SCDOT unit bid prices and bid tabulations

Unit prices bid on 1,037 South Carolina DOT contracts let from 11 JAN 2022 to 13 OCT 2026, read from SCDOT's own tabulations. 267 pay items have enough recent bids for a page of their own; every item is in the explorer.

Contracts
1,037
Bids
3,257
Unit prices
175,917

Data through 13 OCT 2026, the latest SCDOT letting read. Compiled by Mirage Metrics.

Price a SCDOT pay item

Check my bid

Add the lines you are pricing, with your quantity and unit price. Each line is placed against what bidders carried in the last 24 months, at a similar quantity when enough bids exist. Your numbers stay in this browser.

Columns: item code, quantity, unit price, with or without a header row.

Competitors

Who bids, how often they are low, how far off they are when they lose, and how much they leave on the table when they win.

Sort by: most bids counts every bid a firm submitted; most low bids counts the contracts where it was the low bidder; win rate is low bids divided by bids, for firms with five bids or more; low bid volume adds up its low bids in dollars. Gap when not low is the average distance from its total to the low bid; left on table is the average distance from its low bid to the second bid.

160 firms in South Carolina, the 50 with the most bids shown.

BidderBidsLow bidsWin rateGap when not lowLeft on tableLow bid volume
Palmetto Corp. of Conway35012235%+15%+9.0%$1.1B
King Asphalt, Inc.2307733%+17%+9.0%$640.0M
Reeves Construction Company2013517%+24%+10%$374.5M
C.R. Jackson, Inc.1987337%+12%+7.0%$976.5M
Rogers Group, Inc.1122522%+16%+8.0%$252.3M
Peek Pavement Marking, LLC1092321%+29%+8.0%$19.6M
TRP Construction Group, LLC921213%+61%+10%$15.9M
Satterfield Construction Company, Inc.847792%+12%+18%$471.8M
Dane Construction, LLC771418%+31%+12%$42.7M
Blythe Construction, Inc.762229%+15%+15%$173.3M
Bagwell Fence Company, Inc.756384%+16%+59%$55.1M
United Infrastructure Group, Inc.682334%+23%+20%$186.2M
Eagle Construction Company631016%+27%+11%$41.2M
Aos Specialty Contractors, Inc.611830%+27%+15%$45.5M
Lynches River Contracting, Inc.572340%+16%+10%$150.4M
Eurovia Atlantic Coast LLC521529%+14%+8.0%$156.5M
Reynolds Fence & Guardrail, Inc.5024%+58%+13%$3.1M
Cekra, Inc.481531%+32%+22%$49.4M
Banks Construction Company472860%+15%+20%$548.9M
Coastal Asphalt, LLC412049%+10%+16%$79.2M
W.M. Roebuck, Incorporated392462%+29%+17%$26.1M
A & A Safety, Inc.3800%+24%
Thorn Creek Markers LLC383079%+7.0%+16%$9.4M
Sanders Brothers Construction Company,371335%+18%+8.0%$97.6M
Straight Line, Inc.362364%+12%+7.0%$22.4M
Oglesby Construction, Inc.3513%+25%+12%$861K
Truerock Construction, LLC341132%+13%+7.0%$64.6M
Palmetto Sitework Services, LLC331236%+36%+18%$42.5M
Dellinger, Inc.26727%+16%+10%$19.2M
Alpha Space Control, LLC26831%+19%+7.0%$7.5M
Cherokee, Inc.25520%+25%+17%$8.0M
Lee Construction Company of the25416%+46%+6.0%$22.9M
Crowder Construction Company2414%+27%+8.0%$9.6M
Universal Civil Construction, LLC24729%+23%+14%$12.4M
Walker Brothers, Inc.231043%+23%+19%$7.3M
Southern Road & Bridge, LLC2300%+114%
Blythe Brothers Asphalt Co., LLC221359%+6.0%+7.0%$89.2M
Ipc Paving LLC2115%+27%+7.0%$2.6M
L-J, Inc.2015%+49%+1.0%$444K
Freyssinet, Inc.20630%+38%+13%$9.4M
Coogler Construction, Inc.20525%+24%+11%$20.5M
Apac-Atlantic Inc.19947%+19%+21%$73.4M
Lci-Lineberger Construction, Inc.19526%+15%+10%$30.8M
Performance Sealing and Striping, Inc.1915%+14%+14%$1.1M
Gordon Company Inc.191158%+22%+12%$11.4M
Blythe Development, LLC18211%+25%+11%$14.3M
Site-Prep, Inc. of NC17635%+13%+12%$5.3M
S and S Construction, Inc. of Anderson16850%+15%+8.0%$14.7M
Remac Asphalt Maintenance, Inc.16425%+16%+7.0%$2.8M
Republic Contracting Corporation1517%+35%+15%$3.3M

Lettings

Open any contract to read the full tabulation: every line, every bidder.

