TDOT contract CNZ029 bid tabulation

The construction of a concrete bulb-tee beam bridge on wattendorf memorial highway/aedc road over i-24 (l.m. 7.67), including grading, drainage, retaining walls, and paving. Let by Tennessee DOT on February 7, 2025, Coffee County. 4 bids received; low bid $18,286,764 by Jones Bros. Contractors, LLC.

Owner
Tennessee DOT
Letting
07 FEB 2025
Pay items
141
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Jones Bros. Contractors, LLC$18,286,764Low
2Dement Construction Group, LLC$18,716,771+2.0%
3Bell & Associates Construction, LLC$19,195,652+5.0%
4Wright Brothers Civil Construction, LLC$20,672,625+13%
TDOT contract CNZ029: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Jones Bros. Contractors, LLC2. Dement Construction Group, LLC3. Bell & Associates Construction, LLC4. Wright Brothers Civil Construction, LLC
1Construction stakes, lines and grades (105-01)LS1$100,000$200,000$97,500$100,000
2CPM project schedule (108-03)LS1$53,031$150,000$45,980$52,000
3Clearing and grubbing (201-01)LS1$50,000$1,000,000$140,200$130,000
4Removal of structures and obstructions (202-01)LS1$5,000.00$10,000$6,600.00$8,700.00
5Removal of rigid pavement (202-03.02)CY3,235$60.00$15.00$54.00$27.00
6Road & drainage excavation (unclassified) (203-01)CY28,560$58.00$20.00$33.00$27.00
7Borrow excavation (graded solid rock) (203-02.01)TON8,500$36.00$35.00$32.75$38.70
8Borrow excavation (unclassified) (203-03)CY21,319$61.00$20.00$33.50$36.00
9Placing and spreading topsoil (203-04)CY6,984$33.00$20.00$23.00$15.00
10Undercutting (203-05)CY6,200$36.00$30.00$33.00$19.60
11Water (203-06)MG2,510$1.00$15.00$14.00$1.00
12Temporary silt fence (with backing) (209-08.02)LF13,818$4.90$7.50$5.45$5.90
13Enhanced rock check dam (209-08.08)EACH30$2,000.00$1,000.00$618.00$670.00
14Catch basin protection (type A) (209-40.30)EACH1$900.00$1,500.00$210.00$308.00
15Catch basin filter assembly(type 5) (209-40.45)EACH1$2,800.00$4,000.00$860.00$1,000.00
16Mineral aggregate, type A base, grading D (303-01)TON16,708$34.70$25.65$36.00$37.70
17Mineral aggregate (size 57) (303-10.01)TON737$51.00$32.25$109.00$59.00
18Mineral aggregate (size ) (303-10.04)TON875$51.00$75.00$115.00$56.25
19Mineral aggregate (size 4) (303-10.07)TON1,000$40.00$32.25$39.00$50.25
20Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08)TON285$135.00$135.00$150.00$151.00
21Asp. conc. mix(PG70-22) (BPMB-HM) GR. A-S (307-01.21)TON701$118.00$118.00$131.00$132.00
22Asphalt concrete mix (PG70-22) (BPMB-HM) grading A (307-02.01)TON895$118.00$118.00$131.00$132.00
23Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08)TON587$135.00$135.00$150.00$151.00
24Treated permeable base (313-03)SY6,550$27.50$24.75$27.00$27.70
25Bituminous material for prime coat (PC) (402-01)TON27$1,050.00$1,050.00$1,170.00$1,200.00
26Aggregate for cover material (PC) (402-02)TON89$112.80$112.80$125.00$126.00
27Bituminous material for tack coat (TC) (403-01)TON7.60$905.00$905.00$1,009.00$1,000.00
28Saw cutting asphalt pavement (407-20.05)LF5,903$8.00$10.00$3.20$5.60
29Acs mix (PG64-22) grading E shoulder (411-01.07)TON447$145.00$145.00$161.00$162.00
30Acs mix(PG70-22) grading D (411-02.10)TON1,238$156.00$156.00$173.00$175.00
31Cold planing bituminous pavement (415-01.01)TON81$235.85$235.85$291.00$264.00
32Portland cement concrete pavement (plain) 10" (501-01.03)SY6,033$163.00$151.00$160.00$168.00
33Concrete shoulder rumble strips (501-03.10)LF4,722$10.00$0.15$0.15$0.15
34Sawing concrete pavement (full depth) (502-04.01)LF1,000$8.00$15.00$3.20$8.95
35Class A concrete (roadway) (604-01.01)CY17$1,000.00$816.88$1,860.00$1,400.00
36Class A concrete (concrete footing) (604-03.07)CY17$1,000.00$2,500.00$1,780.00$1,400.00
37Retaining wall (retaining wall no. 1) (604-07.01)SF9,095$125.00$100.00$211.00$290.00
38Retaining wall (retaining wall no. 2) (604-07.02)SF8,622$125.00$100.00$161.00$173.50
39Retaining wall (retaining wall no. 3) (604-07.03)SF1,391$125.00$100.00$199.00$254.00
40Retaining wall (retaining wall no. 4) (604-07.04)SF7,623$125.00$100.00$192.00$225.00
41Catch basins, type 43, > 4' - 8' depth (611-43.02)EACH1$5,000.00$20,000$20,000$18,300
42Conc parapet single slope (STD-1-1SS) (620-05.01)LF2,503$115.00$150.00$102.00$425.00
43Temporary shoring (621-05.02)LS1$30,000$100,000$91,000$1.00
44Concrete curb (702-01)CY7$2,000.00$2,500.00$830.00$900.00
45Guardrail transition 27IN to 31IN (705-02.10)EACH1$750.00$184.00$195.00$210.00
46W beam GR (type 2) MASH TL-3 (705-06.01)LF1,063$28.00$29.22$31.00$33.29
47GR terminaltrailing end (type 13) MASH TL-3 (705-06.10)EACH4$1,100.00$1,519.00$1,600.00$1,700.00
48GR terminal (in-inline) MASH TL-3 (705-06.11)EACH5$1,400.00$1,041.00$1,100.00$1,175.00
49Tangent energy absorbing term MASH TL-3 (705-06.20)EACH7$3,600.00$3,240.00$3,400.00$3,675.00
50Thrie beam bridge transition MASH TL-3 (705-06.25)EACH14$3,400.00$2,045.00$2,150.00$2,300.00
51Thrie beam bridge transition MASH TL-2 (705-06.26)EACH1$2,000.00$1,070.00$1,130.00$1,200.00
52Guardrail removed (706-01)LF3,603$3.00$2.00$2.00$2.25
53Radius rail (706-06.03)LF353$35.00$35.40$37.00$40.00
54Chain-link fence (4-foot) (707-01.01)LF2,702$10.00$10.00$10.50$11.50
55End & corner post assembly(chain-link fence 4') (707-01.02)EACH204$250.00$250.00$260.00$285.00
56Removal of fence (C.A. fence) (707-06.01)LF2,218$5.00$5.00$4.00$5.75
57High-visibility construction fence (707-08.11)LF885$3.30$3.50$2.00$2.25
58Markers (concrete R.O.W. posts) (708-02.01)EACH17$300.00$384.50$310.00$345.00
59Machined rip-rap (class A-3) (709-05.05)TON662$52.00$32.72$125.00$50.00
60Aggregate underdrains (with pipe) (710-02)LF6,500$10.00$18.00$12.50$13.15
61Lateral underdrain (710-05)LF650$10.00$15.00$11.50$12.30
62Lateral underdrain endwall (4:1) (710-06.13)EACH33$1,300.00$1,750.00$1,200.00$1,300.00
6351IN single slope concrete barrier wall (711-05.71)LF165$240.00$300.00$189.00$235.00
64Traffic control (712-01)LS1$170,000$750,000$202,000$215,000
65Interconnected portable barrier rail (712-02.02)LF10,500$51.00$50.00$40.00$66.50
66Portable barrier rail, reduced deflection (MASH TL-3) (712-02.12)LF380$57.00$200.00$60.00$143.00
67Temporary work zone crash cushion (MASH TL-3) (712-02.60)EACH12$13,000$6,500.00$8,780.00$14,250
68Flexible drums (channelizing) (712-04.01)EACH382$65.00$65.00$32.00$35.40
69Barrier rail delineator (712-04.50)EACH513$15.25$15.25$9.00$11.40
70Warning lights (type A) (712-05.01)EACH324$29.00$29.00$31.00$34.30
71Signs (construction) (712-06)SF1,411$8.45$8.45$8.00$8.50
72Temporary barricades (type III) (712-07.03)LF168$15.00$15.00$31.00$34.30
73Arrow board (type C) (712-08.03)EACH2$2,400.00$2,400.00$1,250.00$1,400.00
74Queue protection truck (712-08.11)HR1,200$110.00$110.00$134.00$150.00
75Removable pavement marking (8" barrier line) (712-09.02)LF12,600$3.10$4.65$4.00$5.20
76Class A concrete (foundation for sign supports) (713-01.01)CY1.30$700.00$509.00$525.00$580.00
77Steel bar reinforcement(foundation for sign supports) (713-01.02)LB392$3.85$3.04$3.20$3.45
78Steel I-beams & WF-beams(breakaway) sign support (713-06)LB2,565$7.45$5.13$5.30$5.84
79Perforated/knockout square tube post (713-11.02)LB1,374$5.60$3.31$3.70$3.75
80P post slip base (713-11.21)EACH4$620.00$648.00$670.00$740.00
81Flat sheet aluminum signs (0.080" thick) (713-13.02)SF134$18.55$12.23$13.00$13.95
82Flat sheet aluminum signs (0.100" thick) (713-13.03)SF298$19.68$13.05$13.75$14.85
83Extruded aluminum panel signs (713-14)SF153$31.00$24.97$26.00$28.50
84Removal of signs, posts and footings (713-15)LS1$2,000.00$3,063.00$3,200.00$3,475.00
85Removal & relocation of sign & support (713-15.02)EACH5$500.00$546.00$570.00$620.00
86Changeable message sign unit (713-16.01)EACH12$11,500$11,500$9,300.00$10,250
87Barrier mounted sign support (see plans) (713-30.09)EACH11$1,200.00$399.00$415.00$455.00
88Raised PVMT markers (BI-directional) (1 color lens) (716-01.11)EACH132$10.00$15.00$16.00$16.79
89Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH78$34.00$60.00$62.00$67.25
90Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22)EACH56$33.00$60.00$62.00$67.25
91Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23)EACH26$35.00$60.00$62.00$67.25
92Plastic pavement marking(channelization striping) (716-02.04)SY65$35.00$30.00$32.00$33.50
93Plastic pavement marking (stop line) (716-02.05)LF24$18.00$15.00$15.80$16.79
94Plastic pavement marking (turn lane arrow) (716-02.06)EACH13$165.00$300.00$310.00$336.00
95Plastic pavement marking (24" barrier line) (716-02.07)LF3,900$18.00$10.00$10.50$11.19
96Plastic pavement marking (8" dotted line) (716-02.08)LF475$2.00$4.00$4.25$4.50
97Plastic word pavement marking (only) (716-03.01)EACH5$400.00$150.00$157.00$168.00
98Plastic pavement marking (straight-turn arrow) (716-04.01)EACH7$300.00$400.00$421.00$448.00
99Plastic pavement marking (transverse shoulder) (716-04.04)LF250$10.00$8.00$8.50$8.95
100Plastic pavement marking (wrong way arrow) (716-04.06)EACH2$75.00$350.00$363.00$392.00
101Plastic pavement marking (yield line) (716-04.12)SF24$45.00$18.00$18.75$20.20
102Plastic pavement marking (lane reduction arrow) (716-04.14)EACH1$600.00$450.00$468.00$500.00
103Painted pavement marking (4" line) (716-05.01)LM2.30$1,000.00$1,750.00$1,830.00$2,000.00
104Painted pavement marking (channelization striping) (716-05.04)SY2,013$35.00$12.00$12.70$13.45
105Painted pavement marking (stop line) (716-05.05)LF38$10.00$7.00$7.40$7.85
106Painted pavement marking (6" line) (716-05.20)LM5.20$1,100.00$2,250.00$2,375.00$2,500.00
107Removal of pavement marking (line) (716-08.01)LF10,000$1.00$1.00$1.00$1.10
108Contrast pavement marking 6" (716-09.86)LM1.40$18,000$40,000$41,750$44,800
109Contrast pavement marking 8" (716-09.88)LM0.10$26,600$60,000$63,000$67,200
110Contrast pavement marking 6" dotted (716-09.90)LF74$9.15$8.00$8.50$8.95
111Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM2.70$6,500.00$10,500$11,100$11,800
112Enhanced flatline thermo PVMT MRKNG (8IN barrier line) (716-12.03)LF4,895$2.00$4.00$4.30$4.50
113Spray thermo PVMT MRKNG (60 mil) (6IN line) (716-13.02)LM1.64$3,200.00$8,000.00$8,400.00$9,000.00
114Mobilization (717-01)LS1$1,140,000$1,665,000$1,326,990$1,320,000
115Geogrid reinforcement type 2 (740-07.04)SY2,300$6.00$6.00$6.50$4.80
116Geotextile (type III)(erosion control) (740-10.03)SY628$5.00$5.00$4.75$3.65
117Geotextile (type IV)(stabilization) (740-10.04)SY13,750$4.00$4.35$3.80$3.85
118Temporary sediment tube 12IN (740-11.02)LF27,981$3.25$3.25$2.90$3.10
119Temporary seeding (with mulch) (801-01.07)UNIT915$55.00$35.00$36.75$61.50
120Water (seeding & sodding) (801-03)MG1,108$50.00$50.00$10.60$56.00
121Seed (supplemental application) (801-07)LB658$2.50$9.00$3.70$2.80
122Sodding (new sod) (803-01)SY29,475$5.00$6.30$6.30$5.60
123Removal of structures (existing BR. no. 16-00918-7.67) (202-04.01)LS1$270,000$245,745$266,000$200,000
124Dry excavation (bridges) (204-02.01)CY663$45.00$40.00$35.00$73.50
125Granular backfill (bridges) (303-01.02)TON72$60.00$45.00$174.00$41.30
126Epoxy coated reinforcing steel (604-02.03)LB159,934$1.80$1.80$1.75$1.40
127Class A concrete (bridges) (604-03.01)CY562$1,200.00$2,000.00$1,427.00$1,400.00
128Steel bar reinforcement (bridges) (604-03.02)LB114,804$1.30$1.60$1.35$1.15
129Pavement @ bridge ends (604-03.04)SY278$425.00$650.00$546.00$400.00
130Class D concrete (bridge deck) (604-03.09)CY618$1,200.00$2,250.00$1,290.00$1,400.00
131Applied texture finish (new structures) (604-04.01)SY3,519$16.00$8.25$8.75$10.50
132Three star state emblem (604-04.41)EACH10$2,000.00$1,500.00$4,010.00$3,600.00
133Bridge deck grooving (mechanical) (604-05.31)SY2,340$3.42$3.42$5.40$11.90
134Steel piles (12 inch) (606-03.03)LF5,380$75.00$60.00$91.00$71.75
135Pile tips (steel piles, 12 inch) (606-03.06)EACH132$100.00$500.00$226.00$139.00
136Prestressed concrete bulb tee beam (6" web)(BT-63) (615-01.11)LF2,181$600.00$550.00$614.00$443.00
137Bridge deck crack sealing (617-02)LF422$5.00$10.00$4.00$15.55
138Sealant (HMWM) (617-05)GAL3$300.00$350.00$502.00$550.00
139Conc parapet single slope (STD-1-1SS) (620-05.01)LF815$100.00$200.00$116.00$125.00
1406" perforated pipe with vertical drain system (710-09.01)LF186$80.00$50.00$93.00$50.00
1416" pipe underdrain (710-09.02)LF48$20.00$15.00$38.00$28.00
TDOT contract CNZ029: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of February 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy