TDOT contract CNZ029 bid tabulation
The construction of a concrete bulb-tee beam bridge on wattendorf memorial highway/aedc road over i-24 (l.m. 7.67), including grading, drainage, retaining walls, and paving. Let by Tennessee DOT on February 7, 2025, Coffee County. 4 bids received; low bid $18,286,764 by Jones Bros. Contractors, LLC.
- Owner
- Tennessee DOT
- Letting
- 07 FEB 2025
- Pay items
- 141
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Jones Bros. Contractors, LLC | $18,286,764 | Low |
| 2 | Dement Construction Group, LLC | $18,716,771 | +2.0% |
| 3 | Bell & Associates Construction, LLC | $19,195,652 | +5.0% |
| 4 | Wright Brothers Civil Construction, LLC | $20,672,625 | +13% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Jones Bros. Contractors, LLC | 2. Dement Construction Group, LLC | 3. Bell & Associates Construction, LLC | 4. Wright Brothers Civil Construction, LLC |
|---|---|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $100,000 | $200,000 | $97,500 | $100,000 |
| 2 | CPM project schedule (108-03) | LS | 1 | $53,031 | $150,000 | $45,980 | $52,000 |
| 3 | Clearing and grubbing (201-01) | LS | 1 | $50,000 | $1,000,000 | $140,200 | $130,000 |
| 4 | Removal of structures and obstructions (202-01) | LS | 1 | $5,000.00 | $10,000 | $6,600.00 | $8,700.00 |
| 5 | Removal of rigid pavement (202-03.02) | CY | 3,235 | $60.00 | $15.00 | $54.00 | $27.00 |
| 6 | Road & drainage excavation (unclassified) (203-01) | CY | 28,560 | $58.00 | $20.00 | $33.00 | $27.00 |
| 7 | Borrow excavation (graded solid rock) (203-02.01) | TON | 8,500 | $36.00 | $35.00 | $32.75 | $38.70 |
| 8 | Borrow excavation (unclassified) (203-03) | CY | 21,319 | $61.00 | $20.00 | $33.50 | $36.00 |
| 9 | Placing and spreading topsoil (203-04) | CY | 6,984 | $33.00 | $20.00 | $23.00 | $15.00 |
| 10 | Undercutting (203-05) | CY | 6,200 | $36.00 | $30.00 | $33.00 | $19.60 |
| 11 | Water (203-06) | MG | 2,510 | $1.00 | $15.00 | $14.00 | $1.00 |
| 12 | Temporary silt fence (with backing) (209-08.02) | LF | 13,818 | $4.90 | $7.50 | $5.45 | $5.90 |
| 13 | Enhanced rock check dam (209-08.08) | EACH | 30 | $2,000.00 | $1,000.00 | $618.00 | $670.00 |
| 14 | Catch basin protection (type A) (209-40.30) | EACH | 1 | $900.00 | $1,500.00 | $210.00 | $308.00 |
| 15 | Catch basin filter assembly(type 5) (209-40.45) | EACH | 1 | $2,800.00 | $4,000.00 | $860.00 | $1,000.00 |
| 16 | Mineral aggregate, type A base, grading D (303-01) | TON | 16,708 | $34.70 | $25.65 | $36.00 | $37.70 |
| 17 | Mineral aggregate (size 57) (303-10.01) | TON | 737 | $51.00 | $32.25 | $109.00 | $59.00 |
| 18 | Mineral aggregate (size ) (303-10.04) | TON | 875 | $51.00 | $75.00 | $115.00 | $56.25 |
| 19 | Mineral aggregate (size 4) (303-10.07) | TON | 1,000 | $40.00 | $32.25 | $39.00 | $50.25 |
| 20 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 285 | $135.00 | $135.00 | $150.00 | $151.00 |
| 21 | Asp. conc. mix(PG70-22) (BPMB-HM) GR. A-S (307-01.21) | TON | 701 | $118.00 | $118.00 | $131.00 | $132.00 |
| 22 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading A (307-02.01) | TON | 895 | $118.00 | $118.00 | $131.00 | $132.00 |
| 23 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08) | TON | 587 | $135.00 | $135.00 | $150.00 | $151.00 |
| 24 | Treated permeable base (313-03) | SY | 6,550 | $27.50 | $24.75 | $27.00 | $27.70 |
| 25 | Bituminous material for prime coat (PC) (402-01) | TON | 27 | $1,050.00 | $1,050.00 | $1,170.00 | $1,200.00 |
| 26 | Aggregate for cover material (PC) (402-02) | TON | 89 | $112.80 | $112.80 | $125.00 | $126.00 |
| 27 | Bituminous material for tack coat (TC) (403-01) | TON | 7.60 | $905.00 | $905.00 | $1,009.00 | $1,000.00 |
| 28 | Saw cutting asphalt pavement (407-20.05) | LF | 5,903 | $8.00 | $10.00 | $3.20 | $5.60 |
| 29 | Acs mix (PG64-22) grading E shoulder (411-01.07) | TON | 447 | $145.00 | $145.00 | $161.00 | $162.00 |
| 30 | Acs mix(PG70-22) grading D (411-02.10) | TON | 1,238 | $156.00 | $156.00 | $173.00 | $175.00 |
| 31 | Cold planing bituminous pavement (415-01.01) | TON | 81 | $235.85 | $235.85 | $291.00 | $264.00 |
| 32 | Portland cement concrete pavement (plain) 10" (501-01.03) | SY | 6,033 | $163.00 | $151.00 | $160.00 | $168.00 |
| 33 | Concrete shoulder rumble strips (501-03.10) | LF | 4,722 | $10.00 | $0.15 | $0.15 | $0.15 |
| 34 | Sawing concrete pavement (full depth) (502-04.01) | LF | 1,000 | $8.00 | $15.00 | $3.20 | $8.95 |
| 35 | Class A concrete (roadway) (604-01.01) | CY | 17 | $1,000.00 | $816.88 | $1,860.00 | $1,400.00 |
| 36 | Class A concrete (concrete footing) (604-03.07) | CY | 17 | $1,000.00 | $2,500.00 | $1,780.00 | $1,400.00 |
| 37 | Retaining wall (retaining wall no. 1) (604-07.01) | SF | 9,095 | $125.00 | $100.00 | $211.00 | $290.00 |
| 38 | Retaining wall (retaining wall no. 2) (604-07.02) | SF | 8,622 | $125.00 | $100.00 | $161.00 | $173.50 |
| 39 | Retaining wall (retaining wall no. 3) (604-07.03) | SF | 1,391 | $125.00 | $100.00 | $199.00 | $254.00 |
| 40 | Retaining wall (retaining wall no. 4) (604-07.04) | SF | 7,623 | $125.00 | $100.00 | $192.00 | $225.00 |
| 41 | Catch basins, type 43, > 4' - 8' depth (611-43.02) | EACH | 1 | $5,000.00 | $20,000 | $20,000 | $18,300 |
| 42 | Conc parapet single slope (STD-1-1SS) (620-05.01) | LF | 2,503 | $115.00 | $150.00 | $102.00 | $425.00 |
| 43 | Temporary shoring (621-05.02) | LS | 1 | $30,000 | $100,000 | $91,000 | $1.00 |
| 44 | Concrete curb (702-01) | CY | 7 | $2,000.00 | $2,500.00 | $830.00 | $900.00 |
| 45 | Guardrail transition 27IN to 31IN (705-02.10) | EACH | 1 | $750.00 | $184.00 | $195.00 | $210.00 |
| 46 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 1,063 | $28.00 | $29.22 | $31.00 | $33.29 |
| 47 | GR terminaltrailing end (type 13) MASH TL-3 (705-06.10) | EACH | 4 | $1,100.00 | $1,519.00 | $1,600.00 | $1,700.00 |
| 48 | GR terminal (in-inline) MASH TL-3 (705-06.11) | EACH | 5 | $1,400.00 | $1,041.00 | $1,100.00 | $1,175.00 |
| 49 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 7 | $3,600.00 | $3,240.00 | $3,400.00 | $3,675.00 |
| 50 | Thrie beam bridge transition MASH TL-3 (705-06.25) | EACH | 14 | $3,400.00 | $2,045.00 | $2,150.00 | $2,300.00 |
| 51 | Thrie beam bridge transition MASH TL-2 (705-06.26) | EACH | 1 | $2,000.00 | $1,070.00 | $1,130.00 | $1,200.00 |
| 52 | Guardrail removed (706-01) | LF | 3,603 | $3.00 | $2.00 | $2.00 | $2.25 |
| 53 | Radius rail (706-06.03) | LF | 353 | $35.00 | $35.40 | $37.00 | $40.00 |
| 54 | Chain-link fence (4-foot) (707-01.01) | LF | 2,702 | $10.00 | $10.00 | $10.50 | $11.50 |
| 55 | End & corner post assembly(chain-link fence 4') (707-01.02) | EACH | 204 | $250.00 | $250.00 | $260.00 | $285.00 |
| 56 | Removal of fence (C.A. fence) (707-06.01) | LF | 2,218 | $5.00 | $5.00 | $4.00 | $5.75 |
| 57 | High-visibility construction fence (707-08.11) | LF | 885 | $3.30 | $3.50 | $2.00 | $2.25 |
| 58 | Markers (concrete R.O.W. posts) (708-02.01) | EACH | 17 | $300.00 | $384.50 | $310.00 | $345.00 |
| 59 | Machined rip-rap (class A-3) (709-05.05) | TON | 662 | $52.00 | $32.72 | $125.00 | $50.00 |
| 60 | Aggregate underdrains (with pipe) (710-02) | LF | 6,500 | $10.00 | $18.00 | $12.50 | $13.15 |
| 61 | Lateral underdrain (710-05) | LF | 650 | $10.00 | $15.00 | $11.50 | $12.30 |
| 62 | Lateral underdrain endwall (4:1) (710-06.13) | EACH | 33 | $1,300.00 | $1,750.00 | $1,200.00 | $1,300.00 |
| 63 | 51IN single slope concrete barrier wall (711-05.71) | LF | 165 | $240.00 | $300.00 | $189.00 | $235.00 |
| 64 | Traffic control (712-01) | LS | 1 | $170,000 | $750,000 | $202,000 | $215,000 |
| 65 | Interconnected portable barrier rail (712-02.02) | LF | 10,500 | $51.00 | $50.00 | $40.00 | $66.50 |
| 66 | Portable barrier rail, reduced deflection (MASH TL-3) (712-02.12) | LF | 380 | $57.00 | $200.00 | $60.00 | $143.00 |
| 67 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 12 | $13,000 | $6,500.00 | $8,780.00 | $14,250 |
| 68 | Flexible drums (channelizing) (712-04.01) | EACH | 382 | $65.00 | $65.00 | $32.00 | $35.40 |
| 69 | Barrier rail delineator (712-04.50) | EACH | 513 | $15.25 | $15.25 | $9.00 | $11.40 |
| 70 | Warning lights (type A) (712-05.01) | EACH | 324 | $29.00 | $29.00 | $31.00 | $34.30 |
| 71 | Signs (construction) (712-06) | SF | 1,411 | $8.45 | $8.45 | $8.00 | $8.50 |
| 72 | Temporary barricades (type III) (712-07.03) | LF | 168 | $15.00 | $15.00 | $31.00 | $34.30 |
| 73 | Arrow board (type C) (712-08.03) | EACH | 2 | $2,400.00 | $2,400.00 | $1,250.00 | $1,400.00 |
| 74 | Queue protection truck (712-08.11) | HR | 1,200 | $110.00 | $110.00 | $134.00 | $150.00 |
| 75 | Removable pavement marking (8" barrier line) (712-09.02) | LF | 12,600 | $3.10 | $4.65 | $4.00 | $5.20 |
| 76 | Class A concrete (foundation for sign supports) (713-01.01) | CY | 1.30 | $700.00 | $509.00 | $525.00 | $580.00 |
| 77 | Steel bar reinforcement(foundation for sign supports) (713-01.02) | LB | 392 | $3.85 | $3.04 | $3.20 | $3.45 |
| 78 | Steel I-beams & WF-beams(breakaway) sign support (713-06) | LB | 2,565 | $7.45 | $5.13 | $5.30 | $5.84 |
| 79 | Perforated/knockout square tube post (713-11.02) | LB | 1,374 | $5.60 | $3.31 | $3.70 | $3.75 |
| 80 | P post slip base (713-11.21) | EACH | 4 | $620.00 | $648.00 | $670.00 | $740.00 |
| 81 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 134 | $18.55 | $12.23 | $13.00 | $13.95 |
| 82 | Flat sheet aluminum signs (0.100" thick) (713-13.03) | SF | 298 | $19.68 | $13.05 | $13.75 | $14.85 |
| 83 | Extruded aluminum panel signs (713-14) | SF | 153 | $31.00 | $24.97 | $26.00 | $28.50 |
| 84 | Removal of signs, posts and footings (713-15) | LS | 1 | $2,000.00 | $3,063.00 | $3,200.00 | $3,475.00 |
| 85 | Removal & relocation of sign & support (713-15.02) | EACH | 5 | $500.00 | $546.00 | $570.00 | $620.00 |
| 86 | Changeable message sign unit (713-16.01) | EACH | 12 | $11,500 | $11,500 | $9,300.00 | $10,250 |
| 87 | Barrier mounted sign support (see plans) (713-30.09) | EACH | 11 | $1,200.00 | $399.00 | $415.00 | $455.00 |
| 88 | Raised PVMT markers (BI-directional) (1 color lens) (716-01.11) | EACH | 132 | $10.00 | $15.00 | $16.00 | $16.79 |
| 89 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 78 | $34.00 | $60.00 | $62.00 | $67.25 |
| 90 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 56 | $33.00 | $60.00 | $62.00 | $67.25 |
| 91 | Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23) | EACH | 26 | $35.00 | $60.00 | $62.00 | $67.25 |
| 92 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 65 | $35.00 | $30.00 | $32.00 | $33.50 |
| 93 | Plastic pavement marking (stop line) (716-02.05) | LF | 24 | $18.00 | $15.00 | $15.80 | $16.79 |
| 94 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 13 | $165.00 | $300.00 | $310.00 | $336.00 |
| 95 | Plastic pavement marking (24" barrier line) (716-02.07) | LF | 3,900 | $18.00 | $10.00 | $10.50 | $11.19 |
| 96 | Plastic pavement marking (8" dotted line) (716-02.08) | LF | 475 | $2.00 | $4.00 | $4.25 | $4.50 |
| 97 | Plastic word pavement marking (only) (716-03.01) | EACH | 5 | $400.00 | $150.00 | $157.00 | $168.00 |
| 98 | Plastic pavement marking (straight-turn arrow) (716-04.01) | EACH | 7 | $300.00 | $400.00 | $421.00 | $448.00 |
| 99 | Plastic pavement marking (transverse shoulder) (716-04.04) | LF | 250 | $10.00 | $8.00 | $8.50 | $8.95 |
| 100 | Plastic pavement marking (wrong way arrow) (716-04.06) | EACH | 2 | $75.00 | $350.00 | $363.00 | $392.00 |
| 101 | Plastic pavement marking (yield line) (716-04.12) | SF | 24 | $45.00 | $18.00 | $18.75 | $20.20 |
| 102 | Plastic pavement marking (lane reduction arrow) (716-04.14) | EACH | 1 | $600.00 | $450.00 | $468.00 | $500.00 |
| 103 | Painted pavement marking (4" line) (716-05.01) | LM | 2.30 | $1,000.00 | $1,750.00 | $1,830.00 | $2,000.00 |
| 104 | Painted pavement marking (channelization striping) (716-05.04) | SY | 2,013 | $35.00 | $12.00 | $12.70 | $13.45 |
| 105 | Painted pavement marking (stop line) (716-05.05) | LF | 38 | $10.00 | $7.00 | $7.40 | $7.85 |
| 106 | Painted pavement marking (6" line) (716-05.20) | LM | 5.20 | $1,100.00 | $2,250.00 | $2,375.00 | $2,500.00 |
| 107 | Removal of pavement marking (line) (716-08.01) | LF | 10,000 | $1.00 | $1.00 | $1.00 | $1.10 |
| 108 | Contrast pavement marking 6" (716-09.86) | LM | 1.40 | $18,000 | $40,000 | $41,750 | $44,800 |
| 109 | Contrast pavement marking 8" (716-09.88) | LM | 0.10 | $26,600 | $60,000 | $63,000 | $67,200 |
| 110 | Contrast pavement marking 6" dotted (716-09.90) | LF | 74 | $9.15 | $8.00 | $8.50 | $8.95 |
| 111 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 2.70 | $6,500.00 | $10,500 | $11,100 | $11,800 |
| 112 | Enhanced flatline thermo PVMT MRKNG (8IN barrier line) (716-12.03) | LF | 4,895 | $2.00 | $4.00 | $4.30 | $4.50 |
| 113 | Spray thermo PVMT MRKNG (60 mil) (6IN line) (716-13.02) | LM | 1.64 | $3,200.00 | $8,000.00 | $8,400.00 | $9,000.00 |
| 114 | Mobilization (717-01) | LS | 1 | $1,140,000 | $1,665,000 | $1,326,990 | $1,320,000 |
| 115 | Geogrid reinforcement type 2 (740-07.04) | SY | 2,300 | $6.00 | $6.00 | $6.50 | $4.80 |
| 116 | Geotextile (type III)(erosion control) (740-10.03) | SY | 628 | $5.00 | $5.00 | $4.75 | $3.65 |
| 117 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 13,750 | $4.00 | $4.35 | $3.80 | $3.85 |
| 118 | Temporary sediment tube 12IN (740-11.02) | LF | 27,981 | $3.25 | $3.25 | $2.90 | $3.10 |
| 119 | Temporary seeding (with mulch) (801-01.07) | UNIT | 915 | $55.00 | $35.00 | $36.75 | $61.50 |
| 120 | Water (seeding & sodding) (801-03) | MG | 1,108 | $50.00 | $50.00 | $10.60 | $56.00 |
| 121 | Seed (supplemental application) (801-07) | LB | 658 | $2.50 | $9.00 | $3.70 | $2.80 |
| 122 | Sodding (new sod) (803-01) | SY | 29,475 | $5.00 | $6.30 | $6.30 | $5.60 |
| 123 | Removal of structures (existing BR. no. 16-00918-7.67) (202-04.01) | LS | 1 | $270,000 | $245,745 | $266,000 | $200,000 |
| 124 | Dry excavation (bridges) (204-02.01) | CY | 663 | $45.00 | $40.00 | $35.00 | $73.50 |
| 125 | Granular backfill (bridges) (303-01.02) | TON | 72 | $60.00 | $45.00 | $174.00 | $41.30 |
| 126 | Epoxy coated reinforcing steel (604-02.03) | LB | 159,934 | $1.80 | $1.80 | $1.75 | $1.40 |
| 127 | Class A concrete (bridges) (604-03.01) | CY | 562 | $1,200.00 | $2,000.00 | $1,427.00 | $1,400.00 |
| 128 | Steel bar reinforcement (bridges) (604-03.02) | LB | 114,804 | $1.30 | $1.60 | $1.35 | $1.15 |
| 129 | Pavement @ bridge ends (604-03.04) | SY | 278 | $425.00 | $650.00 | $546.00 | $400.00 |
| 130 | Class D concrete (bridge deck) (604-03.09) | CY | 618 | $1,200.00 | $2,250.00 | $1,290.00 | $1,400.00 |
| 131 | Applied texture finish (new structures) (604-04.01) | SY | 3,519 | $16.00 | $8.25 | $8.75 | $10.50 |
| 132 | Three star state emblem (604-04.41) | EACH | 10 | $2,000.00 | $1,500.00 | $4,010.00 | $3,600.00 |
| 133 | Bridge deck grooving (mechanical) (604-05.31) | SY | 2,340 | $3.42 | $3.42 | $5.40 | $11.90 |
| 134 | Steel piles (12 inch) (606-03.03) | LF | 5,380 | $75.00 | $60.00 | $91.00 | $71.75 |
| 135 | Pile tips (steel piles, 12 inch) (606-03.06) | EACH | 132 | $100.00 | $500.00 | $226.00 | $139.00 |
| 136 | Prestressed concrete bulb tee beam (6" web)(BT-63) (615-01.11) | LF | 2,181 | $600.00 | $550.00 | $614.00 | $443.00 |
| 137 | Bridge deck crack sealing (617-02) | LF | 422 | $5.00 | $10.00 | $4.00 | $15.55 |
| 138 | Sealant (HMWM) (617-05) | GAL | 3 | $300.00 | $350.00 | $502.00 | $550.00 |
| 139 | Conc parapet single slope (STD-1-1SS) (620-05.01) | LF | 815 | $100.00 | $200.00 | $116.00 | $125.00 |
| 140 | 6" perforated pipe with vertical drain system (710-09.01) | LF | 186 | $80.00 | $50.00 | $93.00 | $50.00 |
| 141 | 6" pipe underdrain (710-09.02) | LF | 48 | $20.00 | $15.00 | $38.00 | $28.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of February 7, 2025. Compiled by Mirage Metrics.