TDOT contract CNZ194 bid tabulation
The grading, drainage, and paving on u.s. 70 (s.r. 1) from the camden bypass (l.m. 8.54) to the tennessee river (l.m. 12.65). Let by Tennessee DOT on June 27, 2025, Benton County. 4 bids received; low bid $85,754,540 by Vaughn Contractors, Inc..
- Owner
- Tennessee DOT
- Letting
- 27 JUN 2025
- Pay items
- 378
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Vaughn Contractors, Inc. | $85,754,540 | Low |
| 2 | Eubank Asphalt Paving & Sealing, LLC | $94,474,864 | +10% |
| 3 | Jones Bros. Contractors, LLC | $98,688,769 | +15% |
| 4 | Delta Contracting Company, LLC | $104,624,164 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Vaughn Contractors, Inc. | 2. Eubank Asphalt Paving & Sealing, LLC | 3. Jones Bros. Contractors, LLC | 4. Delta Contracting Company, LLC |
|---|---|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $350,000 | $600,000 | $500,000 | $750,000 |
| 2 | CPM project schedule (108-03) | LS | 1 | $175,000 | $180,000 | $200,000 | $158,500 |
| 3 | Trainee (109-10.01) | HR | 5,760 | $0.80 | $0.80 | $0.80 | $0.80 |
| 4 | Clearing and grubbing (201-01) | LS | 1 | $1,550,000 | $1,100,000 | $2,750,000 | $6,443,636 |
| 5 | Removal of structures and obstructions (202-01) | LS | 1 | $25,000 | $300,000 | $150,000 | $150,000 |
| 6 | Water well abandonment (202-13) | EACH | 1 | $5,000.00 | $5,000.00 | $6,000.00 | $5,000.00 |
| 7 | Road & drainage excavation (unclassified) (203-01) | CY | 240,160 | $12.00 | $9.25 | $9.00 | $9.40 |
| 8 | RD & DRNG excv (acid producing- off site disposal) (203-01.07) | CY | 68,172 | $40.00 | $95.00 | $93.00 | $14.00 |
| 9 | Road & drainage excavation (stream mitigation) (203-01.13) | CY | 13,208 | $20.00 | $42.00 | $20.00 | $13.40 |
| 10 | Borrow excavation (graded solid rock) (203-02.01) | TON | 961,000 | $27.00 | $26.90 | $22.00 | $30.00 |
| 11 | Borrow excavation (unclassified) (203-03) | CY | 58,803 | $7.00 | $14.00 | $25.00 | $12.00 |
| 12 | Select granular material (203-03.10) | TON | 6,093 | $10.00 | $24.00 | $46.87 | $35.00 |
| 13 | Placing and spreading topsoil (203-04) | CY | 10,248 | $8.00 | $12.00 | $10.00 | $7.00 |
| 14 | Undercutting (203-05) | CY | 12,138 | $12.00 | $10.00 | $20.00 | $14.00 |
| 15 | Furnishing & spreading topsoil (203-07) | CY | 2,903 | $14.00 | $40.00 | $40.00 | $25.00 |
| 16 | Channel excavation (unclassified) (203-08) | CY | 52,472 | $14.50 | $22.00 | $35.00 | $45.00 |
| 17 | Channel substrate (203-20.01) | CY | 727 | $25.00 | $50.00 | $70.00 | $84.00 |
| 18 | Flowable fill (general) (204-06.01) | CY | 182 | $250.00 | $400.00 | $350.00 | $350.00 |
| 19 | Foundation fill material (204-08) | CY | 727 | $75.00 | $110.00 | $120.00 | $70.00 |
| 20 | 18" temporary slope drain (209-02.07) | LF | 23 | $50.00 | $100.00 | $40.00 | $30.00 |
| 21 | Filter sock (24 inch) (209-03.23) | LF | 714 | $12.50 | $12.50 | $15.00 | $12.50 |
| 22 | Stream mitigation cross vane structure (209-03.37) | EACH | 37 | $5,000.00 | $6,300.00 | $5,000.00 | $5,100.00 |
| 23 | Stream mitigation - live brush layering (209-03.42) | LF | 365 | $200.00 | $180.00 | $115.00 | $140.00 |
| 24 | Stream mitigation - brush mattress (209-03.59) | SY | 76 | $250.00 | $265.00 | $200.00 | $160.00 |
| 25 | Stream mitigation – wood toe W/reinforced earth (209-03.67) | LF | 365 | $400.00 | $350.00 | $250.00 | $113.00 |
| 26 | Protected area marker (white with decal) (209-03.99) | EACH | 22 | $300.00 | $420.00 | $150.00 | $120.00 |
| 27 | Sediment removal (209-05) | CY | 2,023 | $10.00 | $20.00 | $40.00 | $13.00 |
| 28 | Temporary silt fence (with backing) (209-08.02) | LF | 145,088 | $3.50 | $4.95 | $3.90 | $4.25 |
| 29 | Temporary silt fence (without backing) (209-08.03) | LF | 69,795 | $1.90 | $3.15 | $2.00 | $1.90 |
| 30 | Rock check dam (209-08.07) | EACH | 226 | $500.00 | $1,000.00 | $920.00 | $1,055.70 |
| 31 | Enhanced rock check dam (209-08.08) | EACH | 67 | $1,000.00 | $1,200.00 | $1,050.00 | $1,418.99 |
| 32 | Sandbags (209-09.01) | BAG | 5,226 | $6.00 | $7.35 | $10.00 | $5.20 |
| 33 | Sediment filter bag (15' X 15') (209-09.03) | EACH | 28 | $400.00 | $352.00 | $550.00 | $400.00 |
| 34 | Jute mesh fabric (209-09.24) | SY | 4,744 | $4.50 | $3.05 | $6.00 | $4.50 |
| 35 | Curb inlet protection (type 4) (209-09.43) | EACH | 87 | $450.00 | $200.00 | $350.00 | $450.00 |
| 36 | Turbidity curtain(epsc) (209-13.04) | LF | 17,874 | $20.00 | $50.00 | $21.00 | $20.00 |
| 37 | Polyethylene sheeting (6 mil. minimum) (209-20.03) | SY | 9,000 | $4.50 | $2.90 | $3.00 | $1.80 |
| 38 | Polyethylene sheeting (10 mil.) (209-20.04) | SY | 17,167 | $4.50 | $3.20 | $3.00 | $2.00 |
| 39 | Catch basin protection (type D) (209-40.33) | EACH | 2 | $550.00 | $475.00 | $550.00 | $550.00 |
| 40 | Catch basin filter assembly(type 2) (209-40.42) | EACH | 23 | $900.00 | $710.00 | $750.00 | $900.00 |
| 41 | Catch basin filter assembly(type 3) (209-40.43) | EACH | 7 | $900.00 | $1,000.00 | $750.00 | $900.00 |
| 42 | Catch basin filter assembly(type 4) (209-40.44) | EACH | 1 | $900.00 | $3,000.00 | $750.00 | $900.00 |
| 43 | Catch basin filter assembly(type 6) (209-40.46) | EACH | 33 | $900.00 | $680.00 | $750.00 | $900.00 |
| 44 | Catch basin filter assembly(type 7) (209-40.47) | EACH | 36 | $900.00 | $1,200.00 | $1,500.00 | $900.00 |
| 45 | Catch basin filter assembly(type 8) (209-40.48) | EACH | 3 | $900.00 | $1,400.00 | $1,500.00 | $900.00 |
| 46 | Temporary diversion channel (209-65.03) | LF | 547 | $25.00 | $100.00 | $25.00 | $44.00 |
| 47 | Temporary in stream diversion (209-65.04) | LF | 53 | $150.00 | $400.00 | $110.00 | $280.00 |
| 48 | Granular backfill (roadway) (303-01.01) | TON | 14,729 | $25.00 | $40.00 | $50.00 | $31.52 |
| 49 | Mineral aggregate, type B base, grading (D) (303-02) | TON | 1,000 | $30.00 | $30.00 | $44.00 | $37.24 |
| 50 | Mineral aggregate (size 57) (303-10.01) | TON | 161 | $48.00 | $75.00 | $60.00 | $48.79 |
| 51 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01) | TON | 40,389 | $106.00 | $104.00 | $115.00 | $106.00 |
| 52 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 27,206 | $108.00 | $113.00 | $130.00 | $108.00 |
| 53 | Asp. conc. mix(PG64-22) (BPMB-HM) GR. A-S (307-01.20) | TON | 22,047 | $106.00 | $103.00 | $115.00 | $106.00 |
| 54 | Bituminous material for prime coat (PC) (402-01) | TON | 289 | $300.00 | $800.00 | $1,000.00 | $300.00 |
| 55 | Aggregate for cover material (PC) (402-02) | TON | 969 | $20.00 | $40.00 | $50.00 | $20.00 |
| 56 | Bituminous material for tack coat (TC) (403-01) | TON | 170 | $300.00 | $850.00 | $1,000.00 | $300.00 |
| 57 | Acs mix (PG64-22) grading E shoulder (411-01.07) | TON | 1,697 | $128.00 | $122.00 | $134.00 | $128.00 |
| 58 | Acs mix(PG64-22) grading D (411-01.10) | TON | 14,279 | $148.00 | $126.00 | $160.00 | $148.00 |
| 59 | Scoring shoulders (non-continuous) (16IN width) (411-12.02) | LM | 7.32 | $1,175.00 | $1,200.00 | $1,800.00 | $1,617.00 |
| 60 | Cold planing bituminous pavement (415-01.01) | TON | 1,743 | $48.00 | $30.00 | $68.00 | $48.00 |
| 61 | Class A concrete (roadway) (604-01.01) | CY | 1,669 | $1,300.00 | $1,575.00 | $1,400.00 | $2,024.77 |
| 62 | Steel bar reinforcement (roadway) (604-01.02) | LB | 350,518 | $1.50 | $1.30 | $2.00 | $1.40 |
| 63 | Portland cement grout (604-15.01) | CY | 1 | $300.00 | $1,500.00 | $1,500.00 | $1,000.00 |
| 64 | 18" concrete pipe culvert (class III) (607-03.02) | LF | 10,364 | $61.25 | $97.50 | $89.00 | $82.00 |
| 65 | 18" concrete pipe culvert(class IV)jacked-in-place (607-03.05) | LF | 89 | $1,050.00 | $1,250.00 | $1,125.00 | $1,105.00 |
| 66 | 24" concrete pipe culvert (class III) (607-05.02) | LF | 1,188 | $77.00 | $125.00 | $113.00 | $100.00 |
| 67 | 30" concrete pipe culvert (class III) (607-06.02) | LF | 2,398 | $97.50 | $140.00 | $143.00 | $164.00 |
| 68 | 30" concrete pipe culvert(class IV)jacked-in-place (607-06.05) | LF | 179 | $2,000.00 | $1,600.00 | $1,500.00 | $1,975.00 |
| 69 | 36" concrete pipe culvert (class III) (607-07.02) | LF | 57 | $150.00 | $225.00 | $224.00 | $175.00 |
| 70 | 36" concrete pipe culvert(class IV)jacked-in-place (607-07.05) | LF | 85 | $2,450.00 | $1,900.00 | $1,700.00 | $2,534.00 |
| 71 | 30"X 19" horizontal oval concrete pipe culvert (607-16.02) | LF | 60 | $115.00 | $210.00 | $175.00 | $200.00 |
| 72 | 68"X 43" horizontal oval concrete pipe culvert (607-16.10) | LF | 56 | $500.00 | $900.00 | $500.00 | $600.00 |
| 73 | 18" corrugated metal pipe culvert (607-37.02) | LF | 282 | $82.00 | $90.00 | $110.00 | $56.00 |
| 74 | 24" corrugated metal pipe culvert (607-37.03) | LF | 96 | $105.00 | $120.00 | $135.00 | $65.00 |
| 75 | 36" corrugated metal pipe culvert (607-37.05) | LF | 350 | $150.00 | $150.00 | $175.00 | $90.00 |
| 76 | 48" corrugated metal pipe culvert (607-37.07) | LF | 188 | $200.00 | $175.00 | $230.00 | $110.00 |
| 77 | 18" pipe culvert (side drain) (607-39.02) | LF | 471 | $51.00 | $90.00 | $75.00 | $40.00 |
| 78 | 24" pipe culvert (side drain) (607-39.03) | LF | 152 | $64.00 | $120.00 | $90.00 | $50.00 |
| 79 | Class A concrete (pipe endwalls) (611-07.01) | CY | 32 | $1,400.00 | $2,200.00 | $2,400.00 | $2,380.00 |
| 80 | Steel bar reinforcement (pipe endwalls) (611-07.02) | LB | 1,258 | $2.60 | $3.30 | $3.00 | $3.80 |
| 81 | 18IN endwall (side drain) (611-07.31) | EACH | 10 | $4,000.00 | $4,200.00 | $5,400.00 | $5,500.00 |
| 82 | 24IN endwall (side drain) (611-07.32) | EACH | 4 | $5,500.00 | $5,200.00 | $5,600.00 | $7,200.00 |
| 83 | 30IN endwall (side drain) (611-07.33) | EACH | 2 | $12,000 | $7,300.00 | $13,300 | $15,000 |
| 84 | 18IN endwall (cross drain) 3:1 (611-07.54) | EACH | 2 | $2,500.00 | $2,900.00 | $2,550.00 | $3,000.00 |
| 85 | 24IN endwall (cross drain) 3:1 (611-07.57) | EACH | 3 | $2,500.00 | $4,300.00 | $4,100.00 | $3,500.00 |
| 86 | 30IN endwall (cross drain) 3:1 (611-07.60) | EACH | 7 | $5,500.00 | $4,700.00 | $7,600.00 | $6,000.00 |
| 87 | 36IN endwall (cross drain) 3:1 (611-07.63) | EACH | 2 | $5,500.00 | $5,800.00 | $10,300 | $7,300.00 |
| 88 | 42IN endwall (cross drain) 3:1 (611-07.66) | EACH | 2 | $5,500.00 | $7,800.00 | $12,300 | $8,800.00 |
| 89 | Catch basins, type 10, > 4' - 8' depth (611-10.02) | EACH | 1 | $7,600.00 | $4,500.00 | $6,300.00 | $5,500.00 |
| 90 | Catch basins, type 10, > 12' - 16' depth (611-10.04) | EACH | 1 | $11,000 | $6,700.00 | $12,800 | $7,800.00 |
| 91 | Catch basins, type 25, 0' - 4' depth (611-25.01) | EACH | 11 | $4,000.00 | $4,500.00 | $6,850.00 | $6,300.00 |
| 92 | Catch basins, type 25, > 4' - 8' depth (611-25.02) | EACH | 20 | $5,150.00 | $6,000.00 | $7,700.00 | $8,500.00 |
| 93 | Catch basins, type 25, > 8' - 12' depth (611-25.03) | EACH | 9 | $8,250.00 | $7,800.00 | $10,100 | $9,000.00 |
| 94 | Catch basins, type 25, > 12' - 16' depth (611-25.04) | EACH | 2 | $8,300.00 | $10,000 | $9,600.00 | $12,000 |
| 95 | Catch basins, type 25, > 16' - 20' depth (611-25.05) | EACH | 3 | $14,000 | $12,000 | $14,800 | $12,500 |
| 96 | Catch basins, type 25, > 20' - 24' depth (611-25.06) | EACH | 2 | $10,000 | $14,000 | $16,000 | $14,000 |
| 97 | Catch basins, type 26, > 4' - 8' depth (611-26.02) | EACH | 29 | $7,500.00 | $7,000.00 | $10,500 | $10,000 |
| 98 | Catch basins, type 26, > 8' - 12' depth (611-26.03) | EACH | 5 | $11,200 | $9,000.00 | $14,100 | $12,000 |
| 99 | Catch basins, type 26, > 12' - 16' depth (611-26.04) | EACH | 1 | $17,000 | $15,000 | $21,400 | $1.00 |
| 100 | Catch basins, type 27, > 8' - 12' depth (611-27.03) | EACH | 5 | $15,000 | $9,500.00 | $18,400 | $15,000 |
| 101 | Catch basins, type 27, > 16' - 20' depth (611-27.05) | EACH | 1 | $23,500 | $16,000 | $24,400 | $1.00 |
| 102 | Catch basins, type 42, 0' - 4' depth (611-42.01) | EACH | 10 | $4,800.00 | $4,500.00 | $6,850.00 | $6,000.00 |
| 103 | Catch basins, type 42, > 4' - 8' depth (611-42.02) | EACH | 5 | $4,800.00 | $6,500.00 | $16,000 | $6,200.00 |
| 104 | Temporary structure (sta. 252+50) (621-01.01) | LS | 1 | $10,000 | $100,000 | $235,000 | $1.00 |
| 105 | Temporary structure (sta. 271+00) (621-01.02) | LS | 1 | $10,000 | $100,000 | $235,000 | $1.00 |
| 106 | Temporary structure (sta. 289+50) (621-01.03) | LS | 1 | $10,000 | $100,000 | $235,000 | $1.00 |
| 107 | 18" temporary drainage pipe (621-03.02) | LF | 1,655 | $40.00 | $65.00 | $35.00 | $30.00 |
| 108 | 24" temporary drainage pipe (621-03.03) | LF | 616 | $50.00 | $85.00 | $45.00 | $40.00 |
| 109 | 30" temporary drainage pipe (621-03.04) | LF | 147 | $70.00 | $95.00 | $65.00 | $55.00 |
| 110 | Temporary shoring (621-05.01) | SF | 4,138 | $125.00 | $75.00 | $40.00 | $65.00 |
| 111 | Concrete sidewalk (4 ") (701-01.01) | SF | 87,825 | $6.60 | $6.85 | $6.65 | $8.00 |
| 112 | Concrete driveway (701-02) | SF | 7,995 | $9.65 | $9.90 | $12.50 | $11.00 |
| 113 | Concrete curb ramp (701-02.03) | SF | 2,322 | $21.85 | $23.00 | $13.50 | $30.00 |
| 114 | Concrete combined curb & gutter (702-03) | CY | 1,443 | $484.00 | $495.00 | $435.00 | $510.00 |
| 115 | Guardrail transition 27IN to 31IN (705-02.10) | EACH | 2 | $485.00 | $220.00 | $485.00 | $188.00 |
| 116 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 20,820 | $27.00 | $29.00 | $27.00 | $30.10 |
| 117 | GR terminal (in-inline) MASH TL-3 (705-06.11) | EACH | 12 | $1,200.00 | $1,150.00 | $1,200.00 | $1,063.00 |
| 118 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 5 | $3,500.00 | $3,500.00 | $3,500.00 | $3,320.00 |
| 119 | GR terminal (energy absorbing) MASH TL-2 (705-06.30) | EACH | 11 | $3,400.00 | $3,300.00 | $3,400.00 | $2,920.00 |
| 120 | Guardrail removed (706-01) | LF | 20,295 | $2.00 | $1.00 | $3.00 | $0.75 |
| 121 | Radius rail (706-06.03) | LF | 512 | $35.00 | $32.00 | $35.00 | $37.00 |
| 122 | Rounded end element (706-10.26) | EACH | 5 | $300.00 | $102.00 | $300.00 | $125.00 |
| 123 | High-visibility construction fence (707-08.11) | LF | 46,641 | $2.00 | $3.35 | $2.00 | $3.00 |
| 124 | Markers (concrete R.O.W. posts) (708-02.01) | EACH | 151 | $300.00 | $245.00 | $390.00 | $309.00 |
| 125 | Machined rip-rap (class A-3) (709-05.05) | TON | 8,180 | $41.00 | $40.00 | $62.00 | $48.43 |
| 126 | Machined rip-rap (class A-1) (709-05.06) | TON | 24,990 | $39.00 | $40.00 | $62.00 | $48.43 |
| 127 | Machined rip-rap (class B) (709-05.08) | TON | 752 | $45.00 | $50.00 | $62.00 | $48.43 |
| 128 | Rock riffles (709-05.81) | LS | 1 | $50,000 | $50,000 | $45,000 | $68,911 |
| 129 | Aggregate underdrains (with pipe) (710-02) | LF | 40,592 | $12.00 | $10.00 | $12.00 | $12.00 |
| 130 | Lateral underdrain (710-05) | LF | 4,514 | $11.25 | $12.00 | $11.25 | $11.25 |
| 131 | Lateral underdrain endwall (6:1) (710-06.15) | EACH | 118 | $1,200.00 | $300.00 | $1,200.00 | $1,200.00 |
| 132 | 6" perforated pipe with vertical drain system (710-09.01) | LF | 215 | $40.00 | $16.00 | $50.00 | $80.00 |
| 133 | Traffic control (712-01) | LS | 1 | $145,000 | $1,000,000 | $500,000 | $713,200 |
| 134 | Portable barrier rail (MASH TL-3) (712-02.10) | LF | 25,160 | $30.00 | $110.00 | $40.00 | $39.25 |
| 135 | Portable barrier rail, reduced deflection (MASH TL-3) (712-02.12) | LF | 1,830 | $150.00 | $210.00 | $95.00 | $130.00 |
| 136 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 65 | $10,500 | $16,000 | $15,000 | $11,000 |
| 137 | Flexible drums (channelizing) (712-04.01) | EACH | 2,360 | $35.00 | $40.00 | $35.00 | $35.00 |
| 138 | Barrier rail delineator (712-04.50) | EACH | 69 | $10.00 | $15.00 | $10.00 | $10.00 |
| 139 | Signs (construction) (712-06) | SF | 1,723 | $7.35 | $10.00 | $7.35 | $7.35 |
| 140 | Signs (construction)(reduced speed warning) (712-06.16) | EACH | 3 | $750.00 | $800.00 | $750.00 | $750.00 |
| 141 | Temporary barricades (type III) (712-07.03) | LF | 1,500 | $15.00 | $20.00 | $15.00 | $15.00 |
| 142 | Arrow board (type C) (712-08.03) | EACH | 2 | $1,350.00 | $2,000.00 | $5,000.00 | $1,350.00 |
| 143 | Removable pavement marking (8" barrier line) (712-09.02) | LF | 1,560 | $8.00 | $6.00 | $8.00 | $8.00 |
| 144 | Class A concrete (foundation for sign supports) (713-01.01) | CY | 59 | $575.00 | $210.00 | $200.00 | $575.00 |
| 145 | Steel bar reinforcement(foundation for sign supports) (713-01.02) | LB | 620 | $3.58 | $3.50 | $3.25 | $3.60 |
| 146 | Delineator (mile marker) & steel post (713-02.04) | EACH | 8 | $306.00 | $230.00 | $220.00 | $306.00 |
| 147 | Roadside obstacle delineation (713-02.20) | SF | 40 | $50.00 | $25.00 | $24.00 | $30.00 |
| 148 | Steel I-beams & WF-beams(breakaway) sign support (713-06) | LB | 178 | $16.00 | $21.00 | $20.00 | $16.00 |
| 149 | Perforated/knockout square tube post (713-11.02) | LB | 3,209 | $3.63 | $6.75 | $6.50 | $3.70 |
| 150 | P post slip base (713-11.21) | EACH | 29 | $442.00 | $570.00 | $550.00 | $442.00 |
| 151 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 661 | $15.24 | $19.00 | $18.25 | $15.50 |
| 152 | Flat sheet aluminum signs (0.100" thick) (713-13.03) | SF | 241 | $14.65 | $20.00 | $19.00 | $14.70 |
| 153 | Extruded aluminum panel signs (713-14) | SF | 312 | $28.04 | $52.50 | $50.00 | $28.00 |
| 154 | Removal of signs, posts and footings (713-15) | LS | 1 | $9,532.00 | $7,300.00 | $7,000.00 | $9,532.00 |
| 155 | Sign installation (RRFB, solar powered ) (713-15.40) | LS | 1 | $5,000.00 | $25,000 | $9,020.00 | $20,000 |
| 156 | Changeable message sign unit (713-16.01) | EACH | 2 | $6,000.00 | $12,000 | $10,000 | $5,900.00 |
| 157 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 642 | $65.00 | $31.50 | $65.00 | $65.00 |
| 158 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 587 | $65.00 | $31.50 | $65.00 | $65.00 |
| 159 | Removal of snowplowable reflective marker (716-01.30) | EACH | 42 | $100.00 | $21.00 | $65.00 | $35.00 |
| 160 | Plastic pavement marking (cross-walk) (716-02.03) | LF | 644 | $35.00 | $12.60 | $35.00 | $35.00 |
| 161 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 40 | $60.00 | $42.00 | $60.00 | $60.00 |
| 162 | Plastic pavement marking (stop line) (716-02.05) | LF | 318 | $42.00 | $21.00 | $42.00 | $42.00 |
| 163 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 15 | $370.00 | $240.00 | $370.00 | $370.00 |
| 164 | Plastic pavement marking (longitudinal cross-walk) (716-02.09) | LF | 240 | $65.00 | $47.00 | $65.00 | $65.00 |
| 165 | Plastic pavement marking (yield line) (716-04.12) | SF | 234 | $38.00 | $32.00 | $38.00 | $38.00 |
| 166 | Painted pavement marking (4" line) (716-05.01) | LM | 42.10 | $2,600.00 | $1,100.00 | $2,600.00 | $2,600.00 |
| 167 | Removal of pavement marking (channelization striping) (716-08.04) | SY | 48 | $35.00 | $21.00 | $35.00 | $35.00 |
| 168 | Removal of pavement marking (line) (716-08.20) | LM | 16.70 | $11,000 | $2,500.00 | $11,000 | $11,000 |
| 169 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 23.71 | $11,880 | $7,000.00 | $11,880 | $11,880 |
| 170 | Mobilization (717-01) | LS | 1 | $3,900,000 | $4,800,000 | $9,000,000 | $6,363,357 |
| 171 | Rectangular rapid flashing beacon assembly (solar powered) (730-50.20) | EACH | 12 | $12,000 | $13,500 | $9,635.00 | $11,782 |
| 172 | Geotextile (type III)(erosion control) (740-10.03) | SY | 6,390 | $2.50 | $2.45 | $3.00 | $2.42 |
| 173 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 304,695 | $2.60 | $3.50 | $2.65 | $3.37 |
| 174 | Temporary sediment tube 8IN (740-11.01) | LF | 901 | $3.75 | $3.40 | $5.00 | $3.75 |
| 175 | Temporary sediment tube 18IN (740-11.03) | LF | 73,182 | $5.00 | $4.15 | $5.00 | $5.00 |
| 176 | Temporary sediment tube 20IN (740-11.04) | LF | 5,620 | $5.50 | $4.15 | $5.00 | $5.50 |
| 177 | Seeding (wildflower mixture) (801-01.04) | UNIT | 67 | $100.00 | $270.00 | $100.00 | $100.00 |
| 178 | Temporary seeding (with mulch) (801-01.07) | UNIT | 2,532 | $30.00 | $34.50 | $30.00 | $30.00 |
| 179 | Grass seed mix (ripzn/FLPL) (801-01.34) | UNIT | 1,617 | $70.00 | $100.00 | $70.00 | $70.00 |
| 180 | Grass seed mix (ripzn/FLPL) W/mulch (801-01.35) | UNIT | 67 | $100.00 | $270.00 | $100.00 | $100.00 |
| 181 | Special wetland seed mixture (801-01.36) | UNIT | 67 | $175.00 | $270.00 | $175.00 | $175.00 |
| 182 | Water (seeding & sodding) (801-03) | MG | 800 | $20.00 | $80.00 | $20.00 | $20.00 |
| 183 | Cuttings: salix nigra (24-48IN length) (802-02.40) | EACH | 54 | $8.00 | $12.60 | $8.00 | $8.00 |
| 184 | Cuttings: cornus amomum (24-48IN) (802-02.42) | EACH | 163 | $8.00 | $12.60 | $8.00 | $8.00 |
| 185 | Cuttings: sambucus canadensis (24-48IN) (802-02.43) | EACH | 163 | $8.00 | $12.60 | $8.00 | $8.00 |
| 186 | Cuttings: cephalanthus occidentalis (24-48IN) (802-02.45) | EACH | 163 | $8.00 | $12.60 | $8.00 | $8.00 |
| 187 | Acer rubrum (red maple 2-5FT CNTNR GRWN) (802-11.02) | EACH | 15 | $75.00 | $45.00 | $75.00 | $75.00 |
| 188 | Cercis canadensis (redbud 2-5FT CNTNR GRWN) (802-11.11) | EACH | 15 | $75.00 | $45.00 | $75.00 | $75.00 |
| 189 | Platanus occidentalis (sycamore 2-5FT CNTNR GRWN) (802-11.26) | EACH | 15 | $75.00 | $45.00 | $75.00 | $75.00 |
| 190 | Betula nigra (river birch seedlng B.R.) (802-12.07) | EACH | 34 | $8.00 | $12.60 | $8.00 | $8.00 |
| 191 | Cercis canadensis (redbud seedlng B.R.) (802-12.11) | EACH | 86 | $8.00 | $12.60 | $8.00 | $8.00 |
| 192 | Fraxinus pennsylvanica (green ash seedlng B.R.) (802-12.16) | EACH | 34 | $8.00 | $12.60 | $8.00 | $8.00 |
| 193 | Liquidamber styraciflua (sweetgum seedlng B.R.) (802-12.18) | EACH | 86 | $8.00 | $12.60 | $8.00 | $8.00 |
| 194 | Liriodendron tulipifera (tulip poplar seedlng B.R.) (802-12.19) | EACH | 86 | $8.00 | $12.60 | $8.00 | $8.00 |
| 195 | Nyssa aquatica (swamp tupelo seedlng B.R.) (802-12.20) | EACH | 14 | $8.00 | $12.00 | $8.00 | $8.00 |
| 196 | Platanus occidentalis (sycamore seedlng B.R.) (802-12.26) | EACH | 34 | $8.00 | $12.60 | $8.00 | $8.00 |
| 197 | Quercus michauxii (SWMP CHSTNT oak seedlng B.R.) (802-12.33) | EACH | 70 | $8.00 | $12.00 | $8.00 | $8.00 |
| 198 | Quercus phellos (willow oak seedlng B.R.) (802-12.38) | EACH | 104 | $8.00 | $12.60 | $8.00 | $8.00 |
| 199 | Taxodium distichum (bald cypress seedlng B.R.) (802-12.42) | EACH | 14 | $8.00 | $12.00 | $8.00 | $8.00 |
| 200 | Quercus shumardii (shumard oak seedling B.R.) (802-12.46) | EACH | 86 | $8.00 | $12.60 | $8.00 | $8.00 |
| 201 | Alnus serrulata (hazel alder seedling B.R.) (802-12.61) | EACH | 70 | $8.00 | $12.00 | $8.00 | $8.00 |
| 202 | Cephalanthus occidentalis (buttonbush SDLNG bare root) (802-13.53) | EACH | 70 | $8.00 | $12.00 | $8.00 | $8.00 |
| 203 | Hamamelis virginiana (witch hazel SDLNG bare root) (802-13.55) | EACH | 106 | $8.00 | $12.00 | $8.00 | $8.00 |
| 204 | Lindera benzoin (spicebush SDLNG bare root) (802-13.59) | EACH | 34 | $8.00 | $12.60 | $8.00 | $8.00 |
| 205 | Sambucus canadensis ( elderberry SDLNG bare root) (802-13.60) | EACH | 106 | $8.00 | $12.00 | $8.00 | $8.00 |
| 206 | Sodding (new sod) (803-01) | SY | 78,910 | $4.25 | $7.00 | $4.05 | $4.25 |
| 207 | Erosion control blanket (type II) (805-12.02) | SY | 154,265 | $1.25 | $1.00 | $1.25 | $1.25 |
| 208 | 700 gram coir fiber erosion blanket (805-12.08) | SY | 145,846 | $4.05 | $4.40 | $4.05 | $4.05 |
| 209 | Project mowing (806-02.03) | CYCL | 8 | $7,500.00 | $8,000.00 | $10,000 | $17,000 |
| 210 | Clearing and grubbing (201-01.03) | ACRE | 13 | $7,500.00 | $4,000.00 | $10,000 | $7,000.00 |
| 211 | Backfill material (flowable fill) (204-08.01) | CY | 200 | $400.00 | $350.00 | $400.00 | $400.00 |
| 212 | Mineral aggregate (size 57) (303-10.01) | TON | 600 | $90.00 | $40.00 | $60.00 | $90.00 |
| 213 | Fuse cutout (VM5-9) (760-15.22) | EACH | 47 | $460.00 | $470.00 | $466.68 | $466.70 |
| 214 | Transformer VG25KVA(all 25 kva'S)* (760-15.24) | EACH | 7 | $3,480.00 | $2,800.00 | $2,766.40 | $2,767.00 |
| 215 | Transformer VG15KVA (all 15 kva'S)* (760-15.25) | EACH | 10 | $3,100.00 | $2,400.00 | $2,383.60 | $2,384.00 |
| 216 | Transformer VG50KVA (all 50 kva'S)* (760-15.28) | EACH | 5 | $5,180.00 | $3,300.00 | $3,243.40 | $3,244.00 |
| 217 | Pole 30FT class 4 wood (790-01.03) | EACH | 1 | $1,200.00 | $1,100.00 | $1,064.00 | $1,064.00 |
| 218 | Pole 35FT class 4 wood (790-02.03) | EACH | 3 | $1,300.00 | $1,220.00 | $1,195.20 | $1,196.00 |
| 219 | Pole 40FT class 3 wood (790-03.02) | EACH | 1 | $1,600.00 | $1,450.00 | $1,407.60 | $1,410.00 |
| 220 | Pole 40FT class 4 wood (790-03.03) | EACH | 5 | $1,500.00 | $1,400.00 | $1,338.00 | $1,338.00 |
| 221 | Pole 45FT class 2 wood (790-04.02) | EACH | 40 | $2,000.00 | $1,700.00 | $1,666.40 | $1,660.00 |
| 222 | Pole 45FT class 3 wood (790-04.03) | EACH | 11 | $1,800.00 | $1,600.00 | $1,562.00 | $1,562.00 |
| 223 | Pole 45FT class 2 metal (790-04.07) | EACH | 51 | $6,630.00 | $5,100.00 | $5,016.20 | $5,017.00 |
| 224 | Pole 45FT class 3 metal (790-04.21) | EACH | 1 | $5,500.00 | $4,000.00 | $3,912.80 | $3,913.00 |
| 225 | Pole 50FT class 2 wood (790-05.02) | EACH | 4 | $2,200.00 | $1,900.00 | $1,849.80 | $1,850.00 |
| 226 | Pole 50FT class 2 metal (790-05.06) | EACH | 42 | $6,370.00 | $4,800.00 | $4,730.80 | $4,731.00 |
| 227 | Pole 55 FT class 2 metal (790-06.06) | EACH | 3 | $7,100.00 | $6,100.00 | $6,060.60 | $6,061.00 |
| 228 | 1PH SGL primary support 15KV (790-21.01) | EACH | 2 | $325.00 | $385.00 | $374.12 | $375.00 |
| 229 | 1PH DBL primary support 15KV (790-21.05) | EACH | 2 | $360.00 | $475.00 | $467.56 | $468.00 |
| 230 | 1PH primary LG angle 15KV (790-21.07) | EACH | 1 | $400.00 | $660.00 | $650.32 | $651.00 |
| 231 | 1PH deadend 15KV (790-21.08) | EACH | 7 | $415.00 | $525.00 | $500.16 | $500.00 |
| 232 | 1PH primary tap 15KV (790-21.09) | EACH | 20 | $435.00 | $625.00 | $599.92 | $600.00 |
| 233 | 1PH vertical dde 15KV (790-21.10) | EACH | 3 | $540.00 | $725.00 | $710.24 | $711.00 |
| 234 | 2PH crossarm const deadend (SGL) 15KV (790-23.07) | EACH | 3 | $1,275.00 | $1,300.00 | $1,179.52 | $1,180.00 |
| 235 | 2PH crossarm const DBL line arm 15KV (790-23.09) | EACH | 1 | $1,215.00 | $1,500.00 | $1,423.76 | $1,424.00 |
| 236 | 3PH crossarm DBL LRG cond 15KV (790-25.07) | EACH | 4 | $1,300.00 | $1,850.00 | $1,784.52 | $1,785.00 |
| 237 | 3PH crossarm SGL LRG cond 15KV (790-25.08) | EACH | 107 | $850.00 | $1,175.00 | $1,125.12 | $1,125.00 |
| 238 | 3PH crossarm DBL prim sup LRG cond 15KV (790-25.11) | EACH | 12 | $1,700.00 | $2,200.00 | $2,047.68 | $2,048.00 |
| 239 | 3PH vertical 15KV (790-25.15) | EACH | 3 | $1,000.00 | $1,850.00 | $1,765.40 | $1,765.00 |
| 240 | 3PH vertical deadend large angle 15KV (790-25.17) | EACH | 2 | $1,300.00 | $1,600.00 | $1,581.72 | $1,582.00 |
| 241 | 3PH crossarm deadend SGL 15KV (790-25.21) | EACH | 29 | $2,150.00 | $1,425.00 | $1,371.40 | $1,372.00 |
| 242 | 3PH crossarm dde 15KV (790-25.23) | EACH | 7 | $2,600.00 | $2,500.00 | $2,442.00 | $2,443.00 |
| 243 | Secondary assemblies deadend (790-30.03) | EACH | 1 | $135.00 | $185.00 | $170.24 | $171.00 |
| 244 | Secondary conductor 6 AL duplex (790-30.06) | LF | 523 | $2.30 | $2.27 | $2.22 | $2.25 |
| 245 | Secondary conductor 4 AL triplex (790-30.12) | LF | 887 | $2.85 | $3.00 | $2.90 | $2.90 |
| 246 | Secondary conductor 2 AL triplex (790-30.13) | LF | 1,246 | $2.85 | $4.45 | $4.39 | $4.40 |
| 247 | Secondary conductor 1/0 AL triplex (790-30.14) | LF | 233 | $4.00 | $6.45 | $6.36 | $6.35 |
| 248 | Secondary conductor 4/0 AL triplex (790-30.17) | LF | 159 | $6.00 | $8.40 | $8.34 | $8.35 |
| 249 | Secondary conductor 1/0 AL qplex (790-30.22) | LF | 277 | $5.50 | $7.50 | $7.33 | $7.35 |
| 250 | Secondary conductor 4/0 AL qplex (790-30.25) | LF | 60 | $8.00 | $11.75 | $11.24 | $11.25 |
| 251 | Service assembly-pole type (790-31.02) | EACH | 33 | $150.00 | $175.00 | $166.76 | $167.00 |
| 252 | Down guy - through bolt type (790-32.01) | EACH | 147 | $400.00 | $440.00 | $430.84 | $431.00 |
| 253 | OH guy - through bolt type (790-32.07) | EACH | 2 | $400.00 | $535.00 | $515.52 | $516.00 |
| 254 | Guy guard (790-32.23) | EACH | 209 | $50.00 | $16.00 | $15.80 | $15.80 |
| 255 | Expanding type anchor 6,000LB-8,000LB (790-33.01) | EACH | 147 | $650.00 | $725.00 | $708.72 | $709.00 |
| 256 | OH cond 2 7/1 acsr sparate (790-40.02) | LF | 17,928 | $2.00 | $2.55 | $2.44 | $2.45 |
| 257 | OH cond 3/0 6/1 acsr pigeon (790-40.05) | LF | 38,180 | $2.55 | $3.60 | $3.42 | $3.45 |
| 258 | OH cond 477 18/1 acsr pelican (790-40.15) | LF | 114,540 | $4.50 | $5.00 | $4.93 | $4.95 |
| 259 | Secondary riser (UM5) (790-43.59) | EACH | 3 | $860.00 | $1,400.00 | $1,293.00 | $1,293.00 |
| 260 | 5KVA 1PH OH xformer 14.4KV 120/240 (790-54.02) | EACH | 1 | $2,450.00 | $2,400.00 | $2,283.60 | $2,284.00 |
| 261 | 3 - 1PH sectionalizers or reclosers 15KV (790-60.05) | EACH | 4 | $2,750.00 | $5,800.00 | $5,603.08 | $5,604.00 |
| 262 | 3PH sectlr or recl W/ bypass SW 25KV (790-61.10) | EACH | 2 | $5,400.00 | $7,500.00 | $7,375.60 | $7,375.00 |
| 263 | Sec MTG 1PH 120/240 volts (790-64.01) | EACH | 5 | $1,720.00 | $1,600.00 | $1,481.00 | $1,481.00 |
| 264 | Lightning arrester arm MTD 9 KV (790-65.03) | EACH | 71 | $425.00 | $375.00 | $362.92 | $363.00 |
| 265 | 3PH capacitor assembly 15KV (790-65.15) | EACH | 5 | $31,600 | $19,000 | $17,130 | $17,130 |
| 266 | Street light interstate type (790-70.05) | EACH | 11 | $545.00 | $1,650.00 | $1,518.00 | $1,518.00 |
| 267 | 96 fiber(material only) (790-74.08) | LF | 31,260 | $3.25 | $5.45 | $5.36 | $5.40 |
| 268 | 12-96 fiber(installation only) (790-74.19) | LF | 38,180 | $4.50 | $2.90 | $2.75 | $2.75 |
| 269 | Fiber splice-12 fiber ribbon (790-74.25) | EACH | 112 | $325.00 | $550.00 | $535.00 | $535.00 |
| 270 | Fiber optic maintenance loop (790-74.26) | EACH | 19 | $500.00 | $825.00 | $809.00 | $809.00 |
| 271 | Remove wire (790-98.01) | LF | 141,407 | $1.25 | $1.90 | $1.75 | $1.75 |
| 272 | Remove poles (790-98.02) | EACH | 126 | $320.00 | $465.00 | $450.00 | $450.00 |
| 273 | Remove framing/associated apparatus (790-98.03) | EACH | 317 | $530.00 | $420.00 | $400.00 | $400.00 |
| 274 | Remove fiber optic cable (790-98.04) | LF | 38,180 | $1.25 | $1.60 | $1.50 | $1.50 |
| 275 | Pole 30FT class 5 wood (793-01.02) | EACH | 2 | $3,000.00 | $3,000.00 | $750.00 | $3,000.00 |
| 276 | Anchor 3/4IN (793-01.40) | EACH | 18 | $1,200.00 | $165.00 | $158.00 | $1,200.00 |
| 277 | Anchor 1IN (793-01.41) | EACH | 43 | $1,200.00 | $165.00 | $316.00 | $1,200.00 |
| 278 | Guy wire 6.6M or 1/4IN (793-02.07) | EACH | 18 | $300.00 | $475.00 | $326.00 | $300.00 |
| 279 | 6M strand (793-03.02) | LF | 10,800 | $4.00 | $2.10 | $3.40 | $4.00 |
| 280 | Install strand bond (793-03.40) | EACH | 21 | $75.00 | $16.00 | $316.00 | $75.00 |
| 281 | Underground splice closure (793-04.12) | EACH | 4 | $3,000.00 | $400.00 | $851.00 | $3,000.00 |
| 282 | 48 fiber(material only) (793-07.04) | LF | 3,445 | $1.00 | $1.10 | $2.90 | $2.00 |
| 283 | 144 fiber(material only) (793-07.07) | LF | 36,950 | $2.00 | $1.10 | $1.60 | $2.00 |
| 284 | 108-144 fiber(installation only) (793-07.17) | LF | 37,150 | $2.00 | $2.20 | $2.90 | $2.00 |
| 285 | Fiber optic maintenance loop (793-07.23) | EACH | 6 | $750.00 | $315.00 | $750.00 | $750.00 |
| 286 | Single fiber optic cable splice (793-07.25) | EACH | 576 | $55.00 | $60.00 | $135.00 | $55.00 |
| 287 | Test bare fiber (793-07.99) | EACH | 864 | $21.75 | $18.00 | $101.00 | $21.75 |
| 288 | Expose existing cable/conduit (all depths) (793-10.20) | LF | 385 | $250.00 | $5.25 | $50.00 | $250.00 |
| 289 | 6IN pedestal (793-11.04) | EACH | 3 | $1,000.00 | $220.00 | $2,975.00 | $1,000.00 |
| 290 | 10IN pedestal (793-11.08) | EACH | 1 | $1,500.00 | $240.00 | $701.00 | $1,500.00 |
| 291 | Buried riser guard (793-11.13) | EACH | 4 | $400.00 | $57.50 | $247.00 | $400.00 |
| 292 | Marker post (793-11.19) | EACH | 52 | $300.00 | $52.50 | $180.00 | $300.00 |
| 293 | Handhole 30INX48IN (793-11.20) | EACH | 4 | $3,500.00 | $825.00 | $4,910.00 | $3,500.00 |
| 294 | Concrete handhole 4FT X 4FT X 4FT (793-11.25) | EACH | 25 | $18,000 | $1,100.00 | $11,850 | $18,000 |
| 295 | Rearrange existing splice case (793-11.50) | EACH | 1 | $1,500.00 | $160.00 | $350.00 | $1,500.00 |
| 296 | Remove handhole (793-11.58) | EACH | 5 | $500.00 | $420.00 | $1,700.00 | $500.00 |
| 297 | Dig splice pit 80 C.F. (793-12.01) | EACH | 1 | $250.00 | $1,000.00 | $1,445.00 | $250.00 |
| 298 | Rearrangement existing cable (793-12.02) | EACH | 8 | $1,000.00 | $27.50 | $450.00 | $1,000.00 |
| 299 | 1 duct formation @ 24IN depth (793-13.11) | LF | 75 | $35.00 | $4.75 | $14.00 | $35.00 |
| 300 | 1 duct formation @ 36IN depth (793-13.12) | LF | 118 | $40.00 | $5.25 | $24.50 | $40.00 |
| 301 | 2 duct formation @ 48IN depth (793-13.18) | LF | 21,340 | $80.00 | $6.20 | $19.00 | $80.00 |
| 302 | Sand encasement per duct (793-14.01) | LF | 42,680 | $4.00 | $1.65 | $3.90 | $4.00 |
| 303 | 1 1/4IN innerduct (793-14.12) | LF | 64,900 | $6.00 | $2.10 | $1.60 | $6.00 |
| 304 | 1 1/2IN innerduct (793-14.13) | LF | 600 | $15.00 | $2.10 | $1.60 | $15.00 |
| 305 | 4IN SCH 80 orange flexpipe (793-14.19) | LF | 523 | $18.00 | $4.20 | $8.40 | $18.00 |
| 306 | Place manhole over existing cable (793-14.20) | EACH | 2 | $1,500.00 | $1,400.00 | $3,190.00 | $1,500.00 |
| 307 | Directional bore 2IN/flex sleeve (793-16.02) | LF | 407 | $130.00 | $10.50 | $46.50 | $130.00 |
| 308 | Directional bore 4IN/flex sleeve (793-16.04) | LF | 523 | $130.00 | $17.00 | $46.50 | $130.00 |
| 309 | Ground bed (793-16.22) | EACH | 8 | $1,200.00 | $21.00 | $405.00 | $1,200.00 |
| 310 | Remove aerial cable and wire (793-98.01) | LF | 10,850 | $3.00 | $1.05 | $0.65 | $3.00 |
| 311 | Remove poles all sizes (793-98.04) | EACH | 26 | $410.00 | $250.00 | $535.00 | $500.00 |
| 312 | Retire buried facilities in place (793-98.05) | LF | 21,326 | $2.00 | $1.30 | $1.10 | $2.00 |
| 313 | Remove pedestals (793-98.06) | EACH | 28 | $250.00 | $265.00 | $249.00 | $250.00 |
| 314 | Remove anchor (any size) (793-98.08) | EACH | 18 | $150.00 | $185.00 | $499.00 | $150.00 |
| 315 | Remove down guy (793-98.09) | EACH | 18 | $100.00 | $27.00 | $499.00 | $150.00 |
| 316 | 6IN dip slip joint water line (795-01.04) | LF | 650 | $85.00 | $90.00 | $85.00 | $85.00 |
| 317 | 8IN dip slip joint water line (795-01.06) | LF | 1,050 | $100.00 | $110.00 | $100.00 | $100.00 |
| 318 | 12IN dip slip joint water line (795-01.10) | LF | 21,000 | $118.00 | $126.00 | $118.00 | $118.00 |
| 319 | Connect to 6IN water line (795-06.04) | EACH | 4 | $6,000.00 | $6,300.00 | $600.00 | $6,000.00 |
| 320 | Connect to 10IN water line (795-06.06) | EACH | 2 | $11,000 | $12,600 | $11,000 | $11,000 |
| 321 | Connect to 12IN water line (795-06.07) | EACH | 2 | $14,000 | $16,250 | $14,000 | $14,000 |
| 322 | Cut and cap 6IN water line (795-06.33) | EACH | 3 | $3,000.00 | $10,500 | $3,000.00 | $3,000.00 |
| 323 | Cut & cap 10IN water line (795-06.36) | EACH | 2 | $4,000.00 | $10,500 | $4,000.00 | $4,000.00 |
| 324 | Cut and cap 12IN water line (795-06.37) | EACH | 2 | $5,000.00 | $10,500 | $5,000.00 | $5,000.00 |
| 325 | 6IN gate valve assembly (795-08.04) | EACH | 3 | $2,200.00 | $5,250.00 | $2,200.00 | $2,200.00 |
| 326 | 8IN gate valve assembly (795-08.05) | EACH | 2 | $2,500.00 | $7,300.00 | $2,500.00 | $2,500.00 |
| 327 | 10IN gate valve assembly (795-08.06) | EACH | 2 | $3,500.00 | $10,000 | $3,500.00 | $3,500.00 |
| 328 | 12IN gate valve assembly (795-08.09) | EACH | 20 | $6,500.00 | $12,600 | $6,500.00 | $6,500.00 |
| 329 | 3/4IN pexa service pipe in 2IN steel casing (795-09.61) | LF | 4,500 | $60.00 | $15.75 | $60.00 | $60.00 |
| 330 | 2IN pexa service pipe (795-09.64) | LF | 300 | $75.00 | $42.00 | $75.00 | $75.00 |
| 331 | 4IN casing pipe (795-09.80) | LF | 100 | $100.00 | $105.00 | $100.00 | $100.00 |
| 332 | 4IN auto air release valve assembly (795-10.09) | EACH | 3 | $4,000.00 | $18,000 | $6,000.00 | $4,000.00 |
| 333 | Fire hydrant assembly (795-11.02) | EACH | 13 | $17,000 | $14,000 | $17,000 | $17,000 |
| 334 | Retire in place existing water main (795-11.12) | LF | 13,000 | $5.00 | $1.00 | $5.00 | $5.00 |
| 335 | Remove water meter (795-12.08) | EACH | 55 | $300.00 | $525.00 | $300.00 | $300.00 |
| 336 | DI fittings (795-13.01) | LB | 20,000 | $1.00 | $21.00 | $1.00 | $1.00 |
| 337 | 12IN steel casing pipe open cut method (795-15.02) | LF | 240 | $400.00 | $260.00 | $400.00 | $400.00 |
| 338 | 24IN steel casing pipe open cut method (795-15.07) | LF | 400 | $600.00 | $420.00 | $600.00 | $600.00 |
| 339 | Relocate/reconnect 3/4IN water meter assembly (795-16.16) | EACH | 50 | $2,000.00 | $3,200.00 | $2,000.00 | $2,000.00 |
| 340 | Relocate/reconnect 2IN water meter assembly (795-16.21) | EACH | 5 | $6,000.00 | $7,850.00 | $6,000.00 | $6,000.00 |
| 341 | 48IN manhole 4FT-6FT depth (797-07.02) | EACH | 3 | $12,000 | $5,250.00 | $5,000.00 | $12,000 |
| 342 | Fiber optic cable enclosure (798-05.02) | EACH | 15 | $1,050.00 | $315.00 | $2,015.00 | $5,000.00 |
| 343 | Fiber optic cable splice (798-05.03) | EACH | 156 | $41.25 | $60.00 | $979.00 | $500.00 |
| 344 | Trunk/feeder cable .625 (798-05.09) | LF | 252 | $2.75 | $2.10 | $3.00 | $40.00 |
| 345 | Trunk/feeder cable .750 (798-05.13) | LF | 8,299 | $2.75 | $2.10 | $3.10 | $45.00 |
| 346 | Trunk/feeder cable .875 (798-05.16) | LF | 2,721 | $2.75 | $2.10 | $3.20 | $50.00 |
| 347 | Trunk/feeder cable .500 (798-05.57) | LF | 35,058 | $2.75 | $2.10 | $2.90 | $40.00 |
| 348 | 5/16" ehs steel strand (798-05.60) | LF | 34,767 | $2.00 | $2.10 | $3.20 | $16.00 |
| 349 | Fiber optic cable (96F) (798-06.11) | LF | 427 | $3.35 | $3.00 | $4.00 | $18.00 |
| 350 | Fiber optic cable (24F) (798-06.13) | LF | 1,068 | $3.00 | $2.85 | $3.50 | $18.00 |
| 351 | Fiber optic cable (144F) (798-06.20) | LF | 28,848 | $4.25 | $3.00 | $4.40 | $22.00 |
| 352 | 12-96 fiber optic cable (install only) (798-06.32) | LF | 3,445 | $3.00 | $2.10 | $2.80 | $18.00 |
| 353 | Fiber optic receiver (798-06.40) | EACH | 1 | $800.00 | $105.00 | $14,200 | $8,000.00 |
| 354 | Fiber storage loop (798-06.48) | EACH | 19 | $260.00 | $156.00 | $1,635.00 | $1,500.00 |
| 355 | Remove steel strand (798-09.01) | LF | 36,067 | $1.25 | $1.05 | $2.80 | $2.00 |
| 356 | Remove aerial cable/terminals (798-09.02) | LF | 103,698 | $0.35 | $1.05 | $0.85 | $2.00 |
| 357 | Remove poles, guys, anchors (798-09.03) | EACH | 88 | $500.00 | $300.00 | $1,570.00 | $650.00 |
| 358 | Remove strand pole framing (798-09.08) | EACH | 156 | $30.00 | $27.50 | $529.00 | $350.00 |
| 359 | Amplifier assembly (798-10.15) | EACH | 6 | $625.00 | $615.00 | $3,465.00 | $7,500.00 |
| 360 | Service tap assembly (798-10.16) | EACH | 18 | $125.00 | $153.00 | $2,205.00 | $4,500.00 |
| 361 | Power installed anchor (798-11.31) | EACH | 62 | $250.00 | $210.00 | $1,950.00 | $4,500.00 |
| 362 | Downguy - wrap type (798-11.41) | EACH | 62 | $150.00 | $77.00 | $549.00 | $65.00 |
| 363 | Overhead guy - wrap type (798-11.42) | EACH | 3 | $175.00 | $155.00 | $1,700.00 | $65.00 |
| 364 | Splitter (798-12.24) | EACH | 1 | $155.00 | $80.00 | $1,570.00 | $2,450.00 |
| 365 | Copper cable splice (798-12.30) | EACH | 17 | $45.00 | $27.50 | $1,585.00 | $500.00 |
| 366 | Branch strand termination (798-13.02) | EACH | 2 | $250.00 | $27.50 | $1,605.00 | $65.00 |
| 367 | Strand tangent assembly (798-13.03) | EACH | 118 | $100.00 | $10.50 | $1,730.00 | $5,000.00 |
| 368 | Strand angle assembly (798-13.04) | EACH | 25 | $150.00 | $10.50 | $1,885.00 | $6,000.00 |
| 369 | Directional coupler (798-13.05) | EACH | 1 | $200.00 | $80.00 | $1,760.00 | $2,200.00 |
| 370 | Strand double deadend assembly (798-13.07) | EACH | 16 | $300.00 | $42.00 | $1,885.00 | $6,500.00 |
| 371 | Strand deadend assembly (798-13.08) | EACH | 28 | $200.00 | $21.00 | $1,885.00 | $5,000.00 |
| 372 | Water (203-06) | MG | 815 | $10.00 | $40.00 | $25.00 | |
| 373 | Mineral aggregate, type A base, grading D (303-01) | TON | 160,845 | $28.10 | $28.75 | $36.00 | |
| 374 | Water (203-06) | MG | 1,171 | $40.00 | |||
| 375 | Mineral aggregate, type A base, grading D (303-01) | TON | 71,889 | $33.00 | |||
| 376 | Mineral aggregate (A-CBC) (309-01.01) | TON | 42,500 | $33.00 | |||
| 377 | Portland cement (A-CBC) (309-01.02) | TON | 2,080 | $510.00 | |||
| 378 | Bituminous material (A-CBC) (309-02) | TON | 123 | $1,030.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of June 27, 2025. Compiled by Mirage Metrics.