ODOT contract 250238 bid tabulation
HAM-IR 75-08.91 (MAJOR RECONSTRUCTION). Let by Ohio DOT on May 15, 2025, HAM. 2 bids received; low bid $86,882,128 by John R Jurgensen Company, +2.3% against the engineer's estimate of $84,934,000.
- Owner
- Ohio DOT
- Letting
- 15 MAY 2025
- Pay items
- 593
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | John R Jurgensen Company | $86,882,128 | Low | +2.0% |
| 2 | Sunesis Construction Co | $88,443,108 | +2.0% | +4.0% |
Engineer's estimate: $84,934,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. John R Jurgensen Company | 2. Sunesis Construction Co |
|---|---|---|---|---|---|
| 1 | Portions of structure removed, as per plan (202E11201) | LS | 1 | $251,075 | $342,294 |
| 2 | Headwall removed (202E20010) | EACH | 3 | $1,133.80 | $564.55 |
| 3 | Pavement removed, as per plan (202E23001) | SY | 91,917 | $9.76 | $15.41 |
| 4 | Wearing course removed (202E23500) | SY | 91,839 | $5.30 | $4.75 |
| 5 | Walk removed (202E30000) | SF | 3,654 | $5.29 | $2.63 |
| 6 | Concrete barrier removed (202E30700) | FT | 9,924 | $28.88 | $27.68 |
| 7 | Curb removed (202E32000) | FT | 3,942 | $8.69 | $7.98 |
| 8 | Gutter removed (202E32600) | FT | 1,315 | $9.95 | $9.32 |
| 9 | Pipe removed, 24" and under (202E35100) | FT | 9,021 | $40.89 | $18.81 |
| 10 | Pipe removed, over 24" diameter (202E35200) | FT | 3,153 | $78.85 | $33.27 |
| 11 | Guardrail removed (202E38000) | FT | 6,872 | $3.00 | $3.00 |
| 12 | Manhole removed (202E58000) | EACH | 42 | $1,862.07 | $528.00 |
| 13 | Catch basin removed (202E58100) | EACH | 60 | $1,133.80 | $398.53 |
| 14 | Inlet removed (202E58200) | EACH | 29 | $1,602.00 | $418.41 |
| 15 | Manhole abandoned (202E58700) | EACH | 2 | $1,705.81 | $770.68 |
| 16 | Special - fill and plug existing conduit (202E70000) | FT | 1,384 | $55.30 | $41.95 |
| 17 | Special - pipe cleanout, 24" and under (202E70110) | FT | 100 | $154.25 | $90.00 |
| 18 | Special - pipe cleanout, 27" to 48" (202E70120) | FT | 100 | $179.25 | $125.00 |
| 19 | Special - pipe cleanout over 48" (202E70130) | FT | 100 | $204.25 | $165.00 |
| 20 | Fence removed (202E75000) | FT | 9,367 | $5.00 | $5.00 |
| 21 | Gate removed (202E75250) | EACH | 1 | $100.00 | $100.00 |
| 22 | Removal misc.: access hatch removal (202E98000) | LS | 1 | $12,691 | $9,100.13 |
| 23 | Removal misc.: drainage structure abandoned, as PE (202E98100) | EACH | 56 | $1,133.80 | $950.44 |
| 24 | Removal misc.: drainage pipe abandoned, 24" and UN (202E98200) | FT | 1,824 | $50.63 | $22.10 |
| 25 | Excavation (203E10000) | CY | 163,464 | $25.13 | $37.63 |
| 26 | Embankment (203E20000) | CY | 26,285 | $10.81 | $14.84 |
| 27 | Proof rolling (204E45000) | HR | 47 | $241.73 | $248.71 |
| 28 | Cement (206E10500) | TON | 4,175 | $245.41 | $195.00 |
| 29 | Curing coat (206E11000) | SY | 135,138 | $1.40 | $1.30 |
| 30 | Cement stabilized subgrade, 14 inches deep (206E15020) | SY | 135,138 | $6.35 | $5.26 |
| 31 | Mixture design for chemically stabilized soils (206E30000) | LS | 1 | $79,000 | $42,000 |
| 32 | Guardrail, type MGS (606E15050) | FT | 8,233 | $20.00 | $20.00 |
| 33 | Guardrail, type MGS half post spacing (606E15150) | FT | 25 | $28.50 | $28.50 |
| 34 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 8 | $2,200.00 | $2,200.00 |
| 35 | Anchor assembly, MGS type T (606E26550) | EACH | 7 | $1,175.00 | $1,175.00 |
| 36 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 10 | $2,400.00 | $2,400.00 |
| 37 | MGS bridge terminal assembly, type 2 (606E35102) | EACH | 5 | $300.00 | $300.00 |
| 38 | Impact attenuator, type 3 unidirectional (606E60040) | EACH | 3 | $48,317 | $42,250 |
| 39 | Fence, type CLT (607E23000) | FT | 8,736 | $22.50 | $22.50 |
| 40 | Fence, type CLT, as per plan (607E23001) | FT | 508 | $40.00 | $40.00 |
| 41 | Fenceline seeding and mulching (607E70000) | FT | 8,736 | $0.75 | $5.00 |
| 42 | Fence, misc.: wood fence (607E98000) | FT | 500 | $45.00 | $45.00 |
| 43 | 4" concrete walk (608E10000) | SF | 1,424 | $13.26 | $12.38 |
| 44 | Curb ramp (608E52000) | SF | 1,309 | $34.02 | $21.94 |
| 45 | Concrete barrier, single slope, type B1 (622E10100) | FT | 4,924 | $205.00 | $189.00 |
| 46 | Concrete barrier, single slope, type C1 (622E10140) | FT | 2,151 | $205.00 | $199.00 |
| 47 | Concrete barrier, single slope, type D (622E10160) | FT | 3,555 | $110.00 | $110.00 |
| 48 | Barrier transition (622E10200) | EACH | 1 | $8,300.00 | $10,000 |
| 49 | Concrete barrier end section, type B1 (622E24850) | EACH | 2 | $14,092 | $10,000 |
| 50 | Concrete barrier end section, type C1 (622E24860) | EACH | 1 | $14,090 | $12,000 |
| 51 | Concrete barrier end section, type D (622E25000) | EACH | 10 | $5,591.28 | $3,700.00 |
| 52 | Concrete barrier, end anchorage, reinforced, type B1 (622E25006) | EACH | 54 | $6,241.37 | $5,441.97 |
| 53 | Concrete barrier, end anchorage, reinforced, type B1, as per plan (622E25007) | EACH | 10 | $8,341.28 | $6,176.34 |
| 54 | Concrete barrier, end anchorage, reinforced, type C1 (622E25014) | EACH | 18 | $6,591.37 | $5,450.10 |
| 55 | Concrete barrier, end anchorage, reinforced, type C1, as per plan (622E25015) | EACH | 2 | $8,341.84 | $7,198.20 |
| 56 | Concrete barrier, end anchorage, reinforced, type D (622E25050) | EACH | 32 | $4,841.40 | $3,944.26 |
| 57 | Concrete barrier, end anchorage, reinforced, type D, as per plan (622E25051) | EACH | 1 | $4,840.45 | $4,738.98 |
| 58 | Crushed aggregate slope protection (601E20000) | SY | 2 | $643.46 | $52.62 |
| 59 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 10 | $297.19 | $200.12 |
| 60 | Tied concrete block mat with type 2 underlayment (601E21060) | SY | 159 | $75.98 | $188.94 |
| 61 | Paved gutter, type 1-2 (601E37500) | FT | 2,875 | $264.08 | $70.00 |
| 62 | Soil analysis test (659E00100) | EACH | 2 | $500.00 | $75.00 |
| 63 | Topsoil (659E00300) | CY | 6,479 | $3.00 | $55.34 |
| 64 | Seeding and mulching (659E10000) | SY | 58,372 | $0.92 | $3.61 |
| 65 | Repair seeding and mulching (659E14000) | SY | 2,919 | $0.50 | $1.05 |
| 66 | Inter-seeding (659E15000) | SY | 2,919 | $0.01 | $1.05 |
| 67 | Commercial fertilizer (659E20000) | TON | 13.13 | $1,500.00 | $760.00 |
| 68 | Lime (659E31000) | ACRE | 12.06 | $200.00 | $50.00 |
| 69 | Water (659E35000) | MGAL | 331 | $1.00 | $50.00 |
| 70 | Mowing (659E40000) | MSF | 525 | $1.00 | $10.00 |
| 71 | Ditch erosion protection (670E00700) | SY | 2,947 | $1.95 | $3.65 |
| 72 | Storm water pollution prevention plan (832E15000) | LS | 1 | $6,845.00 | $6,845.00 |
| 73 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $55,344 | $57,780 |
| 74 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $32,636 | $32,636 |
