WSDOT unit bid prices and bid tabulations
Unit prices bid on 1,317 Washington State DOT contracts let from 29 DEC 1999 to 07 OCT 2026, read from WSDOT's own tabulations. 167 pay items have enough recent bids for a page of their own; every item is in the explorer.
- Contracts
- 1,317
- Bids
- 5,732
- Unit prices
- 365,366
- Latest letting
- 07 OCT 2026
Price a WSDOT pay item
Loading the bids.
Check my bid
Add the lines you are pricing, with your quantity and unit price. Each line is placed against what bidders carried in the last 24 months, at a similar quantity when enough bids exist. Your numbers stay in this browser.
Competitors
Who bids, how often they are low, how far off they are when they lose, and how much they leave on the table when they win.
Lettings
Open any contract to read the full tabulation: every line, every bidder.
Where the numbers come from
Each price is copied from a bid tabulation the owner published after the letting. Nothing is estimated or averaged before it reaches this page.
How each bid was checked
For every bidder, quantity times unit price was summed over all lines of the contract and compared with the total bid printed by the owner. A bid is published only when the two match to within one dollar. The states marked not checkable or third party are explained in the table.
Read the numbers like an estimator
- Item codes and measurement rules are each owner's. Prices are compared inside one state and never pooled across states.
- Unit price moves with quantity, location and season. Set your quantity and region before you trust a median.
- Some bidders price a line at a cent and load the cost elsewhere. Those token prices, and bids more than three times the low bid, are left out of statistics by default and stay visible in tabulations.
- The low bidder's price on one line is not always the lowest price on that line. Orange marks the bidder who was low on the whole contract.
- Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.
The WSDOT pay items bid most often
| Pay item | Code | Unit | Low-bid median | Low bids | Window | Bids, all time |
|---|---|---|---|---|---|---|
| Esc lead | DAY | $100.00 | 1 | Last 24 months | 2,952 | |
| Paint line | LF | $0.78 | 4 | Last 24 months | 2,878 | |
| Construction signs class a | SF | $32.50 | 6 | Last 24 months | 2,787 | |
| Flexible guide post | EACH | $110.00 | 3 | Last 24 months | 2,759 | |
| Crushed surfacing base course | TON | $58.00 | 6 | Last 24 months | 2,701 | |
| Planing bituminous pavement | SY | $5.97 | 2 | Last 24 months | 2,440 | |
| Roadway excavation incl. haul | CY | $30.50 | 4 | Last 24 months | 2,290 | |
| Inlet protection | EACH | $122.50 | 2 | Last 24 months | 2,162 | |
| Plastic traffic arrow | EACH | $340.50 | 2 | Last 24 months | 2,001 | |
| High visibility fence | LF | $8.00 | 3 | Last 24 months | 1,810 | |
| Plastic drainage marking | EACH | $68.00 | 1 | Last 24 months | 1,773 | |
| Plastic stop line | LF | $72.00 | 1 | Last 24 months | 1,742 | |
| Removing guardrail | LF | $8.00 | 3 | Last 24 months | 1,653 | |
| Embankment compaction | CY | $16.00 | 3 | Last 24 months | 1,587 | |
| Raised pavement marker type 2 | HUND | $4,500.00 | 1 | Last 24 months | 1,551 | |
| Removing guardrail anchor | EACH | $365.00 | 2 | Last 24 months | 1,549 | |
| Clearing and grubbing | ACRE | $9,302.50 | 2 | Last 24 months | 1,521 | |
| Structure excavation class b incl. haul | CY | $14.75 | 3 | Last 24 months | 1,444 | |
| Sequential arrow sign | HR | $3.25 | 326 | All lettings | 1,427 | |
| Other traffic control labor | HR | $48.00 | 306 | All lettings | 1,400 | |
| Silt fence | LF | $4.50 | 235 | All lettings | 1,382 | |
| Shoring or extra excavation class b | SF | $0.57 | 2 | Last 24 months | 1,348 | |
| Recessed pavement marker | HUND | $1,182.50 | 310 | All lettings | 1,243 | |
| Temporary impact attenuator | EACH | $4,900.00 | 2 | Last 24 months | 1,214 | |
| Beam guardrail type 31 non-flared terminal | EACH | $5,200.00 | 2 | Last 24 months | 1,196 | |
| Extruded curb | LF | $18.00 | 1 | Last 24 months | 1,196 | |
| Seeding, fertilizing, and mulching | ACRE | $8,875.00 | 4 | Last 24 months | 1,187 | |
| Beam guardrail type 31 | LF | $45.00 | 2 | Last 24 months | 1,161 | |
| Plastic crosswalk line | SF | $13.50 | 1 | Last 24 months | 1,126 | |
| Street cleaning | HR | $200.00 | 1 | Last 24 months | 1,120 | |
| Pavement repair excavation incl. haul | SY | $37.50 | 2 | Last 24 months | 1,119 | |
| Hma cl. 1/2 in. pg 64-22 | TON | $79.00 | 213 | All lettings | 1,082 | |
| Portable changeable message sign | HR | $3.30 | 4 | Last 24 months | 1,072 | |
| Cement conc. sidewalk | SY | $99.00 | 1 | Last 24 months | 1,026 | |
| Removing paint line | LF | $0.75 | 195 | All lettings | 1,024 | |
| Plastic line | LF | $6.00 | 1 | Last 24 months | 1,020 | |
| Quarry spalls | TON | $74.00 | 1 | Last 24 months | 1,003 | |
| Plastic wide line | LF | $6.40 | 2 | Last 24 months | 920 | |
| Adjust catch basin | EACH | $425.00 | 224 | All lettings | 909 | |
| Temporary pavement marking-short duration | LF | $0.37 | 3 | Last 24 months | 907 | |
| Adjust monument case and cover | EACH | $300.00 | 243 | All lettings | 884 | |
| Check dam | LF | $28.00 | 1 | Last 24 months | 882 | |
| Cement conc. traffic curb and gutter | LF | $41.00 | 1 | Last 24 months | 878 | |
| Catch basin type 1 | EACH | $5,000.00 | 2 | Last 24 months | 871 | |
| Structure excavation class a incl. haul | CY | $30.00 | 1 | Last 24 months | 854 | |
| Training | HR | $3.00 | 175 | All lettings | 846 | |
| Adjust manhole | EACH | $500.00 | 211 | All lettings | 827 | |
| Testing storm sewer pipe | LF | $2.00 | 1 | Last 24 months | 825 | |
| Plugging existing pipe | EACH | $615.00 | 1 | Last 24 months | 823 | |
| Wattle | LF | $4.00 | 135 | All lettings | 805 | |
| Plastic traffic letter | EACH | $255.00 | 1 | Last 24 months | 775 | |
| Gravel backfill for drain | CY | $40.00 | 117 | All lettings | 762 | |
| Stabilized construction entrance | SY | $29.00 | 1 | Last 24 months | 761 | |
| Resetting impact attenuator | EACH | $2,800.00 | 1 | Last 24 months | 745 | |
| Plastic wide lane line | LF | $3.25 | 213 | All lettings | 734 | |
| Removing asphalt conc. pavement | SY | $8.00 | 126 | All lettings | 733 | |
| Centerline rumble strip | MI | $49,000 | 1 | Last 24 months | 720 | |
| Beam guardrail anchor type 10 | EACH | $900.00 | 142 | All lettings | 720 | |
| Cement conc. pedestrian curb | LF | $44.00 | 1 | Last 24 months | 704 | |
| Adjust valve box | EACH | $750.00 | 1 | Last 24 months | 690 | |
| Connection to drainage structure | EACH | $1,785.00 | 1 | Last 24 months | 685 | |
| Removing plastic line | LF | $1.00 | 161 | All lettings | 671 | |
| Construction geotextile for underground drainage | SY | $2.50 | 106 | All lettings | 665 | |
| Schedule a storm sewer pipe 12 in. diam. | LF | $147.50 | 2 | Last 24 months | 663 | |
| Commercial hma | TON | $150.00 | 134 | All lettings | 654 | |
| Raised pavement marker type 1 | HUND | $250.00 | 146 | All lettings | 653 | |
| Catch basin type 2 48 in. diam. | EACH | $7,500.00 | 1 | Last 24 months | 653 | |
| Underdrain pipe 6 in. diam. | LF | $12.00 | 94 | All lettings | 650 | |
| Gravel backfill for wall | CY | $31.00 | 91 | All lettings | 647 | |
| Gravel borrow incl. haul | TON | $15.25 | 100 | All lettings | 645 | |
| Barrier delineator | EACH | $16.40 | 155 | All lettings | 645 | |
| Grate inlet type 2 | EACH | $5,630.00 | 1 | Last 24 months | 645 | |
| Profiled plastic line | LF | $1.12 | 160 | All lettings | 637 | |
| Removing guide post | EACH | $7.12 | 136 | All lettings | 622 | |
| Asphalt for fog seal | TON | $650.00 | 209 | All lettings | 621 | |
| Schedule a culv. pipe 18 in. diam. | LF | $44.10 | 98 | All lettings | 611 | |
| Compost sock | LF | $8.00 | 117 | All lettings | 611 | |
| Removing drainage structure | EACH | $500.00 | 97 | All lettings | 563 | |
| Quarry spalls | CY | $71.75 | 4 | Last 24 months | 559 | |
| Raising existing beam guardrail | LF | $4.07 | 158 | All lettings | 551 | |
| Beam guardrail transition section type 21 | EACH | $8,850.00 | 2 | Last 24 months | 535 | |
| Bridge approach slab | SY | $600.00 | 1 | Last 24 months | 522 | |
| Conc. class 4000 for bridge | CY | $1,300.00 | 1 | Last 24 months | 513 | |
| Mailbox support type 1 | EACH | $300.00 | 89 | All lettings | 511 | |
| Ditch excavation incl. haul | CY | $14.45 | 1 | Last 24 months | 502 | |
| Common borrow incl. haul | CY | $24.50 | 2 | Last 24 months | 491 | |
| Construction geotextile for separation | SY | $2.00 | 83 | All lettings | 489 | |
| Removing raised pavement marker | HUND | $140.00 | 106 | All lettings | 487 | |
| St. reinf. bar for bridge | LB | $2.00 | 1 | Last 24 months | 487 | |
| Construction geotextile for permanent erosion control | SY | $15.50 | 4 | Last 24 months | 484 | |
| Removing plastic traffic marking | EACH | $55.00 | 113 | All lettings | 481 | |
| Traffic barrier | LF | $440.00 | 1 | Last 24 months | 475 | |
| Schedule a culv. pipe 12 in. diam. | LF | $31.00 | 78 | All lettings | 473 | |
| Removing wire fence | LF | $6.50 | 1 | Last 24 months | 469 | |
| Removing and resetting beam guardrail | LF | $16.00 | 111 | All lettings | 456 | |
| Seeding and fertilizing by hand | SY | $2.50 | 1 | Last 24 months | 453 | |
| Painted drainage marking | EACH | $25.00 | 126 | All lettings | 450 | |
| Cement conc. traffic curb | LF | $30.00 | 96 | All lettings | 449 | |
| Removing and resetting existing permanent barrier | LF | $25.00 | 1 | Last 24 months | 444 | |
| Painted stop line | LF | $4.00 | 98 | All lettings | 442 | |
| End, gate, corner, and pull post for chain link fence | EACH | $222.50 | 70 | All lettings | 440 | |
| Shoulder finishing | MI | $2,500.00 | 1 | Last 24 months | 437 | |
| Schedule a storm sewer pipe 18 in. diam. | LF | $81.00 | 1 | Last 24 months | 433 | |
| Directional boring | LF | $170.00 | 1 | Last 24 months | 415 | |
| Hma sawcut and seal | LF | $30.00 | 123 | All lettings | 413 | |
| Removing cement conc. sidewalk | SY | $20.00 | 102 | All lettings | 409 | |
| Mailbox support type 2 | EACH | $441.50 | 68 | All lettings | 404 | |
| Painted wide line | LF | $0.40 | 85 | All lettings | 403 | |
| Detectable warning surface | SF | $31.00 | 1 | Last 24 months | 399 | |
| Streambed sediment | TON | $40.00 | 56 | All lettings | 390 | |
| Shoulder rumble strip type 1 | MI | $1,550.00 | 95 | All lettings | 389 | |
| Plastic junction box marking | EACH | $35.00 | 81 | All lettings | 389 | |
| Removing chain link fence | LF | $4.50 | 63 | All lettings | 380 | |
| Construction geotextile for soil stabilization | SY | $3.00 | 72 | All lettings | 374 | |
| Permanent impact attenuator | EACH | $27,000 | 79 | All lettings | 373 | |
| Longitudinal joint seal | LF | $4.75 | 95 | All lettings | 369 | |
| Seeding and mulching | ACRE | $5,000.00 | 65 | All lettings | 368 | |
| High visibility silt fence | LF | $4.40 | 2 | Last 24 months | 367 | |
| Sign covering | SF | $10.00 | 77 | All lettings | 363 | |
| Removing conc. barrier | LF | $8.00 | 77 | All lettings | 360 | |
| Compost blanket | SY | $4.00 | 52 | All lettings | 359 | |
| Select borrow incl. haul | TON | $14.00 | 58 | All lettings | 358 | |
| Wire fence type 2 | LF | $8.00 | 54 | All lettings | 356 | |
| Channel excavation incl. haul | CY | $21.23 | 2 | Last 24 months | 354 | |
| Chain link fence type 3 | LF | $17.00 | 56 | All lettings | 337 | |
| Catch basin type 1L | EACH | $1,200.00 | 53 | All lettings | 334 | |
| Conduit pipe 2 in. diam. | LF | $85.00 | 1 | Last 24 months | 331 | |
| Locking solid metal cover and frame for catch basin | EACH | $400.00 | 52 | All lettings | 324 | |
| Removing cement conc. curb and gutter | LF | $10.00 | 79 | All lettings | 323 | |
| Adjust junction box | EACH | $275.00 | 87 | All lettings | 318 | |
| Temporary barrier | LF | $39.00 | 2 | Last 24 months | 311 | |
| Adjust inlet | EACH | $1,111.00 | 1 | Last 24 months | 303 | |
| St. reinf. bar for retaining wall | LB | $1.00 | 41 | All lettings | 299 | |
| Conc. class 4000 for retaining wall | CY | $575.00 | 41 | All lettings | 299 | |
| Transportable attenuator | EACH | $8,000.00 | 81 | All lettings | 298 | |
| No trespassing sign | EACH | $200.00 | 57 | All lettings | 298 | |
| Bark or wood chip mulch | SY | $5.70 | 1 | Last 24 months | 284 | |
| Drain pipe 6 in. diam. | LF | $20.50 | 44 | All lettings | 281 | |
| Beam guardrail type 31 - 8 ft. long post | LF | $24.00 | 48 | All lettings | 278 | |
| Removing cement conc. curb | LF | $10.00 | 70 | All lettings | 276 | |
| Temporary pavement marking-long duration | LF | $1.34 | 54 | All lettings | 269 | |
| Plastic aerial surveillance 1/2 marker | EACH | $150.00 | 78 | All lettings | 267 | |
| Schedule a culv. pipe 24 in. diam. | LF | $60.00 | 41 | All lettings | 266 | |
| Grooved plastic line | LF | $2.05 | 72 | All lettings | 265 | |
| Additional brooming | HR | $146.00 | 89 | All lettings | 262 | |
| Cement conc. pavement | CY | $620.00 | 1 | Last 24 months | 262 | |
| Flaggers | HR | $61.00 | 74 | All lettings | 259 | |
| Hma cl. 1/2 in. pg 58H-22 | TON | $192.00 | 1 | Last 24 months | 257 | |
| Plastic aerial surveillance full marker | EACH | $150.00 | 78 | All lettings | 254 | |
| Bark or wood chip mulch | ACRE | $25,000 | 41 | All lettings | 251 |
17 more items have a page; search any item in the explorer above.
Latest lettings
| Let | Contract | Region | Project | Bids | Low bid | Source |
|---|---|---|---|---|---|---|
| 07 OCT 2026 | XE3773 | OR region | Sr 20 Us 101 I/S To N Of Fairmount Rd Hfst | 6 | $355,249 | WSDOT |
| 07 OCT 2026 | XE3770 | NCR region | Sr 28 Ewc 2026 Demo No 3 | 3 | $45,557 | WSDOT |
| 23 SEP 2026 | XE3772 | SCR region | Sr 906 Hyak Vicinity Emergency Washout Restoration | 8 | $1,242,940 | WSDOT |
| 26 AUG 2026 | XE3764 | SCR region | Us 12 Locust Ln Vicinity Emergency Washout Repair | 7 | $329,923 | WSDOT |
| 26 AUG 2026 | XE3762 | WSF region | Sr 104 Bremerton Trm Slip 1 Vts Tower Preservation | 2 | $140,982 | WSDOT |
| 12 AUG 2026 | XE3760 | SCR region | I-90 Eb 3 Miles E Of North Bend - Emergency Seeding And Erosion Control | 5 | $233,938 | WSDOT |
| 15 JUL 2026 | XE3755 | SCR region | Us 12 Eschbach Rd & Ackley Rd/Clover Ln - I/S Safety Improvements | 5 | $1,717,172 | WSDOT |
| 08 JUL 2026 | XE3751 | SCR region | Us 395 Kartchner St I/C Nb Ramp Terminal Improvements | 4 | $1,093,111 | WSDOT |
| 01 JUL 2026 | XE3749 | SCR region | Sr 240 Beloit Road To Hagen Rd Pavement Repairs | 3 | $400,000 | WSDOT |
| 01 JUL 2026 | XE3756 | SCR region | I-90 Hansen Rd Overpass Emergency Bridge Replacement | 6 | $5,406,051 | WSDOT |
| 19 APR 2023 | 009952 | SCR region | Us 97 jones rd - intersection improvements | 4 | $3,896,214 | WSDOT |
| 12 APR 2023 | 009945 | SCR region | Sr 241 mabton vicinity retrofit bridges | 3 | $18,224,953 | WSDOT |
Where these numbers come from
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
| Year | Contracts |
|---|---|
| 1999 | 1 |
| 2000 | 36 |
| 2001 | 66 |
| 2002 | 42 |
| 2003 | 59 |
| 2004 | 54 |
| 2005 | 56 |
| 2006 | 52 |
| 2007 | 57 |
| 2008 | 53 |
| 2009 | 56 |
| 2010 | 74 |
| 2011 | 65 |
| 2012 | 48 |
| 2013 | 65 |
| 2014 | 36 |
| 2015 | 53 |
| 2016 | 61 |
| 2017 | 79 |
| 2018 | 68 |
| 2019 | 63 |
| 2020 | 34 |
| 2021 | 50 |
| 2022 | 43 |
| 2023 | 36 |
| 2026 | 10 |
Every state's coverage and check is on the bid results hub.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.