |
| 209 | Portable barrier, anchored (622E41110) | FT | 1,050 | $46.00 | $45.22 | $45.22 |
| 210 | Work zone egress warning system (829E00100) | SNMT | 12 | $900.00 | $900.00 | $4,500.00 |
| 211 | Portable non-intrusive traffic sensor, class I (896E00010) | SNMT | 84 | $900.00 | $900.00 | $1,100.00 |
| 212 | Portable changeable message sign, as per plan (896E00021) | SNMT | 12 | $800.00 | $800.00 | $1,400.00 |
| 213 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $30,000 | $1,346.26 | $45,000 |
| 214 | Unclassified excavation, as per plan (503E21301) | LS | 1 | $325,000 | $46,534 | $275,000 |
| 215 | Steel piles, misc.:soldier piles, W27X178 (507E00400) | FT | 813 | $300.00 | $330.02 | $258.00 |
| 216 | Steel piles, misc.:soldier piles, W27X258 (507E00400) | FT | 179 | $450.00 | $538.00 | $404.00 |
| 217 | Galvanized steel reinforcement (509E26000) | LB | 176,174 | $2.20 | $2.87 | $2.00 |
| 218 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 1,677 | $38.00 | $17.34 | $30.25 |
| 219 | Class QC1 concrete with QC/QA, retaining/wingwall not including footing (511E46012) | CY | 880 | $1,275.00 | $1,870.19 | $1,030.00 |
| 220 | Class QC1 concrete with QC/QA, footing (511E46512) | CY | 123 | $1,050.00 | $638.21 | $815.00 |
| 221 | Class QC1 concrete, misc.:moment slab with QC/QA (511E53010) | CY | 253 | $1,150.00 | $952.96 | $1,725.00 |
| 222 | Class QC1 concrete, misc.:shaft cap with QC/QA (511E53010) | CY | 475 | $950.00 | $1,058.30 | $995.00 |
| 223 | Sealing of concrete surfaces (512E10000) | SY | 2,229 | $33.00 | $41.32 | $38.64 |
| 224 | Sealing of concrete surfaces, as per plan (512E10001) | SY | 2,229 | $20.00 | $19.74 | $18.23 |
| 225 | Type 2 waterproofing, as per plan (512E33001) | SY | 10 | $28.00 | $110.00 | $110.00 |
| 226 | Welded stud shear connectors, as per plan (513E20001) | EACH | 574 | $5.50 | $94.74 | $12.50 |
| 227 | 1" preformed expansion joint filler (516E13600) | SF | 488 | $17.00 | $6.47 | $30.00 |
| 228 | Railing, misc.:texas railing (517E76300) | FT | 810 | $400.00 | $581.86 | $342.50 |
| 229 | Prefabricated geocomposite drain (518E20000) | SY | 237 | $47.50 | $23.97 | $34.75 |
| 230 | Porous backfill with geotextile fabric (518E21200) | CY | 160 | $170.00 | $96.37 | $122.00 |
| 231 | 4" non-perforated corrugated plastic pipe, including specials (518E39900) | FT | 72 | $20.00 | $36.68 | $88.00 |
| 232 | 6" perforated corrugated plastic pipe (518E40000) | FT | 1,010 | $20.00 | $4.46 | $4.75 |
| 233 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 80 | $60.00 | $70.48 | $112.50 |
| 234 | Drilled shafts, 42" diameter, above bedrock, as per plan (524E94803) | FT | 807 | $310.00 | $253.95 | $385.00 |
| 235 | Drilled shafts, 48" diameter above bedrock, as per plan (524E94903) | FT | 181 | $425.00 | $1,266.68 | $695.00 |
| 236 | Drilled shafts, 60" diameter, above bedrock, as per plan (524E94915) | FT | 5,260 | $815.00 | $675.10 | $735.00 |
| 237 | Special - structures: preconstruction condition SU (530E00200) | LS | 1 | $45,000 | $82,839 | $85,000 |
| 238 | Special - retaining wall, precast concrete lagging (530E51010) | SF | 288 | $50.00 | $108.42 | $175.00 |
| 239 | Special - retaining wall, timber lagging (530E51020) | SF | 2,104 | $25.00 | $17.58 | $21.85 |
| 240 | Vandal protection fence, 6' straight, coated fabric, as per plan (607E39901) | FT | 809 | $152.00 | $185.00 | $120.00 |
| 241 | Aesthetic surface treatment (840E26050) | SF | 8,401 | $16.00 | $21.14 | $11.25 |
| 242 | Thermal integrity profiling (tip) test (894E10000) | EACH | 12 | $7,750.00 | $5,513.28 | $9,500.00 |
| 243 | Unclassified excavation (503E21300) | LS | 1 | $6,000.00 | $1,346.26 | $30,000 |
| 244 | Steel piles, misc.: soldier piles, W33X387 (507E00400) | FT | 1,872 | $800.00 | $799.76 | $695.00 |
| 245 | Galvanized steel reinforcement (509E26000) | LB | 13,104 | $2.20 | $2.05 | $2.00 |
| 246 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 8 | $38.00 | $23.99 | $30.25 |
| 247 | Class QC1 concrete, misc.:moment slab (511E53010) | CY | 28 | $1,125.00 | $1,085.14 | $2,080.00 |
| 248 | Class QC1 concrete, misc.:shaft cap & collar (511E53010) | CY | 82 | $1,075.00 | $833.67 | $1,220.00 |
| 249 | Sealing of concrete surfaces, as per plan (512E10001) | SY | 245 | $20.00 | $20.23 | $23.00 |
| 250 | 1" preformed expansion joint filler (516E13600) | SF | 41 | $20.00 | $6.09 | $12.00 |
| 251 | Railing, misc.:texas railing (517E76300) | FT | 111 | $425.00 | $584.70 | $392.00 |
| 252 | Drilled shafts, 60" diameter, above bedrock, as per plan (524E94915) | FT | 2,528 | $1,820.00 | $1,952.77 | $1,925.00 |
| 253 | Vandal protection fence, 6' straight, coated fabric (607E39900) | FT | 112 | $158.00 | $215.00 | $157.00 |
| 254 | Structure removed, over 20 foot span, as per plan (202E11003) | LS | 1 | $1,465,000 | $1,049,764 | $1,500,000 |
| 255 | Approach slab removed (202E22900) | SY | 634 | $55.00 | $45.67 | $32.75 |
| 256 | Steps removed (202E30204) | LS | 1 | $5,037.42 | $1,648.39 | $9,500.00 |
| 257 | Embankment, as per plan (203E20001) | CY | 27 | $75.00 | $76.54 | $88.00 |
| 258 | Granular material, type B, as per plan (203E35111) | CY | 864 | $75.00 | $83.66 | $88.00 |
| 259 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $650,000 | $607,903 | $425,000 |
| 260 | Unclassified excavation (503E21300) | LS | 1 | $350,000 | $223,399 | $350,000 |
| 261 | Pile driving equipment mobilization (505E11100) | LS | 1 | $125,000 | $51,746 | $86,500 |
| 262 | 12" cast-in-place reinforced concrete piles, driven, as per plan (507E00501) | FT | 4,680 | $47.00 | $60.24 | $49.50 |
| 263 | 12" cast-in-place reinforced concrete piles, furnished (507E00550) | FT | 4,960 | $50.00 | $50.96 | $33.75 |
| 264 | 14" cast-in-place reinforced concrete piles, driven, as per plan (507E00601) | FT | 5,500 | $48.00 | $53.66 | $54.25 |
| 265 | 14" cast-in-place reinforced concrete piles, furnished (507E00650) | FT | 5,880 | $55.00 | $59.59 | $44.25 |
| 266 | Prebored holes, as per plan (507E92201) | FT | 1,480 | $47.50 | $45.24 | $65.00 |
| 267 | Galvanized steel reinforcement, as per plan (509E26001) | LB | 502,155 | $2.65 | $2.58 | $2.00 |
| 268 | Class QC SCC concrete with QC/QA, bridge deck (parapet), as per plan (511E34463) | CY | 313 | $1,600.00 | $3,297.74 | $1,700.00 |
| 269 | Class QC1 concrete with QC/QA, footing, as per plan (511E46513) | CY | 307 | $850.00 | $795.58 | $650.00 |
| 270 | Class QC2 concrete with QC/QA, sidewalk, as per plan (511E51513) | CY | 510 | $390.00 | $670.46 | $575.00 |
| 271 | Class QC2 concrete, misc.: planter walls, with QC/ (511E53012) | CY | 98 | $3,800.00 | $3,845.13 | $3,000.00 |
| 272 | Class QC2 concrete, misc.: raised median, with QC/ (511E53012) | CY | 83 | $475.00 | $926.37 | $825.00 |
| 273 | Class QC3 concrete, misc.: abutment not including (511E53014) | CY | 155 | $1,450.00 | $1,351.56 | $1,175.00 |
| 274 | Class QC3 concrete, misc.: bridge deck, with QC/QA (511E53014) | CY | 1,079 | $1,100.00 | $1,853.35 | $1,100.00 |
| 275 | Class QC3 concrete, misc.: pier above footings, WI (511E53014) | CY | 237 | $1,700.00 | $1,792.20 | $1,650.00 |
| 276 | Concrete, misc.: precast concrete plinths (511E81300) | EACH | 48 | $1,500.00 | $4,616.16 | $3,850.00 |
| 277 | Sealing of concrete surfaces, as per plan (512E10001) | SY | 3,868 | $20.00 | $19.95 | $17.25 |
| 278 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 2,827 | $20.00 | $14.78 | $13.82 |
| 279 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 3,868 | $33.00 | $32.89 | $30.76 |
| 280 | Type 2 waterproofing (512E33000) | SY | 61 | $25.00 | $110.00 | $110.00 |
| 281 | Special - waterproofing for planters areas (512E67200) | SY | 844 | $215.00 | $123.01 | $293.00 |
| 282 | Structural steel members, level 3, as per plan (513E10261) | LB | 128,300 | $2.75 | $3.20 | $3.50 |
| 283 | Structural steel members, level 4, as per plan (513E10281) | LB | 1,275,300 | $2.45 | $3.18 | $2.80 |
| 284 | Welded stud shear connectors (513E20000) | EACH | 9,784 | $4.60 | $5.17 | $5.00 |
| 285 | Field painting structural steel, intermediate coat (514E00060) | SF | 15,361 | $20.00 | $12.51 | $13.25 |
| 286 | Field painting structural steel, finish coat (514E00066) | SF | 15,361 | $6.88 | $11.47 | $11.00 |
| 287 | Armorless preformed joint seal (516E10010) | FT | 182 | $105.00 | $66.95 | $40.00 |
| 288 | Armorless preformed joint seal, as per plan (516E10011) | FT | 11 | $105.00 | $67.98 | $100.00 |
| 289 | Structural expansion joint including elastomeric strip seal, as per plan (516E11211) | FT | 258 | $900.00 | $1,402.76 | $1,300.00 |
| 290 | 1/4" preformed expansion joint filler (516E13000) | SF | 81 | $12.50 | $4.01 | $5.75 |
| 291 | 1/2" preformed expansion joint filler (516E13200) | SF | 64 | $15.00 | $2.74 | $6.75 |
| 292 | 2" preformed expansion joint filler (516E13900) | SF | 356 | $18.00 | $8.71 | $12.00 |
| 293 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44101) | EACH | 9 | $1,750.00 | $1,410.98 | $1,150.00 |
| 294 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44101) | EACH | 9 | $2,400.00 | $2,007.58 | $1,700.00 |
| 295 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44201) | EACH | 5 | $4,900.00 | $4,770.20 | $3,755.00 |
| 296 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44201) | EACH | 4 | $5,700.00 | $5,717.08 | $4,625.00 |
| 297 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44301) | EACH | 5 | $2,200.00 | $2,099.55 | $1,655.00 |
| 298 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44301) | EACH | 5 | $2,200.00 | $2,069.08 | $1,630.00 |
| 299 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44301) | EACH | 4 | $2,300.00 | $2,312.96 | $1,805.00 |
| 300 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44301) | EACH | 4 | $3,200.00 | $3,329.09 | $2,650.00 |
| 301 | Railing, misc.: sidewalk railing at rear abutment (517E76300) | FT | 29 | $485.00 | $750.00 | $465.00 |
| 302 | Prefabricated geocomposite drain (518E20000) | SY | 276 | $30.00 | $23.98 | $72.50 |
| 303 | Porous backfill with geotextile fabric, as per plan (518E21201) | CY | 65 | $225.00 | $177.01 | $180.00 |
| 304 | 4" perforated corrugated plastic pipe (518E39800) | FT | 767 | $25.00 | $10.64 | $7.25 |
| 305 | Structure drainage, misc.: neoprene trough and dra (518E62100) | FT | 89 | $525.00 | $782.13 | $215.00 |
| 306 | Dynamic load testing (523E20000) | EACH | 4 | $7,500.00 | $6,666.54 | $7,250.00 |
| 307 | Restrike (523E20500) | EACH | 4 | $5,000.00 | $941.63 | $5,000.00 |
| 308 | Reinforced concrete approach slabs with QC/QA (T=1 (526E30011) | SY | 602 | $500.00 | $530.20 | $265.00 |
| 309 | Type C installation (526E90030) | FT | 180 | $410.00 | $462.76 | $395.00 |
| 310 | Special - structures: temporary supports for girde (530E00200) | LS | 1 | $135,000 | $57,052 | $75,000 |
| 311 | Special - structural survey and monitoring of vibration (530E14000) | LS | 1 | $60,000 | $10,000 | $50,000 |
| 312 | Concrete slope protection, as per plan (601E21001) | SY | 69 | $125.00 | $156.91 | $118.50 |
| 313 | 6" unclassified pipe underdrains, as per plan (605E13301) | FT | 316 | $75.00 | $22.76 | $37.25 |
| 314 | Underdrains, misc.: cleanout (605E98300) | EACH | 20 | $625.00 | $1,220.06 | $425.00 |
| 315 | Underdrains, misc.: drainage outlet at abutment (605E98300) | EACH | 4 | $2,000.00 | $1,224.91 | $2,600.00 |
| 316 | Underdrains, misc.: drainage outlet at pier 1 (605E98300) | EACH | 2 | $9,250.00 | $3,737.23 | $1,875.00 |
| 318 | Concrete steps, type A, as per plan (608E40001) | FT | 384 | $185.00 | $167.04 | $86.00 |
| 319 | Topsoil, as per plan (659E00301) | CY | 284 | $75.00 | $204.98 | $73.00 |
| 320 | Mulch (661E00500) | CY | 21 | $215.00 | $282.00 | $200.00 |
| 321 | Special - bridge pilaster letters (690E98000) | EACH | 2 | $3,000.00 | $9,008.86 | $2,800.00 |
| 322 | Special - planter pots (690E98000) | EACH | 48 | $4,500.00 | $23,896 | $9,500.00 |
| 323 | Mechanically stabilized earth wall (840E20000) | SF | 6,010 | $58.00 | $67.79 | $50.75 |
| 324 | Wall excavation (840E21000) | CY | 3,033 | $95.00 | $43.89 | $51.75 |
| 325 | Foundation preparation (840E22000) | SY | 717 | $40.00 | $80.64 | $31.00 |
| 326 | Select granular backfill (840E23000) | CY | 3,283 | $65.00 | $66.79 | $101.25 |
| 327 | 6" drainage pipe, perforated (840E25010) | FT | 665 | $15.00 | $7.43 | $31.00 |
| 328 | 6" drainage pipe, non-perforated (840E25020) | FT | 60 | $30.00 | $11.43 | $61.75 |
| 329 | Concrete coping (840E26000) | FT | 420 | $275.00 | $305.28 | $405.00 |
| 330 | Aesthetic surface treatment (840E26050) | SF | 2,812 | $3.00 | $0.01 | $2.25 |
| 331 | On-site assistance (840E27000) | DAY | 5 | $1,500.00 | $1,368.41 | $3,500.00 |
| 332 | SGB inspection and compaction testing (840E28000) | LS | 1 | $30,000 | $23,000 | $25,000 |
| 333 | Structure removed, over 20 foot span, as per plan (202E11003) | LS | 1 | $35,000 | $27,444 | $45,000 |
| 334 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $35,000 | $256.11 | $25,000 |
| 335 | Unclassified excavation (503E21100) | CY | 3 | $400.00 | $1,178.59 | $325.00 |
| 336 | Pile driving equipment mobilization (505E11100) | LS | 1 | $30,000 | $21,385 | $21,250 |
| 337 | 12" cast-in-place reinforced concrete piles, driven, as per plan (507E00501) | FT | 420 | $42.00 | $68.35 | $56.50 |
| 338 | 12" cast-in-place reinforced concrete piles, furnished (507E00550) | FT | 450 | $35.00 | $38.19 | $25.00 |
| 339 | Galvanized steel reinforcement (509E26000) | LB | 7,791 | $2.20 | $2.10 | $2.00 |
| 340 | Class QC2 concrete, superstructure, as per plan (511E31611) | CY | 16 | $3,100.00 | $4,112.74 | $2,800.00 |
| 341 | Class QC1 concrete, abutment including footing (511E43510) | CY | 41 | $1,400.00 | $1,327.33 | $1,150.00 |
| 342 | Sealing of concrete surfaces, as per plan (512E10001) | SY | 477 | $20.00 | $19.94 | $23.59 |
| 343 | Prestressed concrete composite box beam bridge members, level 1, CB21-36 (515E12040) | EACH | 3 | $35,000 | $41,733 | $34,050 |
| 344 | 1/2" preformed expansion joint filler (516E13200) | SF | 33 | $15.00 | $3.30 | $1.50 |
| 345 | 1" preformed expansion joint filler (516E13600) | SF | 32 | $16.00 | $5.62 | $3.25 |
| 346 | 2" preformed expansion joint filler (516E13900) | SF | 23 | $17.00 | $7.66 | $7.00 |
| 347 | Semi-integral abutment expansion joint seal (516E14020) | FT | 28 | $48.00 | $55.97 | $59.25 |
| 348 | 2" deep joint sealer (516E31010) | FT | 26 | $38.00 | $9.17 | $29.50 |
| 349 | Elastomeric bearing with internal laminates only (neoprene) (516E43100) | EACH | 12 | $675.00 | $351.86 | $350.00 |
| 350 | Porous backfill with geotextile fabric (518E21200) | CY | 4 | $235.00 | $109.63 | $150.00 |
| 351 | 6" perforated corrugated plastic pipe (518E40000) | FT | 23 | $12.00 | $4.74 | $12.25 |
| 352 | 6" non-perforated corrugated plastic pipe, including specials, as per plan (518E40011) | FT | 130 | $25.00 | $16.02 | $20.50 |
| 353 | Concrete slope protection (601E21000) | SY | 6 | $500.00 | $271.37 | $400.00 |
| 354 | Special - vandal protection fence (607E40000) | FT | 131 | $415.82 | $397.00 | $342.00 |
| 355 | Vandal protection fence, 8' straight, coated fabric, as per plan (607E39911) | FT | 131 | $544.43 | $525.00 | $287.00 |
| 356 | 6" concrete walk (608E13000) | SF | 1,354 | $19.00 | $12.31 | $18.25 |
| 357 | Structure grounding system (625E33000) | EACH | 1 | $11,050 | $11,050 | $11,050 |
| 358 | Mechanically stabilized earth wall (840E20000) | SF | 3,461 | $58.00 | $68.78 | $48.75 |
| 359 | Wall excavation (840E21000) | CY | 688 | $73.00 | $44.31 | $31.75 |
| 360 | Foundation preparation, as per plan (840E22001) | SY | 220 | $60.00 | $201.09 | $33.00 |
| 361 | Select granular backfill (840E23000) | CY | 752 | $88.00 | $69.48 | $99.00 |
| 362 | Select granular backfill, as per plan (840E23001) | CY | 122 | $116.00 | $97.71 | $100.00 |
| 363 | 6" drainage pipe, perforated (840E25010) | FT | 297 | $15.00 | $6.36 | $6.50 |
| 364 | 6" drainage pipe, non-perforated (840E25020) | FT | 29 | $40.00 | $64.45 | $20.00 |
| 365 | Concrete coping (840E26000) | FT | 288 | $300.00 | $340.04 | $410.00 |
| 366 | Department'S share of the dispute resolution board (100E51100) | EACH | 115,000 | $1.00 | $1.00 | $1.00 |
| 367 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $350,000 | $218,603 | $195,000 |
| 368 | CPM progress schedule (108E10000) | LS | 1 | $10,000 | $83,350 | $125,000 |
| 369 | Maintaining traffic (614E11000) | LS | 1 | $2,018,000 | $1,548,977 | $6,178,636 |
| 370 | Special - field office, type C (690E99800) | DLR | 250,000 | $1.00 | $1.00 | $1.00 |
| 371 | Construction layout stakes and surveying (623E10000) | LS | 1 | $425,000 | $250,000 | $500,000 |
| 372 | Mobilization (624E10000) | LS | 1 | $2,325,000 | $1,218,491 | $1,200,000 |
| 400 | Concrete median removed (202E30600) | SY | 45 | $25.00 | $125.25 | $45.50 |
| 401 | Portable barrier, anchored, as per plan (622E41111) | FT | 640 | $62.00 | $120.32 | $80.21 |
| 402 | 12" conduit, type B, as per plan (611E04401) | FT | 931 | $200.00 | $140.38 | $141.00 |
| 404 | 15" conduit, type B, as per plan (611E05901) | FT | 263 | $235.00 | $185.11 | $151.00 |
| 405 | 18" conduit, type B, as per plan (611E07401) | FT | 254 | $275.00 | $248.71 | $228.50 |
| 406 | 18" conduit, type C, as per plan (611E07601) | FT | 24 | $275.00 | $241.23 | $656.25 |
| 408 | 12" conduit, type B (611E04400) | FT | 103 | $425.00 | $352.03 | $311.25 |
| 409 | Special - maintain existing lighting (625E40000) | LS | 1 | $47,600 | $82,000 | $82,000 |
| 410 | Special - replacement of existing lighting unit (625E40010) | EACH | 2 | $1,500.00 | $1,500.00 | $1,500.00 |
| 411 | Class QC2 concrete, bridge deck (parapet) (511E34448) | CY | 10 | $3,850.00 | $2,740.16 | $2,055.00 |
| 412 | Type 2 waterproofing (512E33000) | SY | 6 | $25.00 | $110.00 | $110.00 |
| 413 | Concrete reinforcement, misc.:: additional galvani (509E40000) | LB | 4,000 | $3.25 | $2.05 | $2.00 |
| 414 | Special - structures: screen walls (530E01300) | FT | 728 | $1,598.00 | $1,595.00 | $2,375.00 |
| 415 | Special - bridge pilaster story panels (690E98000) | EACH | 2 | $7,250.00 | $3,000.00 | $8,300.00 |
| 416 | Railing, misc.: pedestrian ADA compliant rating (517E76300) | FT | 166 | $267.00 | $265.00 | $245.00 |
| 417 | Walkway, misc.: 10" concrete walk (608E98000) | SF | 470 | $53.00 | $20.00 | $37.00 |
| 418 | Aesthetic surface treatment (840E26050) | SF | 3,461 | $3.00 | $0.01 | $2.25 |
| 419 | On-site assistance (840E27000) | DAY | 5 | $1,500.00 | $1,368.41 | $3,500.00 |
| 420 | SGB inspection and compaction testing (840E28000) | LS | 1 | $10,000 | $5,720.28 | $5,000.00 |
| 421 | 12" conduit, type C, as per plan (611E04601) | FT | 92 | $160.00 | $130.25 | $134.50 |
| 422 | Special -: drainage system cleaning, 36" and under (690E98600) | HR | 200 | $535.00 | $180.00 | $195.25 |
| 423 | Special -: drainage system cleaning, over 36" (690E98600) | HR | 100 | $550.00 | $250.00 | $271.25 |
| 424 | Trench drain, type A with standard grate (839E29000) | FT | 268 | $260.00 | $200.10 | $264.25 |
| 425 | Pull box removed (625E31510) | EACH | 2 | $300.00 | $300.00 | $300.00 |
| 426 | Light tower removed (625E75350) | EACH | 1 | $6,000.00 | $6,000.00 | $6,000.00 |
| 427 | Light pole removed (625E75400) | EACH | 6 | $400.00 | $400.00 | $400.00 |
| 428 | Portion of light pole foundation removed (625E75502) | EACH | 6 | $200.00 | $200.00 | $200.00 |
| 429 | Luminaire removed (625E75506) | EACH | 10 | $50.00 | $50.00 | $50.00 |
| 430 | Power service removed (625E75510) | EACH | 2 | $600.00 | $600.00 | $600.00 |
| 431 | Light tower foundation removed (625E75540) | EACH | 1 | $400.00 | $400.00 | $400.00 |
| 432 | Distribution cable removed (625E75550) | FT | 2,008 | $1.00 | $1.00 | $1.00 |
| 433 | Precast reinforced concrete outlet (611E99710) | EACH | 1 | $400.00 | $287.59 | $2,500.00 |
| 434 | Steel sheet piling left in place, as per plan (504E11101) | SF | 535 | $40.00 | $191.20 | $81.75 |
| 435 | Work zone lane line, class I, 6", 807 paint (614E20056) | MI | 2 | $975.00 | $975.00 | $975.00 |
| 436 | Portable barrier, unanchored, as per plan (622E41101) | FT | 250 | $75.00 | $112.99 | $74.49 |
| 438 | Dynamic load testing (523E20000) | EACH | 1 | $6,000.00 | $6,666.52 | $7,250.00 |
| 439 | Conduit, 2", 725.04 (625E25400) | FT | 233 | $30.00 | $30.00 | $30.00 |
| 440 | Pull box, 725.08, 18" (625E30700) | EACH | 2 | $1,000.00 | $1,000.00 | $1,000.00 |
| 441 | Power service, as per plan (625E34001) | EACH | 1 | $6,500.00 | $6,500.00 | $6,500.00 |
| 442 | Special - structures' screen walls job standard MO (530E00400) | EACH | 2 | $10,000 | $7,500.00 | $10,120 |
| 443 | Removal misc.:' street car rails and ties removed (202E98200) | FT | 150 | $50.43 | $480.55 | $165.00 |
| 444 | Manhole adjusted to grade (611E99654) | EACH | 1 | $3,000.00 | $652.33 | $1,575.00 |
| 445 | Special - complete irrigation system (680E43100) | EACH | 1 | $200,000 | $146,452 | $330,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of October 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way