TDOT contract CNZ042 bid tabulation

The construction of concrete bulb-tee beam bridges on s.r. 68 over u.s. 64 (u.s. 74, s.r. 40) (l.m. 18.39), including grading, drainage, and paving. Let by Tennessee DOT on February 7, 2025, Polk County. 4 bids received; low bid $10,963,940 by Wright Brothers Civil Construction, LLC.

Owner
Tennessee DOT
Letting
07 FEB 2025
Pay items
132
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Wright Brothers Civil Construction, LLC$10,963,940Low
2APAC-Atlantic, Inc.$11,099,222+1.0%
3Jones Bros. Contractors, LLC$12,523,104+14%
4Summers-Taylor, Inc.$12,566,613+15%
TDOT contract CNZ042: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Wright Brothers Civil Construction, LLC2. APAC-Atlantic, Inc.3. Jones Bros. Contractors, LLC4. Summers-Taylor, Inc.
1Construction stakes, lines and grades (105-01)LS1$80,000$80,211$150,000$85,000
2Clearing and grubbing (201-01)LS1$95,000$63,438$53,000$53,000
3Removal of pipe (18" ,sta. 100+70.00) (202-01.13)LF69$49.70$159.91$125.00$125.00
4Removal of pipe (15" ,sta. 103+00.00) (202-01.14)LF97$48.40$159.92$120.00$120.00
5Removal of asphalt pavement (202-03.01)SY9,072$8.10$17.18$14.50$14.50
6Removal of structures (drop inlet, sta. 103+46.00) (202-04.01)LS1$1,800.00$4,377.28$4,600.00$4,600.00
7Road & drainage excavation (unclassified) (203-01)CY13,866$27.20$34.18$54.00$54.00
8Borrow excavation (borrow material) (203-02.05)CY1,911$27.20$46.23$63.50$63.50
9Placing and spreading topsoil (203-04)CY944$13.90$34.53$56.50$56.50
10Water (203-06)MG190$19.60$36.42$70.00$70.00
11Furnishing & spreading topsoil (203-07)CY238.02$50.75$89.59$77.00$77.00
12Backfill material (flowable fill) (204-08.01)CY10$520.00$2,112.03$600.00$550.00
13Temporary silt fence (with backing) (209-08.02)LF1,570$5.50$5.47$4.85$5.50
14Temporary silt fence (without backing) (209-08.03)LF3,150$3.40$3.40$3.00$3.50
15Enhanced rock check dam (209-08.08)EACH13$1,000.00$1,374.65$900.00$2,350.00
16Catch basin protection (type A) (209-40.30)EACH6$1,100.00$1,120.00$1,000.00$1,200.00
17Mineral aggregate, type A base, grading D (303-01)TON11,715.51$66.00$57.09$66.50$66.50
18Mineral aggregate (size 57) (303-10.01)TON2,786$62.00$59.48$60.00$74.50
19Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01)TON1,611.44$179.00$157.84$157.85$189.00
20Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08)TON2,268.15$177.00$156.50$156.50$187.50
21Bituminous material for prime coat (PC) (402-01)TON28.91$1,100.00$1,014.76$1,014.80$1,216.00
22Aggregate for cover material (PC) (402-02)TON100.74$355.00$323.62$323.75$388.00
23Bituminous material for tack coat (TC) (403-01)TON21$830.00$734.16$734.15$880.00
24Acs mix(PG64-22) grading D (411-01.10)TON2,387.17$197.00$173.91$174.00$177.00
25Cold planing bituminous pavement (415-01.01)TON1,047.62$49.30$43.44$43.50$45.00
26Class A concrete (roadway) (604-01.01)CY392.04$900.00$724.69$1,000.00$765.00
27Epoxy coated reinforcing steel (604-02.03)LB2,196$1.60$2.23$2.00$2.00
28Retaining wall (retaining wall 1) (604-07.01)SF1,137$199.00$330.53$300.00$278.25
2924" concrete pipe culvert (class III) (607-05.02)LF197$154.00$194.60$213.00$213.00
3024IN endwall (cross drain) 6:1 (611-07.59)EACH3$4,800.00$3,926.37$8,150.00$8,150.00
31Catch basins, type 42, 0' - 4' depth (611-42.01)EACH1$10,500$10,009$12,250$12,250
3218" temporary drainage pipe (621-03.02)LF236.50$75.25$75.99$102.00$102.00
3324" temporary drainage pipe (621-03.03)LF55.50$87.75$86.98$122.00$122.00
34Concrete curb (702-01.02)LF1,086$39.00$35.62$30.00$36.00
35Guardrail transition 27IN to 31IN (705-02.10)EACH4$223.00$224.00$100.00$230.00
36Earth pad for type 38 GR end treatment (705-04.09)EACH5$2,200.00$2,308.30$1,250.00$2,300.00
37W beam GR (type 2) MASH TL-3 (705-06.01)LF512.50$38.00$47.04$39.50$39.50
38GR terminaltrailing end (type 13) MASH TL-3 (705-06.10)EACH1$1,800.00$1,904.00$1,850.00$1,900.00
39Tangent energy absorbing term MASH TL-3 (705-06.20)EACH5$4,100.00$3,920.00$4,000.00$4,200.00
40Thrie beam bridge transition MASH TL-3 (705-06.25)EACH6$2,500.00$3,640.00$3,950.00$2,630.00
41Guardrail removed (706-01)LF1,263$4.00$1.12$1.00$4.00
42High-visibility construction fence (707-08.11)LF910$3.15$3.12$2.75$3.25
43Historical marker - move and reset (708-02.03)EACH1$2,300.00$713.33$1,250.00$1,255.00
44Machined rip-rap (class A-3) (709-05.05)TON1,115$69.25$97.67$81.50$81.50
45Machined rip-rap (class A-1) (709-05.06)TON136.20$67.25$97.67$96.00$96.00
46Traffic control (712-01)LS1$245,000$134,624$170,000$162,000
47Interconnected portable barrier rail (712-02.02)LF620$39.00$70.00$75.00$75.00
48Temporary work zone crash cushion (MASH TL-3) (712-02.60)EACH3$8,400.00$12,880$7,800.00$6,300.00
49Flexible drums (channelizing) (712-04.01)EACH450$43.30$42.56$38.00$45.00
50Signs (construction) (712-06)SF2,500.13$9.05$8.90$7.95$9.50
51Temporary barricades (type III) (712-07.03)LF37$23.30$22.96$20.50$24.50
52Arrow board (type C) (712-08.03)EACH4$2,300.00$2,240.00$2,000.00$2,400.00
53Queue protection truck (712-08.11)HR80$120.00$117.60$105.00$125.00
54Removable pavement marking (8" barrier line) (712-09.02)LF8,000$4.75$5.32$3.65$4.50
55Removable pavement marking (stop line) (712-09.04)LF427$28.00$28.00$26.00$31.00
56Removable pavement marking (6" line) (712-09.08)LF1,250$3.90$4.76$3.50$4.25
57Removable black-out tape (8IN) (712-09.31)LF1,000$5.30$5.32$3.85$4.50
58Sign post delineation enhancement (713-02.21)LF10$6.00$6.94$6.20$7.50
59Perforated/knockout square tube post (713-11.02)LB1,589$4.50$6.16$5.50$6.50
60Flat sheet aluminum signs (0.080" thick) (713-13.02)SF124$14.80$18.48$16.50$19.50
61Flat sheet aluminum signs (0.100" thick) (713-13.03)SF307$15.80$19.32$17.25$20.50
62Removal of signs, posts and footings (713-15)LS1$740.00$560.00$500.00$600.00
63Removal & relocation of sign & support (713-15.02)EACH3$342.00$168.00$150.00$178.00
64Changeable message sign unit (713-16.01)EACH9$9,450.00$9,296.00$8,300.00$9,850.00
65Barrier mounted sign support (see plans) (713-30.09)EACH4$484.00$1,344.00$1,200.00$1,425.00
66Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH41$56.00$56.00$41.50$49.00
67Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22)EACH22$56.00$56.00$41.50$49.00
68Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23)EACH183$56.00$56.00$41.50$49.00
69Plastic pavement marking(channelization striping) (716-02.04)SY909$23.60$28.00$21.50$25.50
70Plastic pavement marking (stop line) (716-02.05)LF190$16.80$14.00$12.00$14.25
71Plastic pavement marking (turn lane arrow) (716-02.06)EACH3$280.00$252.00$175.00$210.00
72Plastic pavement marking (24" barrier line) (716-02.07)LF330$10.10$8.68$11.00$13.00
73Plastic pavement marking (8" dotted line) (716-02.08)LF836.67$3.35$2.80$2.50$3.00
74Plastic pavement marking (8IN line) (716-02.12)LM0.28$11,400$16,921$10,000$12,000
75Plastic pavement marking(double turning arrow) (716-04.02)EACH1$393.00$252.00$200.00$237.00
76Plastic pavement marking (yield line) (716-04.12)SF18$16.80$28.00$20.00$24.00
77Plastic pavement marking (lane reduction arrow) (716-04.14)EACH1$393.00$252.00$275.00$325.00
78Painted pavement marking (turn lane arrow) (716-05.06)EACH7$168.00$56.00$90.00$107.00
79Painted pavement marking (6" line) (716-05.20)LM3.23$1,790.00$2,802.60$1,350.00$1,600.00
80Painted pavement marking(4"dotted line) (716-05.21)LF150$1.10$1.40$0.75$1.00
81Removal of pavement marking (line) (716-08.01)LF25,383.26$1.10$0.56$0.42$0.50
82Removal of pavement marking (turn lane arrow) (716-08.06)EACH5$140.00$56.00$85.00$100.00
83Removal of pavement marking (double turning arrow) (716-08.08)EACH1$280.00$84.00$100.00$119.00
84Removal of pavement marking (dotted line) (716-08.09)LF150$1.10$0.84$0.50$1.00
85Removal of pavement marking (yield line) (716-08.19)SF18$8.95$14.28$3.25$4.00
86Contrast pavement marking 6" dotted (716-09.90)LF167$8.95$16.80$9.75$11.50
87Contrast pavement shadow marking 6" (716-09.94)LM0.21$44,000$84,001$24,500$29,000
88Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM4.32$9,500.00$8,400.89$6,875.00$8,150.00
89Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05)LF470.83$2.25$2.53$2.00$2.40
90Mobilization (717-01)LS1$912,000$587,960$1,240,000$900,000
91Geogrid reinforcement type 2 (740-07.04)SY4,000$4.40$1.16$12.00$9.90
92Geotextile (type III)(erosion control) (740-10.03)SY837.60$4.40$4.20$4.25$4.15
93Geotextile (type IV)(stabilization) (740-10.04)SY1,000$4.45$4.52$4.25$5.75
94Temporary sediment tube 18IN (740-11.03)LF2,681$5.80$5.75$5.10$6.00
95Temporary seeding (with mulch) (801-01.07)UNIT127.66$45.50$44.80$40.00$47.50
96Water (seeding & sodding) (801-03)MG6.38$114.00$113.07$100.00$120.00
97Sodding (new sod) (803-01)SY7,092.11$7.65$7.50$6.70$8.00
98Removal of structures (BR. no. 70-SR68-18.39LT) (202-04.01)LS1$242,000$248,667$350,000$265,000
99Removal of structures (BR. no. 70-SR68-18.39RT) (202-04.02)LS1$242,000$248,667$600,000$265,000
100Dry excavation (bridges) (204-02.01)CY654$65.00$56.95$35.00$56.00
101Granular backfill (bridges) (303-01.02)TON118$82.00$105.01$60.00$101.00
102Epoxy coated reinforcing steel (604-02.03)LB166,930$1.55$1.57$1.75$1.45
103Class A concrete (bridges) (604-03.01)CY468$1,420.00$1,225.75$1,500.00$1,895.00
104Steel bar reinforcement (bridges) (604-03.02)LB86,619$1.30$1.86$1.50$1.70
105Pavement @ bridge ends (604-03.04)SY485$322.00$485.74$375.00$411.00
106Class D concrete (bridge deck) (604-03.09)CY702$1,420.00$1,197.11$1,500.00$1,279.00
107Applied texture finish (new structures) (604-04.01)SY6,331$18.50$12.32$8.25$9.80
108Three star state emblem (604-04.41)EACH12$3,700.00$2,785.37$4,000.00$2,300.00
109Bridge deck grooving (mechanical) (604-05.31)SY2,849$4.35$12.60$3.83$5.20
110Steel piles (12 inch) (606-03.03)LF8,151$79.00$74.54$75.00$85.00
111Pile tips (steel piles, 12 inch) (606-03.06)EACH128$140.00$189.66$130.00$149.00
112Prestressed concrete bulb tee beam (6" web)(BT-63) (615-01.11)LF2,539$375.00$549.33$475.00$575.00
113Conc parapet single slope (STD-1-1SS) (620-05.01)LF1,082$113.00$156.40$120.00$145.00
1146" perforated pipe with vertical drain system (710-09.01)LF303$49.70$79.21$50.00$37.00
1156" pipe underdrain (710-09.02)LF160$17.95$42.42$10.00$30.00
116Pole 35FT class 5 wood (793-01.08)EACH8$2,400.00$1,730.40$2,125.00$2,520.00
117Anchor 1IN (793-01.41)EACH4$960.00$1,338.40$857.00$1,015.00
118Concrete handhole 4FT X 4FT X 4FT (793-11.25)EACH2$14,000$15,051$12,500$14,800
119Dig splice pit (50 LF) (793-12.21)EACH2$4,700.00$4,768.96$4,190.00$4,970.00
1202 duct formation @ 36IN depth (793-13.17)LF35$93.00$85.12$83.00$98.00
1214 duct formation @ 36IN depth (793-13.27)LF1,302$97.50$106.40$87.00$103.00
1226 duct formation @ 36IN depth (793-13.32)LF130$129.00$196.00$115.00$136.00
123Concrete encasement per duct (793-14.02)LF6,058$14.60$8.80$13.00$15.40
124MH precast 4-FT W X 8-FT L X 6-FT H (793-14.05)EACH1$36,100$26,009$32,150$38,100
125Bridge conduit hanger system (793-14.09)LS1$101,500$103,965$90,500$110,000
126Multi duct (793-14.14)LF2,030$3.50$5.88$3.10$3.60
127Rod ducts (793-14.21)LF4,060$1.35$1.29$1.20$1.40
128Underground to overhead riser (793-14.26)EACH5$660.00$1,613.92$588.00$697.00
129Directional bore 4IN/flex sleeve (793-16.04)LF420$89.25$122.08$79.50$94.00
130Bore/jack 16IN casing - unconsolidated (793-16.09)LF280$990.00$1,246.56$885.00$1,760.00
131Adjust manhole lid (793-16.21)EACH1$1,600.00$2,128.00$1,465.00$1,737.00
132MH(retire/remove/sand backfill) (793-16.25)EACH1$1,600.00$11,480$1,455.00$1,725.00
TDOT contract CNZ042: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of February 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy