Turn-Key Tunneling Inc: ODOT bid record

Turn-Key Tunneling Inc submitted 27 bids on Ohio DOT contracts in the data, from 26 MAR 2020 to 01 OCT 2026, and was the low bidder on 5 of them (19%). When it was not low, its total sat a median +57% above the low bid.

Owner
Ohio DOT
Low bid volume
$3,160,309
Latest bid
01 OCT 2026
Data through
12 NOV 2026
27Bids
5Low bids
19Win rate, percent
+57%Median gap to the low bid when not low, 21 bids

By year

YearBidsLow bidsWin rate
20202150%
20218113%
20223133%
20235120%
2024400%
2025200%
20263133%
Turn-Key Tunneling Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
BEL300%
GAL200%
TUS2150%
COL200%
CUY200%
SCI2150%
WAS2150%
HIG11100%
District 9100%
PAU100%
PIK100%
CHP100%
Turn-Key Tunneling Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH2626 (100%)$1.00$1.00
Water659E35000MGAL2515 (60%)$1.00$1.00
Repair seeding and mulching659E14000SY148 (57%)$1.00$1.25
Special - pipe cleanout over 48"202E70130FT126 (50%)$18.25$50.00
Excavation203E10000CY165 (31%)$30.00$27.00
Backfill for liner pipe837E21000FT145 (36%)$347.50$305.00
Lime659E31000ACRE224 (18%)$907.00$150.00
Asphalt concrete for maintaining traffic614E13000CY54 (80%)$68.25$250.00
Soil analysis test659E00100EACH93 (33%)$52.50$115.50
Water616E10000MGAL53 (60%)$5.00$20.00
Commercial fertilizer659E20000TON242 (8%)$1,512.50$850.00
Concrete masonry602E20000CY122 (17%)$2,273.25$2,300.00
Turn-Key Tunneling Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Eclipse Co LLC116 of 11
Axis Civil Construction LLC96 of 9
Ohio-West Virginia Excavating Co86 of 8
Stanley Miller Construction Company74 of 7
Allard Excavation LLC63 of 6
S E T Inc64 of 6
BCC Ohio Inc55 of 5
Sunesis Construction Co41 of 4
Capitol Tunneling Inc32 of 3
Geotech Services Inc32 of 3
Turn-Key Tunneling Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
01 OCT 2026260419BELBEL-IR 70-19.19 (CULVERT REPLACEMENT)4 of 4$11,188,480+49%
11 JUN 2026260291SCISCI-SR 335-01.72 (CULVERT REPLACEMENT)1 of 2$1,341,422Low, 2.0% under the second
21 MAY 2026260263COSCOS-SR 16-01.40 (CULVERT REPLACEMENT)2 of 2$4,913,390+10%
14 AUG 2025250379HASHAS-SR 212-00.41 (CULVERT REPLACEMENT)3 of 3$1,687,556+15%
17 JUL 2025250339BELBEL-SR 149-02.11 (CULVERT REPLACEMENT)4 of 7$1,397,000+59%
05 DEC 2024240554HAMHAM-Inverts FY2025 (CULVERT REPLACEMENT)3 of 3$3,636,324+79%
05 DEC 2024240564WASWAS-SR 145-02.09 (CULVERT REPLACEMENT)2 of 2$1,738,569+97%
14 NOV 2024240527HOCHOC-US 33-10.12 (CULVERT REPLACEMENT)3 of 7$438,965+11%
12 SEP 2024240426CLECLE-SR 232-01.80 (CULVERT REPLACEMENT)5 of 5$585,196+72%
26 OCT 2023230526WASWAS-SR 339-07.32 (CULVERT REPLACEMENT)1 of 5$236,496Low, 16% under the second
10 AUG 2023230421TUSTUS-IR 77-07.12 (CULVERT REPLACEMENT)2 of 3$1,897,421+27%
13 JUL 2023230384NOBNOB-IR 77-11.97 (CULVERT REPLACEMENT)4 of 5$914,051+5.0%
25 MAY 2023230336CUYCUY-IR 480-00.09 Replace (CULVERT REPLACEMENT)3 of 4$1,109,278+12%
27 APR 2023230268SCISCI-US 23-16.41 (CULVERT REPLACEMENT)2 of 2$733,871+11%
17 NOV 2022220599COLCOL-SR 14-05.71 (CULVERT REPLACEMENT)7 of 7$814,722+116%
11 AUG 2022220462ATHATH-SR 7-00.067 (CULVERT REPLACEMENT)1 of 4$346,013Low, 2.0% under the second
27 JAN 2022220052GALGAL-SR 7-02.45 (CULVERT REPLACEMENT)3 of 3$246,308+72%
16 DEC 2021210680CHPCHP-ODNR Kiser Lake State Park (CULVERT REPLACEMENT)3 of 5$60,575+35%
02 DEC 2021210639PIKPIK-US 23-15.35 Liner (CULVERT REPLACEMENT)5 of 8$187,575+65%
30 SEP 2021210489CUYCUY-IR 90-18.22/VAR (CULVERT REPLACEMENT)5 of 5$9,755,000+128%
15 JUL 2021210418PAUPAU-US 30-00.00 (CULVERT REPLACEMENT)3 of 3$250,321+123%
15 JUL 2021210424COLCOL-ODNR Highlandtown Culvert (CULVERT REPLACEMENT)4 of 4$295,503+57%
27 MAY 2021210352TUSTUS-IR 77-11.52/12.84 (CULVERT REPLACEMENT)1 of 5$920,939Low, -16% under the second
13 MAY 2021210294BELBEL-US 40-11.62/11.81 (CULVERT REPLACEMENT)5 of 5$499,599+53%
14 JAN 2021210015District 9D09-CR-FY2021 (CULVERT REPLACEMENT)9 of 9$2,179,839+315%
Turn-Key Tunneling Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy