TDOT contract CNZ267 bid tabulation

The construction of a concrete box beam bridge on s.r. 320 (east brainerd road) over the csx railroad (l.m. 0.86) in chattanooga, including grading, drainage, retaining wall, and paving. Let by Tennessee DOT on October 3, 2025, Hamilton County. 2 bids received; low bid $10,219,956 by Dement Construction Group, LLC.

Owner
Tennessee DOT
Letting
03 OCT 2025
Pay items
219
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Dement Construction Group, LLC$10,219,956Low
2Wright Brothers Civil Construction, LLC$11,514,449+13%
TDOT contract CNZ267: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Dement Construction Group, LLC2. Wright Brothers Civil Construction, LLC
1Construction stakes, lines and grades (105-01)LS1$100,000$61,000
2CPM project schedule (108-03)LS1$50,000$10,000
3Trainee (109-10.01)HR1,100$0.80$0.80
4Clearing and grubbing (201-01)LS1$468,000$445,000
5Removal of structures and obstructions (202-01.50)EACH1$1,500.00$770.00
6Removal of pipe (18" RCP, sta. 50+49 benham drive) (202-02.01)LF105$25.00$25.00
7Removal of rigid pavement, sidewalk, etc. (202-03)SY465$15.00$8.45
8Removal of asphalt pavement (202-03.01)SY1,610$15.00$7.25
9Removal of curb (concrete curb) (202-08.10)LF1,695$10.00$12.50
10Road & drainage excavation (unclassified) (203-01)CY5,017$40.00$34.00
11Borrow excavation (graded solid rock) (203-02.01)TON350$100.00$67.25
12Borrow excavation (unclassified) (203-03)CY4,820$50.00$38.00
13Placing and spreading topsoil (203-04)CY483$25.00$12.10
14Water (203-06)MG16$25.00$25.80
15Furnishing & spreading topsoil (203-07)CY1,002$56.00$11.65
16Waste material (203-10.15)CY207$200.00$143.00
17Construction of haul road (203-50)LS1$80,000$365,500
1810" temporary slope drain (209-02.04)LF71$14.00$33.00
19Sediment removal (209-05)CY116$30.00$34.00
20Temporary silt fence (with backing) (209-08.02)LF3,532$5.00$5.65
21Rock check dam (209-08.07)EACH3$800.00$900.00
22Enhanced rock check dam (209-08.08)EACH5$1,000.00$1,100.00
23Curb inlet protection (type 4) (209-09.43)EACH17$375.50$424.00
24Catch basin protection (type D) (209-40.33)EACH13$425.50$480.00
25Mineral aggregate, type A base, grading D (303-01)TON2,692$31.30$59.00
26Mineral aggregate (size 57) (303-10.04)TON346$70.00$112.00
27Mineral aggregate (size 4) (303-10.07)TON70$100.00$66.00
28Asp. conc. mix(PG70-22) (BPMB-HM) GR. A-S (307-01.21)TON453$210.00$148.00
29Asphalt concrete mix (PG70-22) (BPMB-HM) grading A (307-02.01)TON490$202.50$148.00
30Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08)TON446$215.50$200.00
31Bituminous material for prime coat (PC) (402-01)TON4$2,200.00$1,175.00
32Aggregate for cover material (PC) (402-02)TON15$500.00$300.00
33Bituminous material for tack coat (TC) (403-01)TON5$850.00$830.00
34Saw cutting asphalt pavement (407-20.05)LF766$25.00$11.00
35Acs mix(PG70-22) grading D (411-02.10)TON239$296.00$216.00
36Cold planing bituminous pavement (415-01.02)SY731$42.25$29.00
37Concrete pavement removal (502-03.13)SY152$25.00$16.65
38Sawing concrete pavement (full depth) (502-04.01)LF147$30.00$16.70
39Retaining wall (wall C) (604-07.01)SF3,355$175.00$233.00
4018" concrete pipe culvert (class III) (607-03.02)LF1,155$120.00$113.00
41Class A concrete (pipe endwalls) (611-07.01)CY1$2,500.00$4,200.00
42Steel bar reinforcement (pipe endwalls) (611-07.02)LB45$15.00$13.00
43Adjustment of existing catchbasin (611-09.01)EACH1$1,000.00$2,600.00
44Catch basins, type 12, 0' - 4' depth (611-12.01)EACH4$5,000.00$7,300.00
45Catch basins, type 12, > 4' - 8' depth (611-12.02)EACH4$6,000.00$8,300.00
46Catch basins, type 12, > 12' - 16' depth (611-12.04)EACH2$9,000.00$8,900.00
47Catch basins, type 14, > 4' - 8' depth (611-14.02)EACH2$6,000.00$10,500
48Concrete sidewalk (4 ") (701-01.01)SF9,316$7.85$8.75
49Concrete driveway (701-02)SF1,391$12.00$13.40
50Concrete curb ramp (701-02.03)SF207$28.00$31.40
51Concrete curb (702-01)CY2$760.00$850.00
52Concrete combined curb & gutter (702-03)CY112$520.00$580.00
53GR terminaltrailing end (type 13) MASH TL-3 (705-06.10)EACH2$1,350.00$1,500.00
54Tangent energy absorbing term MASH TL-3 (705-06.20)EACH1$3,350.00$3,800.00
55Thrie beam bridge transition MASH TL-3 (705-06.25)EACH4$3,850.00$4,300.00
56Thrie beam 38IN vehicle & pedestrian safety rail MASH TL-3 (705-06.27)LF890$44.50$50.25
57GR terminal (energy absorbing) MASH TL-2 (705-06.30)EACH1$3,050.00$3,400.00
58Guardrail removed (706-01)LF1,293$1.50$1.70
59Chain-link fence (6 foot) (vinyl coated) (707-02.11)LF190$23.00$26.40
60End & corner post assemblies (6' vinyl coated) (707-02.12)EACH5$400.00$459.00
61Removal of fence (various) (707-06.01)LF795$6.00$7.00
62Markers (concrete R.O.W. posts) (708-02.01)EACH11$600.00$344.00
63Machined rip-rap (class A-3) (709-05.05)TON100$100.00$72.75
64Machined rip-rap (class A-1) (709-05.06)TON18$100.00$81.00
65Aggregate underdrains (with pipe) (710-02)LF1,755$20.00$16.00
66Traffic control (712-01)LS1$251,850$100,000
67Interconnected portable barrier rail (712-02.02)LF2,240$30.00$33.50
68Bridge mounted interconnected portable barrier rail (712-02.47)LF440$60.00$50.00
69Temporary work zone crash cushion (MASH TL-3) (712-02.60)EACH10$7,950.00$8,975.00
70Flexible drums (channelizing) (712-04.01)EACH50$31.00$50.75
71Barrier rail delineator (712-04.50)EACH268$10.00$16.35
72Warning lights (type A) (712-05.01)EACH76$20.00$42.00
73Signs (construction) (712-06)SF911$7.50$9.25
74Temporary barricades (type II) (712-07.02)LF12$15.50$22.60
75Temporary barricades (type III) (712-07.03)LF144$28.00$20.30
76Removable pavement marking (8" barrier line) (712-09.02)LF424$3.65$4.10
77Removable pavement marking (6" line) (712-09.08)LF1,029$3.15$3.55
78Class A concrete (foundation for sign supports) (713-01.01)CY2$605.70$730.00
79Steel bar reinforcement(foundation for sign supports) (713-01.02)LB271$8.06$3.90
80Sign post delineation enhancement (713-02.21)LF12$10.45$6.50
81Steel I-beams & WF-beams(breakaway) sign support (713-06)LB493$10.03$8.50
82"U" section steel posts (713-11.01)LB38$8.10$7.00
83Perforated/knockout square tube post (713-11.02)LB85$8.64$7.00
84Flat sheet aluminum signs (0.100" thick) (713-13.03)SF32$21.48$18.65
85Extruded aluminum panel signs (713-14)SF40$37.89$31.60
86Removal of signs, posts and footings (713-15)LS1$679.95$560.00
87Changeable message sign unit (713-16.01)EACH3$8,700.00$11,300
88Remove and replace sign (existing street name signs) (713-16.50)EACH2$315.45$282.00
89Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH21$100.00$113.00
90Removal of snowplowable reflective marker (716-01.30)EACH15$30.00$33.90
91Plastic pavement marking(channelization striping) (716-02.04)SY5$30.00$33.90
92Plastic pavement marking (stop line) (716-02.05)LF23$15.00$17.00
93Plastic pavement marking (longitudinal cross-walk) (716-02.09)LF76$25.00$28.20
94Painted pavement marking (8" barrier line) (716-05.02)LF2,305$0.50$0.55
95Painted pavement marking (6" line) (716-05.20)LM1.71$1,750.00$2,000.00
96Hydroblast removal of pavement marking (line) (716-08.30)LM1.13$4,750.00$5,400.00
97Contrast pavement marking 6" (716-09.83)LF847$14.00$15.80
98Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM0.81$10,000$11,300
99Mobilization (717-01)LS1$950,000$1,150,000
100Geogrid reinforcement type 2 (740-07.04)SY524$20.00$8.15
101Geotextile (type III)(erosion control) (740-10.03)SY223$6.00$3.90
102Geotextile (type IV)(stabilization) (740-10.04)SY762$5.00$4.30
103Temporary sediment tube 12IN (740-11.02)LF1,616$4.85$5.45
104Seeding (with mulch) (801-01)UNIT7$75.00$84.75
105Temporary seeding (with mulch) (801-01.07)UNIT160$35.50$40.10
106Seeding (without mulch) (801-02)UNIT45$31.52$35.60
107Water (seeding & sodding) (801-03)MG9$250.00$282.00
108Sodding (new sod) (803-01)SY4,325$6.25$7.00
109Turf reinforcement mat (class I) (805-01.01)SY392$5.00$5.60
110Erosion control blanket (type II) (805-12.02)SY3,581$1.25$1.40
111Removal of structures (BR. no. 33-SR320-0.86) (202-04.01)LS1$125,000$345,000
112Dry excavation (bridges) (204-02.01)CY2,024$25.00$62.75
113Granular backfill (bridges) (303-01.02)TON1,985$55.00$107.00
114Epoxy coated reinforcing steel (604-02.03)LB92,655$1.60$1.85
115Class A concrete (bridges) (604-03.01)CY897$900.00$1,035.00
116Steel bar reinforcement (bridges) (604-03.02)LB165,612$1.50$1.45
117Pavement @ bridge ends (604-03.04)SY262$650.00$403.00
118Class D concrete (bridge deck) (604-03.09)CY247$1,250.00$2,200.00
119Applied texture finish (new structures) (604-04.01)SY1,413$12.99$27.20
120Three star state emblem (604-04.41)EACH4$1,350.00$3,600.00
121Bridge deck grooving (mechanical) (604-05.31)SY825$7.74$8.75
122Steel piles (12 inch) (606-03.03)LF3,249$95.00$90.50
123Pile tips (steel piles, 12 inch) (606-03.06)EACH191$315.00$164.00
124Deck drains (grate type 2) (610-10.45)EACH4$2,000.00$4,150.00
125Prestressed concrete box beam (24" X 36") (615-02.19)LF1,412$450.00$485.00
126Bridge deck crack sealing (617-02)LF211$5.00$10.00
127Sealant (HMWM) (617-05)GAL3$300.00$262.00
128Concrete parapet with structural tubing (620-05)LF677$300.00$384.00
129Temporary shoring (621-05.01)SF1,200$125.00$88.50
130Chain-link fence (bridges) (707-07.01)SF1,168$28.00$32.00
131Reinforced concrete slope pavement (709-04)CY31$1,500.00$1,700.00
1326" perforated pipe with vertical drain system (710-09.01)LF135$50.00$53.75
1336" pipe underdrain (710-09.02)LF50$20.00$28.10
134Concrete sidewalk (4 ") (701-01.01)SF75$10.00$21.50
135Concrete combined curb & gutter (702-03)CY1$1,000.00$1,800.00
136Pole 40FT class 4 wood (790-03.03)EACH1$1,231.25$1,400.00
137Pole 45FT class 4 wood (790-04.04)EACH1$1,342.50$1,515.00
138Pole 50FT class 2 wood (790-05.02)EACH3$1,825.00$2,050.00
139Pole 50FT class H2 metal (790-05.08)EACH1$6,653.75$7,500.00
140Pole 55FT class 1 wood (790-06.01)EACH1$2,060.00$2,300.00
141Pole 60FT class 1 wood (790-07.01)EACH3$2,400.00$2,700.00
142Pole 65FT class H4 metal (790-08.06)EACH1$10,749$12,100
143Pole 85FT class H4 metal (790-12.07)EACH2$17,875$20,200
1441PH deadend 15KV (790-21.08)EACH1$410.21$463.00
1451PH primary tap 15KV (790-21.09)EACH1$514.43$580.00
1462PH crossarm const deadend (SGL) 15KV (790-23.07)EACH2$1,276.58$1,400.00
1473PH crossarm DBL LRG cond 15KV (790-25.07)EACH2$1,672.66$1,900.00
1483PH crossarm SGL LRG cond 15KV (790-25.08)EACH2$994.78$1,100.00
1493PH crossarm dde LRG cond 15KV (790-25.24)EACH1$2,122.95$2,400.00
1503PH crossarm dde 10FT arms LRG cond 15KV (790-25.27)EACH2$2,535.58$2,900.00
1513PH crossarm DBL 10FT LRG cond 15KV (790-25.30)EACH1$1,745.94$2,000.00
152Secondary conductor 6 AL duplex (790-30.06)LF481$1.96$2.20
153Service assembly-pole type (790-31.02)EACH9$134.30$152.00
154Service conductor 1/0 AL qplex (790-31.20)LF62$7.71$8.70
155Down guy - through bolt type heavy duty (790-32.02)EACH3$629.06$710.00
156Down guy - insulated (790-32.06)EACH3$615.20$690.00
157OH guy - through bolt type (790-32.07)EACH4$1,241.88$1,400.00
158Guy guard (790-32.23)EACH6$14.75$16.60
159Screw type anchor 23,000LB (F1-5D-P) (790-33.31)EACH6$649.19$730.00
160Transfer light (790-36.06)EACH1$356.25$400.00
161Transfer existing 3PH transformer/recloser (790-36.12)EACH1$5,400.38$6,100.00
162Transfer conductor (790-36.14)EACH9$117.50$133.00
163OH cond 1/0 6/1 acsr raven (790-40.03)LF796$3.51$4.00
164OH cond 4/0 7 aac oxlip (790-40.39)LF4,468$4.33$5.00
1651PH primary riser W/ 3IN conduit (790-43.53)EACH1$2,281.66$2,600.00
1661PH transformer conv W/xarm MTD fuse & LA (790-46.03)EACH1$1,001.50$1,100.00
1671PH fuse cutout xarm mount 15KV (790-60.01)EACH5$490.15$550.00
168Sec MTG 3PH 120/208 V (4 wire GRD wye) (790-64.12)EACH1$1,596.38$1,800.00
169Lightning arrester arm MTD 9 KV (790-65.03)EACH3$331.40$374.00
170Pole ground rod type (790-68.01)EACH4$267.96$302.00
171Pole ground plate type (790-68.02)EACH5$250.83$283.00
172Ground-ground rod for ST pole (790-69.11)EACH4$209.91$237.00
173Arm pin (790-69.32)EACH18$66.50$75.00
174Extension link - epoxy -8FT (790-69.41)EACH4$145.56$164.00
175DBL arm line post ins no ohgw 46KV max (790-71.04)EACH2$2,442.75$2,800.00
176Fiber tangent assembly (790-74.31)EACH5$183.46$207.00
177Fiber deadend assembly (790-74.32)EACH1$796.61$900.00
178Fiber double deadend assembly (790-74.33)EACH2$1,406.06$1,575.00
179Remove wire (790-98.01)LF6,326$2.25$2.55
180Remove poles (790-98.02)EACH9$550.00$620.00
181Remove framing/associated apparatus (790-98.03)EACH60$400.00$452.00
182Tree and brush removal off row (790-98.20)LS1$15,000$27,800
1832IN mdpe gas main (791-02.02)LF195$123.00$139.00
1846IN mdpe gas main (791-02.05)LF1,080$210.00$237.00
185HDD 6IN PE pipe - unconsolidated (791-04.05)LF400$1,050.00$1,175.00
186Bore/jack ___in - steel casing pipe - uncon. (791-05.14)LF300$2,300.00$2,595.00
187Connect to __in EX. PE main (791-06.09)EACH1$6,000.00$6,800.00
188Connect to 6IN EX. STL main (791-06.12)EACH2$51,000$57,600
1896IN PE gas valve assembly (791-07.03)EACH2$2,150.00$2,400.00
190Pole 35FT class 2 wood (793-01.05)EACH1$3,510.00$780.00
191Pole 40FT class 4 wood (793-01.12)EACH2$4,030.00$780.00
192Anchor 1IN (793-01.41)EACH9$807.00$510.00
193Handhole 30INX48IN (793-11.20)EACH1$6,240.00$2,050.00
194Dig splice pit (15 LF) (793-12.21)EACH2$910.00$660.00
1952 duct formation @ 36IN depth (793-13.17)LF150$73.50$60.00
196Concrete encasement per duct (793-14.02)LF300$16.50$13.00
1974IN core drill into manhole (793-14.10)EACH2$472.00$339.00
1981 1/4IN innerduct (793-14.12)LF450$4.30$1.40
199MH(retire/remove/gravel backfill) (793-16.01)EACH3$1,485.00$1,675.00
200Restore asphalt (793-97.01)SY100$500.00$150.00
201Remove poles all sizes (793-98.04)EACH10$654.00$254.00
202Communication assembly (bond) (798-05.27)EACH4$5,285.00$5,950.00
203Communication assembly (CSC) (798-05.29)EACH5$5,600.00$6,300.00
204Communication assembly (dde) (798-05.32)EACH2$5,250.00$5,925.00
205Communication assembly (DE) (798-05.33)EACH6$4,844.00$5,450.00
206Communication assembly (E1-2) (798-05.34)EACH7$4,294.00$4,825.00
207Communication assembly (E2-2) (798-05.35)EACH3$6,605.00$7,450.00
208Communication assembly (F2&F3) (798-05.37)EACH1$8,807.00$9,925.00
209Communication assembly (loop) (798-05.52)EACH1$910.00$1,025.00
210Communication assembly (SVC) (798-05.54)EACH8$11,124$12,600
2115/16" HS steel strand (798-05.59)LF1,378$19.15$21.60
21218”/15 deg fiberglass standoff bracket (798-06.90)EACH1$1,904.00$2,125.00
213Riser (798-08.01)EACH2$2,996.00$3,400.00
214Transfer communication assy (SVC) (798-08.04)EACH1$7,416.00$8,375.00
215Transfer fiberoptic cable (798-08.06)EACH18$3,708.00$4,200.00
216Transfer SVC drop (798-08.07)EACH8$4,368.00$4,925.00
217Remove steel strand (798-09.01)LF1,402$4.40$5.00
218Remove poles, guys, anchors (798-09.03)EACH4$1,750.00$1,975.00
219Remove strand pole framing (798-09.08)EACH25$700.00$790.00
TDOT contract CNZ267: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of October 3, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy