TDOT contract CNZ129 bid tabulation
The widening on u.s. 64 (u.s. 70, s.r. 1, summer avenue) from near i-40 (l.m. 12.02) to 0.1 mile north of sycamore view road (l.m. 13.89), including bridges and a retaining wall. Let by Tennessee DOT on March 21, 2025, Shelby County. 2 bids received; low bid $69,405,754 by Bell & Associates Construction, LLC.
- Owner
- Tennessee DOT
- Letting
- 21 MAR 2025
- Pay items
- 465
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Bell & Associates Construction, LLC | $69,405,754 | Low |
| 2 | Dement Construction Group, LLC | $73,886,599 | +6.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Bell & Associates Construction, LLC | 2. Dement Construction Group, LLC |
|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $746,136 | $607,000 |
| 2 | Trainee (109-10.01) | HR | 6,260 | $0.80 | $0.80 |
| 3 | Clearing and grubbing (201-01) | LS | 1 | $695,219 | $299,300 |
| 4 | Removal of structures and obstructions (202-01) | LS | 1 | $296,768 | $927,650 |
| 5 | Removal of rigid pavement (202-03.02) | CY | 7,100 | $35.56 | $30.00 |
| 6 | Road & drainage excavation (unclassified) (203-01) | CY | 80,962 | $22.97 | $18.75 |
| 7 | Road & drainage excavation (stream mitigation) (203-01.13) | CY | 7,543 | $18.38 | $36.00 |
| 8 | Borrow excavation (unclassified) (203-03) | CY | 6,700 | $20.02 | $22.50 |
| 9 | Select granular material (203-03.10) | TON | 19,500 | $36.65 | $32.05 |
| 10 | Placing and spreading topsoil (203-04) | CY | 4,812 | $26.64 | $12.00 |
| 11 | Construction of haul road (203-50) | LS | 1 | $615,629 | $1,000,000 |
| 12 | 12" temporary slope drain (209-02.05) | LF | 97 | $49.21 | $125.00 |
| 13 | 18" temporary slope drain (209-02.07) | LF | 24 | $69.93 | $185.00 |
| 14 | Filter sock (12 inch) (209-03.21) | LF | 8,056 | $6.56 | $7.70 |
| 15 | Filter sock (24 inch) (209-03.23) | LF | 20,604 | $12.03 | $13.20 |
| 16 | Stream mitigation cross vane structure (209-03.37) | EACH | 23 | $4,923.18 | $7,800.00 |
| 17 | Sediment removal (209-05) | CY | 740 | $35.94 | $30.00 |
| 18 | Temporary silt fence (with backing) (209-08.02) | LF | 19,601 | $5.47 | $7.15 |
| 19 | Temporary silt fence (without backing) (209-08.03) | LF | 25,968 | $2.74 | $4.40 |
| 20 | Rock check dam (209-08.07) | EACH | 21 | $1,623.78 | $1,060.00 |
| 21 | Enhanced rock check dam (209-08.08) | EACH | 8 | $2,212.15 | $1,690.00 |
| 22 | Sandbags (209-09.01) | BAG | 630 | $10.94 | $11.00 |
| 23 | Sediment filter bag (15' X 15') (209-09.03) | EACH | 33 | $621.01 | $1,050.00 |
| 24 | Curb inlet protection (type 4) (209-09.43) | EACH | 112 | $382.91 | $385.00 |
| 25 | Turbidity curtainstr 1 & STR 3 (209-13.04) | LF | 6,390 | $27.35 | $28.60 |
| 26 | Polyethylene sheeting (6 mil. minimum) (209-20.03) | SY | 31 | $6.32 | $40.00 |
| 27 | Catch basin protection (type D) (209-40.33) | EACH | 112 | $437.62 | $440.00 |
| 28 | Catch basin protection (type E) (209-40.34) | EACH | 10 | $437.62 | $440.00 |
| 29 | Temporary stream diversion (with pump around) (209-65.01) | LS | 1 | $4,361.92 | $19,600 |
| 30 | Mineral aggregate (size 57) (303-10.01) | TON | 2,234 | $67.62 | $69.50 |
| 31 | Retaining wall (sta. 79+33.80 to sta. 80+01.80) (604-07.01) | SF | 453 | $121.14 | $200.00 |
| 32 | Concrete (604-10.09) | CY | 62 | $808.99 | $2,257.00 |
| 33 | Sheet piles (606-24.10) | SF | 2,125 | $49.87 | $130.00 |
| 34 | 18" concrete pipe culvert (class III) (607-03.02) | LF | 5,209 | $76.58 | $97.90 |
| 35 | 18" concrete pipe culvert(class IV)jacked-in-place (607-03.05) | LF | 90 | $1,996.62 | $1,318.00 |
| 36 | 24" concrete pipe culvert (class III) (607-05.02) | LF | 3,316 | $100.10 | $124.05 |
| 37 | 30" concrete pipe culvert (class III) (607-06.02) | LF | 1,848 | $126.36 | $155.35 |
| 38 | 36" concrete pipe culvert (class III) (607-07.02) | LF | 2,611 | $160.00 | $190.30 |
| 39 | 42" concrete pipe culvert (class III) (607-08.02) | LF | 796 | $197.47 | $225.20 |
| 40 | 18" pipe culvert (side drain) (607-39.02) | LF | 96 | $85.88 | $97.90 |
| 41 | 60" pipe culvert (side drain) (607-39.09) | LF | 55 | $300.86 | $429.00 |
| 42 | Manholes, > 4' - 8' depth (611-01.02) | EACH | 9 | $5,880.47 | $6,205.00 |
| 43 | Manholes, > 8' - 12' depth (611-01.03) | EACH | 8 | $11,288 | $11,900 |
| 44 | Manholes, > 12' - 16' depth (611-01.04) | EACH | 5 | $12,713 | $12,275 |
| 45 | Manholes, > 16' - 20' depth (611-01.05) | EACH | 1 | $14,551 | $13,500 |
| 46 | Adjustment of existing manhole (611-01.20) | EACH | 3 | $3,110.36 | $4,125.00 |
| 47 | Class A concrete (pipe endwalls) (611-07.01) | CY | 25 | $2,997.67 | $2,520.00 |
| 48 | Steel bar reinforcement (pipe endwalls) (611-07.02) | LB | 714 | $4.27 | $4.00 |
| 49 | 18IN endwall (side drain) (611-07.31) | EACH | 4 | $6,104.75 | $5,850.00 |
| 50 | 30IN endwall (cross drain) 3:1 (611-07.60) | EACH | 1 | $9,797.14 | $8,680.00 |
| 51 | Adjustment of existing catchbasin (611-09.01) | EACH | 3 | $1,559.01 | $4,200.00 |
| 52 | Catch basins, type 12, 0' - 4' depth (611-12.01) | EACH | 2 | $4,912.25 | $7,395.00 |
| 53 | Catch basins, type 12, > 4' - 8' depth (611-12.02) | EACH | 32 | $5,836.71 | $8,340.00 |
| 54 | Catch basins, type 12, > 8' - 12' depth (611-12.03) | EACH | 20 | $8,599.16 | $11,225 |
| 55 | Catch basins, type 12, > 12' - 16' depth (611-12.04) | EACH | 6 | $12,773 | $14,420 |
| 56 | Catch basins, type 12, > 16' - 20' depth (611-12.05) | EACH | 2 | $13,774 | $15,425 |
| 57 | Catch basins, type 13, > 4' - 8' depth (611-13.02) | EACH | 2 | $5,530.38 | $8,520.00 |
| 58 | Catch basins, type 14, 0' - 4' depth (611-14.01) | EACH | 1 | $9,912.01 | $8,855.00 |
| 59 | Catch basins, type 14, > 4' - 8' depth (611-14.02) | EACH | 27 | $10,481 | $16,650 |
| 60 | Catch basins, type 14, > 8' - 12' depth (611-14.03) | EACH | 11 | $18,407 | $24,045 |
| 61 | Catch basins, type 14, > 12' - 16' depth (611-14.04) | EACH | 3 | $25,327 | $30,660 |
| 62 | Catch basins, type 16, > 4' - 8' depth (611-16.02) | EACH | 1 | $13,457 | $13,375 |
| 63 | Catch basins, type 25, > 4' - 8' depth (611-25.02) | EACH | 2 | $5,617.90 | $7,530.00 |
| 64 | Catch basins, type 42, 0' - 4' depth (611-42.01) | EACH | 6 | $4,578.56 | $6,770.00 |
| 65 | Catch basins, type 42, > 4' - 8' depth (611-42.02) | EACH | 2 | $6,604.73 | $13,170 |
| 66 | Catch basins, type 42, > 8' - 12' depth (611-42.03) | EACH | 1 | $8,265.48 | $10,630 |
| 67 | Catch basins, type 43, > 4' - 8' depth (611-43.02) | EACH | 1 | $13,845 | $16,630 |
| 68 | Junction structure, 48IN round,> 4FT-8FT depth (611-63.01) | EACH | 6 | $5,181.38 | $4,610.00 |
| 69 | Junction structure, 108IN round,> (9FT depth) (611-63.51) | EACH | 2 | $33,773 | $27,700 |
| 70 | 18" temporary drainage pipe (621-03.02) | LF | 582 | $76.58 | $92.50 |
| 71 | Concrete sidewalk (4 ") (701-01.01) | SF | 108,731 | $7.82 | $7.15 |
| 72 | Concrete driveway (701-02) | SF | 4,401 | $12.03 | $11.00 |
| 73 | Concrete curb ramp (retrofit) (701-02.01) | SF | 208 | $27.35 | $25.00 |
| 74 | Concrete driveway (8") (701-02.02) | SF | 13,629 | $14.22 | $13.00 |
| 75 | Concrete curb ramp (701-02.03) | SF | 2,465 | $27.35 | $25.00 |
| 76 | Concrete curb (702-01) | CY | 42 | $913.52 | $835.00 |
| 77 | Concrete combined curb & gutter (702-03) | CY | 1,353 | $503.26 | $460.00 |
| 78 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 100 | $40.39 | $30.00 |
| 79 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 8 | $4,243.78 | $3,300.00 |
| 80 | Thrie beam bridge transition MASH TL-3 (705-06.25) | EACH | 8 | $2,637.73 | $2,875.00 |
| 81 | Guardrail removed (706-01) | LF | 756 | $2.74 | $5.00 |
| 82 | High-visibility construction fence (707-08.11) | LF | 1,065 | $2.19 | $3.85 |
| 83 | Machined rip-rap (class A-3) (709-05.05) | TON | 1,050 | $91.87 | $71.55 |
| 84 | Machined rip-rap (class A-1) (709-05.06) | TON | 3,212 | $69.87 | $70.85 |
| 85 | Machined rip-rap (class B) (709-05.08) | TON | 3,981 | $67.83 | $70.85 |
| 86 | Rock riffles (709-05.81) | LS | 1 | $20,736 | $181,500 |
| 87 | Aggregate underdrains (with pipe) (710-02) | LF | 16,156 | $13.13 | $12.50 |
| 88 | Traffic control (712-01) | LS | 1 | $265,633 | $255,000 |
| 89 | Interconnected portable barrier rail (712-02.02) | LF | 19,565 | $15.31 | $50.00 |
| 90 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 54 | $4,655.88 | $7,500.00 |
| 91 | Flexible drums (channelizing) (712-04.01) | EACH | 721 | $49.23 | $62.00 |
| 92 | Barrier rail delineator (712-04.50) | EACH | 200 | $49.23 | $15.50 |
| 93 | Warning lights (type A) (712-05.01) | EACH | 28 | $19.69 | $57.00 |
| 94 | Warning lights (type C) (712-05.03) | EACH | 47 | $17.50 | $59.00 |
| 95 | Signs (construction) (712-06) | SF | 1,048 | $10.94 | $8.80 |
| 96 | Temporary barricades (type II) (712-07.02) | LF | 65 | $27.35 | $25.00 |
| 97 | Temporary barricades (type III) (712-07.03) | LF | 2,233 | $24.07 | $5.00 |
| 98 | Arrow board (type C) (712-08.03) | EACH | 3 | $2,735.10 | $2,400.00 |
| 99 | Speed feedback sign assembly (712-08.08) | EACH | 6 | $7,111.27 | $8,800.00 |
| 100 | Removable pavement marking (8" barrier line) (712-09.02) | LF | 14,664 | $8.75 | $8.00 |
| 101 | Removable pavement marking(channelizing striping) (712-09.03) | SY | 31 | $52.51 | $48.00 |
| 102 | Removable pavement marking (stop line) (712-09.04) | LF | 314 | $27.35 | $25.00 |
| 103 | Removable pavement marking (arrow) (712-09.05) | EACH | 26 | $273.51 | $250.00 |
| 104 | Removable pavement marking (6" line) (712-09.08) | LF | 26,467 | $7.66 | $7.00 |
| 105 | Flexible delineator (white) (713-02.14) | EACH | 13 | $70.02 | $78.00 |
| 106 | "U" section steel posts (713-11.01) | LB | 1,469 | $4.37 | $5.95 |
| 107 | Perforated/knockout square tube post (713-11.02) | LB | 300 | $4.97 | $9.75 |
| 108 | P post slip base (713-11.21) | EACH | 3 | $993.39 | $725.00 |
| 109 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 231 | $15.82 | $20.00 |
| 110 | Flat sheet aluminum signs (0.100" thick) (713-13.03) | SF | 278 | $17.35 | $23.00 |
| 111 | Street name sign (rigid 0.100IN thick (713-14.21) | SF | 260 | $33.92 | $100.00 |
| 112 | Removal of signs, posts and footings (713-15) | LS | 1 | $3,830.24 | $5,500.00 |
| 113 | Removal & relocation of sign & support (713-15.02) | EACH | 5 | $322.74 | $325.00 |
| 114 | Suspended flat sheet aluminum sign (0.080" thick) (713-15.07) | EACH | 28 | $114.87 | $200.00 |
| 115 | Metal barricade (type III) (713-15.35) | EACH | 3 | $1,341.29 | $1,200.00 |
| 116 | Changeable message sign unit (713-16.01) | EACH | 19 | $9,299.35 | $13,500 |
| 117 | End of roadway sign and support (713-16.07) | EACH | 2 | $384.01 | $475.00 |
| 118 | Signs (protected area sign) (713-16.20) | EACH | 24 | $345.72 | $400.00 |
| 119 | Jacked or bored conduit (714-03) | LF | 1,300 | $41.21 | $37.67 |
| 120 | Direct burial conduit (2" PVC, schedule 40) (714-03.01) | LF | 10,988 | $22.44 | $20.51 |
| 121 | Pull boxes (type C) (714-05.04) | EACH | 111 | $2,183.23 | $1,995.57 |
| 122 | Cable (1/C # 10 AWG) (714-06.03) | LF | 11,280 | $2.74 | $2.50 |
| 123 | Cable (1/C # 8 AWG) (714-06.04) | LF | 17,345 | $3.12 | $2.85 |
| 124 | Cable (1/C # 6 AWG) (714-06.05) | LF | 14,280 | $3.28 | $3.00 |
| 125 | Light standards (30' M.H. with A 15' arm) (714-08.09) | EACH | 58 | $7,677.80 | $7,017.84 |
| 126 | Light standards (30' M.H. with A 6' arm high rise, bridge mounted) (714-08.10) | EACH | 8 | $7,818.76 | $7,146.68 |
| 127 | Foundation for light standards - roadway (30' standard) (714-08.28) | EACH | 58 | $3,159.76 | $2,888.16 |
| 128 | LED luminaires (150W LED) (714-09.47) | EACH | 108 | $923.39 | $844.02 |
| 129 | LED luminaires (200W LED) (714-09.48) | EACH | 9 | $1,072.11 | $979.95 |
| 130 | Overhead conductors (1/C #12 AWG) (714-10.01) | LF | 2,750 | $8.83 | $8.07 |
| 131 | Overhead conductors (1/C #10 AWG) (714-10.02) | LF | 3,350 | $8.98 | $8.21 |
| 132 | Overhead conductors (1/C #8 AWG) (714-10.03) | LF | 5,610 | $10.55 | $9.64 |
| 133 | Mastarm - 15' (714-14.01) | EACH | 41 | $1,922.26 | $1,757.03 |
| 134 | Electrical connection (psa & PSB) (714-25.01) | LS | 1 | $25,804 | $23,586 |
| 135 | Electrical connection (PSC) (714-25.02) | LS | 1 | $12,856 | $11,751 |
| 136 | Electrical connection (PSD & pse) (714-25.03) | LS | 1 | $25,804 | $23,586 |
| 137 | Electrical connection (PSF & PSG) (714-25.04) | LS | 1 | $25,804 | $23,586 |
| 138 | Electrical connection (PSH, psi, PSJ) (714-25.05) | LS | 1 | $38,706 | $35,379 |
| 139 | Install SVC riser (30') (714-25.22) | EACH | 17 | $4,653.80 | $4,253.77 |
| 140 | Temporary raised pavement marker,yellow (716-01.07) | EACH | 99 | $10.94 | $10.00 |
| 141 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 325 | $67.83 | $62.00 |
| 142 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 504 | $67.83 | $62.00 |
| 143 | Removal of snowplowable reflective marker (716-01.30) | EACH | 550 | $60.17 | $50.00 |
| 144 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 220 | $56.89 | $52.00 |
| 145 | Plastic pavement marking (stop line) (716-02.05) | LF | 1,192 | $30.63 | $28.00 |
| 146 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 44 | $289.92 | $265.00 |
| 147 | Plastic pavement marking (8" dotted line) (716-02.08) | LF | 2,736 | $4.38 | $4.00 |
| 148 | Plastic pavement marking (longitudinal cross-walk) (716-02.09) | LF | 1,692 | $60.17 | $55.00 |
| 149 | Plastic pavement marking (8IN line) (716-02.12) | LM | 0.86 | $23,106 | $21,120 |
| 150 | Plastic word pavement marking (only) (716-03.01) | EACH | 25 | $300.86 | $275.00 |
| 151 | Plastic pavement marking(double turning arrow) (716-04.02) | EACH | 5 | $508.73 | $465.00 |
| 152 | Plastic pavement marking (transverse shoulder) (716-04.04) | LF | 44 | $15.32 | $14.00 |
| 153 | Plastic pavement marking (yield line) (716-04.12) | SF | 12 | $41.57 | $38.00 |
| 154 | Plastic pavement marking (bikelane symbol & arrow) (716-04.13) | EACH | 15 | $547.02 | $500.00 |
| 155 | Plastic pavement marking-bike symbol/arrow shared (716-04.15) | EACH | 3 | $547.02 | $500.00 |
| 156 | Painted pavement marking (8" barrier line) (716-05.02) | LF | 21,983 | $2.19 | $2.00 |
| 157 | Painted pavement marking (channelization striping) (716-05.04) | SY | 50 | $41.57 | $38.00 |
| 158 | Painted pavement marking (stop line) (716-05.05) | LF | 386 | $19.69 | $18.00 |
| 159 | Painted pavement marking (turn lane arrow) (716-05.06) | EACH | 29 | $218.81 | $200.00 |
| 160 | Painted pavement marking (6" line) (716-05.20) | LM | 7.03 | $3,391.53 | $3,100.00 |
| 161 | Removal of pavement marking (stop line) (716-08.05) | LF | 348 | $19.69 | $18.00 |
| 162 | Removal of pavement marking (turn lane arrow) (716-08.06) | EACH | 33 | $218.81 | $200.00 |
| 163 | Removal of pavement marking (double turning arrow) (716-08.08) | EACH | 2 | $437.62 | $400.00 |
| 164 | Removal of pavement marking (dotted line) (716-08.09) | LF | 548 | $4.38 | $4.00 |
| 165 | Removal of word pavement marking (only) (716-08.11) | EACH | 11 | $229.75 | $210.00 |
| 166 | Removal of pavement marking (line) (716-08.20) | LM | 10.87 | $6,234.89 | $5,700.00 |
| 167 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 14.57 | $11,163 | $10,200 |
| 168 | Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05) | LF | 1,832 | $4.38 | $4.00 |
| 169 | Mobilization (717-01) | LS | 1 | $6,801,764 | $7,366,000 |
| 170 | CCTV camera system remove and relocate (725-20.96) | EACH | 1 | $8,308.44 | $7,425.00 |
| 171 | Remove & relocate existing traffic signal equipment (730-01.01) | EACH | 1 | $11,190 | $10,000 |
| 172 | Removal of signal equipment (730-01.02) | EACH | 4 | $9,511.34 | $8,500.00 |
| 173 | Modification of existing traffic signal equipment (730-01.03) | EACH | 3 | $11,190 | $10,000 |
| 174 | Signal head assembly (130 A3 with backplate) (730-02.03) | EACH | 18 | $2,014.17 | $1,800.00 |
| 175 | Signal head assembly (130 with backplate) (730-02.09) | EACH | 32 | $2,014.17 | $1,800.00 |
| 176 | Signal head assembly (130 A2 with backplate) (730-02.11) | EACH | 5 | $2,014.17 | $1,800.00 |
| 177 | Signal head assembly (150 A2H with backplate) (730-02.17) | EACH | 5 | $3,189.10 | $2,850.00 |
| 178 | Signal head assembly (150 A2 pole mounted) (730-02.18) | EACH | 2 | $2,909.36 | $2,600.00 |
| 179 | Signal head assembly (130 A2 pole mounted) (730-02.30) | EACH | 2 | $1,846.32 | $1,650.00 |
| 180 | Signal head assembly (130 A3 pole mounted) (730-02.31) | EACH | 11 | $1,846.32 | $1,650.00 |
| 181 | Install pull box (type B) (730-03.21) | EACH | 25 | $1,230.88 | $1,100.00 |
| 182 | Install pull box (fiber optic-type A) (730-03.23) | EACH | 20 | $2,070.12 | $1,850.00 |
| 183 | Install pull box (fiber optic-type B) (730-03.24) | EACH | 6 | $2,909.35 | $2,600.00 |
| 184 | Fiber optic splice fusion (730-03.33) | EACH | 34 | $117.49 | $105.00 |
| 185 | Fiber optic drop cable (6F) (730-03.55) | LF | 79 | $8.95 | $8.00 |
| 186 | Electrical service connection (730-05.01) | EACH | 4 | $3,916.44 | $3,500.00 |
| 187 | Signal cable - 5 conductor (730-08.02) | LF | 7,753 | $2.24 | $2.00 |
| 188 | Signal cable - 7 conductor (730-08.03) | LF | 7,434 | $3.36 | $3.00 |
| 189 | Signal cable - 9 conductor (730-08.04) | LF | 1,482 | $4.48 | $4.00 |
| 190 | Interconnect cable - fiber optic (36 strand SM) (730-08.40) | LF | 9,408 | $8.39 | $7.50 |
| 191 | Conduit 2" diameter (directional bore) (730-12.23) | LF | 1,197 | $50.35 | $45.00 |
| 192 | Conduit 3" diameter (directional bore) (730-12.24) | LF | 1,807 | $61.54 | $55.00 |
| 193 | Conduit 2" diameter (PVC schedule 80) (730-12.26) | LF | 7,662 | $50.35 | $45.00 |
| 194 | Conduit 3" diameter (PVC schedule 80) (730-12.27) | LF | 1,203 | $61.54 | $55.00 |
| 195 | Curb marker (fiber optic conduit) (730-12.42) | EACH | 5 | $39.16 | $35.00 |
| 196 | Vehicle detector (video) (730-13.02) | EACH | 5 | $11,190 | $10,000 |
| 197 | Vehicle detector (optically activated priority control) (730-13.06) | EACH | 15 | $8,392.36 | $7,500.00 |
| 198 | Vehicle detector (radar/video) (730-13.16) | EACH | 10 | $15,666 | $14,000 |
| 199 | Cabinet (atc) (730-15.07) | EACH | 4 | $47,557 | $42,500 |
| 200 | Controller (atc) (730-16.04) | EACH | 4 | $5,427.06 | $4,850.00 |
| 201 | Steel strain pole (signal & lighting support) (730-23.02) | EACH | 2 | $29,653 | $26,500 |
| 202 | Pedestal pole (type A) (730-23.28) | EACH | 5 | $4,475.93 | $4,000.00 |
| 203 | Cantilever signal support (1 arm @ 55') (730-25.07) | EACH | 1 | $49,235 | $44,000 |
| 204 | Cantilever signal support (1 arm @ 65') (730-25.13) | EACH | 1 | $54,271 | $48,500 |
| 205 | Cantilever signal support (1 arm @ 70') (730-25.14) | EACH | 2 | $55,949 | $50,000 |
| 206 | Cantilever signal support (1 arm @ 75') (730-25.15) | EACH | 1 | $56,509 | $50,500 |
| 207 | Cantilever signal support (1 arm @ 80') (730-25.16) | EACH | 6 | $65,460 | $58,500 |
| 208 | Cantilever signal support (1 arm @ 85') (730-25.17) | EACH | 4 | $67,139 | $60,000 |
| 209 | Countdown pedestrian signal (730-26.05) | EACH | 10 | $1,790.37 | $1,600.00 |
| 210 | Pedestrian pushbutton post (730-26.06) | EACH | 7 | $3,916.44 | $3,500.00 |
| 211 | Pedestrian pushbutton with 15IN sign (730-26.09) | EACH | 11 | $1,958.22 | $1,750.00 |
| 212 | Countdown ped SGNL head W/audible pushbutton & 15IN sign (730-26.11) | EACH | 18 | $3,189.10 | $2,850.00 |
| 213 | Battery back-UP system (730-35.06) | EACH | 4 | $12,309 | $11,000 |
| 214 | Temporary traffic signal system (730-40) | EACH | 2 | $55,949 | $50,000 |
| 215 | Geogrid reinforcement type 2 (740-07.04) | SY | 6,540 | $6.43 | $6.00 |
| 216 | Geotextile (type III)(erosion control) (740-10.03) | SY | 2,817 | $3.19 | $4.25 |
| 217 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 38,293 | $2.41 | $9.55 |
| 218 | Seeding (with mulch) (801-01) | UNIT | 100 | $54.70 | $55.00 |
| 219 | Temporary seeding (with mulch) (801-01.07) | UNIT | 94 | $43.76 | $44.00 |
| 220 | Grass seed mix (ripzn/FLPL) (801-01.34) | UNIT | 228 | $87.52 | $88.00 |
| 221 | Fertilizer (801-02.15) | TON | 1 | $1,094.04 | $1,100.00 |
| 222 | Water (seeding & sodding) (801-03) | MG | 273 | $10.94 | $11.00 |
| 223 | Seed (supplemental application) (801-07) | LB | 22 | $16.41 | $16.50 |
| 224 | Fertilizer (supplemental application) (801-08) | TON | 1 | $1,094.04 | $1,100.00 |
| 225 | Trees (amelanchier arborea CNTNR GRWN) (802-01.10) | EACH | 19 | $54.70 | $55.00 |
| 226 | Seedlings (amelanchier arborea B.R.) (802-02.01) | EACH | 18 | $16.41 | $16.50 |
| 227 | Cuttings: salix interior (18IN-24IN) (802-02.34) | EACH | 186 | $8.21 | $8.25 |
| 228 | Cuttings: cornus amomum (24-48IN) (802-02.42) | EACH | 186 | $8.21 | $8.25 |
| 229 | Cuttings: sambucus canadensis (24-48IN) (802-02.43) | EACH | 186 | $8.21 | $8.25 |
| 230 | Acer rubrum (red maple 2-5FT CNTNR GRWN) (802-11.02) | EACH | 17 | $54.70 | $55.00 |
| 231 | Cercis canadensis (redbud 2-5FT CNTNR GRWN) (802-11.11) | EACH | 18 | $54.70 | $55.00 |
| 232 | Liquidamber styraciflua (sweetgum 2-5FT CNTNR GRWN) (802-11.18) | EACH | 17 | $54.70 | $55.00 |
| 233 | Liriodendron tulipifera (tulip poplar 2-5FT CNTNR GRWN) (802-11.19) | EACH | 18 | $54.70 | $55.00 |
| 234 | Quercus falcata (southern red oak 2-5FT CNTNR GRWN) (802-11.31) | EACH | 17 | $54.70 | $55.00 |
| 235 | Quercus phellos (willow oak 2-5FT CNTNR GRWN) (802-11.38) | EACH | 17 | $54.70 | $55.00 |
| 236 | Taxodium distichum (bald cypress 2-5FT CNTNR GRWN) (802-11.42) | EACH | 17 | $54.70 | $55.00 |
| 237 | Acer rubrum (red maple seedlng B.R.) (802-12.02) | EACH | 18 | $8.21 | $8.25 |
| 238 | Betula nigra (river birch seedlng B.R.) (802-12.07) | EACH | 52 | $8.21 | $8.25 |
| 239 | Cercis canadensis (redbud seedlng B.R.) (802-12.11) | EACH | 18 | $8.21 | $8.25 |
| 240 | Liquidamber styraciflua (sweetgum seedlng B.R.) (802-12.18) | EACH | 18 | $8.21 | $8.25 |
| 241 | Liriodendron tulipifera (tulip poplar seedlng B.R.) (802-12.19) | EACH | 18 | $8.21 | $8.25 |
| 242 | Platanus occidentalis (sycamore seedlng B.R.) (802-12.26) | EACH | 52 | $8.21 | $8.25 |
| 243 | Quercus falcata (southern red oak seedlng B.R.) (802-12.31) | EACH | 18 | $8.21 | $8.25 |
| 244 | Quercus phellos (willow oak seedlng B.R.) (802-12.38) | EACH | 18 | $8.21 | $8.25 |
| 245 | Taxodium distichum (bald cypress seedlng B.R.) (802-12.42) | EACH | 18 | $8.21 | $8.25 |
| 246 | Quercus shumardii (shumard oak seedling B.R.) (802-12.46) | EACH | 52 | $8.21 | $8.25 |
| 247 | Cornus amomum (silky dogwood seedling B.R.) (802-12.51) | EACH | 18 | $8.21 | $8.25 |
| 248 | Cornus amomum (silky dogwood 2-5FT CNTNR GRWN) (802-13.04) | EACH | 19 | $54.70 | $55.00 |
| 249 | Itea virginica (virginia sweetspire 2-5FT CNTNR GRWN) (802-13.08) | EACH | 19 | $54.70 | $55.00 |
| 250 | Lindera benzoin (spicebush 2-5FT CNTNR GRWN) (802-13.09) | EACH | 19 | $54.70 | $55.00 |
| 251 | Sambucus canadensis ( elderberry 2-5FT CNTNR GRWN) (802-13.10) | EACH | 19 | $54.70 | $55.00 |
| 252 | Callicarpa americana (amrcn beautyberry) 2-5FT C.G. (802-13.14) | EACH | 19 | $54.70 | $55.00 |
| 253 | Itea virginica (virginia sweetspire SDLNG bare root) (802-13.58) | EACH | 18 | $8.21 | $8.25 |
| 254 | Lindera benzoin (spicebush SDLNG bare root) (802-13.59) | EACH | 18 | $8.21 | $8.25 |
| 255 | Sambucus canadensis ( elderberry SDLNG bare root) (802-13.60) | EACH | 18 | $8.21 | $8.25 |
| 256 | Cephalanthus occidentalis (buttonbush 3FT live stakes) (802-16.03) | EACH | 186 | $8.21 | $8.25 |
| 257 | Sodding (new sod) (803-01) | SY | 26,940 | $5.47 | $5.50 |
| 258 | Erosion control blanket (type I) (805-12.01) | SY | 14,600 | $2.19 | $2.20 |
| 259 | Erosion control blanket (type III) (805-12.03) | SY | 9,624 | $2.52 | $2.53 |
| 260 | 700 gram coir fiber erosion blanket (805-12.08) | SY | 1,321 | $13.13 | $13.20 |
| 261 | Mowing, weedeating & litter pickup (urban area) (806-02.12) | CYCL | 12 | $13,676 | $13,750 |
| 262 | Removal of asbestos (EX. BR. no. 79-1-12.53) (202-01.05) | LS | 1 | $378,082 | $345,583 |
| 263 | Removal of asbestos (EX. BR. no. 79-1-13.39) (202-01.06) | LS | 1 | $175,993 | $160,865 |
| 264 | Removal of structures (EX. BR. no. 79-1-12.53) (202-04.01) | LS | 1 | $514,513 | $775,000 |
| 265 | Removal of structures (EX. BR. no. 79-1-13.39) (202-04.02) | LS | 1 | $296,443 | $275,000 |
| 266 | Dry excavation (bridges) (204-02.01) | CY | 658 | $25.99 | $20.00 |
| 267 | Granular backfill (bridges) (303-01.02) | TON | 204 | $49.87 | $50.00 |
| 268 | Epoxy coated reinforcing steel (604-02.03) | LB | 896,020 | $1.31 | $1.66 |
| 269 | Class A concrete (bridges) (604-03.01) | CY | 805 | $1,012.43 | $950.00 |
| 270 | Steel bar reinforcement (bridges) (604-03.02) | LB | 142,080 | $1.14 | $1.53 |
| 271 | Pavement @ bridge ends (604-03.04) | SY | 1,146 | $277.40 | $425.00 |
| 272 | Class DS concrete (604-03.32) | CY | 2,924 | $728.38 | $1,200.00 |
| 273 | Class X concrete (604-03.74) | CY | 318 | $1,709.49 | $2,000.00 |
| 274 | Applied texture finish (new structures) (604-04.01) | SY | 4,231 | $10.39 | $9.50 |
| 275 | Three star state emblem (604-04.41) | EACH | 8 | $3,599.17 | $1,500.00 |
| 276 | Bridge deck grooving (mechanical) (604-05.31) | SY | 11,058 | $3.34 | $3.05 |
| 277 | Test piles (precast concrete, size 1) (606-09.01) | LF | 120 | $98.46 | $120.00 |
| 278 | Loading test (precast concrete, size 1) (606-09.02) | EACH | 1 | $15,092 | $7,500.00 |
| 279 | Precast concrete piles (size 1) (606-09.03) | LF | 1,500 | $94.23 | $75.00 |
| 280 | Pile anchorage system (seismic) (606-12.01) | EACH | 28 | $193.75 | $250.00 |
| 281 | Test piles (steel pipe piles, 18-inch) (606-20.01) | LF | 1,020 | $256.76 | $200.00 |
| 282 | Loading test (steel pipe piles, 18-inch) (606-20.02) | EACH | 2 | $11,743 | $7,500.00 |
| 283 | Steel pipe piles (18-inch) (606-20.03) | LF | 20,700 | $126.80 | $115.00 |
| 284 | Deck drains (grate type 2) (610-10.45) | EACH | 40 | $2,099.51 | $2,500.00 |
| 285 | Prestressed concrete I-beam (type II) (615-01.02) | LF | 2,156 | $265.45 | $300.00 |
| 286 | Prestressed concrete bulb tee beam (6" web)(BT-54) (615-01.10) | LF | 8,361 | $395.20 | $450.00 |
| 287 | Bridge deck crack sealing (617-02) | LF | 1,009 | $3.58 | $10.00 |
| 288 | Sealant (HMWM) (617-05) | GAL | 6 | $335.23 | $500.00 |
| 289 | Concrete parapet with structural tubing (620-05) | LF | 1,201 | $341.04 | $475.00 |
| 290 | Conc parapet single slope(mod STD-1-1SS) (620-05.03) | LF | 709 | $117.37 | $150.00 |
| 291 | Bike/pedestrian box tube safety rail (707-16.01) | LF | 961 | $233.99 | $250.00 |
| 292 | 6" perforated pipe with vertical drain system (710-09.01) | LF | 524 | $61.86 | $75.00 |
| 293 | 6" pipe underdrain (710-09.02) | LF | 62 | $27.31 | $20.00 |
| 294 | Structural lighting (bridge no. 1 - 79SR0010015) (714-01.01) | LS | 1 | $50,326 | $46,000 |
| 295 | Structural lighting (bridge no. 2 - 79SR0010017) (714-01.02) | LS | 1 | $29,539 | $27,000 |
| 296 | Flowable fill (general) (204-06.01) | CY | 490.60 | $350.09 | $560.00 |
| 297 | Pole 45FT class 1 wood (790-04.01) | EACH | 24 | $3,654.92 | $3,340.00 |
| 298 | Pole 50FT class 1 wood (790-05.01) | EACH | 26 | $4,470.20 | $4,085.95 |
| 299 | Pole 55FT class 1 wood (790-06.01) | EACH | 32 | $5,406.26 | $4,941.55 |
| 300 | Pole 60FT class 1 wood (790-07.01) | EACH | 17 | $6,914.78 | $6,320.40 |
| 301 | Pole 65FT class 1 wood (790-08.30) | EACH | 3 | $7,972.88 | $7,287.55 |
| 302 | Pole 70FT class 1 wood (790-09.01) | EACH | 4 | $9,369.91 | $8,567.50 |
| 303 | 1PH suspension angle 25KV (790-22.10) | EACH | 3 | $827.86 | $756.70 |
| 304 | 1PH dead end 25KV (790-22.13) | EACH | 2 | $887.00 | $810.75 |
| 305 | 1PH dead end tap 25KV (790-22.14) | EACH | 7 | $966.26 | $883.20 |
| 306 | 3PH crossarm SGL LRG cond 25KV (790-26.03) | EACH | 75 | $3,068.62 | $2,804.85 |
| 307 | 3PH crossarm DBL SM angle LRG cond 25KV (790-26.13) | EACH | 5 | $4,936.97 | $4,512.60 |
| 308 | 3PH crossarm dde 25KV (790-26.25) | EACH | 14 | $5,491.81 | $5,019.75 |
| 309 | 3PH crossarm dead end 25KV (790-26.26) | EACH | 67 | $3,459.90 | $3,162.50 |
| 310 | 3PH alley arm 25KV (790-26.44) | EACH | 1 | $9,424.78 | $8,614.65 |
| 311 | Secondary assemblies misc (790-30.04) | EACH | 14 | $434.06 | $396.75 |
| 312 | Service conductor 2 AL duplex (790-31.06) | LF | 140 | $14.66 | $13.40 |
| 313 | Service conductor 2 AL triplex (790-31.11) | LF | 1,905 | $20.04 | $18.32 |
| 314 | Service conductor 2 AL qplex (790-31.19) | LF | 323 | $63.13 | $57.70 |
| 315 | Down guy - two guys heavy duty (790-32.14) | EACH | 41 | $1,509.78 | $1,380.00 |
| 316 | Guy strut down guy (790-32.24) | EACH | 12 | $2,264.66 | $2,070.00 |
| 317 | Down guy light construction - preform (790-32.26) | EACH | 1 | $1,761.41 | $1,680.00 |
| 318 | Down guy heavy construction - preform (790-32.29) | EACH | 22 | $2,075.94 | $1,897.50 |
| 319 | Overhead guy heavy construction - preform (790-32.30) | EACH | 6 | $2,390.48 | $2,185.00 |
| 320 | Switch-900A-underslung (790-36.01) | EACH | 2 | $17,060 | $15,594 |
| 321 | Transfer capacitor bank (790-36.02) | EACH | 1 | $12,413 | $11,346 |
| 322 | Transfer secondary (790-36.05) | EACH | 4 | $641.66 | $586.50 |
| 323 | Transfer light (790-36.06) | EACH | 2 | $1,366.35 | $1,248.90 |
| 324 | Transfer conductor (790-36.14) | EACH | 24 | $641.66 | $586.50 |
| 325 | OH cond 2 7/1 acsr sparate (790-40.02) | LF | 8,054 | $4.33 | $3.96 |
| 326 | OH cond 4/0 6/1 acsr penguin (790-40.06) | LF | 10,093 | $6.89 | $6.30 |
| 327 | OH cond 477 18/1 acsr pelican (790-40.15) | LF | 43,300 | $8.72 | $7.97 |
| 328 | UG pri cond 2 CU 25KV (790-41.33) | LF | 9,150 | $54.49 | $49.81 |
| 329 | UG pri cond 500MCM CU 25KV (790-41.40) | LF | 1,125 | $177.40 | $162.15 |
| 330 | 4IN dia PVC pipe (790-42.10) | LF | 500 | $228.98 | $209.30 |
| 331 | Conduit 5IN dia PVC pipe (790-42.38) | LF | 100 | $249.11 | $227.70 |
| 332 | Splice 900A 25KV (790-43.32) | EACH | 3 | $3,321.51 | $3,036.00 |
| 333 | 1PH primary riser W/ 4IN conduit (790-43.54) | EACH | 4 | $12,581 | $11,500 |
| 334 | Primary riser (W/ 5IN conduit 500 CU epr) (790-43.60) | EACH | 1 | $20,130 | $18,400 |
| 335 | Primary riser (W/ 4IN conduit 2 CU epr) (790-43.68) | EACH | 8 | $15,098 | $13,800 |
| 336 | 1PH transformer conv W/pole MTD fuse & LA (790-46.02) | EACH | 15 | $7,548.88 | $6,900.00 |
| 337 | 3PH XFMR BNK pole MTD W/ fuse/arresters (790-49.02) | EACH | 3 | $18,872 | $17,250 |
| 338 | Lightning arrester 3PH 9 KV (790-65.08) | EACH | 2 | $3,145.37 | $2,875.00 |
| 339 | Lightning arrester 3PH 18 KV (790-65.09) | EACH | 3 | $3,459.90 | $3,162.50 |
| 340 | 48 fiber(material only) (790-74.07) | LF | 10,000 | $10.07 | $10.00 |
| 341 | 12-96 fiber(installation only) (790-74.19) | LF | 10,000 | $18.87 | $24.25 |
| 342 | Remove wire (790-98.01) | LF | 83,910 | $3.15 | $2.88 |
| 343 | Remove poles (790-98.02) | EACH | 106 | $1,100.88 | $1,006.25 |
| 344 | Remove framing/associated apparatus (790-98.03) | EACH | 392 | $629.07 | $575.00 |
| 345 | 4IN steel gas main (791-01.04) | LF | 115 | $190.36 | $174.00 |
| 346 | 6IN steel gas main (791-01.05) | LF | 760 | $190.36 | $174.00 |
| 347 | 2IN HDPE gas main (791-03.02) | LF | 1,425 | $136.76 | $125.00 |
| 348 | 4IN HDPE gas main (791-03.04) | LF | 955 | $150.98 | $138.00 |
| 349 | 6IN HDPE gas main (791-03.05) | LF | 3,493 | $150.98 | $138.00 |
| 350 | HDD 2IN PE pipe - unconsolidated (791-04.02) | LF | 80 | $189.27 | $173.00 |
| 351 | HDD 4IN PE pipe - unconsolidated (791-04.04) | LF | 60 | $203.49 | $186.00 |
| 352 | HDD 6IN PE pipe - unconsolidated (791-04.05) | LF | 925 | $203.49 | $186.00 |
| 353 | HDD 6IN steel pipe - unconsolidated (791-04.23) | LF | 120 | $212.24 | $194.00 |
| 354 | Connect to 2IN EX. PE main (791-06.02) | EACH | 1 | $6,520.48 | $5,960.00 |
| 355 | Connect to 2IN EX. STL main (791-06.10) | EACH | 1 | $9,808.08 | $8,965.00 |
| 356 | Connect to 4IN EX. STL main (791-06.11) | EACH | 1 | $13,654 | $12,480 |
| 357 | Connect to 2IN EX. STL main W/ stopple (791-06.31) | EACH | 1 | $20,095 | $18,368 |
| 358 | Connect to 4IN EX. STL main W/ stopple (791-06.32) | EACH | 5 | $25,797 | $23,580 |
| 359 | Connect to 6IN EX. STL main W/ stopple (791-06.33) | EACH | 1 | $29,320 | $26,800 |
| 360 | 4IN PE hot tap connection (791-06.52) | EACH | 1 | $9,463.45 | $8,650.00 |
| 361 | 2IN PE gas valve assembly (791-07.01) | EACH | 2 | $4,337.87 | $3,965.00 |
| 362 | 4IN PE gas valve assembly (791-07.02) | EACH | 5 | $4,780.96 | $4,370.00 |
| 363 | 6IN PE gas valve assembly (791-07.03) | EACH | 8 | $5,743.71 | $5,250.00 |
| 364 | 6IN steel gas valve assembly (791-07.11) | EACH | 2 | $17,122 | $15,650 |
| 365 | Adjust existing valve box (791-07.20) | EACH | 6 | $3,829.14 | $3,500.00 |
| 366 | 1IN service assembly (791-08.03) | EACH | 13 | $4,321.46 | $3,950.00 |
| 367 | 2IN service assembly (791-08.05) | EACH | 2 | $7,527.00 | $6,880.00 |
| 368 | 1IN PE service pipe (791-08.08) | LF | 1,140 | $158.64 | $145.00 |
| 369 | 2IN PE service pipe (791-08.10) | LF | 35 | $202.40 | $185.00 |
| 370 | HDD 1IN PE service pipe (791-08.18) | LF | 1,125 | $207.87 | $190.00 |
| 371 | HDD 2IN PE service pipe (791-08.20) | LF | 115 | $207.87 | $190.00 |
| 372 | HDD 5/8 PE service pipe (791-08.26) | LF | 235 | $207.87 | $190.00 |
| 373 | 5/8IN service assembly (791-08.27) | EACH | 1 | $3,829.14 | $3,500.00 |
| 374 | 5/8IN PE service pipe (791-08.29) | LF | 115 | $155.35 | $142.00 |
| 375 | Reconnect service assembly (791-08.40) | EACH | 15 | $4,102.65 | $3,750.00 |
| 376 | 1-1/2IN steel service pipe (791-08.50) | LF | 5 | $207.87 | $190.00 |
| 377 | Restore asphalt (791-09.05) | SY | 60 | $103.93 | $95.00 |
| 378 | Restore concrete (791-09.06) | SY | 40 | $229.75 | $210.00 |
| 379 | Restore gravel (791-09.07) | SY | 60 | $82.05 | $75.00 |
| 380 | Retire in place 2IN serv cut & plug (791-10.04) | EACH | 7 | $2,735.10 | $2,500.00 |
| 381 | Retire in place 4IN serv cut & plug (791-10.05) | EACH | 1 | $2,735.10 | $2,500.00 |
| 382 | Retire in place 6IN serv cut & plug (791-10.06) | EACH | 1 | $2,735.10 | $2,500.00 |
| 383 | Aerial splice closure (793-04.07) | EACH | 2 | $5,907.82 | $5,400.00 |
| 384 | 4IN dip slip joint water line (795-01.02) | LF | 83 | $130.57 | $82.00 |
| 385 | 6IN dip slip joint water line (795-01.04) | LF | 1,529 | $78.77 | $75.00 |
| 386 | 8IN dip restrained joint water line (795-01.05) | LF | 70 | $105.30 | $95.50 |
| 387 | 8IN dip slip joint water line (795-01.06) | LF | 879 | $83.69 | $86.80 |
| 388 | 10IN dip restrained joint water line (795-01.07) | LF | 230 | $141.46 | $113.75 |
| 389 | 10IN dip slip joint water line (795-01.08) | LF | 610 | $112.69 | $102.00 |
| 390 | 12IN dip restrained joint water line (795-01.09) | LF | 1,120 | $143.32 | $121.60 |
| 391 | 12IN dip slip joint water line (795-01.10) | LF | 5,905 | $123.63 | $107.65 |
| 392 | 16IN dip restrained joint water line (795-01.13) | LF | 50 | $284.45 | $194.00 |
| 393 | 16IN dip slip joint water line (795-01.14) | LF | 425 | $205.68 | $160.35 |
| 394 | 30IN dip restrained joint water line (795-01.21) | LF | 2,011 | $544.39 | $467.00 |
| 395 | 30IN dip slip joint water line (795-01.22) | LF | 6,770 | $407.42 | $365.00 |
| 396 | HDD 36IN HDPE casing pipe-uncon (795-05.13) | LF | 928 | $1,695.76 | $1,265.00 |
| 397 | Connect to 10IN water line (795-06.06) | EACH | 1 | $2,953.91 | $8,370.00 |
| 398 | Connect to 12IN water line (795-06.07) | EACH | 1 | $3,577.51 | $9,850.00 |
| 399 | Connect to 16IN water line (795-06.09) | EACH | 1 | $5,174.81 | $17,050 |
| 400 | Connect to 30IN water line (795-06.13) | EACH | 12 | $7,767.69 | $43,630 |
| 401 | Cut and cap 8IN water line (795-06.34) | EACH | 2 | $949.08 | $2,460.00 |
| 402 | Cut & cap 10IN water line (795-06.36) | EACH | 2 | $1,018.55 | $2,950.00 |
| 403 | Cut and cap 12IN water line (795-06.37) | EACH | 8 | $1,220.95 | $3,690.00 |
| 404 | Cut and cap 16IN water line (795-06.39) | EACH | 1 | $2,286.55 | $6,985.00 |
| 405 | Cut and cap 30IN water line (795-06.44) | EACH | 6 | $8,861.73 | $18,865 |
| 406 | 8IN X 8IN tapping sleeve and valve (795-07.06) | EACH | 1 | $9,299.35 | $14,520 |
| 407 | 10IN X 10IN tapping sleeve and valve (795-07.10) | EACH | 3 | $14,770 | $19,440 |
| 408 | 12IN X 12IN tapping sleeve and valve (795-07.15) | EACH | 4 | $17,209 | $23,010 |
| 409 | 16IN X 16IN tapping sleeve and valve (795-07.21) | EACH | 1 | $40,808 | $42,315 |
| 410 | 6IN gate valve assembly (795-08.04) | EACH | 5 | $3,063.31 | $2,980.00 |
| 411 | 8IN gate valve assembly (795-08.05) | EACH | 3 | $4,212.06 | $3,820.00 |
| 412 | 10IN gate valve assembly (795-08.06) | EACH | 3 | $5,815.92 | $5,230.00 |
| 413 | 12IN gate valve assembly (795-08.09) | EACH | 9 | $7,083.91 | $6,310.00 |
| 414 | 30IN butterfly valve assembly (795-08.21) | EACH | 9 | $52,842 | $44,030 |
| 415 | 3/4IN water service meter assembly (795-09.01) | EACH | 47 | $820.53 | $3,345.00 |
| 416 | 1IN water service meter assembly (795-09.02) | EACH | 8 | $1,197.98 | $3,600.00 |
| 417 | 2IN water service meter assembly (795-09.04) | EACH | 2 | $2,806.22 | $4,950.00 |
| 418 | 4IN water service meter assembly (795-09.06) | EACH | 2 | $3,856.50 | $6,760.00 |
| 419 | 6IN water service meter assembly (795-09.07) | EACH | 8 | $4,594.97 | $7,830.00 |
| 420 | 8IN water service meter assembly (795-09.08) | EACH | 2 | $6,060.99 | $9,150.00 |
| 421 | Relocate/reconnect service assembly (795-09.09) | EACH | 69 | $3,500.93 | $3,625.00 |
| 422 | 2IN copper service pipe (795-09.12) | LF | 502 | $80.96 | $160.00 |
| 423 | 3/4IN copper service pipe (795-09.28) | LF | 729 | $51.97 | $113.00 |
| 424 | 1IN copper service pipe (795-09.29) | LF | 1,662 | $55.96 | $123.00 |
| 425 | Blow-off assembly (795-11.01) | EACH | 14 | $2,401.42 | $2,800.00 |
| 426 | Fire hydrant assembly (795-11.02) | EACH | 34 | $9,179.00 | $8,260.00 |
| 427 | Reconnect fire hydrant (795-11.03) | EACH | 4 | $3,911.20 | $5,110.00 |
| 428 | Remove fire hydrant (795-12.01) | EACH | 23 | $1,400.37 | $1,375.00 |
| 429 | Removal of existing line (795-12.02) | LS | 1 | $654,510 | $543,000 |
| 430 | Remove blow-off assembly (795-12.05) | EACH | 14 | $1,400.37 | $1,050.00 |
| 431 | Remove water meter (795-12.08) | EACH | 74 | $851.16 | $950.00 |
| 432 | Adjust existing valve boxes (795-12.20) | EACH | 16 | $924.46 | $980.00 |
| 433 | DI fittings (795-13.01) | LB | 121,000 | $10.12 | $13.85 |
| 434 | Open cut 36IN steel casing pipe (797-06.95) | LF | 89 | $2,160.73 | $1,060.00 |
| 435 | 60IN manhole 14FT-16FT depth (797-07.18) | EACH | 3 | $18,325 | $18,650 |
| 436 | Adjust existing manhole (797-07.60) | EACH | 20 | $968.23 | $3,600.00 |
| 437 | 48IN MH adjustment increase height (797-11.15) | VF | 5 | $1,203.44 | $900.00 |
| 438 | 48IN MH adjustment decrease height (797-11.20) | VF | 3 | $2,439.71 | $1,300.00 |
| 439 | Retirein place 60IN manhole (797-11.26) | EACH | 1 | $4,172.67 | $5,175.00 |
| 440 | Fiber optic cable splice (798-05.03) | EACH | 2 | $1,177.63 | $1,123.20 |
| 441 | Communication assembly (bond) (798-05.27) | EACH | 52 | $1,509.78 | $1,981.20 |
| 442 | Communication assembly (DE) (798-05.33) | EACH | 31 | $1,383.96 | $1,746.00 |
| 443 | Communication assembly (E1-2) (798-05.34) | EACH | 18 | $1,226.69 | $1,699.20 |
| 444 | Communication assembly (E2-2) (798-05.35) | EACH | 2 | $1,887.22 | $2,851.20 |
| 445 | Communication assembly (F2&F3) (798-05.37) | EACH | 1 | $2,516.29 | $4,004.40 |
| 446 | Communication assembly (foss) (798-05.40) | EACH | 2 | $4,198.44 | $4,004.40 |
| 447 | Remove aerial cable/terminals (798-09.02) | LF | 10,000 | $3.59 | $3.46 |
| 463 | Water (203-06) | MG | 2,465 | $43.76 | $40.00 |
| 464 | Mineral aggregate, type A base, grading D (303-01) | TON | 9,952 | $35.18 | $48.75 |
| 465 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01) | TON | 415 | $170.88 | $155.00 |
| 466 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 745 | $181.90 | $165.00 |
| 467 | Asp. conc. mix(PG70-22) (BPMB-HM) GR. A-S (307-01.21) | TON | 15,199 | $142.21 | $129.00 |
| 468 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading A (307-02.01) | TON | 16,545 | $131.19 | $119.00 |
| 469 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08) | TON | 11,806 | $132.29 | $120.00 |
| 470 | Mineral aggregate (A-CBC) (309-01.01) | TON | 22,261 | $30.00 | $48.75 |
| 471 | Portland cement (A-CBC) (309-01.02) | TON | 1,084 | $492.32 | $476.00 |
| 472 | Bituminous material (A-CBC) (309-02) | TON | 71 | $3,282.12 | $1,340.00 |
| 473 | Bituminous material for prime coat (PC) (402-01) | TON | 19 | $1,488.27 | $1,350.00 |
| 474 | Aggregate for cover material (PC) (402-02) | TON | 70 | $93.71 | $85.00 |
| 475 | Bituminous material for tack coat (TC) (403-01) | TON | 99 | $1,322.91 | $1,200.00 |
| 476 | Bituminous material (BSC) (405-01.01) | TON | 25 | $2,620.23 | $2,395.00 |
| 477 | Mineral aggregate (BSC) (405-01.02) | TON | 220 | $184.89 | $169.00 |
| 478 | Acs mix(PG64-22) grading D (411-01.10) | TON | 552 | $226.00 | $205.00 |
| 479 | Acs mix(PG70-22) grading D (411-02.10) | TON | 7,656 | $165.36 | $150.00 |
| 480 | Cold planing bituminous pavement (415-01.01) | TON | 1,640 | $71.66 | $60.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of March 21, 2025. Compiled by Mirage Metrics.