Latest SCDOT contracts in the data.

Sources and checks

Each price is copied from a bid tabulation the owner published after the letting. Nothing is estimated or averaged before it reaches this page.

OwnerLettingsContractsBidsPricesCheckHow it was read
Texas DOT9 Jan 2020 to 19 Nov 20268,90937,8241,860,794ReconciledTxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Ohio DOT23 Jan 2020 to 12 Nov 20264,40815,8161,093,243ReconciledODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Illinois DOT15 Jan 2021 to 18 Sep 20265,49416,087932,368ReconciledIDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Florida DOT31 Jan 2018 to 28 Oct 20261,7387,302814,861ReconciledFDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
North Carolina DOT15 Jan 2013 to 20 Oct 20261,6596,770767,334ReconciledNCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Virginia DOT29 Jan 2002 to 28 Oct 20267,62818,240674,864ReconciledVDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Wisconsin DOT11 Jan 2022 to 10 Nov 20261,5985,095608,530ReconciledWisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Indiana DOT12 Jan 2022 to 5 Nov 20262,0827,109552,581ReconciledINDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Washington State DOT29 Dec 1999 to 7 Oct 20261,3175,732365,366ReconciledWSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
New York State DOT6 Jan 2022 to 15 Oct 20261,0803,894344,856ReconciledNYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Kentucky Transportation Cabinet22 Nov 2019 to 22 Oct 20264,4149,448336,278ReconciledKYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
New Jersey DOT22 Jun 2017 to 16 Apr 20269343,363314,765ReconciledNJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
Missouri DOT17 Jan 2020 to 16 Oct 20261,8965,865293,103ReconciledMoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
South Carolina DOT11 Jan 2022 to 13 Oct 20261,0373,257175,917ReconciledSCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Tennessee DOT9 Feb 2018 to 2 Oct 20261,2573,169156,766ReconciledTDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Alabama DOT28 Jan 2022 to 28 Aug 20269932,677153,448ReconciledALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Oregon DOT7 Jan 2021 to 13 Aug 20263941,571131,407Not checkableODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Arkansas DOT12 Jan 2022 to 4 Nov 20261,1182,57880,673ReconciledARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Colorado DOT17 May 2023 to 10 Sep 202614547239,455ReconciledCDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.
Iowa DOT19 Jan 2022 to 20 Oct 202611241512,634ReconciledIowa DOT bid tabulation PDFs: the letting of 19 January 2022 (read from the Internet Archive's copy of Iowa DOT's file) and lettings of August to October 2026. On A+B contracts the item total is kept and the time part dropped. Bids that did not match their published total are left out.
Caltrans25 Apr 2023 to 9 May 202333954,418ReconciledCaltrans bid summary PDFs; scanned pages read by OCR. Bids that did not match their published total are left out.

How each bid was checked

For every bidder, quantity times unit price was summed over all lines of the contract and compared with the total bid printed by the owner. A bid is published only when the two match to within one dollar. The states marked not checkable or third party are explained in the table.

Read the numbers like an estimator

  • Item codes and measurement rules are each owner's. Prices are compared inside one state and never pooled across states.
  • Unit price moves with quantity, location and season. Set your quantity and region before you trust a median.
  • Some bidders price a line at a cent and load the cost elsewhere. Those token prices, and bids more than three times the low bid, are left out of statistics by default and stay visible in tabulations.
  • The low bidder's price on one line is not always the lowest price on that line. Orange marks the bidder who was low on the whole contract.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

The SCDOT pay items bid most often

Pay itemCodeUnitLow-bid medianLow bidsWindowBids, all time
Permanent yellow pavement markers BI-dir.- 4"X4"6301100EACH$6.35325Last 24 months2,409
Liquid asphalt binder PG64-224011004TON$690.00307Last 24 months2,319
Borrow excavation2033000CY$49.61270Last 24 months2,003
Milling existing asphalt pavement (variable)4013990SY$10.03242Last 24 months1,809
4" white solid lines (PVT. edge lines) thermo.- 90 mil.6271010LF$0.50231Last 24 months1,808
4" yellow solid lines(PVT.edge lines) thermo- 90 mil.6271074LF$0.50233Last 24 months1,554
24" white solid lines (stop/diag lines)-thermo.-125 mil6271025LF$10.00231Last 24 months1,443
Permanent clear pavement markers- mono-dir.- 4"X4"6300005EACH$5.50184Last 24 months1,422
Unclassified excavation2031000CY$35.00185Last 24 months1,365
4" white broken lines(gaps excl.)thermoplastic- 90 mil.6271005LF$0.60175Last 24 months1,360
Permanent grassing for non-permitted resurfacing projects8100102ACRE$3,360.00184Last 24 months1,318
Permanent construction signs (ground mounted)6021120SF$7.1228Last 24 months1,273
4" yellow broken lines(gaps exc)thermoplastic - 90 mil.6271064LF$0.47152Last 24 months1,248
Full depth asph. pav. patching 8" unif4012080SY$79.50165Last 24 months1,227
Removal & disposal of existing pavement2023000SY$36.05160Last 24 months1,215
8" white solid lines thermoplastic - 125 mil.6271015LF$2.98152Last 24 months1,151
Maintenance stone3069900TON$75.0029Last 24 months1,148
White single arrows (LT, STRGHT, RT) thermo.-125 mil.6271030EACH$100.00150Last 24 months1,132
Silt fence8153000LF$3.75141Last 24 months1,108
Construction stakes, lines & grades1050800EACH$25,000147Last 24 months1,074
Detectable warning material7204900SF$55.00142Last 24 months1,046
Pedestrian ramp construction7209000SY$160.00140Last 24 months1,040
4"yellow solid line(PVT.edge&no passing zone)-fast dry paint6250110LF$0.1329Last 24 months1,030
4" white solid lines (PVT. edge lines)-fast dry paint6250010LF$0.1429Last 24 months1,025
Milled-in rumble strip4019000MI$500.0026Last 24 months1,019
Permanent construction signs (ground mounted)6051120SF$6.50283Last 24 months1,010
White word message "only" - thermoplastic - 125 mil.6271035EACH$100.00133Last 24 months983
Furnish & install 1.0" schedule 80 PVC conduit6750275LF$19.00135Last 24 months976
Hauling of excavated shoulder material2072000STA$72.00130Last 24 months940
Furnish & instl no. 14 copper wire,1-conductor for loop wire6770413LF$1.38120Last 24 months917
Sawcut for loop detector6780495LF$10.25120Last 24 months917
4" yellow broken lines(gaps exc) - fast dry paint6250105LF$0.1327Last 24 months905
MT3 leading end treatment TL38051151EACH$3,300.00136Last 24 months899
Permanent yellow pavement markers mono-dir.- 4"X 4" perm. yel.6301005EACH$5.00119Last 24 months898
HMA shoulder widening course3104000TON$83.00125Last 24 months892
4" white broken lines -(gaps excluded)-fast dry paint6250005LF$0.1522Last 24 months883
Rip-rap (class B)8041020TON$118.00119Last 24 months866
Maintenance stone3059900TON$80.00243Last 24 months861
Premash type T TL3 leading 50'8057100EACH$3,200.00125Last 24 months858
Hot mix asphalt surface course type B4030320TON$92.5021Last 24 months840
Hot mix asphalt surface course type C4030340TON$87.0015Last 24 months826
Stabilized construction entrance8156490SY$24.00113Last 24 months821
Concrete sidewalk(4" uniform)7204100SY$81.64103Last 24 months757
Mowing8109901ACRE$452.50102Last 24 months756
Removal of silt retained by silt fence8154050LF$4.0089Last 24 months748
Replace/repair silt fence8153090LF$4.2292Last 24 months746
Temporary cover8100200ACRE$1,355.2598Last 24 months743
Permanent cover8100100ACRE$1,754.3398Last 24 months736
MGS3 GR standard shoulder8052100LF$26.75108Last 24 months734
Fertilizer (nitrogen)8104005LB$3.0097Last 24 months732