| 75 | Erosion control (832E30000) | EACH | 500,000 | $1.00 | $1.00 |
| 76 | Rock channel protection, type C with filter (601E32200) | CY | 8 | $553.62 | $192.82 |
| 77 | Concrete masonry (602E20000) | CY | 3 | $1,346.34 | $701.78 |
| 78 | 6" shallow pipe underdrains (605E11100) | FT | 32,794 | $19.19 | $15.78 |
| 79 | 6" unclassified pipe underdrains (605E13300) | FT | 551 | $58.17 | $21.07 |
| 80 | 6" base pipe underdrains (605E14000) | FT | 20,148 | $14.93 | $19.70 |
| 81 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 2,568 | $38.86 | $27.86 |
| 82 | 6" conduit, type B (611E00900) | FT | 100 | $72.61 | $52.66 |
| 83 | 6" conduit, type C (611E01100) | FT | 744 | $53.79 | $18.40 |
| 84 | 6" conduit, type E (611E01400) | FT | 100 | $64.67 | $28.28 |
| 85 | 6" conduit, type F (611E01500) | FT | 100 | $64.67 | $28.28 |
| 86 | 8" conduit, type B (611E01800) | FT | 100 | $82.18 | $54.50 |
| 87 | 8" conduit, type C (611E02000) | FT | 100 | $77.44 | $46.25 |
| 88 | 12" conduit, type B, as per plan (611E04401) | FT | 159 | $118.86 | $125.72 |
| 89 | 12" conduit, type C (611E04600) | FT | 90 | $175.01 | $101.13 |
| 90 | 15" conduit, type B, as per plan (611E05901) | FT | 2,951 | $115.71 | $161.85 |
| 91 | 15" conduit, type C (611E06100) | FT | 934 | $135.75 | $110.17 |
| 92 | 15" conduit, type C (611E06100) | FT | 183 | $138.11 | $131.83 |
| 94 | 18" conduit, type B, as per plan (611E07401) | FT | 907 | $155.77 | $192.02 |
| 95 | 18" conduit, type C (611E07600) | FT | 160 | $141.08 | $102.17 |
| 96 | 18" conduit, type C (611E07600) | FT | 212 | $171.62 | $330.05 |
| 98 | 21" conduit, type B, as per plan (611E08901) | FT | 115 | $246.23 | $726.13 |
| 99 | 21" conduit, type C (611E09100) | FT | 11 | $339.46 | $291.68 |
| 100 | 24" conduit, type B, as per plan (611E10401) | FT | 780 | $186.34 | $215.88 |
| 101 | 24" conduit, type C (611E10600) | FT | 242 | $204.30 | $168.15 |
| 102 | 30" conduit, type B, as per plan (611E13401) | FT | 571 | $278.02 | $416.11 |
| 103 | 30" conduit, type C (611E13600) | FT | 798 | $219.11 | $211.57 |
| 104 | 30" conduit, type C (611E13600) | FT | 176 | $371.87 | $384.90 |
| 105 | 30" conduit, type F (611E14200) | FT | 70 | $275.87 | $207.59 |
| 106 | 36" conduit, type B, as per plan (611E16401) | FT | 719 | $273.31 | $305.53 |
| 107 | 36" conduit, type C (611E16600) | FT | 15 | $792.13 | $378.74 |
| 108 | 36" conduit, type C (611E16600) | FT | 90 | $727.36 | $1,875.21 |
| 109 | 42" conduit, type B, as per plan (611E19401) | FT | 878 | $340.85 | $498.17 |
| 110 | 42" conduit, type C (611E19600) | FT | 302 | $625.90 | $322.19 |
| 111 | 48" conduit, type B, as per plan (611E20901) | FT | 984 | $629.47 | $746.22 |
| 112 | 48" conduit, type B (611E20900) | FT | 295 | $866.98 | $1,692.82 |
| 113 | 54" conduit, type B (611E22400) | FT | 10 | $2,639.50 | $3,669.35 |
| 114 | 24" X 38" conduit, type B, 706.04 (611E52502) | FT | 265 | $387.25 | $476.16 |
| 115 | Conduit, bored or jacked 15", type B (611E96600) | FT | 252 | $759.82 | $889.30 |
| 116 | Conduit, bored or jacked 18", type B (611E96600) | FT | 230 | $745.86 | $859.27 |
| 117 | Conduit, bored or jacked 30" type B (611E96600) | FT | 190 | $1,253.53 | $1,284.41 |
| 118 | Conduit, bored or jacked 36", type B (611E96600) | FT | 69 | $872.63 | $1,586.56 |
| 119 | Conduit, bored or jacked 42", type B (611E96600) | FT | 323 | $1,515.25 | $2,560.16 |
| 120 | Catch basin, no. 3 (611E98150) | EACH | 14 | $5,536.34 | $5,648.16 |
| 121 | Catch basin, no. 3A (611E98180) | EACH | 9 | $3,358.86 | $3,408.52 |
| 122 | Catch basin, no. 5 (611E98300) | EACH | 11 | $5,943.90 | $4,315.42 |
| 123 | Catch basin, no. 6 (611E98370) | EACH | 12 | $5,133.37 | $4,132.14 |
| 124 | Catch basin, no. 8 (611E98410) | EACH | 9 | $6,359.75 | $5,103.44 |
| 125 | Catch basin, no. 8A (611E98434) | EACH | 4 | $12,453 | $10,261 |
| 126 | Catch basin, no. 2-2B (611E98470) | EACH | 1 | $2,146.76 | $2,086.00 |
| 127 | Catch basin, no. 2-3 (611E98510) | EACH | 11 | $3,955.17 | $3,741.14 |
| 128 | Inlet, no. 3 for single slope barrier, type B1 (611E99100) | EACH | 2 | $18,891 | $20,123 |
| 129 | Inlet, no. 3 for single slope barrier, type B1, as per plan (611E99101) | EACH | 6 | $21,267 | $19,536 |
| 130 | Inlet, no. 3 for single slope barrier, type B1, as per plan (611E99101) | EACH | 7 | $23,547 | $19,709 |
| 131 | Inlet, no. 3 for single slope barrier, type B1, as per plan (611E99101) | EACH | 2 | $31,450 | $20,262 |
| 132 | Inlet, no. 3 for single slope barrier, type C1 (611E99110) | EACH | 8 | $17,058 | $20,810 |
| 133 | Inlet, no. 3 for single slope barrier, type C1, as per plan (611E99111) | EACH | 1 | $19,298 | $23,424 |
| 134 | Inlet, no. 3 for single slope barrier, type D (611E99114) | EACH | 9 | $14,767 | $17,839 |
| 135 | Inlet, no. 3 for single slope barrier, type D, as per plan (611E99115) | EACH | 1 | $15,995 | $19,648 |
| 136 | Inlet, no. 3 for single slope barrier, type D, as per plan (611E99115) | EACH | 1 | $19,422 | $12,948 |
| 137 | Manhole, no. 3 (611E99574) | EACH | 25 | $11,379 | $7,622.77 |
| 138 | Precast reinforced concrete outlet (611E99710) | EACH | 5 | $672.83 | $400.36 |
| 139 | Drainage structure, misc.: check valve for 54" con (611E99900) | EACH | 1 | $71,753 | $88,718 |
| 140 | Special - manhole misc.: sanitary manhole per MSD (690E98000) | EACH | 4 | $14,682 | $15,090 |
| 141 | Special - manhole misc.: sanitary manhole per MSD (690E98000) | EACH | 2 | $32,898 | $22,515 |
| 142 | Special - temporary drainage pump (690E99550) | MNTH | 12 | $34,490 | $23,087 |
| 143 | Trench drain with standard grate (839E30000) | FT | 876 | $227.00 | $254.57 |
| 144 | 15" conduit, type C (611E06100) | FT | 34 | $259.74 | $175.30 |
| 145 | 30" conduit, type B (611E13400) | FT | 126 | $646.05 | $140.31 |
| 146 | Special - manhole misc.: sanitary manhole per MSD [alternate group AA1] (690E98000) | EACH | 1 | $14,682 | $13,633 |
| 157 | 36" conduit, type C (611E16600) | FT | 23 | $844.96 | $747.79 |
| 158 | 54" conduit, type B (611E22400) | FT | 235 | $1,202.51 | $1,480.88 |
| 159 | 54" conduit, type C (611E22600) | FT | 112 | $987.55 | $1,164.77 |
| 160 | Conduit, bored or jacked 36", type B, with joints [alternate group AB2] (611E96600) | FT | 256 | $1,474.32 | $2,090.38 |
| 161 | Special - manhole misc.: sanitary manhole per MSD [alternate group AB2] (690E98000) | EACH | 2 | $14,681 | $15,418 |
| 162 | Special - manhole misc.: sanitary manhole per MSD [alternate group AB2] (690E98000) | EACH | 2 | $32,910 | $18,282 |
| 168 | 24" conduit, type B, as per plan (611E10401) | FT | 223 | $310.12 | $299.98 |
| 169 | 30" conduit, type B, as per plan (611E13401) | FT | 32 | $439.63 | $313.49 |
| 170 | 36" conduit, type B, as per plan (611E16401) | FT | 135 | $522.36 | $395.54 |
| 171 | 36" conduit, type C (611E16600) | FT | 244 | $308.44 | $239.95 |
| 172 | 42" conduit, type B, as per plan (611E19401) | FT | 180 | $365.82 | $539.35 |
| 173 | Pavement planing, asphalt concrete, 1.5" depth (254E01000) | SY | 22,391 | $3.80 | $10.50 |
| 174 | Asphalt concrete base, PG64-22, (449) (302E56000) | CY | 43,136 | $197.00 | $188.11 |
| 175 | Aggregate base (304E20000) | CY | 23,927 | $69.43 | $84.12 |
| 176 | Non-tracking tack coat (407E20000) | GAL | 21,196 | $5.00 | $4.20 |
| 177 | Stabilized crushed aggregate (411E10000) | CY | 543 | $114.30 | $94.82 |
| 178 | Asphalt concrete surface course, type 1, (448), PG64-22 (441E50000) | CY | 9 | $900.00 | $610.00 |
| 179 | Asphalt concrete intermediate course, type 1, (448) (441E50200) | CY | 15 | $650.00 | $580.00 |
| 180 | Anti-segregation equipment (442E00100) | CY | 10,466 | $9.50 | $18.00 |
| 181 | Asphalt concrete intermediate course, 12.5 MM, type A (446) (442E10080) | CY | 5,789 | $253.50 | $235.00 |
| 182 | Asphalt concrete surface course, 12.5 MM, type A (447), as per plan (442E10301) | CY | 5,612 | $376.00 | $288.30 |
| 183 | 6" non-reinforced concrete pavement, class QC 1P (452E10010) | SY | 176 | $96.40 | $100.00 |
| 184 | 9" non-reinforced concrete pavement, class QC 1P (452E13010) | SY | 209 | $318.11 | $125.00 |
| 185 | 15" non-reinforced concrete pavement, class QC 1P (452E18010) | SY | 21,427 | $160.00 | $169.00 |
| 186 | Curb, type 4-C, as per plan (609E24511) | FT | 1,399 | $37.40 | $41.22 |
| 187 | Curb, type 6 (609E26000) | FT | 2,059 | $38.55 | $44.22 |
| 188 | Rumble strips, shoulder (asphalt concrete) (618E40600) | MI | 5.83 | $1,350.00 | $2,700.00 |
| 189 | Excavation, as per plan (203E10001) | CY | 10 | $109.24 | $47.70 |
| 190 | Excavation, as per plan (203E10001) | CY | 10 | $109.24 | $47.70 |
| 191 | Uncoated steel reinforcement (509E25000) | LB | 9,354 | $2.02 | $1.69 |
| 192 | Concrete masonry (602E20000) | CY | 89 | $520.83 | $392.74 |
| 193 | Masonry, misc.: brick masonry (602E98200) | CY | 2 | $627.87 | $3,148.94 |
| 194 | Meter and vault removed and reset, as per plan (CI (638E11103) | EACH | 1 | $2,827.03 | $2,254.33 |
| 195 | Special - 6" water main dip and fittings (cin. 110 (638E11602) | FT | 49 | $555.60 | $504.16 |
| 196 | Special - 8" water main dip and fittings (cin. 110 (638E11604) | FT | 13 | $1,034.21 | $1,070.52 |
| 197 | Special - 16" water main dip and fittings (cin. 11 (638E11610) | FT | 806 | $463.81 | $667.99 |
| 198 | Special - 30" steel pipe encasement, bored or jacked (638E20468) | FT | 200 | $1,208.78 | $1,471.67 |
| 199 | Special - valve box (cin. 1116) (638E20498) | EACH | 7 | $839.59 | $557.31 |
| 200 | Special - 2" air release valve (cin. 1116) (638E20738) | EACH | 5 | $3,934.30 | $5,759.71 |
| 201 | Special - 6" fire hydrant (cin. 1112) (638E20750) | EACH | 2 | $1,319.46 | $1,690.19 |
| 202 | Special - fire hydrant removed and disposed of (CI (638E20760) | EACH | 2 | $742.90 | $1,003.46 |
| 203 | Special - fire hydrant service line extended and adjusted to grade (638E20762) | EACH | 2 | $1,223.88 | $2,467.51 |
| 204 | Special - retap, reconnect and extend 3/4" polyethylene water service connection (638E20806) | FT | 1 | $2,694.48 | $2,056.82 |
| 205 | Special - retap, reconnect and extend 1" polyethylene water service connection (638E20826) | FT | 1 | $2,783.30 | $2,204.12 |
| 206 | Special - install 1" polyethylene water service connection (638E20834) | FT | 25 | $202.69 | $236.04 |
| 207 | Special - install 2" copper water service connection (638E20864) | FT | 51 | $148.10 | $230.44 |
| 208 | Special - cut and plug existing 12" water line (CI (638E20884) | EACH | 1 | $3,117.98 | $9,770.55 |
| 209 | Special - cut and plug existing 16" water line (CI (638E20886) | EACH | 1 | $3,748.04 | $11,861 |
| 210 | Special - service box (reconnect) (cin. 1131) (638E20904) | EACH | 1 | $672.83 | $336.44 |
| 211 | Special - service box (renew) (cin. 1131) (638E20904) | EACH | 2 | $649.10 | $336.43 |
| 212 | Special - sheeting and bracing ordered left in place (638E30002) | MBF | 2 | $802.22 | $1.52 |
| 213 | Water work, misc.:removing existing manhole curb A (638E98000) | EACH | 5 | $1,133.80 | $241.03 |
| 214 | Water work, misc.:removing existing valve box (cin (638E98000) | EACH | 1 | $587.60 | $147.42 |
| 215 | Water work, misc.:hauling water works material (CI (638E98100) | LS | 1 | $3,693.93 | $275.30 |
| 216 | Connection, fused pull apart (625E00450) | EACH | 42 | $141.65 | $141.65 |
| 217 | Connection, fused pull apart, as per plan (625E00451) | EACH | 8 | $141.65 | $141.65 |
| 218 | Connection, unfused permanent (625E00480) | EACH | 18 | $108.50 | $108.50 |
| 219 | Light pole, low mast, ALM50 (625E10494) | EACH | 21 | $4,155.00 | $4,155.00 |
| 220 | Light pole (installation only), as per plan (625E10503) | EACH | 4 | $718.00 | $718.00 |
| 221 | Light tower, BBBB100 (625E13200) | EACH | 3 | $30,127 | $30,127 |
| 222 | Light tower, BBBBBB100 (625E13400) | EACH | 7 | $30,737 | $30,737 |
| 223 | Light pole foundation, 24" X 6' deep, as per plan (625E14001) | EACH | 4 | $1,742.00 | $1,742.00 |
| 224 | Median light pole foundation, 10' deep (625E14306) | EACH | 21 | $5,405.00 | $5,505.00 |
| 225 | Light tower foundation, 36" X 20' deep (625E15100) | EACH | 4 | $8,400.00 | $8,400.00 |
| 226 | Light tower foundation, 36" X 25' deep (625E15200) | EACH | 2 | $9,770.00 | $9,770.00 |
| 227 | Light tower foundation, misc.: median, 36" X 20' D (625E15700) | EACH | 4 | $13,288 | $14,488 |
| 228 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 20,737 | $3.90 | $3.90 |
| 229 | No. 2 AWG 2400 volt distribution cable (625E23300) | FT | 4,242 | $5.10 | $5.10 |
| 230 | No. 10 AWG 600 volt distribution cable (625E23306) | FT | 360 | $1.85 | $1.85 |
| 231 | No. 10 AWG pole and bracket cable (625E23400) | FT | 3,150 | $1.85 | $1.85 |
| 232 | 1-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320) | FT | 605 | $11.75 | $11.75 |
| 233 | Conduit, 3/4", 725.04 (625E25000) | FT | 110 | $7.85 | $7.85 |
| 234 | Conduit, 3", 725.051 (625E25504) | FT | 1,497 | $7.30 | $7.30 |
| 235 | Conduit, jacked or drilled, 725.052, 3" (625E25908) | FT | 1,314 | $40.60 | $40.60 |
| 236 | Luminaire, high mast, solid state (LED), as per plan (625E26263) | EACH | 54 | $1,055.00 | $1,055.00 |
| 237 | Luminaire, low mast, solid state (LED), as per plan (625E26273) | EACH | 21 | $1,012.00 | $1,012.00 |
| 238 | Luminaire, installation only, as per plan (625E27561) | EACH | 4 | $116.00 | $116.00 |
| 239 | Trench (625E29000) | FT | 2,128 | $2.70 | $2.70 |
| 240 | Median junction box (625E29930) | EACH | 33 | $4,460.00 | $4,310.00 |
| 241 | Pull box, 725.08, 18" (625E30700) | EACH | 8 | $918.00 | $918.00 |
| 242 | Pull box, 725.08, 24" (625E30706) | EACH | 3 | $1,078.00 | $1,078.00 |
| 243 | Pull box removed (625E31510) | EACH | 16 | $221.00 | $221.00 |
| 244 | Ground rod (625E32000) | EACH | 58 | $255.00 | $255.00 |
| 245 | Structure grounding system (625E33000) | EACH | 1 | $13,900 | $13,900 |
| 246 | Power service, as per plan (625E34001) | EACH | 4 | $8,175.00 | $8,175.00 |
| 247 | Underground warning marking tape (625E36010) | FT | 2,128 | $1.85 | $1.85 |
| 248 | High voltage test (625E38000) | LS | 1 | $3,360.00 | $3,360.00 |
| 249 | Special - maintain existing lighting (625E40000) | LS | 1 | $137,170 | $137,170 |
| 250 | Special - replacement of existing lighting unit (625E40010) | EACH | 2 | $2,830.00 | $2,830.00 |
| 251 | Light tower removed (625E75350) | EACH | 4 | $1,260.00 | $1,260.00 |
| 252 | Light pole removed (625E75400) | EACH | 38 | $420.00 | $420.00 |
| 253 | Light pole removed for storage (625E75402) | EACH | 4 | $420.00 | $420.00 |
| 254 | Light pole foundation removed (625E75500) | EACH | 42 | $440.00 | $440.00 |
| 255 | Luminaire removed for storage (625E75504) | EACH | 4 | $52.50 | $52.50 |
| 256 | Luminaire removed (625E75506) | EACH | 46 | $52.50 | $52.50 |
| 257 | Power service removed (625E75510) | EACH | 2 | $840.00 | $840.00 |
| 258 | Light tower foundation removed (625E75540) | EACH | 4 | $860.00 | $860.00 |
| 259 | Distribution cable removed, as per plan (625E75551) | FT | 45,000 | $0.20 | $0.20 |
| 260 | Delineator, post ground mounted (620E00500) | EACH | 23 | $125.00 | $125.00 |
| 261 | RPM (621E00100) | EACH | 629 | $39.50 | $39.50 |
| 262 | Raised pavement marker removed (621E54000) | EACH | 383 | $13.08 | $20.01 |
| 263 | Ground rod (625E32000) | EACH | 11 | $255.00 | $255.00 |
| 264 | Ground mounted support, no. 3 post (630E03100) | FT | 654 | $13.00 | $13.00 |
| 265 | Ground mounted structural beam support, S4X7.7 (630E06400) | FT | 32.30 | $19.70 | $19.70 |
| 266 | Ground mounted structural beam support, W10X22 (630E07500) | FT | 230.30 | $42.00 | $42.00 |
| 267 | Ground mounted structural beam support, W12X30 (630E08000) | FT | 64.60 | $56.50 | $56.50 |
| 268 | One way support, no. 3 post (630E08004) | FT | 65 | $20.00 | $20.00 |
| 269 | Sign post reflector (630E08600) | EACH | 20 | $58.50 | $58.50 |
| 270 | Breakaway structural beam connection (630E09000) | EACH | 14 | $905.00 | $905.00 |
| 271 | Overhead sign support, type TC-12.31, design 12 (630E72340) | EACH | 1 | $38,200 | $38,200 |
| 272 | Overhead sign support, type TC-15.116, design 2 (630E72420) | EACH | 2 | $85,700 | $86,700 |
| 273 | Overhead sign support, type TC-15.116, design 3 (630E72430) | EACH | 3 | $122,800 | $122,800 |
| 274 | Sign attachment assembly (630E75000) | EACH | 1 | $1,525.00 | $1,525.00 |
| 275 | Sign support assembly, barrier mounted, as per plan (630E79611) | EACH | 1 | $1,325.00 | $1,325.00 |
| 276 | Sign, flat sheet (630E80100) | SF | 628.82 | $18.50 | $18.50 |
| 277 | Sign, ground mounted extrusheet (630E80200) | SF | 689 | $32.00 | $32.00 |
| 278 | Sign, overhead extrusheet (630E80224) | SF | 3,900 | $38.50 | $38.50 |
| 279 | Sign, temporary overlay (630E80300) | SF | 148 | $37.00 | $37.00 |
| 280 | Concrete median barrier sign bracket, as per plan (630E81021) | EACH | 16 | $500.00 | $500.00 |
| 281 | Sign backing assembly (630E82000) | EACH | 1 | $1,540.00 | $1,540.00 |
| 282 | Concrete barrier median overhead sign support foundation, type TC-21.50 (630E84010) | EACH | 5 | $13,400 | $13,700 |
| 283 | Ground mounted structural beam support foundation (630E84500) | EACH | 14 | $1,500.00 | $1,500.00 |
| 284 | Rigid overhead sign support foundation (630E84510) | EACH | 6 | $8,275.00 | $8,275.00 |
| 285 | Removal of ground mounted sign and disposal (630E84900) | EACH | 87 | $15.00 | $15.00 |
| 286 | Removal of ground mounted major sign and disposal (630E85400) | EACH | 6 | $170.00 | $170.00 |
| 287 | Removal of ground mounted major sign and reerection (630E85600) | EACH | 1 | $1,200.00 | $1,200.00 |
| 288 | Removal of ground mounted post support and disposal (630E86002) | EACH | 54 | $25.00 | $25.00 |
| 289 | Removal of ground mounted structural beam support (630E86102) | EACH | 14 | $130.00 | $130.00 |
| 290 | Removal of structure mounted sign and disposal (630E86310) | EACH | 1 | $475.00 | $475.00 |
| 291 | Removal of overhead mounted sign and disposal (630E87400) | EACH | 25 | $450.00 | $450.00 |
| 292 | Removal of pole mounted sign and disposal (630E87500) | EACH | 11 | $20.00 | $20.00 |
| 293 | Removal of overhead sign support and disposal, type TC-12.30 (630E89706) | EACH | 2 | $1,450.00 | $1,450.00 |
| 294 | Removal of overhead sign support and disposal, type TC-9.30 (630E89708) | EACH | 1 | $1,450.00 | $1,450.00 |
| 295 | Removal of overhead sign support and disposal, type TC-7.65 (630E89802) | EACH | 4 | $2,100.00 | $2,100.00 |
| 296 | Removal of overhead sign support and disposal, type TC-18.24 (630E89806) | EACH | 1 | $1,700.00 | $1,700.00 |
| 297 | Removal of miscellaneous traffic control item, bar (630E89902) | EACH | 16 | $50.00 | $50.00 |
| 298 | Edge line, 4" (644E00100) | MI | 0.03 | $18,040 | $18,040 |
| 299 | Center line (644E00300) | MI | 0.04 | $21,550 | $21,550 |
| 300 | Stop line (644E00500) | FT | 20 | $7.00 | $7.00 |
| 301 | Crosswalk line, 12" (644E00620) | FT | 62 | $6.50 | $6.50 |
| 302 | Transverse/diagonal line (644E00700) | FT | 1,459 | $6.75 | $6.75 |
| 303 | Chevron marking (644E00720) | FT | 529 | $6.38 | $6.38 |
| 304 | Lane arrow (644E01300) | EACH | 6 | $200.00 | $200.00 |
| 305 | Removal of pavement marking (644E30000) | FT | 2,087 | $1.90 | $1.90 |
| 306 | Removal of pavement marking (644E30020) | EACH | 8 | $245.00 | $245.00 |
| 307 | Edge line, 6", type A4 (645E00118) | MI | 1.95 | $24,995 | $24,995 |
| 308 | Lane line, 6", type A4 (645E00220) | MI | 0.37 | $9,485.00 | $9,485.00 |
| 309 | Channelizing line, 12", type A4 (645E00418) | FT | 3,717 | $8.55 | $8.55 |
| 310 | Stop line (646E10400) | FT | 172 | $15.00 | $15.00 |
| 311 | Chevron marking (646E10620) | FT | 105 | $14.00 | $14.00 |
| 312 | Lane arrow (646E20300) | EACH | 13 | $250.00 | $250.00 |
| 313 | Wrong way arrow (646E20320) | EACH | 5 | $450.00 | $450.00 |
| 314 | Wet reflective thermoplastic pavement marking, edge line, 6" (807E14010) | MI | 6.19 | $6,905.00 | $6,905.00 |
| 315 | Wet reflective thermoplastic pavement marking, lane line, 6" (807E14110) | MI | 6.58 | $3,405.00 | $3,405.00 |
| 316 | Wet reflective thermoplastic pavement marking, channelizing line, 12" (807E14310) | FT | 6,644 | $2.65 | $2.65 |
| 317 | Wet reflective thermoplastic pavement marking, dotted line, 6" (807E14410) | FT | 3,224 | $1.25 | $1.25 |
| 318 | Wet reflective thermoplastic pavement marking, dotted line, 12" (807E14430) | FT | 4,336 | $1.50 | $1.50 |
| 319 | Grooving for 6" recessed pavement marking, (asphalt) (850E10010) | MI | 12.77 | $2,200.00 | $2,200.00 |
| 320 | Grooving for 6" recessed pavement marking, (asphalt) (850E10110) | FT | 3,224 | $1.25 | $1.25 |
| 321 | Grooving for 12" recessed pavement marking, (asphalt) (850E10130) | FT | 10,980 | $1.65 | $1.65 |
| 322 | Grooving for 6" recessed pavement marking, (concrete) (850E20010) | MI | 2.32 | $3,350.00 | $3,350.00 |
| 323 | Grooving for 12" recessed pavement marking, (concrete) (850E20130) | FT | 3,717 | $1.90 | $1.90 |
| 324 | Conduit, 2", 725.04 (625E25400) | FT | 27 | $36.90 | $36.90 |
| 325 | Conduit, 2", 725.051 (625E25408) | FT | 112 | $7.45 | $7.45 |
| 326 | Conduit, 3", 725.04 (625E25500) | FT | 1,152 | $28.55 | $28.55 |
| 327 | Conduit, 3", 725.051 (625E25504) | FT | 1,119 | $8.40 | $8.40 |
| 328 | Conduit, jacked or drilled, 725.04, 3" (625E25902) | FT | 269 | $70.00 | $70.00 |
| 329 | Trench (625E29000) | FT | 5,495 | $2.70 | $2.70 |
| 330 | Pull box, 725.08, 18" (625E30700) | EACH | 21 | $918.00 | $918.00 |
| 331 | Pull box removed (625E31510) | EACH | 41 | $221.00 | $221.00 |
| 332 | Ground rod (625E32000) | EACH | 32 | $255.00 | $255.00 |
| 333 | Underground warning marking tape (625E36010) | FT | 5,495 | $2.15 | $2.15 |
| 334 | Power service removed (625E75510) | EACH | 4 | $840.00 | $840.00 |
| 335 | Arc flash calculations and label, 2070E #1 (625E76000) | EACH | 1 | $2,085.00 | $2,085.00 |
| 336 | Arc flash calculations and label, 2070E #2 (625E76000) | EACH | 1 | $2,085.00 | $2,085.00 |
| 337 | Arc flash calculations and label, CCTV #10 (625E76000) | EACH | 1 | $2,085.00 | $2,085.00 |
| 338 | Arc flash calculations and label, DMS #12 (625E76000) | EACH | 1 | $2,085.00 | $2,085.00 |
| 339 | Arc flash calculations and label, DMS #15 and CCTV (625E76000) | EACH | 1 | $2,085.00 | $2,085.00 |
| 340 | Arc flash calculations and label, power distributi (625E76000) | EACH | 1 | $2,085.00 | $2,085.00 |
| 341 | Ground mounted support, no. 2 post (630E02100) | FT | 42 | $15.00 | $15.00 |
| 342 | Overhead sign support, DMS pedestal, as per plan (630E70045) | EACH | 2 | $41,800 | $41,800 |
| 343 | Catwalk, DMS pedestal, as per plan (630E70061) | EACH | 2 | $29,700 | $29,700 |
| 344 | Overhead sign support foundation, DMS pedestal (630E70082) | EACH | 2 | $10,100 | $10,400 |
| 345 | Sign hanger assembly, mast arm (630E79100) | EACH | 2 | $545.00 | $545.00 |
| 346 | Sign support assembly, barrier mounted (630E79610) | EACH | 1 | $1,250.00 | $1,250.00 |
| 347 | Sign, flat sheet (630E80100) | SF | 74 | $18.50 | $18.50 |
| 348 | Removal of overhead sign support and disposal (630E89702) | EACH | 2 | $1,450.00 | $1,450.00 |
| 349 | Removal of wood pole and disposal (630E89812) | EACH | 3 | $950.00 | $950.00 |
| 350 | Vehicular signal head, (LED), 2-section, 12" lens, 1-way, polycarbonate (632E04904) | EACH | 8 | $937.00 | $937.00 |
| 351 | Covering of vehicular signal head (632E25000) | EACH | 8 | $37.25 | $37.25 |
| 352 | Detector loop (632E26500) | EACH | 16 | $1,518.00 | $1,518.00 |
| 353 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 3,184 | $2.70 | $2.70 |
| 354 | Signal support foundation (632E64010) | EACH | 2 | $8,660.00 | $8,660.00 |
| 355 | Loop detector lead-in cable (632E65200) | FT | 1,780 | $2.00 | $2.00 |
| 356 | Power cable, 3 conductor, no. 4 AWG (632E69300) | FT | 415 | $8.65 | $8.65 |
| 357 | Power cable, 1 conductor, no. 2 AWG (632E69310) | FT | 2,120 | $7.35 | $7.35 |
| 358 | Power cable, misc.: 1 conductor, 1/0 AWG (632E69350) | FT | 2,120 | $7.50 | $7.50 |
| 359 | Service cable, misc.: 1 conductor, 1/0 AWG (632E69950) | FT | 992 | $7.50 | $7.50 |
| 360 | Conduit riser, 2" diameter (632E70400) | EACH | 5 | $930.00 | $930.00 |
| 361 | Signal support, type TC-81.22, design 4 (632E72110) | EACH | 1 | $15,765 | $15,765 |
| 362 | Signal support, type TC-81.22, design 12 (632E72130) | EACH | 1 | $18,690 | $18,690 |
| 363 | Signalization, misc.: removal of fiber optic and P (632E90300) | LS | 1 | $12,600 | $12,600 |
| 364 | Signalization, misc.: ramp meter sign (632E90400) | EACH | 4 | $4,271.00 | $4,271.00 |
| 365 | Cabinet foundation (633E67100) | EACH | 2 | $1,600.00 | $1,600.00 |
| 366 | Cabinet foundation, as per plan (633E67101) | EACH | 5 | $2,150.00 | $2,150.00 |
| 367 | Controller work pad (633E67200) | EACH | 2 | $1,765.00 | $1,765.00 |
| 368 | Controller work pad, as per plan (633E67201) | EACH | 4 | $1,115.00 | $1,115.00 |
| 369 | Fiber optic cable, airblown/pushable, 72 fiber (804E21030) | FT | 16,255 | $4.25 | $4.25 |
| 370 | ITS JUNCTION BOX, 17x24x6 INCHES (809E00530) | EACH | 14 | $3,480.00 | $3,330.00 |
| 371 | 32" ITS pull box with pad and standard lid assembly, type 2 (809E02000) | EACH | 23 | $2,910.00 | $2,910.00 |
| 372 | 32" ITS pull box with pad and hinged lid assembly, type 2 (809E02002) | EACH | 7 | $4,010.00 | $4,010.00 |
| 373 | Communication cable marker (809E11000) | EACH | 13 | $270.50 | $270.50 |
| 374 | Micro-duct innerduct, 14/10 (809E23100) | FT | 9,086 | $1.05 | $1.05 |
| 375 | Conduit, multicell, misc.: 2" HDPE with 4-14MM/10M (809E25000) | FT | 3,030 | $12.20 | $12.20 |
| 376 | Conduit, multicell, misc.: 2" HDPE with 4-14MM/10M (809E25000) | FT | 769 | $50.50 | $50.50 |
| 377 | Conduit, multicell, misc.: 4" HDPE (809E25000) | FT | 4,447 | $19.40 | $19.40 |
| 378 | Conduit, multicell, misc.: 4" HDPE, jacked or dril (809E25000) | FT | 1,155 | $51.15 | $51.15 |
| 379 | ITS power service, pole mounted, 120/240V, 60 amp (809E55000) | EACH | 2 | $4,430.00 | $4,430.00 |
| 380 | ITS power service, pole mounted, 120/240V, 100 amp (809E55100) | EACH | 2 | $4,650.00 | $4,650.00 |
| 381 | ITS power service, pole mounted, 240/480V, 60 amp (809E56000) | EACH | 1 | $4,430.00 | $4,430.00 |
| 382 | CCTV IP-camera system, enhanced (809E60030) | EACH | 3 | $8,918.00 | $8,918.00 |
| 383 | CCTV concrete pole, 70 feet (809E61002) | EACH | 3 | $57,153 | $57,153 |
| 384 | CCTV lowering unit (809E61090) | EACH | 3 | $9,220.00 | $9,220.00 |
| 385 | Dynamic message sign (DMS), full-size walk-in (809E63000) | EACH | 2 | $107,544 | $107,544 |
| 386 | Ethernet cable, outdoor-rated (809E64550) | FT | 290 | $3.20 | $3.20 |
| 387 | ITS cabinet - ground mounted (809E65000) | EACH | 2 | $9,380.00 | $9,380.00 |
| 388 | ITS cabinet - power distribution cabinet (PDC) (809E65020) | EACH | 1 | $6,850.00 | $6,850.00 |
| 389 | ITS cabinet - ramp meter (809E65030) | EACH | 2 | $15,480 | $15,480 |
| 390 | ITS cabinet - DMS (809E65040) | EACH | 2 | $11,580 | $11,580 |
| 391 | Step-down transformer, 3KVA (809E65100) | EACH | 1 | $10,400 | $10,400 |
| 392 | ITS device, misc.: removal of CCTV pole, camera, F (809E65990) | EACH | 2 | $3,470.00 | $3,470.00 |
| 393 | ITS device, misc.: removal of DMS sign (809E65990) | EACH | 2 | $3,360.00 | $3,360.00 |
| 394 | ITS device, misc.: removal of ITS cabinet assembly (809E65990) | EACH | 7 | $840.00 | $840.00 |
| 395 | Side-fired radar detector (809E68900) | EACH | 2 | $9,970.00 | $9,970.00 |
| 396 | Atc controller (809E69122) | EACH | 2 | $6,890.00 | $6,890.00 |
| 397 | Maintaining ITS during construction (809E70000) | LS | 1 | $149,770 | $149,770 |
| 398 | As-built construction plans (809E70050) | LS | 1 | $21,600 | $21,600 |
| 399 | Conduit, 2", 725.051 (625E25408) | FT | 325 | $6.75 | $6.75 |
| 400 | Conduit, 3", 725.051 (625E25504) | FT | 6 | $19.20 | $19.20 |
| 401 | Conduit, jacked or drilled, 725.04, 3" (625E25902) | FT | 96 | $101.70 | $101.70 |
| 402 | Trench (625E29000) | FT | 166 | $2.70 | $2.70 |
| 403 | Pull box, 725.08, 24" (625E30706) | EACH | 3 | $1,028.00 | $1,028.00 |
| 404 | Ground rod (625E32000) | EACH | 6 | $255.00 | $255.00 |
| 405 | Underground warning marking tape (625E36010) | FT | 166 | $2.20 | $2.20 |
| 406 | Ground mounted support, no. 2 post (630E02100) | FT | 28 | $24.00 | $24.00 |
| 407 | Sign hanger assembly, mast arm (630E79100) | EACH | 6 | $490.00 | $490.50 |
| 408 | Sign support assembly, pole mounted (630E79500) | EACH | 2 | $160.00 | $160.00 |
| 409 | Sign, flat sheet (630E80100) | SF | 9 | $18.50 | $18.50 |
| 410 | Sign, street name (630E80510) | EACH | 3 | $445.00 | $445.00 |
| 411 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate (632E05006) | EACH | 6 | $1,042.00 | $1,042.00 |
| 412 | Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate (632E05086) | EACH | 1 | $1,768.00 | $1,768.00 |
| 413 | Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731) | EACH | 2 | $794.00 | $794.00 |
| 414 | Accessible pedestrian pushbutton, as per plan (632E20751) | EACH | 2 | $870.00 | $870.00 |
| 415 | Covering of vehicular signal head (632E25000) | EACH | 7 | $37.25 | $37.25 |
| 416 | Covering of pedestrian signal head (632E25010) | EACH | 2 | $37.25 | $37.25 |
| 417 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 770 | $3.30 | $3.30 |
| 418 | Signal support foundation, as per plan (632E64011) | EACH | 2 | $8,585.00 | $8,585.00 |
| 419 | Pedestal foundation, as per plan (632E64021) | EACH | 391 | $695.00 | $1,390.00 |
| 420 | Loop detector lead-in cable (632E65200) | FT | 246 | $2.05 | $2.05 |
| 421 | Power cable, 2 conductor, no. 6 AWG (632E68200) | FT | 62 | $3.75 | $3.75 |
| 422 | Service cable, 3 conductor, no. 6 AWG (632E69800) | FT | 119 | $4.70 | $4.70 |
| 423 | Power service, as per plan (632E70001) | EACH | 1 | $3,880.00 | $3,880.00 |
| 424 | Signal support, type TC-12.31 design 6 pole, with mast arms TC-81.22 design 4 and design 4, as per plan (632E71225) | EACH | 1 | $24,300 | $24,300 |
| 425 | Signal support, type TC-81.22, design 4, as per plan (632E72111) | EACH | 1 | $15,765 | $15,765 |
| 426 | Pedestal, 11', transformer base, as per plan (632E90001) | EACH | 1 | $1,640.00 | $1,640.00 |
| 427 | Pedestal, misc.: pedestal, 19', transformer base (632E90010) | EACH | 1 | $2,950.00 | $2,950.00 |
| 428 | Removal of traffic signal installation, as per plan (632E90101) | EACH | 1 | $4,310.00 | $4,310.00 |
| 429 | Cabinet, type 332 (633E65520) | EACH | 1 | $18,470 | $18,470 |
| 430 | Cabinet foundation (633E67100) | EACH | 1 | $1,435.00 | $1,435.00 |
| 431 | Controller work pad (633E67200) | EACH | 1 | $1,060.00 | $1,060.00 |
| 432 | Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001) | EACH | 1 | $8,100.00 | $8,100.00 |
| 433 | Advance radar detection, as per plan (809E69001) | EACH | 1 | $9,200.00 | $9,200.00 |
| 434 | Stop line radar detection, as per plan (809E69101) | EACH | 4 | $8,870.00 | $8,870.00 |
| 436 | Atc controller, as per plan (809E69123) | EACH | 1 | $7,715.00 | $7,715.00 |
| 437 | Pavement repair, misc.: performed in 2025 (253E90000) | CY | 300 | $380.00 | $870.00 |
| 438 | Pavement repair, misc.: performed in 2026 (253E90000) | CY | 300 | $380.00 | $900.00 |
| 439 | Pavement repair, misc.: performed in 2027 (253E90000) | CY | 150 | $380.00 | $925.00 |
| 440 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $265,027 | $476,366 |
| 441 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $110,700 | $193,588 |
| 442 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $50,080 | $78,617 |
| 443 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $1,270,855 | $1,939,182 |
| 444 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $1,077,996 | $889,685 |
| 445 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $747,093 | $669,237 |
| 446 | Impact attenuator, type 2 (unidirectional), 60 MPH (606E60022) | EACH | 4 | $48,317 | $42,250 |
| 447 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 1,500 | $137.41 | $107.50 |
| 448 | Increased barrier delineation (614E11630) | FT | 11,300 | $2.97 | $2.70 |
| 449 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 23 | $2,578.43 | $1,925.33 |
| 450 | Work zone impact attenuator, misc.: 24" wide hazar (614E12400) | EACH | 2 | $3,189.43 | $2,340.51 |
| 451 | Detour signing (614E12420) | LS | 1 | $14,270 | $14,270 |
| 452 | Work zone increased penalties sign (614E12484) | EACH | 21 | $296.24 | $253.43 |
| 453 | Replacement sign (614E12500) | EACH | 10 | $296.64 | $232.62 |
| 454 | Replacement drum (614E12600) | EACH | 100 | $124.51 | $58.32 |
| 455 | Work zone crossover lighting system (614E12756) | EACH | 2 | $32,525 | $32,525 |
| 456 | Work zone raised pavement marker (614E12800) | EACH | 250 | $19.31 | $6.78 |
| 457 | Work zone raised pavement marker, as per plan (614E12801) | EACH | 1,650 | $49.55 | $96.75 |
| 458 | Asphalt concrete for maintaining traffic (614E13000) | CY | 75 | $192.35 | $250.00 |
| 459 | Barrier reflector, type 1, bidirectional (614E13310) | EACH | 1,565 | $21.28 | $12.20 |
| 460 | Barrier reflector, type 2, bidirectional (614E13312) | EACH | 10 | $29.78 | $12.20 |
| 461 | Object marker, one way (614E13350) | EACH | 1,275 | $21.93 | $18.77 |
| 462 | Object marker, two way (614E13360) | EACH | 300 | $21.93 | $19.10 |
| 463 | Portable changeable message sign, as per plan (614E18601) | SNMT | 52 | $886.48 | $886.48 |
| 464 | Work zone lane line, class I, 6", 807 paint (614E20056) | MI | 14.10 | $1,555.00 | $1,555.00 |
| 465 | Work zone lane line, class I, 6", 648 (614E20366) | MI | 4.20 | $1,250.00 | $1,250.00 |
| 466 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 7.04 | $250.00 | $250.00 |
| 467 | Work zone edge line, class I, 6", 807 paint (614E22056) | MI | 37.70 | $2,250.00 | $2,250.00 |
| 468 | Work zone edge line, class I, 6", 648 (614E22336) | MI | 10 | $4,255.00 | $4,255.00 |
| 469 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 8.10 | $750.00 | $750.00 |
| 470 | Work zone channelizing line, class I, 12", 807 paint (614E23110) | FT | 49,344 | $1.60 | $1.60 |
| 471 | Work zone channelizing line, class I, 8", 648 (614E23140) | FT | 5,650 | $1.50 | $1.50 |
| 472 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 10,304 | $0.75 | $0.75 |
| 473 | Work zone dotted line, class I, 6", 807 paint (614E24102) | FT | 22,093 | $1.25 | $1.25 |
| 474 | Work zone dotted line, class I, 6", 648 (614E24142) | FT | 2,580 | $1.25 | $1.25 |
| 475 | Work zone dotted line, class III, 6", 642 paint (614E24612) | FT | 7,560 | $0.70 | $0.70 |
| 476 | Work zone transverse/diagonal line, class I, 642 paint (614E25200) | FT | 1,298 | $3.75 | $3.75 |
| 477 | Work zone stop line, class I, 642 paint (614E26200) | FT | 56 | $4.00 | $4.00 |
| 478 | Work zone crosswalk line, class I, 12", 642 paint (614E27050) | FT | 378 | $3.50 | $3.50 |
| 479 | Work zone gore marking, class II, 642 paint (614E28200) | FT | 156 | $3.75 | $3.75 |
| 480 | Work zone arrow, class I, 642 paint (614E30200) | EACH | 26 | $100.00 | $100.00 |
| 481 | Roads for maintaining traffic (615E10000) | LS | 1 | $341,540 | $91,951 |
| 482 | Pavement for maintaining traffic, class A (615E20000) | SY | 4,658 | $96.25 | $105.25 |
| 483 | Pavement for maintaining traffic, class A, as per plan (615E20001) | SY | 4,830 | $27.00 | $25.00 |
| 484 | Water (616E10000) | MGAL | 810 | $165.70 | $15.26 |
| 485 | Portable barrier, 50", as per plan (622E41011) | FT | 14,832 | $35.91 | $29.37 |
| 486 | Dual portable barrier transition/termination (622E41060) | EACH | 4 | $3,259.56 | $7,623.24 |
| 487 | Portable barrier, unanchored (622E41100) | FT | 50,923 | $16.43 | $19.76 |
| 488 | Portable barrier, anchored (622E41110) | FT | 10,705 | $53.06 | $27.84 |
| 489 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 132 | $779.62 | $1,218.74 |
| 490 | Portable non-intrusive traffic sensor, class I (896E00010) | SNMT | 96 | $1,036.94 | $1,036.94 |
| 491 | Portable changeable message sign, as per plan (896E00021) | SNMT | 24 | $886.48 | $886.48 |
| 492 | Sealing of concrete surfaces (512E10000) | SY | 375 | $18.00 | $18.00 |
| 493 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 175 | $28.50 | $28.50 |
| 494 | Unclassified excavation, as per plan (503E21301) | LS | 1 | $58,360 | $73,333 |
| 495 | Steel piles, misc.: HP12X53 (507E00400) | FT | 14,230 | $75.00 | $127.56 |
| 496 | Epoxy coated steel reinforcement (509E10000) | LB | 297,098 | $1.45 | $1.89 |
| 497 | Class QC1 concrete, retaining/wingwall not including footing, as per plan (511E46011) | CY | 2,312 | $1,518.28 | $1,613.98 |
| 498 | Sealing of concrete surfaces, as per plan (512E10001) | SY | 4,745 | $18.00 | $18.44 |
| 499 | Sealing of concrete surfaces (epoxy-urethane), as per plan (512E10101) | SY | 4,745 | $20.00 | $20.44 |
| 500 | Type 2 waterproofing, as per plan (512E33001) | SY | 774 | $44.77 | $26.75 |
| 501 | 1" preformed expansion joint filler (516E13600) | SF | 8,650 | $15.56 | $9.00 |
| 502 | Prefabricated geocomposite drain (518E20000) | SY | 995 | $55.34 | $20.58 |
| 503 | 4" non-perforated corrugated plastic pipe, including specials (518E39900) | FT | 668 | $58.31 | $125.32 |
| 504 | Drilled shafts, 30" diameter, above bedrock, as per plan (524E94603) | FT | 13,589 | $125.22 | $124.83 |
| 505 | Special - retaining wall, timber lagging (530E51020) | SF | 49,169 | $20.03 | $28.11 |
| 506 | Ground anchor, 105 kip max test load (866E00100) | EACH | 266 | $6,165.00 | $4,070.00 |
| 507 | Ground anchor, 128 kip max test load (866E00100) | EACH | 243 | $6,725.00 | $4,610.00 |
| 508 | Ground anchor, 138 kip max test load (866E00100) | EACH | 9 | $7,285.00 | $4,730.00 |
| 509 | Ground anchor, 150 kip max test load (866E00100) | EACH | 76 | $8,215.00 | $4,920.00 |
| 510 | Ground anchor, 172 kip max test load (866E00100) | EACH | 38 | $8,965.00 | $5,360.00 |
| 511 | Ground anchor, 175 kip max test load (866E00100) | EACH | 18 | $8,965.00 | $5,770.00 |
| 512 | Ground anchor, 215 kip max test load (866E00100) | EACH | 24 | $13,000 | $6,790.00 |
| 513 | Ground anchor, 78 kip max test load (866E00100) | EACH | 11 | $4,000.00 | $3,690.00 |
| 514 | Investigative anchor pullout tests (866E00300) | LS | 1 | $20,000 | $45,000 |
| 515 | Performance test (866E00400) | EACH | 35 | $250.00 | $2,500.00 |
| 516 | Extended creep test (866E00500) | EACH | 6 | $500.00 | $6,600.00 |
| 517 | Embankment, using natural soils, 703.16.A (203E22000) | CY | 85 | $82.41 | $145.90 |
| 518 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $70,780 | $604,386 |
| 519 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $700,000 | $1,164,718 |
| 520 | Unclassified excavation, as per plan (503E21301) | LS | 1 | $389,728 | $293,725 |
| 521 | Epoxy coated steel reinforcement (509E10000) | LB | 143,037 | $1.60 | $1.84 |
| 522 | Class QC1 concrete with QC/QA, substructure (511E50212) | CY | 1,183 | $1,418.20 | $1,348.41 |
| 523 | Sealing of concrete surfaces, as per plan (512E10001) | SY | 874 | $18.00 | $18.43 |
| 524 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 874 | $28.50 | $28.50 |
| 525 | Type 2 waterproofing (512E33000) | SY | 100 | $55.48 | $26.75 |
| 526 | 1" preformed expansion joint filler (516E13600) | SF | 447 | $15.07 | $6.40 |
| 527 | Porous backfill with geotextile fabric (518E21200) | CY | 460 | $145.45 | $158.22 |
| 528 | 6" perforated corrugated plastic pipe (518E40000) | FT | 1,024 | $22.40 | $3.17 |
| 529 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 371 | $54.15 | $19.42 |
| 530 | Special - form liner (530E13000) | SF | 2,646 | $2.03 | $52.82 |
| 531 | Paved gutter, type 1-2 (601E37500) | FT | 120 | $274.10 | $72.00 |
| 532 | Paved gutter, type 1-2, as per plan (601E37501) | FT | 502 | $271.33 | $100.00 |
| 533 | Granular material, type B, as per plan (203E35111) | CY | 70 | $104.14 | $132.74 |
| 534 | Special - settlement platform (203E65000) | EACH | 5 | $2,844.93 | $1,704.69 |
| 535 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $246,917 | $40,584 |
| 536 | Sealing of concrete surfaces, as per plan (512E10001) | SY | 2,304 | $18.00 | $18.46 |
| 537 | Sealing of concrete surfaces (epoxy-urethane), as per plan (512E10101) | SY | 2,304 | $28.50 | $28.50 |
| 538 | 1" preformed expansion joint filler (516E13600) | SF | 56 | $17.03 | $6.47 |
| 539 | Railing, misc.: traffic barrier on MSE wall (517E76300) | FT | 537 | $737.36 | $1,110.23 |
| 541 | Concrete slope protection (601E21000) | SY | 9 | $479.93 | $243.24 |
| 542 | Paved gutter, type 1-2 (601E37500) | FT | 489 | $97.26 | $100.00 |
| 544 | Wall excavation (840E21000) | CY | 5,447 | $36.27 | $63.89 |
| 545 | Foundation preparation (840E22000) | SY | 1,619 | $36.68 | $52.08 |
| 546 | Select granular backfill (840E23000) | CY | 4,940 | $98.36 | $107.75 |
| 547 | Natural soil (840E23050) | CY | 657 | $50.39 | $39.82 |
| 548 | 6" drainage pipe, perforated (840E25010) | FT | 2,962 | $11.56 | $9.87 |
| 549 | 6" drainage pipe, non-perforated (840E25020) | FT | 92 | $53.93 | $57.01 |
| 550 | Concrete coping (840E26000) | FT | 1,219 | $420.81 | $236.14 |
| 551 | Aesthetic surface treatment (840E26050) | SF | 17,377 | $1.25 | $13.93 |
| 552 | On-site assistance (840E27000) | DAY | 5 | $749.50 | $761.29 |
| 553 | Structure removed, over 20 foot span (202E11002) | LS | 1 | $225,000 | $252,235 |
| 555 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $500.00 | $5,038.17 |
| 556 | Unclassified excavation (503E21100) | CY | 103 | $250.00 | $161.30 |
| 557 | Pile driving equipment mobilization (505E11100) | LS | 1 | $86,500 | $5,819.78 |
| 558 | 14" cast-in-place reinforced concrete piles, driven (507E00600) | FT | 1,350 | $50.00 | $54.81 |
| 559 | 14" cast-in-place reinforced concrete piles, furnished (507E00650) | FT | 1,460 | $55.00 | $88.27 |
| 560 | Epoxy coated steel reinforcement (509E10000) | LB | 11,324 | $2.25 | $2.08 |
| 561 | Class QC1 concrete, footing (511E46510) | CY | 45 | $1,100.00 | $966.76 |
| 562 | Class QC3 concrete, misc.:concrete with QC/QA, bri (511E53014) | CY | 72 | $1,900.00 | $1,308.93 |
| 563 | Class QC3 concrete, misc.:concrete with QC/QA, sub (511E53014) | CY | 52 | $2,500.00 | $2,112.67 |
| 564 | Class QC3 concrete, misc.:concrete, sidewalk, as P (511E53014) | CY | 10 | $2,500.00 | $2,621.27 |
| 565 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 133 | $28.50 | $28.50 |
| 566 | Structural steel, misc.:prefabricated bridge (513E95020) | LS | 1 | $785,000 | $1,120,163 |
| 567 | Armorless preformed joint seal (516E10010) | FT | 12 | $120.00 | $106.04 |
| 568 | Structural expansion joint including elastomeric compression seal, as per plan (516E10501) | FT | 42 | $375.00 | $891.28 |
| 569 | 1" preformed expansion joint filler (516E13600) | SF | 68 | $20.00 | $5.22 |
| 570 | Railing, misc.: steel ornamental railing (517E76300) | FT | 96 | $195.00 | $195.00 |
| 571 | Dynamic load testing (523E20000) | EACH | 6 | $4,500.00 | $7,995.64 |
| 572 | Restrike (523E20500) | EACH | 6 | $3,200.00 | $949.98 |
| 573 | Reinforced concrete approach slabs (T=12") (526E10000) | SY | 28 | $900.00 | $540.04 |
| 574 | Type C installation (526E90030) | FT | 12 | $700.00 | $442.87 |
| 575 | Vandal protection fence, 10' curved, coated fabric, as per plan (607E39921) | FT | 421 | $360.00 | $371.11 |
| 576 | Concrete barrier, single slope, type D, as per plan (622E10161) | FT | 55 | $500.00 | $278.57 |
| 577 | Department'S share of the dispute resolution board (100E51100) | EACH | 100,000 | $1.00 | $1.00 |
| 578 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $579,697 | $478,435 |
| 579 | CPM progress schedule (108E10000) | LS | 1 | $46,552 | $28,380 |
| 580 | Special - departments share facilitated partnering costs (111E10100) | EACH | 50,000 | $1.00 | $1.00 |
| 581 | Maintaining traffic (614E11000) | LS | 1 | $1,891,588 | $2,092,061 |
| 582 | Field office, type C, as per plan (619E16021) | MNTH | 36 | $4,634.60 | $4,910.00 |
| 583 | Construction layout stakes and surveying (623E10000) | LS | 1 | $523,792 | $250,000 |
| 584 | Mobilization (624E10000) | LS | 1 | $4,300,000 | $2,000,000 |
| 585 | Special - consultant for concrete quality control (690E98400) | LS | 1 | $425,406 | $373,675 |
| 600 | Pile driving equipment mobilization (505E11100) | LS | 1 | $34,657 | $5,819.78 |
| 601 | 14" cast-in-place reinforced concrete piles, driven (507E00600) | FT | 475 | $57.82 | $64.09 |
| 602 | 14" cast-in-place reinforced concrete piles, furnished (507E00650) | FT | 570 | $97.02 | $89.41 |
| 603 | Prebored holes, as per plan (507E92201) | FT | 473 | $297.41 | $62.16 |
| 604 | Dynamic load testing (523E20000) | EACH | 1 | $3,800.00 | $7,251.21 |
| 605 | 15" conduit, type B, as per plan (611E05901) | FT | 114 | $292.74 | $296.20 |
| 606 | Conduit, bored or jacked' 24?, type B (611E96600) | FT | 80 | $958.90 | $1,138.03 |
| 607 | Inlet, no. 3 for single slope barrier, type B1, as per plan (611E99101) | EACH | 5 | $9,377.08 | $20,299 |
| 608 | Partial depth pavement repair (441), as per plan (251E01001) | SY | 5 | $2,968.11 | $774.00 |
| 609 | Special -' manhole misc.: sanitary manhole per MSD (690E98000) | EACH | 2 | $32,898 | $27,414 |
| 610 | Special - sanitary sewer (611E97910) | LS | 1 | $87,475 | $50,000 |
| 611 | Catch basin, no. 3, as per plan (611E98151) | EACH | 2 | $2,051.63 | $5,820.11 |
| 612 | Inlet, no. 3 for single slope barrier, type D, as per plan (611E99115) | EACH | 4 | $8,527.38 | $15,921 |
| 613 | Manhole, no. 3, as per plan (611E99575) | EACH | 1 | $11,428 | $4,733.88 |
| 614 | Special - asbestos abatement, SFN 3110133 (690E71000) | LS | 1 | $5,000.00 | $1,500.00 |
| 615 | Special -manhole misc: sanitary manhole per MSD AC (690E98000) | EACH | 1 | $14,682 | $22,820 |
| 616 | Special -manhole misc: sanitary manhole per MSD AC [alternate group AA1] (690E98000) | EACH | 1 | $14,682 | $21,197 |
| 618 | Inspection and compaction testing of unbound materials (878E25000) | LS | 1 | $480,622 | $87,000 |
| 619 | Granular material, type B (203E35110) | CY | 65 | $130.00 | $149.43 |
| 620 | 8" conduit, type B (611E01800) | FT | 50 | $213.70 | $277.44 |
| 621 | Roadway, misc.: dynamic cone penetration test (203E98600) | EACH | 4 | $625.00 | $500.00 |
| 622 | Excavation of subgrade (204E13000) | CY | 3,592 | $69.42 | $64.13 |
| 623 | Granular material, type C (204E30020) | CY | 3,592 | $72.98 | $84.93 |
| 624 | Geotextile fabric (204E50000) | SY | 8,083 | $2.10 | $1.30 |
| 625 | Pavement repair, misc.: performed in 2028 (253E90000) | CY | 100 | $380.00 | $995.00 |
| 626 | Crosswalk line, 12" (646E10510) | FT | 535 | $8.00 | $8.00 |
| 627 | 36" conduit, type B, as per plan (611E16401) | FT | 20 | $902.97 | $754.89 |
| 628 | Mechanically stabilized earth wall (840E20000) | SF | 19,813 | $52.20 | $51.70 |
| 629 | Clearing and grubbing (201E11000) | LS | 1 | $419,560 | $325,174 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 15, 2025. Compiled by Mirage Metrics.