AI deployment for megaprojects
Morocco's megaprojects in 3D: transport, water, energy, industry and the World Cup stadiums
- Projects
- 47
- In 3D
- 47
- Companies named
- 88
Who owns and builds each project, its cost and its stage, every figure linked to its source, every site in 3D; how the map is made.
47 projects on the map.
Base map: Natural Earth. Sites, buildings and the land around: OpenStreetMap contributors, ODbL. Each mark sits on its site.Every project as text, with its owner, its builders and its sources, below the map
Who builds Morocco's megaprojects
The companies named on the most projects of this map, as the owners, the companies and the press name them. A company counts once per project, whatever its number of lots, and a joint venture counts for each of its members. The projects listed under the map count as well as those on it.
| Rank | Company | Projects | On |
|---|---|---|---|
| 1 | Novec | 9 | Aït Ziat dam, Béni Azimane dam, Boulaouane dam, Kenitra-Marrakech high-speed line, Kheng Grou dam, Oued Sakia El Hamra viaduct, Laayoune bypass and 3 more |
| 2 | CID | 5 | El Menzel pumped-storage plant, Rabat-Casablanca continental motorway, Safi new port, OCP extension (phase 2), Strait of Gibraltar fixed rail link, Tamri dam |
| 3 | LPEE | 3 | Safi new port, OCP extension (phase 2), Tamri dam, Tessema stadium reconstruction, Casablanca |
| 4 | Artelia | 2 | Nador West Med port and industrial complex, Safi new port, OCP extension (phase 2) |
| 4 | Oualalou+Choi | 2 | Casa-Sud station, Grand Stade Hassan II |
| Rank | Company | Projects | On |
|---|---|---|---|
| 1 | Ministry of Equipment and Water | 36 | Agadir motorway bypass, Agadir north-east ring road, Agadir urban motorway, Aït Ziat dam, Béni Azimane dam, Bou Ahmed dam and 30 more |
| 2 | 23 | Aït Melloul provincial hospital, Benguerir provincial hospital, Béni Mellal Regional Hospital reconstruction, Béni Mellal University Hospital, Berkane provincial hospital, Casablanca Moulay Rachid hospital and 17 more | |
| 3 | ONCF | 22 | Aïn Sebaâ local station, Casa-Oasis local station, Casa-Sud station, Fès-Oujda line electrification, Grand Stade Hassan II station, Greater Casablanca rail programme and 16 more |
| 4 | Masen | 11 | Nassim Dar Chaoui wind farm, Nassim Koudia Al Baida wind farm extension, Noor Atlas Aïn Beni Mathar solar plant, Noor Atlas Bouanane solar plant, Noor Atlas Boudnib solar plant, Noor Atlas Enjil solar plant and 5 more |
| 4 | ONEE | 11 | Al Wahda open-cycle gas turbine power plant, Casablanca seawater desalination plant, Chtouka-Aït Baha (Agadir) desalination plant extension, El Menzel pumped-storage plant, Ifahsa pumped-storage plant, Nador combined-cycle gas power plant and 5 more |
| 6 | Nareva | 8 | Boujdour II wind farm (Énergie Éolienne du Maroc), Casablanca waste-to-energy centre (Médiouna), Dakhla seawater desalination plant, Green hydrogen 'Offre Maroc' projects, Souss-Massa seawater desalination plant (Tiznit), South to Centre HVDC link (Oued Lakraa to Médiouna) and 2 more |
| 7 | ONDA | 7 | Agadir Al Massira airport: terminal extension, Casablanca Mohammed V airport: new hub terminal, Fès-Saïss airport: terminal extension, Marrakech Menara airport: terminal extension, ONDA Airports 2030 investment programme, Rabat-Salé airport: new terminal and 1 more |
| 8 | ADM | 5 | Grand Stade Hassan II access roads (ADM), Grand Stade Hassan II road access programme, Guercif-Nador motorway, Rabat-Casablanca continental motorway, Tangier/Tetouan-Fès/Meknès motorway |
| 8 | OCP Green Water | 5 | Jorf Lasfar-Khouribga desalinated water pipeline, Mzinda Phosphate Hub-Benguerir water pipeline, OCP Green Water programme, OCP new Safi desalination plant, Safi-Gantour desalinated water pipeline (S2G) |
| 10 | OCP | 4 | OCP Green Water programme, OCP Strategic Program Mzinda-Meskala (SP2M), OCP Tarfaya green ammonia project, Safi new port, OCP extension (phase 2) |
| 10 | TAQA Morocco | 4 | Souss-Massa seawater desalination plant (Tiznit), South to Centre HVDC link (Oued Lakraa to Médiouna), TAQA Morocco, Nareva and Fonds Mohammed VI energy and water programme, Water highway phase 2: Sidi Mohammed Ben Abdellah dam to Al Massira dam |
| 12 | Agence pour l'aménagement du site de la lagune de Marchica | 3 | Ghassi quarter restructuring, Béni Ensar, Marchica agency investment programme 2026-2027, Nador, Nador historic centre requalification (Damier quarter, Boulevard Mohammed V) |
| 12 | Government of Morocco | 3 | Green hydrogen 'Offre Maroc' projects, Morocco-Portugal power interconnection, TAQA Morocco, Nareva and Fonds Mohammed VI energy and water programme |
| 12 | Ministry of Agriculture | 3 | Chtouka-Aït Baha (Agadir) desalination plant extension, Gharb South-East irrigation scheme, Saïss plain irrigation scheme (water from the M'dez dam) |
| 12 | Ministry of Energy Transition and Sustainable Development | 3 | Igoudar Numérique green data centre campus, Dakhla, Nador West Med LNG terminal (FSRU), National gas pipeline corridor: Nador West Med to the GME, Kenitra and Mohammedia |
| 12 | OCP Nutricrops | 3 | OCP Meskala hub and Louta mine, OCP Mzinda Phosphate Hub, OCP Strategic Program Mzinda-Meskala (SP2M) |
| 17 | ACWA Power | 2 | Green hydrogen 'Offre Maroc' projects, Noor Midelt II and III solar and battery storage plants |
| 17 | ANEP | 2 | Grand Stade de Marrakech upgrade for the 2030 World Cup, Tessema stadium reconstruction, Casablanca |
| 17 | Commune of Casablanca | 2 | Avenue Royale (Mahaj Royal), Casablanca, Casablanca waste-to-energy centre (Médiouna) |
| 17 | Engie | 2 | Dakhla seawater desalination plant, OCP Tarfaya green ammonia project |
| 17 | Forests | 2 | Gharb South-East irrigation scheme, Saïss plain irrigation scheme (water from the M'dez dam) |
| 17 | Green of Africa | 2 | Casablanca seawater desalination plant, Noor Midelt I solar and battery storage plant |
| 17 | Maritime Fisheries | 2 | Gharb South-East irrigation scheme, Saïss plain irrigation scheme (water from the M'dez dam) |
| 17 | Nador West Med SA | 2 | Nador West Med LNG terminal (FSRU), Nador West Med port and industrial complex |
| 17 | ONHYM | 2 | Nigeria-Morocco (African Atlantic) gas pipeline, Tendrara gas field, phase 1 (micro-LNG) |
| Rank | Company | Projects | On |
|---|---|---|---|
| 1 | African Development Bank | 11 | Agadir Al Massira airport: terminal extension, Fès-Saïss airport: terminal extension, Gotion battery gigafactory, Kenitra, Guercif-Nador motorway, Ifahsa pumped-storage plant, Kenitra-Marrakech high-speed line and 5 more |
| 2 | Bank of Africa | 9 | Al Wahda open-cycle gas turbine power plant, Casablanca seawater desalination plant, Noor Atlas Aïn Beni Mathar solar plant, Noor Atlas Bouanane solar plant, Noor Atlas Boudnib solar plant, Noor Atlas Enjil solar plant and 3 more |
| 3 | European Investment Bank | 8 | Noor Atlas Aïn Beni Mathar solar plant, Noor Atlas Bouanane solar plant, Noor Atlas Boudnib solar plant, Noor Atlas Enjil solar plant, Noor Atlas solar programme, Noor Atlas Tan-Tan solar plant and 2 more |
| 4 | KfW | 7 | Noor Atlas Aïn Beni Mathar solar plant, Noor Atlas Bouanane solar plant, Noor Atlas Boudnib solar plant, Noor Atlas Enjil solar plant, Noor Atlas solar programme, Noor Atlas Tan-Tan solar plant and 1 more |
| 5 | Attijariwafa Bank | 3 | Al Wahda open-cycle gas turbine power plant, Boujdour II wind farm (Énergie Éolienne du Maroc), Casablanca seawater desalination plant |
| 6 | Banque Centrale Populaire | 2 | Boujdour II wind farm (Énergie Éolienne du Maroc), Casablanca seawater desalination plant |
| 6 | FIEM | 2 | Casablanca seawater desalination plant, ONCF fleet programme: 168 new trains |
| 6 | Islamic Development Bank | 2 | El Menzel pumped-storage plant, Guercif-Nador motorway |
A company missing, or a project missing from a company's row? Write to mehdi@miragemetrics.com with a public source. Share the ranking on LinkedIn.
All 47 projects on the map
The same projects as the map above, as text, by family. Each name opens the project's page, with every figure, the companies and their roles, and the sources.
| Project | Where | Owner | Built by | Amount | Stage |
|---|---|---|---|---|---|
| Agadir Grand Stadium upgrade (World Cup phase 2) | Agadir, Souss-Massa | SONARGES | TGCC, Inter Tridim, Encom-Protelec | MAD 2.42 bn (budget) | Under construction |
| Fès stadium upgrade (World Cup phase 2) | Fès, Fès-Meknès | SONARGES (Société Nationale de Réalisation et de Gestion des Équipements Sportifs) | SGTM | MAD 1.29 bn (budget) | Under construction |
| Grand Stade de Marrakech upgrade for the 2030 World Cup | Marrakech, Marrakech-Safi | ANEP (Agence nationale des équipements publics) | TGCC | MAD 1.26 bn (budget) | Contract awarded, works not confirmed |
| Grand Stade Hassan II | El Mansouria, Benslimane province, Casablanca-Settat | Fédération Royale Marocaine de Football (FRMF) | SGTM, TGCC, CMS-GTR | Under construction | |
| Tessema stadium reconstruction, Casablanca | Ben M'Sik-Sidi Othmane, Casablanca, Casablanca-Settat | ANEP (Agence nationale des équipements publics), Direction des infrastructures sportives | TGCC, SNTRO | MAD 1.77 bn (budget) | Contract awarded, works not confirmed |
| Project | Where | Owner | Built by | Amount | Stage |
|---|---|---|---|---|---|
| Casa-Sud station | Hay Hassani, Casablanca, Casablanca-Settat | ONCF | Sogea Maroc | MAD 1.3 bn (total project cost) | Under construction |
| Grand Stade Hassan II station | Benslimane province (El Mansouria area), Casablanca-Settat | ONCF | Jet Contractors | MAD 450 M (budget) | Under construction |
| Kenitra-Marrakech high-speed line | Kenitra (Sidi Ichou) to Marrakech, Rabat-Salé-Kénitra / Casablanca-Settat / Marrakech-Safi | ONCF (Office National des Chemins de Fer) | China Railway No.4 Engineering Group (CREC 4), Shandong Hi-Speed Engineering Construction Group, GTR (Les Grands Travaux Routiers, Colas subsidiary) | MAD 4 bn (budget) | Under construction |
| Nador West Med rail link | Nador province, Selouane to Nador West Med port, Oriental | ONCF (Office National des Chemins de Fer) | Under construction |
| Project | Where | Owner | Built by | Amount | Stage |
|---|---|---|---|---|---|
| Agadir north-east ring road | Agadir, Souss-Massa | Ministry of Equipment and Water | Stage not confirmed | ||
| Fès-Taounate expressway (RN8 dualling) | Fès to Taounate, Fès-Meknès | Ministry of Equipment and Water (provincial directorate of Taounate) | SSMT-Taroudant, Univers Bat, Les Grands Chantiers Routiers | MAD 1.56 bn (total project cost, approx.) | Under construction |
| Guercif-Nador motorway | Guercif, Saka, Driouch, Nador West Med, Oriental | Ministry of Equipment and Water (Direction régionale de l'Oriental), ADM (Société Nationale des Autoroutes du Maroc) | China Road and Bridge Corporation (CRBC), Bioui Travaux, Mojazine | MAD 7.9 bn (total project cost) | Under construction |
| Oued Sakia El Hamra viaduct, Laayoune bypass | Laâyoune, Laâyoune-Sakia El Hamra | Ministry of Equipment and Water | SGTM (Société Générale des Travaux du Maroc) | MAD 9 bn (total project cost) | Under construction |
| Rabat-Casablanca continental motorway | Tamesna (Rabat bypass) to Tit Mellil (Casablanca), Rabat-Salé-Kénitra / Casablanca-Settat | ADM (Société Nationale des Autoroutes du Maroc) | Mojazine, El Hallaoui, SNTRO with China Railway No.4 Engineering Group | MAD 6.95 bn (budget) | Under construction |
| RN16 doubling, Touima to Nador West Med port | Touima (Taouima) to the Nador West Med port, Nador province, Oriental | Ministry of Equipment and Water (Direction provinciale de Nador) | MAD 450 M (total project cost) | Under construction | |
| RN6 widening, Dar Sikka-Sidi Allal Bahraoui | Salé to Sidi Allal Bahraoui, Rabat-Salé-Kénitra | Ministry of Equipment and Water | Under construction | ||
| Sidi Yahya-Sidi Kacem expressway (RN4) | Sidi Yahya El Gharb to Sidi Kacem, Rabat-Salé-Kénitra | Ministry of Equipment and Water | Stage not confirmed | ||
| Tétouan-Chefchaouen expressway (RN2) | Tétouan to Chefchaouen, Tanger-Tétouan-Al Hoceïma | Ministry of Equipment and Water | MAD 900 M (total project cost) | Under construction |
| Project | Where | Owner | Built by | Amount | Stage |
|---|---|---|---|---|---|
| Agadir Al Massira airport: terminal extension | Agadir (Agadir-Al Massira airport, Inezgane-Aït Melloul prefecture), Souss-Massa | ONDA (Office National des Aéroports) | SGTM | Under construction | |
| Casablanca Mohammed V airport: new hub terminal | Nouaceur (Mohammed V International Airport, Casablanca), Casablanca-Settat | ONDA (Office National des Aéroports) | SGTM, TGCC, STAM | MAD 15 bn (total project cost, approx.) | Under construction |
| Marrakech Menara airport: terminal extension | Marrakech (commune of Ménara), Marrakech-Safi | ONDA (Office National des Aéroports) | Jet Contractors | MAD 3 bn (budget) | Under construction |
| Rabat-Salé airport: new terminal | Salé (Rabat-Salé airport), Rabat-Salé-Kénitra | ONDA | Sinohydro, Menasteel Industry, Systherm | €171 M (total project cost) | Under construction |
| Project | Where | Owner | Built by | Amount | Stage |
|---|---|---|---|---|---|
| Dakhla Atlantique port | N'Tireft (N'Tirift), north of Dakhla, Oued Eddahab province, Dakhla-Oued Eddahab | Ministry of Equipment and Water (Direction des Ports et du Domaine Public Maritime) | SGTM, SGTM-Somagec Sud | MAD 12.6 bn (total project cost) | Under construction |
| Laâyoune phosphate port (Phosboucraa) | Laâyoune coast (El Marsa area), Laâyoune-Sakia El Hamra | Phosboucraa (OCP Group) | Archirodon | MAD 5.2 bn (total project cost) | Under construction |
| Nador West Med port and industrial complex | Iaazzanene (Iâazanene), Nador province, Oriental | Nador West Med SA, West Med Container Terminal (Marsa Maroc and Terminal Investment Limited, MSC), Marsa Maroc and CMA CGM, Marsa Maroc-Boluda Towage France | STFA-SGTM joint venture, SBTX, NGE Contracting | MAD 10.1 bn (total project cost) | Partly in service, partly under construction |
| Safi new port, OCP extension (phase 2) | Safi, south of the city, Marrakech-Safi | OCP Group, Ministry of Equipment (Direction des Ports) | SGTM/STFA grouping | MAD 4.4 bn (total project cost) | Under construction |
| Project | Where | Owner | Built by | Amount | Stage |
|---|---|---|---|---|---|
| Casablanca seawater desalination plant | Lamharza Essahel, El Jadida province (south of Casablanca, near Sidi Rahal Chatai), Casablanca-Settat | ONEE (Office National de l'Electricité et de l'Eau Potable), Al Baidaa Desalination Company, Green of Africa, Afriquia Gaz | Acciona (Acciona Agua), CAPEP | €613 M (total project cost) | Under construction |
| Chtouka-Aït Baha (Agadir) desalination plant extension | Chtouka-Aït Baha province, south of Agadir, Souss-Massa | Ministry of Agriculture, ONEE, Cox | MAD 4.41 bn (total project cost) | Contract awarded, works not confirmed | |
| Saïss plain irrigation scheme (water from the M'dez dam) | Saïss plain, between Fès, Meknès, El Hajeb, Sefrou and Moulay Yacoub, Fès-Meknès | Ministry of Agriculture, Maritime Fisheries, Rural Development and Water and Forests | CMGP Group | MAD 9 bn (total project cost) | Partly in service, partly under construction |
| Project | Where | Owner | Built by | Amount | Stage |
|---|---|---|---|---|---|
| Aït Ziat dam | Al Haouz province, Marrakech-Safi | Ministry of Equipment and Water | SGTM | MAD 1.9 bn (total project cost) | Under construction |
| Mokhtar Soussi dam raising | On the Oued Aouzioua, about 100 km east of Taroudant, Souss-Massa | Ministry of Equipment and Water | Somagec | MAD 1.3 bn (total project cost) | Under construction |
| Oued Lakhdar dam | Commune of Aït Majden, Azilal province, Béni Mellal-Khénifra | Ministry of Equipment and Water | STAM | MAD 1.72 bn (budget) | Under construction |
| Ratba dam | Commune of Oudka, Taounate province, Fès-Meknès | Ministry of Equipment and Water | SGTM (Société Générale des Travaux du Maroc), STAM | MAD 4.5 bn (total project cost) | Under construction |
| Tamri dam | Agadir Ida-Outanane prefecture, 62 km north of Agadir, Souss-Massa | Ministry of Equipment and Water | Somagec | MAD 2.7 bn (total project cost) | Under construction |
| Targa Ou Madi dam | On the Oued Zobzit, about 74 km from Guercif (Jerada province in the ministry's list), Oriental | Ministry of Equipment and Water (Direction des Aménagements Hydrauliques, DAH) | Bioui Travaux, SBTX | MAD 1.85 bn (total project cost) | Under construction |
| Project | Where | Owner | Built by | Amount | Stage |
|---|---|---|---|---|---|
| Al Wahda open-cycle gas turbine power plant | Lamjaara, Ouazzane province, Tanger-Tétouan-Al Hoceïma | ONEE | China Energy Engineering Co., Ltd. (CEEC), Mitsubishi Power | MAD 5.6 bn (total project cost) | Under construction |
| Noor Atlas Bouanane solar plant | Bouanane commune, Figuig province, Oriental | MASEN | Under construction | ||
| Noor Atlas Boudnib solar plant | Oued Naam commune, Errachidia province, Drâa-Tafilalet | MASEN | Under construction | ||
| Noor Atlas Enjil solar plant | Enjil commune, Boulemane province, Fès-Meknès | MASEN | Under construction | ||
| Noor Atlas Tan-Tan solar plant | Chbika commune, Tan-Tan province, Guelmim-Oued Noun | MASEN | Under construction |
| Project | Where | Owner | Built by | Amount | Stage |
|---|---|---|---|---|---|
| Ibn Sina University Hospital, Rabat | Rabat, Rabat-Salé-Kénitra | Ministry of Health and Social Protection | SGTM-TGCC, Jet Contractors | MAD 7.31 bn (total project cost) | Under construction |
| Laâyoune University Hospital | Laâyoune, Laâyoune-Sakia El Hamra | Ministry of Health and Social Protection | MAD 2.8 bn (total project cost) | Under construction |
| Project | Where | Owner | Built by | Amount | Stage |
|---|---|---|---|---|---|
| Gotion battery gigafactory, Kenitra | Kenitra Atlantic Free Zone, Rabat-Salé-Kénitra | Gotion Power Morocco, CDG Invest | US$1.3 bn (announced investment) | Partly in service, partly under construction | |
| OCP Mzinda Phosphate Hub | Mzinda, near Youssoufia, Marrakech-Safi | OCP Nutricrops | Under construction | ||
| Stellantis Kenitra plant extension | Kenitra Atlantic Free Zone, Rabat-Salé-Kénitra | Stellantis | €1.2 bn (announced investment) | Opened |
| Project | Where | Owner | Built by | Amount | Stage |
|---|---|---|---|---|---|
| Avenue Royale (Mahaj Royal), Casablanca | Casablanca (Ancienne Médina, between the Hassan II Mosque and the city centre), Casablanca-Settat | Commune of Casablanca | MAD 2 bn (budget) | Planning | |
| Nador historic centre requalification (Damier quarter, Boulevard Mohammed V) | Nador city centre, Oriental | Agence pour l'aménagement du site de la lagune de Marchica | Procurement |
130 more projects and programmes, without a site to draw
These have no site a model can be drawn from yet: a national envelope or a fleet rather than one site, a line whose route is not published, a plant whose works no document or image places. Each keeps its record and moves onto the map once its site is known.
| Project | Type | Owner | Stage | Why it is not on the map |
|---|---|---|---|---|
| Marrakech-Agadir high-speed line | Rail | ONCF, Ministry of Transport and Logistics | Planning | A line whose route is not published yet |
| ONCF fleet programme: 168 new trains | Rail | ONCF | Contract awarded, works not confirmed | A programme of several projects, not one site |
| Hyundai Rotem train plant, Benguerir | Industry | Hyundai Rotem, ONCF | Stage not confirmed | No published source, map or recent satellite image places the works yet |
| Fès-Marrakech motorway | Highways | Ministry of Equipment and Water | Planning | A line whose route is not published yet |
| Strait of Gibraltar fixed rail link | Rail | SNED (Société Nationale d'Études du Détroit de Gibraltar), SECEGSA (Sociedad Española de Estudios para la Comunicación Fija a través del Estrecho de Gibraltar) | Planning | A line whose route is not published yet |
| Greater Casablanca rail programme | Rail | ONCF | Under construction | A programme of several projects, not one site |
| Aïn Sebaâ local station | Rail | ONCF | Under construction | No published source, map or recent satellite image places the works yet |
| Casa-Oasis local station | Rail | ONCF | Under construction | No published source, map or recent satellite image places the works yet |
| Hay Mohammadi local station | Rail | ONCF | Under construction | No published source, map or recent satellite image places the works yet |
| Mers Sultan local station | Rail | ONCF | Under construction | No published source, map or recent satellite image places the works yet |
| Mohammedia Facultés local station | Rail | ONCF | Under construction | No published source, map or recent satellite image places the works yet |
| Nouaceur Ville nouvelle local station | Rail | ONCF | Under construction | No published source, map or recent satellite image places the works yet |
| Sidi Bernoussi local station | Rail | ONCF | Under construction | No published source, map or recent satellite image places the works yet |
| Sidi Maârouf local station | Rail | ONCF | Under construction | No published source, map or recent satellite image places the works yet |
| Zenata Ville nouvelle local station | Rail | ONCF | Under construction | No published source, map or recent satellite image places the works yet |
| Zenata Zone industrielle local station | Rail | ONCF | Under construction | No published source, map or recent satellite image places the works yet |
| Mohammed V airport rail station (Nouaceur hub) | Rail | ONCF | Under construction | No published source, map or recent satellite image places the works yet |
| Rabat-Salé-Témara bus rapid transit network | Urban transit | Rabat Région Mobilité (SDL) | Procurement | A line whose route is not published yet |
| Rabat-Salé tramway extensions to Témara and Sala Al Jadida | Urban transit | Société du Tramway de Rabat-Salé (STRS), Rabat Région Mobilité (SDL) | Suspended | A line whose route is not published yet |
| Ourika tunnel (Marrakech-Ouarzazate) | Highways | Ministry of Equipment and Water | Planning | A line whose route is not published yet |
| Nador West Med road connections | Highways | Ministry of Equipment and Water (Direction provinciale de Nador) | Under construction | A programme of several projects, not one site |
| Grand Stade Hassan II road access programme | Highways | Casablanca-Settat Regional Council, Ministry of Economy and Finance, Ministry of Equipment and Water, ADM (Société Nationale des Autoroutes du Maroc) | Procurement | A programme of several projects, not one site |
| Grand Stade Hassan II access roads (ADM) | Highways | ADM (Société Nationale des Autoroutes du Maroc) | Procurement | In studies or in tender: no published source places the works yet |
| Tanger Med 3 port extension | Ports | Tanger Med Special Agency (TMSA), APM Terminals (Maersk) | Contract awarded, works not confirmed | No published source, map or recent satellite image places the works yet |
| Dakhla Atlantique port: green hydrogen extension | Ports | Ministry of Equipment and Water | Planning | In studies or in tender: no published source places the works yet |
| Nador West Med LNG terminal (FSRU) | Energy | Ministry of Energy Transition and Sustainable Development, Nador West Med SA | Suspended | In studies or in tender: no published source places the works yet |
| National gas pipeline corridor: Nador West Med to the GME, Kenitra and Mohammedia | Energy | Ministry of Energy Transition and Sustainable Development | Suspended | A line whose route is not published yet |
| Nigeria-Morocco (African Atlantic) gas pipeline | Energy | ONHYM (Office National des Hydrocarbures et des Mines), NNPC Ltd (Nigerian National Petroleum Company), ECOWAS | Planning | A line whose route is not published yet |
| Sidi Moussa coastal protection, Salé (phase 1) | Urban works | Direction provinciale de l'Equipement, du Transport et de la Logistique de Rabat (Ministry of Equipment and Water) | Procurement | In studies or in tender: no published source places the works yet |
| Jorf Lasfar port 'Green Basin' extension | Ports | Agence Nationale des Ports (ANP) | Planning | In studies or in tender: no published source places the works yet |
| Tan-Tan green hydrogen export port | Ports | Ministry of Equipment and Water | Planning | In studies or in tender: no published source places the works yet |
| Nexus AI Factory data centre, Nouaceur | Data centers and networks | Nexus Core Systems, Naver Cloud | Planning | In studies or in tender: no published source places the works yet |
| Igoudar Numérique green data centre campus, Dakhla | Data centers and networks | Ministry of Digital Transition and Administrative Reform, Ministry of Energy Transition and Sustainable Development, Wilaya and Regional Council of Dakhla-Oued Eddahab | Planning | In studies or in tender: no published source places the works yet |
| Iozera data centre, Tetouan | Data centers and networks | Iozera | Stage not confirmed | No published source, map or recent satellite image places the works yet |
| Uni Fiber and Uni Tower (Maroc Telecom-Inwi fibre and 5G infrastructure) | Data centers and networks | Maroc Telecom (IAM), Inwi (Wana Corporate) | Under construction | A programme of several projects, not one site |
| ONDA Airports 2030 investment programme | Airports | ONDA (Office National des Aéroports) | Under construction | A programme of several projects, not one site |
| Tangier Ibn Battouta airport: new terminal and control tower | Airports | ONDA | Under construction | No published source, map or recent satellite image places the works yet |
| Fès-Saïss airport: terminal extension | Airports | ONDA | Procurement | In studies or in tender: no published source places the works yet |
| Béni Mellal University Hospital | Hospitals | Ministry of Health and Social Protection | Under construction | No published source, map or recent satellite image places the works yet |
| Errachidia University Hospital | Hospitals | Ministry of Health and Social Protection | Under construction | No published source, map or recent satellite image places the works yet |
| Guelmim University Hospital | Hospitals | Ministry of Health and Social Protection | Under construction | No published source, map or recent satellite image places the works yet |
| Béni Mellal Regional Hospital reconstruction | Hospitals | Ministry of Health and Social Protection | Under construction | No published source, map or recent satellite image places the works yet |
| Oujda Regional Hospital | Hospitals | Ministry of Health and Social Protection | Procurement | In studies or in tender: no published source places the works yet |
| Settat provincial hospital | Hospitals | Ministry of Health and Social Protection | Planning | In studies or in tender: no published source places the works yet |
| Casablanca Moulay Rachid hospital | Hospitals | Ministry of Health and Social Protection | Planning | In studies or in tender: no published source places the works yet |
| Mohammedia provincial hospital | Hospitals | Ministry of Health and Social Protection | Under construction | No published source, map or recent satellite image places the works yet |
| Marrakech regional hospital | Hospitals | Ministry of Health and Social Protection | Planning | In studies or in tender: no published source places the works yet |
| Benguerir provincial hospital | Hospitals | Ministry of Health and Social Protection | Under construction | No published source, map or recent satellite image places the works yet |
| Taourirt provincial hospital | Hospitals | Ministry of Health and Social Protection | Under construction | No published source, map or recent satellite image places the works yet |
| Berkane provincial hospital | Hospitals | Ministry of Health and Social Protection | Under construction | No published source, map or recent satellite image places the works yet |
| Guercif provincial hospital | Hospitals | Ministry of Health and Social Protection | Under construction | No published source, map or recent satellite image places the works yet |
| Nador provincial hospital | Hospitals | Ministry of Health and Social Protection | Under construction | No published source, map or recent satellite image places the works yet |
| Sidi Slimane provincial hospital | Hospitals | Ministry of Health and Social Protection | Planning | In studies or in tender: no published source places the works yet |
| Moulay Yaâcoub provincial hospital | Hospitals | Ministry of Health and Social Protection | Under construction | No published source, map or recent satellite image places the works yet |
| Meknès specialty hospital | Hospitals | Ministry of Health and Social Protection | Under construction | No published source, map or recent satellite image places the works yet |
| Ouazzane provincial hospital reconstruction | Hospitals | Ministry of Health and Social Protection | Under construction | No published source, map or recent satellite image places the works yet |
| Sidi Ifni provincial hospital | Hospitals | Ministry of Health and Social Protection | Under construction | No published source, map or recent satellite image places the works yet |
| Taroudant provincial hospital reconstruction | Hospitals | Ministry of Health and Social Protection | Planning | In studies or in tender: no published source places the works yet |
| Aït Melloul provincial hospital | Hospitals | Ministry of Health and Social Protection | Planning | In studies or in tender: no published source places the works yet |
| Casablanca waste-to-energy centre (Médiouna) | Urban works | Commune of Casablanca, Kanadevia Inova (formerly Hitachi Zosen Inova), Nareva, ITOCHU Corporation | Contract awarded, works not confirmed | No published source, map or recent satellite image places the works yet |
| Rabat seawater desalination plant | Water | Kingdom of Morocco, Veolia | Planning | In studies or in tender: no published source places the works yet |
| Souss-Massa seawater desalination plant (Tiznit) | Water | ONEE, TAQA Morocco, Nareva, Mohammed VI Investment Fund | Planning | In studies or in tender: no published source places the works yet |
| Oriental seawater desalination project (Nador and Driouch) | Water | Procurement | In studies or in tender: no published source places the works yet | |
| Tangier seawater desalination plant | Water | Planning | In studies or in tender: no published source places the works yet | |
| Dakhla seawater desalination plant | Water | Nareva, Engie | Under construction | No published source, map or recent satellite image places the works yet |
| Water highway phase 2: Sidi Mohammed Ben Abdellah dam to Al Massira dam | Water | Ministry of Equipment and Water, TAQA Morocco-Nareva | Procurement | A line whose route is not published yet |
| Bou Ahmed dam | Dams and hydro | Ministry of Equipment and Water | Under construction | No published source, map or recent satellite image places the works yet |
| Mohammed V dam raising | Dams and hydro | Ministry of Equipment and Water | Under construction | No published source, map or recent satellite image places the works yet |
| Béni Azimane dam | Dams and hydro | Ministry of Equipment and Water | Under construction | No published source, map or recent satellite image places the works yet |
| Kheng Grou dam | Dams and hydro | Ministry of Equipment and Water, Direction des Aménagements Hydrauliques (DAH), Ministry of Equipment and Water | Under construction | No published source, map or recent satellite image places the works yet |
| Boulaouane dam | Dams and hydro | Ministry of Equipment and Water | Under construction | No published source, map or recent satellite image places the works yet |
| Taghzirt dam | Dams and hydro | Ministry of Equipment and Water | Under construction | No published source, map or recent satellite image places the works yet |
| Falit dam | Dams and hydro | Ministry of Equipment and Water (Direction des Aménagements Hydrauliques) | Procurement | In studies or in tender: no published source places the works yet |
| TAQA Morocco, Nareva and Fonds Mohammed VI energy and water programme | Energy | TAQA Morocco, Nareva, Government of Morocco | Planning | A programme of several projects, not one site |
| South to Centre HVDC link (Oued Lakraa to Médiouna) | Energy | ONEE, TAQA Morocco, Nareva | Planning | A line whose route is not published yet |
| Noor Midelt I solar and battery storage plant | Energy | MASEN, EDF Power Solutions, Masdar, Green of Africa | Contract awarded, works not confirmed | No published source, map or recent satellite image places the works yet |
| Noor Midelt II and III solar and battery storage plants | Energy | MASEN, ACWA Power | Contract awarded, works not confirmed | No published source, map or recent satellite image places the works yet |
| Green hydrogen 'Offre Maroc' projects | Green hydrogen | Government of Morocco, ORNX (Ortus, Acciona, Nordex), TAQA and Cepsa (now Moeve), Nareva, ACWA Power, United Energy Group and China Three Gorges | Planning | A programme of several projects, not one site |
| OCP Tarfaya green ammonia project | Green hydrogen | OCP Group, Engie | Planning | In studies or in tender: no published source places the works yet |
| El Menzel pumped-storage plant | Dams and hydro | ONEE | Procurement | In studies or in tender: no published source places the works yet |
| Ifahsa pumped-storage plant | Dams and hydro | ONEE | Planning | In studies or in tender: no published source places the works yet |
| Nador combined-cycle gas power plant | Energy | ONEE | Planning | In studies or in tender: no published source places the works yet |
| ONEE grid battery storage programme (BESS) | Energy | ONEE | Procurement | A programme of several projects, not one site |
| Noor Atlas solar programme | Energy | MASEN | Under construction | A programme of several projects, not one site |
| Noor Atlas Aïn Beni Mathar solar plant | Energy | MASEN | Under construction | No published source, map or recent satellite image places the works yet |
| Noor Atlas Tata solar plant | Energy | MASEN | Under construction | No published source, map or recent satellite image places the works yet |
| Boujdour II wind farm (Énergie Éolienne du Maroc) | Energy | Énergie Éolienne du Maroc (EEM), Nareva | Contract awarded, works not confirmed | No published source, map or recent satellite image places the works yet |
| ONEE investment programme 2026 to 2030 | Energy | ONEE | Planning | A programme of several projects, not one site |
| Tendrara gas field, phase 1 (micro-LNG) | Energy | Managem, ONHYM | Under construction | No published source, map or recent satellite image places the works yet |
| ORNX Laayoune green ammonia project | Green hydrogen | ORNX Laayoune 1 SASU, Ortus Climate Mitigation LLC, Acciona-Nordex Green Hydrogen | Planning | In studies or in tender: no published source places the works yet |
| COBCO battery materials complex, Jorf Lasfar | Industry | COBCO | Partly in service, partly under construction | No published source, map or recent satellite image places the works yet |
| BTR anode materials plant, Tanger Tech | Industry | Betrui Mediterranean Anode New Material Technology Co. | Under construction | No published source, map or recent satellite image places the works yet |
| BTR cathode materials plant, Tanger Tech | Industry | BTR New Material Group | Under construction | No published source, map or recent satellite image places the works yet |
| Hailiang copper products plant, Tanger Tech | Industry | Hailiang | Under construction | No published source, map or recent satellite image places the works yet |
| Shinzoom anode materials plant, Tanger Tech | Industry | Shinzoom | Suspended | In studies or in tender: no published source places the works yet |
| Safran landing gear plant, Nouaceur | Industry | Safran Landing Systems | Planning | In studies or in tender: no published source places the works yet |
| Safran LEAP-1A engine assembly and test plant, Nouaceur | Industry | Safran Aircraft Engines | Under construction | No published source, map or recent satellite image places the works yet |
| Safran LEAP engine maintenance plant, Nouaceur | Industry | Safran Aircraft Engines | Under construction | No published source, map or recent satellite image places the works yet |
| Chbika green hydrogen and ammonia project | Green hydrogen | TE H2, Copenhagen Infrastructure Partners (CIP), A.P. Moller Capital | Planning | In studies or in tender: no published source places the works yet |
| Sila Atlantik Morocco-Germany power link | Energy | Xlinks | Planning | In studies or in tender: no published source places the works yet |
| Third Morocco-Spain power interconnection | Energy | ONEE (Office National de l'Électricité et de l'Eau Potable), Red Eléctrica de España (REE) | Planning | In studies or in tender: no published source places the works yet |
| Morocco-Portugal power interconnection | Energy | Government of Morocco (Ministry of Energy Transition and Sustainable Development), Government of Portugal (Ministry of Environment and Energy) | Planning | In studies or in tender: no published source places the works yet |
| Nassim Koudia Al Baida wind farm extension | Energy | MASEN (Moroccan Agency for Sustainable Energy) | Procurement | In studies or in tender: no published source places the works yet |
| Nassim Dar Chaoui wind farm | Energy | MASEN (Moroccan Agency for Sustainable Energy) | Procurement | In studies or in tender: no published source places the works yet |
| ONCF complementary rail programme for the north and east | Rail | ONCF (Office National des Chemins de Fer) | Planning | A programme of several projects, not one site |
| Tangier-Tetouan fast regional train | Rail | ONCF (Office National des Chemins de Fer) | Planning | In studies or in tender: no published source places the works yet |
| Fès-Oujda line electrification | Rail | ONCF (Office National des Chemins de Fer) | Planning | In studies or in tender: no published source places the works yet |
| Tangier/Tetouan-Fès/Meknès motorway | Highways | ADM (Société Nationale des Autoroutes du Maroc) | Planning | A line whose route is not published yet |
| Tangier-Tetouan motorway | Highways | Planning | A line whose route is not published yet | |
| Agadir motorway bypass | Highways | Ministry of Equipment and Water, regional directorate for Souss-Massa | Planning | A line whose route is not published yet |
| Safi eastern motorway bypass | Highways | Planning | A line whose route is not published yet | |
| Tiznit-Guelmim motorway upgrade | Highways | Planning | A line whose route is not published yet | |
| National expressway programme (300 km under construction, 900 km programmed) | Highways | Ministry of Equipment and Water | Under construction | A programme of several projects, not one site |
| Oued Zem-Aïn Aouda expressway | Highways | Ministry of Equipment and Water | Stage not confirmed | No published source, map or recent satellite image places the works yet |
| RN8 dualling, Marrakech-Kelaa des Sraghna | Highways | Ministry of Equipment and Water | Stage not confirmed | No published source, map or recent satellite image places the works yet |
| Agadir urban motorway | Highways | Ministry of Equipment and Water | Stage not confirmed | A line whose route is not published yet |
| Tiznit-Dakhla expressway | Highways | Ministry of Equipment and Water | Opened | No published source, map or recent satellite image places the works yet |
| Gharb South-East irrigation scheme | Water | Ministry of Agriculture, Maritime Fisheries, Rural Development and Water and Forests | Planning | In studies or in tender: no published source places the works yet |
| Laou-Loukkos-Sebou water link (water highway phase 3) | Water | Ministry of Equipment and Water | Planning | In studies or in tender: no published source places the works yet |
| Oued El Makhazine-Dar Khrofa dam interconnection | Water | Under construction | No published source, map or recent satellite image places the works yet | |
| Transfer of water from the Agadir desalination plant | Water | Planning | In studies or in tender: no published source places the works yet | |
| OCP Green Water programme | Water | OCP Group, OCP Green Water | Partly in service, partly under construction | A programme of several projects, not one site |
| Jorf Lasfar-Khouribga desalinated water pipeline | Water | OCP Green Water | Opened | A line whose route is not published yet |
| OCP new Safi desalination plant | Water | OCP Green Water | Stage not confirmed | No published source, map or recent satellite image places the works yet |
| Safi-Gantour desalinated water pipeline (S2G) | Water | OCP Green Water | Stage not confirmed | A line whose route is not published yet |
| Mzinda Phosphate Hub-Benguerir water pipeline | Water | OCP Green Water | Stage not confirmed | A line whose route is not published yet |
| OCP Strategic Program Mzinda-Meskala (SP2M) | Industry | OCP Group, OCP Nutricrops | Under construction | A programme of several projects, not one site |
| OCP Meskala hub and Louta mine | Industry | OCP Nutricrops | Planning | In studies or in tender: no published source places the works yet |
| Marchica agency investment programme 2026-2027, Nador | Urban works | Agence pour l'aménagement du site de la lagune de Marchica | Procurement | A programme of several projects, not one site |
| Ghassi quarter restructuring, Béni Ensar | Urban works | Agence pour l'aménagement du site de la lagune de Marchica | Procurement | In studies or in tender: no published source places the works yet |
About this map
The map holds Morocco's large projects as of 24 Nov 2026: the stadiums of the 2030 World Cup and the transport, water, energy, health and industrial projects of more than about US$100 million built or prepared alongside it. It started from a list of 110 rows compiled from public reports; each row was then researched again, its facts and the companies it names checked against the owner, the ministry, the company or the press report that states them, and corrected where they were wrong.
- Owners, contractors, architects and lenders are named only where a source names them, each with its role; a lot contractor is listed with its lot.
- Amounts are given as published, in dirhams, euros or dollars, with what they are: a total project cost, a budget, one contract, a loan or a national programme. They are never converted or added together.
- A stage needs a dated statement of its kind: a contract award, a start of works, a progress figure with its date, an inauguration. A planned date is marked as such.
- Moroccan owners publish little online, so many facts come from the press; each source's type is shown on the project's page, and where two sources disagree both figures are kept.
The 3D model of each site is drawn to scale from OpenStreetMap (ODbL): the works as mapped and the land, roads, water and buildings around them. The structure is drawn with its published figures; what no map or source gives is drawn as typical and listed under the model as illustrative. The map draws Morocco from Tangier to Lagouira.
Mirage Metrics builds AI agents for the construction teams that estimate and deliver projects like these: quantities from each drawing set, changes between revisions, and bid documents checked against each other. See AI construction software for contractors. This map is published as a reference and says nothing about any work by Mirage Metrics on these projects. North America's projects are on the infrastructure map.
To report an error, write to mehdi@miragemetrics.com with a public source. Corrections follow the editorial policy.
Questions readers ask
Morocco's projects of more than about US$100 million under way or prepared: the Kenitra-Marrakech high-speed line and the motorways, the ports, the airports' new terminals, the dams and desalination plants, the power plants, the hospitals and factories, and the stadiums of the 2030 FIFA World Cup, which Morocco co-hosts with Spain and Portugal. A project is on the map once its site can be drawn; programmes and lines whose site is not published are listed below the map with the reason.
From the owners, ministries and companies where they publish (ONCF, ONDA, the Tanger Med and Nador West Med agencies, the Ministry of Equipment and Water, MASEN, the contractors and architects), from the lenders' project documents, and otherwise from the Moroccan and international press, which is where most Moroccan contract awards and progress figures are reported. Every fact carries a link to its source and the source's type on the project's page. Where two sources disagree, both figures are kept.
Each site is drawn to scale from OpenStreetMap: the works as mapped (a stadium's footprint, a terminal, a dam, a quay, a plant's land), with the roads, water, buildings and land around. Where OpenStreetMap maps nothing yet, the works are placed from a dated Sentinel-2 satellite image (Copernicus), and the model says so. The structure is drawn with the figures its owner, architect or builder publishes: a stadium's capacity, tiers and roof, a dam's height and crest, a port's breakwaters and quays, a plant's capacity. What no map or source gives is drawn as typical and listed under each model as illustrative.
Yes. The map draws Morocco from Tangier to Lagouira, and the projects of the southern regions are on it: the Dakhla Atlantique port, the Dakhla desalination plant, the Laayoune phosphate port and hospital, the Boujdour wind farm and the green hydrogen projects of the Laayoune and Dakhla regions.
The map describes these projects from public sources and says nothing about any work by Mirage Metrics on them. Mirage Metrics builds AI agents for the construction teams that estimate and deliver projects like these, and publishes the map as a reference.
Write to mehdi@miragemetrics.com with the project, the fact and a public source for the correction. A verified correction is made on the project's page and its date is updated, as the editorial policy describes.