Turn-Key Tunneling Inc: ODOT bid record
Turn-Key Tunneling Inc submitted 27 bids on Ohio DOT contracts in the data, from 26 MAR 2020 to 01 OCT 2026, and was the low bidder on 5 of them (19%). When it was not low, its total sat a median +57% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $3,160,309
- Latest bid
- 01 OCT 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 2 | 1 | 50% |
| 2021 | 8 | 1 | 13% |
| 2022 | 3 | 1 | 33% |
| 2023 | 5 | 1 | 20% |
| 2024 | 4 | 0 | 0% |
| 2025 | 2 | 0 | 0% |
| 2026 | 3 | 1 | 33% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| BEL | 3 | 0 | 0% |
| GAL | 2 | 0 | 0% |
| TUS | 2 | 1 | 50% |
| COL | 2 | 0 | 0% |
| CUY | 2 | 0 | 0% |
| SCI | 2 | 1 | 50% |
| WAS | 2 | 1 | 50% |
| HIG | 1 | 1 | 100% |
| District 9 | 1 | 0 | 0% |
| PAU | 1 | 0 | 0% |
| PIK | 1 | 0 | 0% |
| CHP | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 26 | 26 (100%) | $1.00 | $1.00 |
| Water | 659E35000 | MGAL | 25 | 15 (60%) | $1.00 | $1.00 |
| Repair seeding and mulching | 659E14000 | SY | 14 | 8 (57%) | $1.00 | $1.25 |
| Special - pipe cleanout over 48" | 202E70130 | FT | 12 | 6 (50%) | $18.25 | $50.00 |
| Excavation | 203E10000 | CY | 16 | 5 (31%) | $30.00 | $27.00 |
| Backfill for liner pipe | 837E21000 | FT | 14 | 5 (36%) | $347.50 | $305.00 |
| Lime | 659E31000 | ACRE | 22 | 4 (18%) | $907.00 | $150.00 |
| Asphalt concrete for maintaining traffic | 614E13000 | CY | 5 | 4 (80%) | $68.25 | $250.00 |
| Soil analysis test | 659E00100 | EACH | 9 | 3 (33%) | $52.50 | $115.50 |
| Water | 616E10000 | MGAL | 5 | 3 (60%) | $5.00 | $20.00 |
| Commercial fertilizer | 659E20000 | TON | 24 | 2 (8%) | $1,512.50 | $850.00 |
| Concrete masonry | 602E20000 | CY | 12 | 2 (17%) | $2,273.25 | $2,300.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Eclipse Co LLC | 11 | 6 of 11 |
| Axis Civil Construction LLC | 9 | 6 of 9 |
| Ohio-West Virginia Excavating Co | 8 | 6 of 8 |
| Stanley Miller Construction Company | 7 | 4 of 7 |
| Allard Excavation LLC | 6 | 3 of 6 |
| S E T Inc | 6 | 4 of 6 |
| BCC Ohio Inc | 5 | 5 of 5 |
| Sunesis Construction Co | 4 | 1 of 4 |
| Capitol Tunneling Inc | 3 | 2 of 3 |
| Geotech Services Inc | 3 | 2 of 3 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 01 OCT 2026 | 260419 | BEL | BEL-IR 70-19.19 (CULVERT REPLACEMENT) | 4 of 4 | $11,188,480 | +49% |
| 11 JUN 2026 | 260291 | SCI | SCI-SR 335-01.72 (CULVERT REPLACEMENT) | 1 of 2 | $1,341,422 | Low, 2.0% under the second |
| 21 MAY 2026 | 260263 | COS | COS-SR 16-01.40 (CULVERT REPLACEMENT) | 2 of 2 | $4,913,390 | +10% |
| 14 AUG 2025 | 250379 | HAS | HAS-SR 212-00.41 (CULVERT REPLACEMENT) | 3 of 3 | $1,687,556 | +15% |
| 17 JUL 2025 | 250339 | BEL | BEL-SR 149-02.11 (CULVERT REPLACEMENT) | 4 of 7 | $1,397,000 | +59% |
| 05 DEC 2024 | 240554 | HAM | HAM-Inverts FY2025 (CULVERT REPLACEMENT) | 3 of 3 | $3,636,324 | +79% |
| 05 DEC 2024 | 240564 | WAS | WAS-SR 145-02.09 (CULVERT REPLACEMENT) | 2 of 2 | $1,738,569 | +97% |
| 14 NOV 2024 | 240527 | HOC | HOC-US 33-10.12 (CULVERT REPLACEMENT) | 3 of 7 | $438,965 | +11% |
| 12 SEP 2024 | 240426 | CLE | CLE-SR 232-01.80 (CULVERT REPLACEMENT) | 5 of 5 | $585,196 | +72% |
| 26 OCT 2023 | 230526 | WAS | WAS-SR 339-07.32 (CULVERT REPLACEMENT) | 1 of 5 | $236,496 | Low, 16% under the second |
| 10 AUG 2023 | 230421 | TUS | TUS-IR 77-07.12 (CULVERT REPLACEMENT) | 2 of 3 | $1,897,421 | +27% |
| 13 JUL 2023 | 230384 | NOB | NOB-IR 77-11.97 (CULVERT REPLACEMENT) | 4 of 5 | $914,051 | +5.0% |
| 25 MAY 2023 | 230336 | CUY | CUY-IR 480-00.09 Replace (CULVERT REPLACEMENT) | 3 of 4 | $1,109,278 | +12% |
| 27 APR 2023 | 230268 | SCI | SCI-US 23-16.41 (CULVERT REPLACEMENT) | 2 of 2 | $733,871 | +11% |
| 17 NOV 2022 | 220599 | COL | COL-SR 14-05.71 (CULVERT REPLACEMENT) | 7 of 7 | $814,722 | +116% |
| 11 AUG 2022 | 220462 | ATH | ATH-SR 7-00.067 (CULVERT REPLACEMENT) | 1 of 4 | $346,013 | Low, 2.0% under the second |
| 27 JAN 2022 | 220052 | GAL | GAL-SR 7-02.45 (CULVERT REPLACEMENT) | 3 of 3 | $246,308 | +72% |
| 16 DEC 2021 | 210680 | CHP | CHP-ODNR Kiser Lake State Park (CULVERT REPLACEMENT) | 3 of 5 | $60,575 | +35% |
| 02 DEC 2021 | 210639 | PIK | PIK-US 23-15.35 Liner (CULVERT REPLACEMENT) | 5 of 8 | $187,575 | +65% |
| 30 SEP 2021 | 210489 | CUY | CUY-IR 90-18.22/VAR (CULVERT REPLACEMENT) | 5 of 5 | $9,755,000 | +128% |
| 15 JUL 2021 | 210418 | PAU | PAU-US 30-00.00 (CULVERT REPLACEMENT) | 3 of 3 | $250,321 | +123% |
| 15 JUL 2021 | 210424 | COL | COL-ODNR Highlandtown Culvert (CULVERT REPLACEMENT) | 4 of 4 | $295,503 | +57% |
| 27 MAY 2021 | 210352 | TUS | TUS-IR 77-11.52/12.84 (CULVERT REPLACEMENT) | 1 of 5 | $920,939 | Low, -16% under the second |
| 13 MAY 2021 | 210294 | BEL | BEL-US 40-11.62/11.81 (CULVERT REPLACEMENT) | 5 of 5 | $499,599 | +53% |
| 14 JAN 2021 | 210015 | District 9 | D09-CR-FY2021 (CULVERT REPLACEMENT) | 9 of 9 | $2,179,839 | +315% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.