Fertilizer (phosphoric acid)8104010LB$3.0097Last 24 months732
Fertilizer (potash)8104015LB$3.0097Last 24 months732
Agricultural granular lime8105005LB$0.5796Last 24 months728
18" smooth wall pipe7143618LF$135.0092Last 24 months718
Furnish & install 2.0" schedule 80 PVC conduit6750278LF$17.0091Last 24 months713
Fine grading2081001SY$7.5092Last 24 months706
Concrete curb and gutter(2'-0") vertical face7203210LF$50.0088Last 24 months696
Right of way marker(rebar and cap)8091010EACH$175.0093Last 24 months682
Full depth asph. pav. patching 6" unif.4012060SY$75.0086Last 24 months675
Flat sheet, type III, fixed SZ. & MSG. sign6510105SF$28.00105Last 24 months666
Selective watering8109050GAL$0.0892Last 24 months665
Milling existing asphalt pavement 2.0"4013200SY$3.3318Last 24 months662
Portland cement for cement modified recycled base course3064000TON$234.1292Last 24 months647
24" white solid lines (stop/diagonal lines)-fast dry paint6250025LF$1.0020Last 24 months638
Asphalt surface course type B4040320TON$91.50193Last 24 months628
Sediment tubes for ditch checks8152007LF$12.7591Last 24 months622
Excavation for shoulder paving2035100STA$92.0016Last 24 months616
Milled-in rumble strip6321000MI$575.00189Last 24 months601
6" white solid lines (PVT. edge lines) thermo.- 90 mil.6271012LF$0.8586Last 24 months599
F&I-13"X24"X18"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD6800518EACH$831.1779Last 24 months588
Removal & disposal of existing asphalt pavement2025000SY$16.0574Last 24 months587
Railroad crossing symbols - thermoplastic - 125 mil.6271045EACH$430.0069Last 24 months584
U-section post for sign supports - 3P6531210LF$12.0087Last 24 months577
White single arrow (left, straight, right)-fast dry paint6250030EACH$10.4812Last 24 months575
Asphalt surface course type C4040340TON$92.95162Last 24 months571
Temporary erosion control blanket (ecb)8151110MSY$2,120.0079Last 24 months564
Hydraulic erosion control product (hecp) - type 38151203ACRE$3,697.1276Last 24 months564
4"yellow solid line(PVT.edge&no passing zone)-fast dry paint6240110LF$0.12180Last 24 months563
4" white solid lines (PVT. edge lines)-fast dry paint6240010LF$0.12179Last 24 months560
Removal of exist. guardrail2027801LF$2.00131Last 24 months559
Surface applied detectable warning7209100SF$65.0083Last 24 months541
White combination arrows(STR&RT.or STR& LT)thermo-125MIL6271040EACH$104.0682Last 24 months525
Flowable fill2103000CY$350.0060Last 24 months523
Driveway paving-surface type C4037220TON$197.5014Last 24 months519
Type B - flashing light608100BEACH$125.0060Last 24 months515
4" white broken lines -(gaps excluded)-fast dry paint6240005LF$0.12165Last 24 months505
MGS3CS GR compressed shoulder8052150LF$29.0083Last 24 months498
Full depth asph. pav. patching 10"unif4012100SY$93.4472Last 24 months490
6" white broken lines(gaps excl.)thermoplastic- 90 mil.6271007LF$1.0071Last 24 months488
24" white solid lines (stop/diagonal lines)-fast dry paint6240025LF$1.00160Last 24 months481
Geotextile for erosion control under riprap(class 2)type C8048210SY$4.6061Last 24 months473
Pavement markings(temporary-paint)-4" yellow solid lines609115BLF$0.1658Last 24 months470
White word message "only"- fast dry paint6250035EACH$13.5310Last 24 months468
Pavement markings(temporary-paint)-4" white solid lines609115ALF$0.1656Last 24 months460
Cleaning silt basins8154010CY$34.0053Last 24 months458
Temporary barrier fence (orange)8068301LF$4.0066Last 24 months456
Cement modified recycled base (12" unif)-curing method B3063242SY$8.4054Last 24 months445
24" smooth wall pipe7143624LF$150.0056Last 24 months443
Concrete driveway(6" uniform)7205000SY$115.0064Last 24 months441
MTBBC3 MASH thrie-beam barrier connector TL38053253EACH$2,650.0070Last 24 months439
Remove & dispose semi-rigid GR device8050010LF$1.1013Last 24 months434
Reinf. steel for structures (bridge)7031200LB$1.7549Last 24 months427
Hot mix asphalt surface course type D4030350TON$138.007Last 24 months424
Premash W-beam strong post system WSP38051050LF$27.3958Last 24 months423
Hot mix asphalt intermediate course type B4020320TON$106.0010Last 24 months422
4" yellow broken lines(gaps exc) - fast dry paint6240105LF$0.12144Last 24 months421
Milling existing asphalt pavement 2.0"4013120SY$2.90128Last 24 months420
Conc. for structures - class 40007011400CY$1,500.0048Last 24 months420
Temporary adjustment of traffic signal equipment6885993EACH$8,000.0063Last 24 months411
Removal & disposal of existing curb2024100LF$16.4154Last 24 months406
Rip-rap (class A)8041010TON$100.0043Last 24 months403
Aggregate no.5 or 57 for erosion control8156410TON$90.3346Last 24 months396
Construction zone electric changeable message sign (trailer6062000EACH$6,400.0046Last 24 months395
Beveling of pipe end7199100EACH$475.0056Last 24 months395
6" yellow solid lines(PVT.edge lines) thermo- 90 mil.6271076LF$0.9066Last 24 months394
Pref.flex.retro.PVMT.mark(T- 1)perm.(60MIL)4"yel.sol.6351450LF$4.0047Last 24 months387
Pref.flex.retro.PVMT.mark(T- 1)perm.(60MIL)4"WH.solid6351150LF$4.5847Last 24 months377
Removal of pavement markings6319505LF$0.5049Last 24 months369
Elastomeric bearing7243100EACH$600.0043Last 24 months369
12IN X 18IN white triang. yield bar (gaps exc)thermo-125MIL6271023LF$15.0038Last 24 months365
Driveway paving-surface type C4047220TON$205.00107Last 24 months363
Driveway paving-surface type D4037230TON$240.007Last 24 months358
6" yellow solid line on curb/median - fast dry paint6250112LF$1.1212Last 24 months355
Inlet structure filter - type F (weighted)8152004LF$15.0049Last 24 months349
8"white solid lines (crosswalk& channelization)fast dry paint6240015LF$0.15111Last 24 months342
Pile driving set-UP7110010EACH$3,375.0038Last 24 months339
24" yellow solid lines - thermoplastic - 125 mil.6271080LF$7.0049Last 24 months339
MB trailing end treatment8051710EACH$1,600.0048Last 24 months338
8"white solid lines (crosswalk& channelization)fast dry paint6250015LF$0.2910Last 24 months336
24IN X 36IN white triang. yield bar (gaps exc)thermo-125MIL6271024LF$13.5051Last 24 months335
Barricade - type III6041200LF$25.0066Last 24 months333
Compost8101105CY$31.0641Last 24 months327
Premash W-beam compressed SHLDR 9' post8053001LF$30.0056Last 24 months323
Reflective sign post panels6531500LF$11.0052Last 24 months322
Excavation for shoulder paving2036000STA$60.00114Last 24 months322
Concrete median7206000SY$131.4641Last 24 months321
Permanent construction signs (barricade mounted)6051125SF$8.6262Last 24 months320
Non-mow strip under guardrail8055250SY$127.5036Last 24 months318
Cement modified recycled base (10" unif)-curing method B3063232SY$8.9051Last 24 months317
4' slope flume (6" curb style with cutoffs)7199200LF$255.0040Last 24 months317
White lane drop arrow(LT.or RT.)thermo-125MIL6271043EACH$150.0041Last 24 months314
Railroad crossing symbols - fast dry paint6250045EACH$62.508Last 24 months312
Temporary yellow pavement markers BI-dir.- 4"X4"6092155EACH$7.7842Last 24 months312
Cleaning existing pipe7149999LF$35.2540Last 24 months307
Asphalt intermediate course type C4030330TON$130.0063Last 24 months305
White combination arrow(STR.& RT.or STR.& LT.)fast dry paint6250040EACH$10.557Last 24 months302
Concrete curb and gutter(1'-6") vertical face7203110LF$40.2542Last 24 months296
Catch basin -type 167191605EACH$8,000.0038Last 24 months291
Asphalt intermediate course type B4030320TON$111.1280Last 24 months291
4" yellow solid lines(PVT.edge lines) thermo-90 mil.6271074LF$0.50108All lettings286
Low bidder's median unit price per pay item, South Carolina

Every other SCDOT pay item with a page

117 more pay items, by item code. Any item without a page is in the explorer above.

The SCDOT market in the last three months

Computed from the bids in the data for 13 JUL 2026 to 13 OCT 2026, against the same three months a year earlier. A contract is counted once, at its letting date.

Last three monthsSame months a year earlier
Contracts let5345
Letting dates32
Low bids, total$310,656,015$292,646,558
Median bidders per contract43
SCDOT lettings, 13 JUL 2026 to 13 OCT 2026 against 13 JUL 2025 to 13 OCT 2025

Pay items whose low-bid median moved most between the last six months and the twelve before (87 items had at least fifteen low bids in each window). Quantity mix and location move these medians as much as the market does.

Pay itemCodeUnitLast 6 months12 months beforeChangeLow bids
8"white solid lines (crosswalk& channelization)fast dry paint6240015LF$0.25$0.12+108%20 / 62
U-section post for sign supports - 3P6531210LF$17.82$12.25+45%19 / 50
Fine grading2081001SY$9.50$7.25+31%20 / 60
Right of way marker(rebar and cap)8091010EACH$208.97$162.50+29%20 / 60
Removal of silt retained by silt fence8154050LF$5.00$4.00+25%21 / 56
Construction stakes, lines & grades1050800EACH$17,612$29,000-39%34 / 92
Agricultural granular lime8105005LB$0.40$0.66-39%18 / 64
Asphalt surface course type E4040360TON$100.00$157.15-36%15 / 38
MTBBC3 MASH thrie-beam barrier connector TL38053253EACH$1,800.00$2,700.00-33%21 / 44
4" white broken lines(gaps excl.)thermoplastic- 90 mil.6271005LF$0.50$0.68-26%33 / 90
SCDOT pay items moving most, low bidder's median, last six months against the twelve before

Who bids on SCDOT work

SCDOT bidders with the most bids in the data

56 firms have a page with their full record: all SCDOT bidders.

Latest lettings

LetContractDistrictProjectBidsLow bidLow bidderSource
13 OCT 20260276070District 7I-20 5-23 MM Interstate Preservation2$29,980,495C.R. Jackson, Inc.SCDOT
13 OCT 20261075380District 6US 17 at Buck Hall Landing Road (Right Turn Lane)7$365,088Ben Cox, LLCSCDOT
13 OCT 20262378290District 3S-978 Tugaloo Road Bridge Replacement in Greenville8$1,298,681Reeves Construction CompanySCDOT
13 OCT 20262973031District 4Intersection Improvement - SC 5 at S-358 (Steel Hill Road)9$1,484,396Truerock Construction, LLCSCDOT
13 OCT 20264175571District 22026 Saluda CTC Resurfacing3$1,188,571Satterfield Construction Company, Inc.SCDOT
13 OCT 20264276560District 3I-585 0-2 MM Interstate Preservation4$5,778,616Palmetto Corp. of ConwaySCDOT
13 OCT 20264673600District 4Br Replacement S-46-832 over Branch of Catawba River8$2,073,442Kemp Sigmon Construction Co., Inc.SCDOT
13 OCT 20264676540District 4I-77 MM 75.86 - 82.5 MM Interstate Preservation2$24,356,034King Asphalt, Inc.SCDOT
13 OCT 20265376970District 32027 Greenville/Spartanburg Crack Seal6$618,678Remac Asphalt Maintenance, Inc.SCDOT
13 OCT 20265377380District 32027 Pickens/Oconee Crack Seal7$252,096Airfield & Pavement Maintenance, LLCSCDOT
13 OCT 20265578320District 5I-20 136-141 Interstate Preservation2$9,718,675Palmetto Corp. of ConwaySCDOT
13 OCT 20265676830District 62027 District 6 Crack Seal4$1,343,277Remac Asphalt Maintenance, Inc.SCDOT
Latest SCDOT contracts in the data

Every SCDOT letting since 2022, contract by contract: SCDOT letting results.

Where these numbers come from

SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.

YearContracts
2022224
2023171
2024240
2025239
2026163
SCDOT contracts in the data, by year of letting

Every state's coverage and check is on the bid results hub.

Other states: Alabama, Arkansas, California, Colorado, Florida, Illinois, Indiana, Iowa, Kentucky, Missouri, New Jersey, New York, North Carolina, Ohio, Oregon, Tennessee, Texas, Virginia, Washington, Wisconsin.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy