TDOT contract CNZ194 bid tabulation

The grading, drainage, and paving on u.s. 70 (s.r. 1) from the camden bypass (l.m. 8.54) to the tennessee river (l.m. 12.65). Let by Tennessee DOT on June 27, 2025, Benton County. 4 bids received; low bid $85,754,540 by Vaughn Contractors, Inc..

Owner
Tennessee DOT
Letting
27 JUN 2025
Pay items
378
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Vaughn Contractors, Inc.$85,754,540Low
2Eubank Asphalt Paving & Sealing, LLC$94,474,864+10%
3Jones Bros. Contractors, LLC$98,688,769+15%
4Delta Contracting Company, LLC$104,624,164+22%
TDOT contract CNZ194: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Vaughn Contractors, Inc.2. Eubank Asphalt Paving & Sealing, LLC3. Jones Bros. Contractors, LLC4. Delta Contracting Company, LLC
1Construction stakes, lines and grades (105-01)LS1$350,000$600,000$500,000$750,000
2CPM project schedule (108-03)LS1$175,000$180,000$200,000$158,500
3Trainee (109-10.01)HR5,760$0.80$0.80$0.80$0.80
4Clearing and grubbing (201-01)LS1$1,550,000$1,100,000$2,750,000$6,443,636
5Removal of structures and obstructions (202-01)LS1$25,000$300,000$150,000$150,000
6Water well abandonment (202-13)EACH1$5,000.00$5,000.00$6,000.00$5,000.00
7Road & drainage excavation (unclassified) (203-01)CY240,160$12.00$9.25$9.00$9.40
8RD & DRNG excv (acid producing- off site disposal) (203-01.07)CY68,172$40.00$95.00$93.00$14.00
9Road & drainage excavation (stream mitigation) (203-01.13)CY13,208$20.00$42.00$20.00$13.40
10Borrow excavation (graded solid rock) (203-02.01)TON961,000$27.00$26.90$22.00$30.00
11Borrow excavation (unclassified) (203-03)CY58,803$7.00$14.00$25.00$12.00
12Select granular material (203-03.10)TON6,093$10.00$24.00$46.87$35.00
13Placing and spreading topsoil (203-04)CY10,248$8.00$12.00$10.00$7.00
14Undercutting (203-05)CY12,138$12.00$10.00$20.00$14.00
15Furnishing & spreading topsoil (203-07)CY2,903$14.00$40.00$40.00$25.00
16Channel excavation (unclassified) (203-08)CY52,472$14.50$22.00$35.00$45.00
17Channel substrate (203-20.01)CY727$25.00$50.00$70.00$84.00
18Flowable fill (general) (204-06.01)CY182$250.00$400.00$350.00$350.00
19Foundation fill material (204-08)CY727$75.00$110.00$120.00$70.00
2018" temporary slope drain (209-02.07)LF23$50.00$100.00$40.00$30.00
21Filter sock (24 inch) (209-03.23)LF714$12.50$12.50$15.00$12.50
22Stream mitigation cross vane structure (209-03.37)EACH37$5,000.00$6,300.00$5,000.00$5,100.00
23Stream mitigation - live brush layering (209-03.42)LF365$200.00$180.00$115.00$140.00
24Stream mitigation - brush mattress (209-03.59)SY76$250.00$265.00$200.00$160.00
25Stream mitigation – wood toe W/reinforced earth (209-03.67)LF365$400.00$350.00$250.00$113.00
26Protected area marker (white with decal) (209-03.99)EACH22$300.00$420.00$150.00$120.00
27Sediment removal (209-05)CY2,023$10.00$20.00$40.00$13.00
28Temporary silt fence (with backing) (209-08.02)LF145,088$3.50$4.95$3.90$4.25
29Temporary silt fence (without backing) (209-08.03)LF69,795$1.90$3.15$2.00$1.90
30Rock check dam (209-08.07)EACH226$500.00$1,000.00$920.00$1,055.70
31Enhanced rock check dam (209-08.08)EACH67$1,000.00$1,200.00$1,050.00$1,418.99
32Sandbags (209-09.01)BAG5,226$6.00$7.35$10.00$5.20
33Sediment filter bag (15' X 15') (209-09.03)EACH28$400.00$352.00$550.00$400.00
34Jute mesh fabric (209-09.24)SY4,744$4.50$3.05$6.00$4.50
35Curb inlet protection (type 4) (209-09.43)EACH87$450.00$200.00$350.00$450.00
36Turbidity curtain(epsc) (209-13.04)LF17,874$20.00$50.00$21.00$20.00
37Polyethylene sheeting (6 mil. minimum) (209-20.03)SY9,000$4.50$2.90$3.00$1.80
38Polyethylene sheeting (10 mil.) (209-20.04)SY17,167$4.50$3.20$3.00$2.00
39Catch basin protection (type D) (209-40.33)EACH2$550.00$475.00$550.00$550.00
40Catch basin filter assembly(type 2) (209-40.42)EACH23$900.00$710.00$750.00$900.00
41Catch basin filter assembly(type 3) (209-40.43)EACH7$900.00$1,000.00$750.00$900.00
42Catch basin filter assembly(type 4) (209-40.44)EACH1$900.00$3,000.00$750.00$900.00
43Catch basin filter assembly(type 6) (209-40.46)EACH33$900.00$680.00$750.00$900.00
44Catch basin filter assembly(type 7) (209-40.47)EACH36$900.00$1,200.00$1,500.00$900.00
45Catch basin filter assembly(type 8) (209-40.48)EACH3$900.00$1,400.00$1,500.00$900.00
46Temporary diversion channel (209-65.03)LF547$25.00$100.00$25.00$44.00
47Temporary in stream diversion (209-65.04)LF53$150.00$400.00$110.00$280.00
48Granular backfill (roadway) (303-01.01)TON14,729$25.00$40.00$50.00$31.52
49Mineral aggregate, type B base, grading (D) (303-02)TON1,000$30.00$30.00$44.00$37.24
50Mineral aggregate (size 57) (303-10.01)TON161$48.00$75.00$60.00$48.79
51Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01)TON40,389$106.00$104.00$115.00$106.00
52Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08)TON27,206$108.00$113.00$130.00$108.00
53Asp. conc. mix(PG64-22) (BPMB-HM) GR. A-S (307-01.20)TON22,047$106.00$103.00$115.00$106.00
54Bituminous material for prime coat (PC) (402-01)TON289$300.00$800.00$1,000.00$300.00
55Aggregate for cover material (PC) (402-02)TON969$20.00$40.00$50.00$20.00
56Bituminous material for tack coat (TC) (403-01)TON170$300.00$850.00$1,000.00$300.00
57Acs mix (PG64-22) grading E shoulder (411-01.07)TON1,697$128.00$122.00$134.00$128.00
58Acs mix(PG64-22) grading D (411-01.10)TON14,279$148.00$126.00$160.00$148.00
59Scoring shoulders (non-continuous) (16IN width) (411-12.02)LM7.32$1,175.00$1,200.00$1,800.00$1,617.00
60Cold planing bituminous pavement (415-01.01)TON1,743$48.00$30.00$68.00$48.00
61Class A concrete (roadway) (604-01.01)CY1,669$1,300.00$1,575.00$1,400.00$2,024.77
62Steel bar reinforcement (roadway) (604-01.02)LB350,518$1.50$1.30$2.00$1.40
63Portland cement grout (604-15.01)CY1$300.00$1,500.00$1,500.00$1,000.00
6418" concrete pipe culvert (class III) (607-03.02)LF10,364$61.25$97.50$89.00$82.00
6518" concrete pipe culvert(class IV)jacked-in-place (607-03.05)LF89$1,050.00$1,250.00$1,125.00$1,105.00
6624" concrete pipe culvert (class III) (607-05.02)LF1,188$77.00$125.00$113.00$100.00
6730" concrete pipe culvert (class III) (607-06.02)LF2,398$97.50$140.00$143.00$164.00
6830" concrete pipe culvert(class IV)jacked-in-place (607-06.05)LF179$2,000.00$1,600.00$1,500.00$1,975.00
6936" concrete pipe culvert (class III) (607-07.02)LF57$150.00$225.00$224.00$175.00
7036" concrete pipe culvert(class IV)jacked-in-place (607-07.05)LF85$2,450.00$1,900.00$1,700.00$2,534.00
7130"X 19" horizontal oval concrete pipe culvert (607-16.02)LF60$115.00$210.00$175.00$200.00
7268"X 43" horizontal oval concrete pipe culvert (607-16.10)LF56$500.00$900.00$500.00$600.00
7318" corrugated metal pipe culvert (607-37.02)LF282$82.00$90.00$110.00$56.00
7424" corrugated metal pipe culvert (607-37.03)LF96$105.00$120.00$135.00$65.00
7536" corrugated metal pipe culvert (607-37.05)LF350$150.00$150.00$175.00$90.00
7648" corrugated metal pipe culvert (607-37.07)LF188$200.00$175.00$230.00$110.00
7718" pipe culvert (side drain) (607-39.02)LF471$51.00$90.00$75.00$40.00
7824" pipe culvert (side drain) (607-39.03)LF152$64.00$120.00$90.00$50.00
79Class A concrete (pipe endwalls) (611-07.01)CY32$1,400.00$2,200.00$2,400.00$2,380.00
80Steel bar reinforcement (pipe endwalls) (611-07.02)LB1,258$2.60$3.30$3.00$3.80
8118IN endwall (side drain) (611-07.31)EACH10$4,000.00$4,200.00$5,400.00$5,500.00
8224IN endwall (side drain) (611-07.32)EACH4$5,500.00$5,200.00$5,600.00$7,200.00
8330IN endwall (side drain) (611-07.33)EACH2$12,000$7,300.00$13,300$15,000
8418IN endwall (cross drain) 3:1 (611-07.54)EACH2$2,500.00$2,900.00$2,550.00$3,000.00
8524IN endwall (cross drain) 3:1 (611-07.57)EACH3$2,500.00$4,300.00$4,100.00$3,500.00
8630IN endwall (cross drain) 3:1 (611-07.60)EACH7$5,500.00$4,700.00$7,600.00$6,000.00
8736IN endwall (cross drain) 3:1 (611-07.63)EACH2$5,500.00$5,800.00$10,300$7,300.00
8842IN endwall (cross drain) 3:1 (611-07.66)EACH2$5,500.00$7,800.00$12,300$8,800.00
89Catch basins, type 10, > 4' - 8' depth (611-10.02)EACH1$7,600.00$4,500.00$6,300.00$5,500.00
90Catch basins, type 10, > 12' - 16' depth (611-10.04)EACH1$11,000$6,700.00$12,800$7,800.00
91Catch basins, type 25, 0' - 4' depth (611-25.01)EACH11$4,000.00$4,500.00$6,850.00$6,300.00
92Catch basins, type 25, > 4' - 8' depth (611-25.02)EACH20$5,150.00$6,000.00$7,700.00$8,500.00
93Catch basins, type 25, > 8' - 12' depth (611-25.03)EACH9$8,250.00$7,800.00$10,100$9,000.00
94Catch basins, type 25, > 12' - 16' depth (611-25.04)EACH2$8,300.00$10,000$9,600.00$12,000
95Catch basins, type 25, > 16' - 20' depth (611-25.05)EACH3$14,000$12,000$14,800$12,500
96Catch basins, type 25, > 20' - 24' depth (611-25.06)EACH2$10,000$14,000$16,000$14,000
97Catch basins, type 26, > 4' - 8' depth (611-26.02)EACH29$7,500.00$7,000.00$10,500$10,000
98Catch basins, type 26, > 8' - 12' depth (611-26.03)EACH5$11,200$9,000.00$14,100$12,000
99Catch basins, type 26, > 12' - 16' depth (611-26.04)EACH1$17,000$15,000$21,400$1.00
100Catch basins, type 27, > 8' - 12' depth (611-27.03)EACH5$15,000$9,500.00$18,400$15,000
101Catch basins, type 27, > 16' - 20' depth (611-27.05)EACH1$23,500$16,000$24,400$1.00
102Catch basins, type 42, 0' - 4' depth (611-42.01)EACH10$4,800.00$4,500.00$6,850.00$6,000.00
103Catch basins, type 42, > 4' - 8' depth (611-42.02)EACH5$4,800.00$6,500.00$16,000$6,200.00
104Temporary structure (sta. 252+50) (621-01.01)LS1$10,000$100,000$235,000$1.00
105Temporary structure (sta. 271+00) (621-01.02)LS1$10,000$100,000$235,000$1.00
106Temporary structure (sta. 289+50) (621-01.03)LS1$10,000$100,000$235,000$1.00
10718" temporary drainage pipe (621-03.02)LF1,655$40.00$65.00$35.00$30.00
10824" temporary drainage pipe (621-03.03)LF616$50.00$85.00$45.00$40.00
10930" temporary drainage pipe (621-03.04)LF147$70.00$95.00$65.00$55.00
110Temporary shoring (621-05.01)SF4,138$125.00$75.00$40.00$65.00
111Concrete sidewalk (4 ") (701-01.01)SF87,825$6.60$6.85$6.65$8.00
112Concrete driveway (701-02)SF7,995$9.65$9.90$12.50$11.00
113Concrete curb ramp (701-02.03)SF2,322$21.85$23.00$13.50$30.00
114Concrete combined curb & gutter (702-03)CY1,443$484.00$495.00$435.00$510.00
115Guardrail transition 27IN to 31IN (705-02.10)EACH2$485.00$220.00$485.00$188.00
116W beam GR (type 2) MASH TL-3 (705-06.01)LF20,820$27.00$29.00$27.00$30.10
117GR terminal (in-inline) MASH TL-3 (705-06.11)EACH12$1,200.00$1,150.00$1,200.00$1,063.00
118Tangent energy absorbing term MASH TL-3 (705-06.20)EACH5$3,500.00$3,500.00$3,500.00$3,320.00
119GR terminal (energy absorbing) MASH TL-2 (705-06.30)EACH11$3,400.00$3,300.00$3,400.00$2,920.00
120Guardrail removed (706-01)LF20,295$2.00$1.00$3.00$0.75
121Radius rail (706-06.03)LF512$35.00$32.00$35.00$37.00
122Rounded end element (706-10.26)EACH5$300.00$102.00$300.00$125.00
123High-visibility construction fence (707-08.11)LF46,641$2.00$3.35$2.00$3.00
124Markers (concrete R.O.W. posts) (708-02.01)EACH151$300.00$245.00$390.00$309.00
125Machined rip-rap (class A-3) (709-05.05)TON8,180$41.00$40.00$62.00$48.43
126Machined rip-rap (class A-1) (709-05.06)TON24,990$39.00$40.00$62.00$48.43
127Machined rip-rap (class B) (709-05.08)TON752$45.00$50.00$62.00$48.43
128Rock riffles (709-05.81)LS1$50,000$50,000$45,000$68,911
129Aggregate underdrains (with pipe) (710-02)LF40,592$12.00$10.00$12.00$12.00
130Lateral underdrain (710-05)LF4,514$11.25$12.00$11.25$11.25
131Lateral underdrain endwall (6:1) (710-06.15)EACH118$1,200.00$300.00$1,200.00$1,200.00
1326" perforated pipe with vertical drain system (710-09.01)LF215$40.00$16.00$50.00$80.00
133Traffic control (712-01)LS1$145,000$1,000,000$500,000$713,200
134Portable barrier rail (MASH TL-3) (712-02.10)LF25,160$30.00$110.00$40.00$39.25
135Portable barrier rail, reduced deflection (MASH TL-3) (712-02.12)LF1,830$150.00$210.00$95.00$130.00
136Temporary work zone crash cushion (MASH TL-3) (712-02.60)EACH65$10,500$16,000$15,000$11,000
137Flexible drums (channelizing) (712-04.01)EACH2,360$35.00$40.00$35.00$35.00
138Barrier rail delineator (712-04.50)EACH69$10.00$15.00$10.00$10.00
139Signs (construction) (712-06)SF1,723$7.35$10.00$7.35$7.35
140Signs (construction)(reduced speed warning) (712-06.16)EACH3$750.00$800.00$750.00$750.00
141Temporary barricades (type III) (712-07.03)LF1,500$15.00$20.00$15.00$15.00
142Arrow board (type C) (712-08.03)EACH2$1,350.00$2,000.00$5,000.00$1,350.00
143Removable pavement marking (8" barrier line) (712-09.02)LF1,560$8.00$6.00$8.00$8.00
144Class A concrete (foundation for sign supports) (713-01.01)CY59$575.00$210.00$200.00$575.00
145Steel bar reinforcement(foundation for sign supports) (713-01.02)LB620$3.58$3.50$3.25$3.60
146Delineator (mile marker) & steel post (713-02.04)EACH8$306.00$230.00$220.00$306.00
147Roadside obstacle delineation (713-02.20)SF40$50.00$25.00$24.00$30.00
148Steel I-beams & WF-beams(breakaway) sign support (713-06)LB178$16.00$21.00$20.00$16.00
149Perforated/knockout square tube post (713-11.02)LB3,209$3.63$6.75$6.50$3.70
150P post slip base (713-11.21)EACH29$442.00$570.00$550.00$442.00
151Flat sheet aluminum signs (0.080" thick) (713-13.02)SF661$15.24$19.00$18.25$15.50
152Flat sheet aluminum signs (0.100" thick) (713-13.03)SF241$14.65$20.00$19.00$14.70
153Extruded aluminum panel signs (713-14)SF312$28.04$52.50$50.00$28.00
154Removal of signs, posts and footings (713-15)LS1$9,532.00$7,300.00$7,000.00$9,532.00
155Sign installation (RRFB, solar powered ) (713-15.40)LS1$5,000.00$25,000$9,020.00$20,000
156Changeable message sign unit (713-16.01)EACH2$6,000.00$12,000$10,000$5,900.00
157Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH642$65.00$31.50$65.00$65.00
158Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22)EACH587$65.00$31.50$65.00$65.00
159Removal of snowplowable reflective marker (716-01.30)EACH42$100.00$21.00$65.00$35.00
160Plastic pavement marking (cross-walk) (716-02.03)LF644$35.00$12.60$35.00$35.00
161Plastic pavement marking(channelization striping) (716-02.04)SY40$60.00$42.00$60.00$60.00
162Plastic pavement marking (stop line) (716-02.05)LF318$42.00$21.00$42.00$42.00
163Plastic pavement marking (turn lane arrow) (716-02.06)EACH15$370.00$240.00$370.00$370.00
164Plastic pavement marking (longitudinal cross-walk) (716-02.09)LF240$65.00$47.00$65.00$65.00
165Plastic pavement marking (yield line) (716-04.12)SF234$38.00$32.00$38.00$38.00
166Painted pavement marking (4" line) (716-05.01)LM42.10$2,600.00$1,100.00$2,600.00$2,600.00
167Removal of pavement marking (channelization striping) (716-08.04)SY48$35.00$21.00$35.00$35.00
168Removal of pavement marking (line) (716-08.20)LM16.70$11,000$2,500.00$11,000$11,000
169Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM23.71$11,880$7,000.00$11,880$11,880
170Mobilization (717-01)LS1$3,900,000$4,800,000$9,000,000$6,363,357
171Rectangular rapid flashing beacon assembly (solar powered) (730-50.20)EACH12$12,000$13,500$9,635.00$11,782
172Geotextile (type III)(erosion control) (740-10.03)SY6,390$2.50$2.45$3.00$2.42
173Geotextile (type IV)(stabilization) (740-10.04)SY304,695$2.60$3.50$2.65$3.37
174Temporary sediment tube 8IN (740-11.01)LF901$3.75$3.40$5.00$3.75
175Temporary sediment tube 18IN (740-11.03)LF73,182$5.00$4.15$5.00$5.00
176Temporary sediment tube 20IN (740-11.04)LF5,620$5.50$4.15$5.00$5.50
177Seeding (wildflower mixture) (801-01.04)UNIT67$100.00$270.00$100.00$100.00
178Temporary seeding (with mulch) (801-01.07)UNIT2,532$30.00$34.50$30.00$30.00
179Grass seed mix (ripzn/FLPL) (801-01.34)UNIT1,617$70.00$100.00$70.00$70.00
180Grass seed mix (ripzn/FLPL) W/mulch (801-01.35)UNIT67$100.00$270.00$100.00$100.00
181Special wetland seed mixture (801-01.36)UNIT67$175.00$270.00$175.00$175.00
182Water (seeding & sodding) (801-03)MG800$20.00$80.00$20.00$20.00
183Cuttings: salix nigra (24-48IN length) (802-02.40)EACH54$8.00$12.60$8.00$8.00
184Cuttings: cornus amomum (24-48IN) (802-02.42)EACH163$8.00$12.60$8.00$8.00
185Cuttings: sambucus canadensis (24-48IN) (802-02.43)EACH163$8.00$12.60$8.00$8.00
186Cuttings: cephalanthus occidentalis (24-48IN) (802-02.45)EACH163$8.00$12.60$8.00$8.00
187Acer rubrum (red maple 2-5FT CNTNR GRWN) (802-11.02)EACH15$75.00$45.00$75.00$75.00
188Cercis canadensis (redbud 2-5FT CNTNR GRWN) (802-11.11)EACH15$75.00$45.00$75.00$75.00
189Platanus occidentalis (sycamore 2-5FT CNTNR GRWN) (802-11.26)EACH15$75.00$45.00$75.00$75.00
190Betula nigra (river birch seedlng B.R.) (802-12.07)EACH34$8.00$12.60$8.00$8.00
191Cercis canadensis (redbud seedlng B.R.) (802-12.11)EACH86$8.00$12.60$8.00$8.00
192Fraxinus pennsylvanica (green ash seedlng B.R.) (802-12.16)EACH34$8.00$12.60$8.00$8.00
193Liquidamber styraciflua (sweetgum seedlng B.R.) (802-12.18)EACH86$8.00$12.60$8.00$8.00
194Liriodendron tulipifera (tulip poplar seedlng B.R.) (802-12.19)EACH86$8.00$12.60$8.00$8.00
195Nyssa aquatica (swamp tupelo seedlng B.R.) (802-12.20)EACH14$8.00$12.00$8.00$8.00
196Platanus occidentalis (sycamore seedlng B.R.) (802-12.26)EACH34$8.00$12.60$8.00$8.00
197Quercus michauxii (SWMP CHSTNT oak seedlng B.R.) (802-12.33)EACH70$8.00$12.00$8.00$8.00
198Quercus phellos (willow oak seedlng B.R.) (802-12.38)EACH104$8.00$12.60$8.00$8.00
199Taxodium distichum (bald cypress seedlng B.R.) (802-12.42)EACH14$8.00$12.00$8.00$8.00
200Quercus shumardii (shumard oak seedling B.R.) (802-12.46)EACH86$8.00$12.60$8.00$8.00
201Alnus serrulata (hazel alder seedling B.R.) (802-12.61)EACH70$8.00$12.00$8.00$8.00
202Cephalanthus occidentalis (buttonbush SDLNG bare root) (802-13.53)EACH70$8.00$12.00$8.00$8.00
203Hamamelis virginiana (witch hazel SDLNG bare root) (802-13.55)EACH106$8.00$12.00$8.00$8.00
204Lindera benzoin (spicebush SDLNG bare root) (802-13.59)EACH34$8.00$12.60$8.00$8.00
205Sambucus canadensis ( elderberry SDLNG bare root) (802-13.60)EACH106$8.00$12.00$8.00$8.00
206Sodding (new sod) (803-01)SY78,910$4.25$7.00$4.05$4.25
207Erosion control blanket (type II) (805-12.02)SY154,265$1.25$1.00$1.25$1.25
208700 gram coir fiber erosion blanket (805-12.08)SY145,846$4.05$4.40$4.05$4.05
209Project mowing (806-02.03)CYCL8$7,500.00$8,000.00$10,000$17,000
210Clearing and grubbing (201-01.03)ACRE13$7,500.00$4,000.00$10,000$7,000.00
211Backfill material (flowable fill) (204-08.01)CY200$400.00$350.00$400.00$400.00
212Mineral aggregate (size 57) (303-10.01)TON600$90.00$40.00$60.00$90.00
213Fuse cutout (VM5-9) (760-15.22)EACH47$460.00$470.00$466.68$466.70
214Transformer VG25KVA(all 25 kva'S)* (760-15.24)EACH7$3,480.00$2,800.00$2,766.40$2,767.00
215Transformer VG15KVA (all 15 kva'S)* (760-15.25)EACH10$3,100.00$2,400.00$2,383.60$2,384.00
216Transformer VG50KVA (all 50 kva'S)* (760-15.28)EACH5$5,180.00$3,300.00$3,243.40$3,244.00
217Pole 30FT class 4 wood (790-01.03)EACH1$1,200.00$1,100.00$1,064.00$1,064.00
218Pole 35FT class 4 wood (790-02.03)EACH3$1,300.00$1,220.00$1,195.20$1,196.00
219Pole 40FT class 3 wood (790-03.02)EACH1$1,600.00$1,450.00$1,407.60$1,410.00
220Pole 40FT class 4 wood (790-03.03)EACH5$1,500.00$1,400.00$1,338.00$1,338.00
221Pole 45FT class 2 wood (790-04.02)EACH40$2,000.00$1,700.00$1,666.40$1,660.00
222Pole 45FT class 3 wood (790-04.03)EACH11$1,800.00$1,600.00$1,562.00$1,562.00
223Pole 45FT class 2 metal (790-04.07)EACH51$6,630.00$5,100.00$5,016.20$5,017.00
224Pole 45FT class 3 metal (790-04.21)EACH1$5,500.00$4,000.00$3,912.80$3,913.00
225Pole 50FT class 2 wood (790-05.02)EACH4$2,200.00$1,900.00$1,849.80$1,850.00
226Pole 50FT class 2 metal (790-05.06)EACH42$6,370.00$4,800.00$4,730.80$4,731.00
227Pole 55 FT class 2 metal (790-06.06)EACH3$7,100.00$6,100.00$6,060.60$6,061.00
2281PH SGL primary support 15KV (790-21.01)EACH2$325.00$385.00$374.12$375.00
2291PH DBL primary support 15KV (790-21.05)EACH2$360.00$475.00$467.56$468.00
2301PH primary LG angle 15KV (790-21.07)EACH1$400.00$660.00$650.32$651.00
2311PH deadend 15KV (790-21.08)EACH7$415.00$525.00$500.16$500.00
2321PH primary tap 15KV (790-21.09)EACH20$435.00$625.00$599.92$600.00
2331PH vertical dde 15KV (790-21.10)EACH3$540.00$725.00$710.24$711.00
2342PH crossarm const deadend (SGL) 15KV (790-23.07)EACH3$1,275.00$1,300.00$1,179.52$1,180.00
2352PH crossarm const DBL line arm 15KV (790-23.09)EACH1$1,215.00$1,500.00$1,423.76$1,424.00
2363PH crossarm DBL LRG cond 15KV (790-25.07)EACH4$1,300.00$1,850.00$1,784.52$1,785.00
2373PH crossarm SGL LRG cond 15KV (790-25.08)EACH107$850.00$1,175.00$1,125.12$1,125.00
2383PH crossarm DBL prim sup LRG cond 15KV (790-25.11)EACH12$1,700.00$2,200.00$2,047.68$2,048.00
2393PH vertical 15KV (790-25.15)EACH3$1,000.00$1,850.00$1,765.40$1,765.00
2403PH vertical deadend large angle 15KV (790-25.17)EACH2$1,300.00$1,600.00$1,581.72$1,582.00
2413PH crossarm deadend SGL 15KV (790-25.21)EACH29$2,150.00$1,425.00$1,371.40$1,372.00
2423PH crossarm dde 15KV (790-25.23)EACH7$2,600.00$2,500.00$2,442.00$2,443.00
243Secondary assemblies deadend (790-30.03)EACH1$135.00$185.00$170.24$171.00
244Secondary conductor 6 AL duplex (790-30.06)LF523$2.30$2.27$2.22$2.25
245Secondary conductor 4 AL triplex (790-30.12)LF887$2.85$3.00$2.90$2.90
246Secondary conductor 2 AL triplex (790-30.13)LF1,246$2.85$4.45$4.39$4.40
247Secondary conductor 1/0 AL triplex (790-30.14)LF233$4.00$6.45$6.36$6.35
248Secondary conductor 4/0 AL triplex (790-30.17)LF159$6.00$8.40$8.34$8.35
249Secondary conductor 1/0 AL qplex (790-30.22)LF277$5.50$7.50$7.33$7.35
250Secondary conductor 4/0 AL qplex (790-30.25)LF60$8.00$11.75$11.24$11.25
251Service assembly-pole type (790-31.02)EACH33$150.00$175.00$166.76$167.00
252Down guy - through bolt type (790-32.01)EACH147$400.00$440.00$430.84$431.00
253OH guy - through bolt type (790-32.07)EACH2$400.00$535.00$515.52$516.00
254Guy guard (790-32.23)EACH209$50.00$16.00$15.80$15.80
255Expanding type anchor 6,000LB-8,000LB (790-33.01)EACH147$650.00$725.00$708.72$709.00
256OH cond 2 7/1 acsr sparate (790-40.02)LF17,928$2.00$2.55$2.44$2.45
257OH cond 3/0 6/1 acsr pigeon (790-40.05)LF38,180$2.55$3.60$3.42$3.45
258OH cond 477 18/1 acsr pelican (790-40.15)LF114,540$4.50$5.00$4.93$4.95
259Secondary riser (UM5) (790-43.59)EACH3$860.00$1,400.00$1,293.00$1,293.00
2605KVA 1PH OH xformer 14.4KV 120/240 (790-54.02)EACH1$2,450.00$2,400.00$2,283.60$2,284.00
2613 - 1PH sectionalizers or reclosers 15KV (790-60.05)EACH4$2,750.00$5,800.00$5,603.08$5,604.00
2623PH sectlr or recl W/ bypass SW 25KV (790-61.10)EACH2$5,400.00$7,500.00$7,375.60$7,375.00
263Sec MTG 1PH 120/240 volts (790-64.01)EACH5$1,720.00$1,600.00$1,481.00$1,481.00
264Lightning arrester arm MTD 9 KV (790-65.03)EACH71$425.00$375.00$362.92$363.00
2653PH capacitor assembly 15KV (790-65.15)EACH5$31,600$19,000$17,130$17,130
266Street light interstate type (790-70.05)EACH11$545.00$1,650.00$1,518.00$1,518.00
26796 fiber(material only) (790-74.08)LF31,260$3.25$5.45$5.36$5.40
26812-96 fiber(installation only) (790-74.19)LF38,180$4.50$2.90$2.75$2.75
269Fiber splice-12 fiber ribbon (790-74.25)EACH112$325.00$550.00$535.00$535.00
270Fiber optic maintenance loop (790-74.26)EACH19$500.00$825.00$809.00$809.00
271Remove wire (790-98.01)LF141,407$1.25$1.90$1.75$1.75
272Remove poles (790-98.02)EACH126$320.00$465.00$450.00$450.00
273Remove framing/associated apparatus (790-98.03)EACH317$530.00$420.00$400.00$400.00
274Remove fiber optic cable (790-98.04)LF38,180$1.25$1.60$1.50$1.50
275Pole 30FT class 5 wood (793-01.02)EACH2$3,000.00$3,000.00$750.00$3,000.00
276Anchor 3/4IN (793-01.40)EACH18$1,200.00$165.00$158.00$1,200.00
277Anchor 1IN (793-01.41)EACH43$1,200.00$165.00$316.00$1,200.00
278Guy wire 6.6M or 1/4IN (793-02.07)EACH18$300.00$475.00$326.00$300.00
2796M strand (793-03.02)LF10,800$4.00$2.10$3.40$4.00
280Install strand bond (793-03.40)EACH21$75.00$16.00$316.00$75.00
281Underground splice closure (793-04.12)EACH4$3,000.00$400.00$851.00$3,000.00
28248 fiber(material only) (793-07.04)LF3,445$1.00$1.10$2.90$2.00
283144 fiber(material only) (793-07.07)LF36,950$2.00$1.10$1.60$2.00
284108-144 fiber(installation only) (793-07.17)LF37,150$2.00$2.20$2.90$2.00
285Fiber optic maintenance loop (793-07.23)EACH6$750.00$315.00$750.00$750.00
286Single fiber optic cable splice (793-07.25)EACH576$55.00$60.00$135.00$55.00
287Test bare fiber (793-07.99)EACH864$21.75$18.00$101.00$21.75
288Expose existing cable/conduit (all depths) (793-10.20)LF385$250.00$5.25$50.00$250.00
2896IN pedestal (793-11.04)EACH3$1,000.00$220.00$2,975.00$1,000.00
29010IN pedestal (793-11.08)EACH1$1,500.00$240.00$701.00$1,500.00
291Buried riser guard (793-11.13)EACH4$400.00$57.50$247.00$400.00
292Marker post (793-11.19)EACH52$300.00$52.50$180.00$300.00
293Handhole 30INX48IN (793-11.20)EACH4$3,500.00$825.00$4,910.00$3,500.00
294Concrete handhole 4FT X 4FT X 4FT (793-11.25)EACH25$18,000$1,100.00$11,850$18,000
295Rearrange existing splice case (793-11.50)EACH1$1,500.00$160.00$350.00$1,500.00
296Remove handhole (793-11.58)EACH5$500.00$420.00$1,700.00$500.00
297Dig splice pit 80 C.F. (793-12.01)EACH1$250.00$1,000.00$1,445.00$250.00
298Rearrangement existing cable (793-12.02)EACH8$1,000.00$27.50$450.00$1,000.00
2991 duct formation @ 24IN depth (793-13.11)LF75$35.00$4.75$14.00$35.00
3001 duct formation @ 36IN depth (793-13.12)LF118$40.00$5.25$24.50$40.00
3012 duct formation @ 48IN depth (793-13.18)LF21,340$80.00$6.20$19.00$80.00
302Sand encasement per duct (793-14.01)LF42,680$4.00$1.65$3.90$4.00
3031 1/4IN innerduct (793-14.12)LF64,900$6.00$2.10$1.60$6.00
3041 1/2IN innerduct (793-14.13)LF600$15.00$2.10$1.60$15.00
3054IN SCH 80 orange flexpipe (793-14.19)LF523$18.00$4.20$8.40$18.00
306Place manhole over existing cable (793-14.20)EACH2$1,500.00$1,400.00$3,190.00$1,500.00
307Directional bore 2IN/flex sleeve (793-16.02)LF407$130.00$10.50$46.50$130.00
308Directional bore 4IN/flex sleeve (793-16.04)LF523$130.00$17.00$46.50$130.00
309Ground bed (793-16.22)EACH8$1,200.00$21.00$405.00$1,200.00
310Remove aerial cable and wire (793-98.01)LF10,850$3.00$1.05$0.65$3.00
311Remove poles all sizes (793-98.04)EACH26$410.00$250.00$535.00$500.00
312Retire buried facilities in place (793-98.05)LF21,326$2.00$1.30$1.10$2.00
313Remove pedestals (793-98.06)EACH28$250.00$265.00$249.00$250.00
314Remove anchor (any size) (793-98.08)EACH18$150.00$185.00$499.00$150.00
315Remove down guy (793-98.09)EACH18$100.00$27.00$499.00$150.00
3166IN dip slip joint water line (795-01.04)LF650$85.00$90.00$85.00$85.00
3178IN dip slip joint water line (795-01.06)LF1,050$100.00$110.00$100.00$100.00
31812IN dip slip joint water line (795-01.10)LF21,000$118.00$126.00$118.00$118.00
319Connect to 6IN water line (795-06.04)EACH4$6,000.00$6,300.00$600.00$6,000.00
320Connect to 10IN water line (795-06.06)EACH2$11,000$12,600$11,000$11,000
321Connect to 12IN water line (795-06.07)EACH2$14,000$16,250$14,000$14,000
322Cut and cap 6IN water line (795-06.33)EACH3$3,000.00$10,500$3,000.00$3,000.00
323Cut & cap 10IN water line (795-06.36)EACH2$4,000.00$10,500$4,000.00$4,000.00
324Cut and cap 12IN water line (795-06.37)EACH2$5,000.00$10,500$5,000.00$5,000.00
3256IN gate valve assembly (795-08.04)EACH3$2,200.00$5,250.00$2,200.00$2,200.00
3268IN gate valve assembly (795-08.05)EACH2$2,500.00$7,300.00$2,500.00$2,500.00
32710IN gate valve assembly (795-08.06)EACH2$3,500.00$10,000$3,500.00$3,500.00
32812IN gate valve assembly (795-08.09)EACH20$6,500.00$12,600$6,500.00$6,500.00
3293/4IN pexa service pipe in 2IN steel casing (795-09.61)LF4,500$60.00$15.75$60.00$60.00
3302IN pexa service pipe (795-09.64)LF300$75.00$42.00$75.00$75.00
3314IN casing pipe (795-09.80)LF100$100.00$105.00$100.00$100.00
3324IN auto air release valve assembly (795-10.09)EACH3$4,000.00$18,000$6,000.00$4,000.00
333Fire hydrant assembly (795-11.02)EACH13$17,000$14,000$17,000$17,000
334Retire in place existing water main (795-11.12)LF13,000$5.00$1.00$5.00$5.00
335Remove water meter (795-12.08)EACH55$300.00$525.00$300.00$300.00
336DI fittings (795-13.01)LB20,000$1.00$21.00$1.00$1.00
33712IN steel casing pipe open cut method (795-15.02)LF240$400.00$260.00$400.00$400.00
33824IN steel casing pipe open cut method (795-15.07)LF400$600.00$420.00$600.00$600.00
339Relocate/reconnect 3/4IN water meter assembly (795-16.16)EACH50$2,000.00$3,200.00$2,000.00$2,000.00
340Relocate/reconnect 2IN water meter assembly (795-16.21)EACH5$6,000.00$7,850.00$6,000.00$6,000.00
34148IN manhole 4FT-6FT depth (797-07.02)EACH3$12,000$5,250.00$5,000.00$12,000
342Fiber optic cable enclosure (798-05.02)EACH15$1,050.00$315.00$2,015.00$5,000.00
343Fiber optic cable splice (798-05.03)EACH156$41.25$60.00$979.00$500.00
344Trunk/feeder cable .625 (798-05.09)LF252$2.75$2.10$3.00$40.00
345Trunk/feeder cable .750 (798-05.13)LF8,299$2.75$2.10$3.10$45.00
346Trunk/feeder cable .875 (798-05.16)LF2,721$2.75$2.10$3.20$50.00
347Trunk/feeder cable .500 (798-05.57)LF35,058$2.75$2.10$2.90$40.00
3485/16" ehs steel strand (798-05.60)LF34,767$2.00$2.10$3.20$16.00
349Fiber optic cable (96F) (798-06.11)LF427$3.35$3.00$4.00$18.00
350Fiber optic cable (24F) (798-06.13)LF1,068$3.00$2.85$3.50$18.00
351Fiber optic cable (144F) (798-06.20)LF28,848$4.25$3.00$4.40$22.00
35212-96 fiber optic cable (install only) (798-06.32)LF3,445$3.00$2.10$2.80$18.00
353Fiber optic receiver (798-06.40)EACH1$800.00$105.00$14,200$8,000.00
354Fiber storage loop (798-06.48)EACH19$260.00$156.00$1,635.00$1,500.00
355Remove steel strand (798-09.01)LF36,067$1.25$1.05$2.80$2.00
356Remove aerial cable/terminals (798-09.02)LF103,698$0.35$1.05$0.85$2.00
357Remove poles, guys, anchors (798-09.03)EACH88$500.00$300.00$1,570.00$650.00
358Remove strand pole framing (798-09.08)EACH156$30.00$27.50$529.00$350.00
359Amplifier assembly (798-10.15)EACH6$625.00$615.00$3,465.00$7,500.00
360Service tap assembly (798-10.16)EACH18$125.00$153.00$2,205.00$4,500.00
361Power installed anchor (798-11.31)EACH62$250.00$210.00$1,950.00$4,500.00
362Downguy - wrap type (798-11.41)EACH62$150.00$77.00$549.00$65.00
363Overhead guy - wrap type (798-11.42)EACH3$175.00$155.00$1,700.00$65.00
364Splitter (798-12.24)EACH1$155.00$80.00$1,570.00$2,450.00
365Copper cable splice (798-12.30)EACH17$45.00$27.50$1,585.00$500.00
366Branch strand termination (798-13.02)EACH2$250.00$27.50$1,605.00$65.00
367Strand tangent assembly (798-13.03)EACH118$100.00$10.50$1,730.00$5,000.00
368Strand angle assembly (798-13.04)EACH25$150.00$10.50$1,885.00$6,000.00
369Directional coupler (798-13.05)EACH1$200.00$80.00$1,760.00$2,200.00
370Strand double deadend assembly (798-13.07)EACH16$300.00$42.00$1,885.00$6,500.00
371Strand deadend assembly (798-13.08)EACH28$200.00$21.00$1,885.00$5,000.00
372Water (203-06)MG815$10.00$40.00$25.00
373Mineral aggregate, type A base, grading D (303-01)TON160,845$28.10$28.75$36.00
374Water (203-06)MG1,171$40.00
375Mineral aggregate, type A base, grading D (303-01)TON71,889$33.00
376Mineral aggregate (A-CBC) (309-01.01)TON42,500$33.00
377Portland cement (A-CBC) (309-01.02)TON2,080$510.00
378Bituminous material (A-CBC) (309-02)TON123$1,030.00
TDOT contract CNZ194: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of June 27, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy