TDOT unit bid prices and bid tabulations
Unit prices bid on 1,257 Tennessee DOT contracts let from 09 FEB 2018 to 02 OCT 2026, read from TDOT's own tabulations. 209 pay items have enough recent bids for a page of their own; every item is in the explorer.
- Contracts
- 1,257
- Bids
- 3,169
- Unit prices
- 156,766
- Latest letting
- 02 OCT 2026
Price a TDOT pay item
Loading the bids.
Check my bid
Add the lines you are pricing, with your quantity and unit price. Each line is placed against what bidders carried in the last 24 months, at a similar quantity when enough bids exist. Your numbers stay in this browser.
Competitors
Who bids, how often they are low, how far off they are when they lose, and how much they leave on the table when they win.
Lettings
Open any contract to read the full tabulation: every line, every bidder.
Where the numbers come from
Each price is copied from a bid tabulation the owner published after the letting. Nothing is estimated or averaged before it reaches this page.
How each bid was checked
For every bidder, quantity times unit price was summed over all lines of the contract and compared with the total bid printed by the owner. A bid is published only when the two match to within one dollar. The states marked not checkable or third party are explained in the table.
Read the numbers like an estimator
- Item codes and measurement rules are each owner's. Prices are compared inside one state and never pooled across states.
- Unit price moves with quantity, location and season. Set your quantity and region before you trust a median.
- Some bidders price a line at a cent and load the cost elsewhere. Those token prices, and bids more than three times the low bid, are left out of statistics by default and stay visible in tabulations.
- The low bidder's price on one line is not always the lowest price on that line. Orange marks the bidder who was low on the whole contract.
- Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.
The TDOT pay items bid most often
| Pay item | Code | Unit | Low-bid median | Low bids | Window | Bids, all time |
|---|---|---|---|---|---|---|
| Signs (construction) | 712-06 | SF | $8.00 | 520 | Last 24 months | 2,270 |
| Flexible drums (channelizing) | 712-04.01 | EACH | $35.00 | 392 | Last 24 months | 1,797 |
| Plastic pavement marking (stop line) | 716-02.05 | LF | $18.00 | 434 | Last 24 months | 1,783 |
| Enhanced flatline thermo pvmt mrkng (6IN line) | 716-12.02 | LM | $7,500.00 | 408 | Last 24 months | 1,739 |
| Bituminous material for tack coat (tc) | 403-01 | TON | $967.40 | 314 | Last 24 months | 1,542 |
| Mineral aggregate, type a base, grading d | 303-01 | TON | $47.86 | 308 | Last 24 months | 1,369 |
| Removal of snowplowable reflective marker | 716-01.30 | EACH | $10.80 | 361 | Last 24 months | 1,328 |
| Snowplowable raised pavement markers (bi-dir) (1 color) | 716-01.21 | EACH | $41.20 | 361 | Last 24 months | 1,326 |
| Cold planing bituminous pavement | 415-01.01 | TON | $31.25 | 348 | Last 24 months | 1,278 |
| Arrow board (type c) | 712-08.03 | EACH | $1,200.00 | 289 | Last 24 months | 1,249 |
| Plastic pavement marking (turn lane arrow) | 716-02.06 | EACH | $211.57 | 294 | Last 24 months | 1,226 |
| Brooming & degrassing shoulders | 208-01.05 | LM | $1,350.00 | 372 | Last 24 months | 1,206 |
| Painted pavement marking (6" line) | 716-05.20 | LM | $1,425.00 | 331 | Last 24 months | 1,191 |
| Plastic pavement marking(channelization striping) | 716-02.04 | SY | $30.00 | 299 | Last 24 months | 1,185 |
| Changeable message sign unit | 713-16.01 | EACH | $5,900.00 | 260 | Last 24 months | 1,097 |
| Acs mix(PG64-22) grading d | 411-01.10 | TON | $167.50 | 198 | Last 24 months | 919 |
| Guardrail removed | 706-01 | LF | $3.00 | 215 | Last 24 months | 891 |
| Tangent energy absorbing term mash tl-3 | 705-06.20 | EACH | $3,553.50 | 193 | Last 24 months | 861 |
| Asphalt concrete mix (PG64-22) (bpmb-hm) grading b-M2 | 307-01.08 | TON | $158.00 | 191 | Last 24 months | 844 |
| Warning lights (type a) | 712-05.01 | EACH | $25.00 | 171 | Last 24 months | 843 |
| Snowplowable raised pavment markers (mono-dir)(1 color) | 716-01.22 | EACH | $41.00 | 212 | Last 24 months | 806 |
| Painted pavement marking (4" line) | 716-05.01 | LM | $1,200.00 | 143 | Last 24 months | 687 |
| Snowplowable raised pavement markers (bi-dir)(2 color) | 716-01.23 | EACH | $41.00 | 190 | Last 24 months | 686 |
| Acs mix(PG70-22) grading d | 411-02.10 | TON | $149.05 | 142 | Last 24 months | 662 |
| Sediment removal | 209-05 | CY | $33.00 | 125 | Last 24 months | 651 |
| Road & drainage excavation (unclassified) | 203-01 | CY | $33.94 | 127 | Last 24 months | 650 |
| Temporary barricades (type iii) | 712-07.03 | LF | $20.00 | 135 | Last 24 months | 644 |
| Water (seeding & sodding) | 801-03 | MG | $100.00 | 120 | Last 24 months | 638 |
| Geotextile (type iii)(erosion control) | 740-10.03 | SY | $5.00 | 123 | Last 24 months | 628 |
| Temporary silt fence (with backing) | 209-08.02 | LF | $6.00 | 109 | Last 24 months | 613 |
| Guardrail transition 27IN to 31IN | 705-02.10 | EACH | $150.00 | 160 | Last 24 months | 582 |
| Machined rip-rap (class a-3) | 709-05.05 | TON | $68.23 | 113 | Last 24 months | 576 |
| Water | 203-06 | MG | $33.25 | 116 | Last 24 months | 562 |
| Plastic pavement marking (8" dotted line) | 716-02.08 | LF | $3.12 | 140 | Last 24 months | 559 |
| High-visibility construction fence | 707-08.11 | LF | $3.25 | 100 | Last 24 months | 557 |
| Bituminous material for prime coat (pc) | 402-01 | TON | $1,167.50 | 108 | Last 24 months | 546 |
| Flat sheet aluminum signs (0.080" thick) | 713-13.02 | SF | $14.93 | 108 | Last 24 months | 545 |
| Enhanced flatline thermo pvmt mrkng (6IN dotted line) | 716-12.05 | LF | $2.10 | 137 | Last 24 months | 538 |
| Mineral aggregate (size 57) | 303-10.01 | TON | $65.00 | 106 | Last 24 months | 533 |
| Perforated/knockout square tube post | 713-11.02 | LB | $4.97 | 104 | Last 24 months | 533 |
| Flat sheet aluminum signs (0.100" thick) | 713-13.03 | SF | $15.88 | 102 | Last 24 months | 525 |
| Saw slot | 730-14.02 | LF | $6.00 | 127 | Last 24 months | 518 |
| Loop wire | 730-14.03 | LF | $1.08 | 127 | Last 24 months | 517 |
| Plastic pavement marking (yield line) | 716-04.12 | SF | $30.00 | 134 | Last 24 months | 516 |
| Scoring for rumble stripe (non-continuous) (8IN width) | 411-12.03 | LM | $796.00 | 114 | Last 24 months | 508 |
| Enhanced rock check dam | 209-08.08 | EACH | $1,028.00 | 100 | Last 24 months | 501 |
| Machined rip-rap (class a-1) | 709-05.06 | TON | $69.94 | 98 | Last 24 months | 500 |
| Cold planing bituminous pavement | 415-01.02 | SY | $21.30 | 85 | Last 24 months | 498 |
| Temporary work zone crash cushion (mash tl-3) | 712-02.60 | EACH | $8,195.04 | 99 | Last 24 months | 497 |
| W beam gr (type 2) mash tl-3 | 705-06.01 | LF | $32.00 | 117 | Last 24 months | 494 |
| Plastic pavement marking (8IN line) | 716-02.12 | LM | $11,380 | 135 | Last 24 months | 482 |
| Barrier rail delineator | 712-04.50 | EACH | $15.00 | 82 | Last 24 months | 475 |
| Plastic pavement marking (longitudinal cross-walk) | 716-02.09 | LF | $34.44 | 123 | Last 24 months | 473 |
| Aggregate for cover material (pc) | 402-02 | TON | $99.50 | 89 | Last 24 months | 468 |
| Scoring shoulders (continuous) (16IN width) | 411-12.01 | LM | $955.00 | 108 | Last 24 months | 450 |
| Sodding (new sod) | 803-01 | SY | $6.48 | 89 | Last 24 months | 449 |
| Interconnected portable barrier rail | 712-02.02 | LF | $50.00 | 56 | Last 24 months | 439 |
| Temporary seeding (with mulch) | 801-01.07 | UNIT | $50.00 | 91 | Last 24 months | 436 |
| Earth pad for type 38 gr end treatment | 705-04.09 | EACH | $1,400.00 | 86 | Last 24 months | 429 |
| Trackless tack coat | 403-02.01 | TON | $939.55 | 161 | Last 24 months | 429 |
| Scoring for rumble stripe (non-continuous) (4IN width) | 411-12.04 | LM | $917.27 | 104 | Last 24 months | 429 |
| Asphalt concrete mix (PG64-22) (bpmb-hm) grading a | 307-01.01 | TON | $162.00 | 88 | Last 24 months | 426 |
| Asphalt concrete mix (PG70-22) (bpmb-hm) grading b-M2 | 307-02.08 | TON | $135.00 | 83 | Last 24 months | 419 |
| Plastic pavement marking (transverse shoulder) | 716-04.04 | LF | $10.00 | 104 | Last 24 months | 418 |
| Scoring shoulders (non-continuous) (16IN width) | 411-12.02 | LM | $935.00 | 108 | Last 24 months | 415 |
| Plastic pavement marking (straight-turn arrow) | 716-04.01 | EACH | $300.00 | 99 | Last 24 months | 409 |
| Seeding (with mulch) | 801-01 | UNIT | $90.00 | 89 | Last 24 months | 401 |
| Placing and spreading topsoil | 203-04 | CY | $20.73 | 80 | Last 24 months | 391 |
| Geotextile (type iv)(stabilization) | 740-10.04 | SY | $5.00 | 79 | Last 24 months | 389 |
| Gr terminal (energy absorbing) mash tl-2 | 705-06.30 | EACH | $3,400.00 | 102 | Last 24 months | 389 |
| SPRAY THERMO PVMT MRKNG (60 mil) (6IN LINE) | 716-13.02 | LM | $3,786.00 | 89 | Last 24 months | 379 |
| Plastic pavement marking (straight arrow) | 716-04.05 | EACH | $200.00 | 94 | Last 24 months | 378 |
| Plastic pavement marking (lane reduction arrow) | 716-04.14 | EACH | $400.00 | 98 | Last 24 months | 375 |
| Plastic word pavement marking (only) | 716-03.01 | EACH | $278.62 | 88 | Last 24 months | 370 |
| Plastic pavement marking (24" barrier line) | 716-02.07 | LF | $12.00 | 96 | Last 24 months | 356 |
| "u" section steel posts | 713-11.01 | LB | $4.50 | 69 | Last 24 months | 354 |
| Acs mix (PG64-22) grading e shoulder | 411-01.07 | TON | $127.50 | 84 | Last 24 months | 353 |
| Sign post delineation enhancement | 713-02.21 | LF | $5.50 | 81 | Last 24 months | 352 |
| Remove sign, support & footing | 713-15.36 | EACH | $26.32 | 57 | Last 24 months | 347 |
| Machined rip-rap (class b) | 709-05.08 | TON | $64.27 | 63 | Last 24 months | 335 |
| Longitudinal joint sealant | 411-01.21 | LM | $2,900.00 | 124 | Last 24 months | 333 |
| Temporary silt fence (without backing) | 209-08.03 | LF | $2.75 | 55 | Last 24 months | 325 |
| Removal of asphalt pavement | 202-03.01 | SY | $20.00 | 90 | Last 24 months | 324 |
| Enhanced flatline thermo pvmt mrkng (8IN barrier line) | 716-12.03 | LF | $2.62 | 90 | Last 24 months | 322 |
| Type 1 thin epoxy overlay (epoxy-urethane) | 617-04.01 | SY | $42.50 | 91 | Last 24 months | 316 |
| Removable pavement marking (8" barrier line) | 712-09.02 | LF | $4.75 | 57 | Last 24 months | 305 |
| Class a concrete (pipe endwalls) | 611-07.01 | CY | $2,500.00 | 66 | Last 24 months | 305 |
| Steel bar reinforcement (pipe endwalls) | 611-07.02 | LB | $4.61 | 66 | Last 24 months | 303 |
| Warning lights (type c) | 712-05.03 | EACH | $15.88 | 91 | Last 24 months | 293 |
| Removal of pavement marking (line) | 716-08.20 | LM | $2,940.00 | 74 | Last 24 months | 292 |
| Furnishing & spreading topsoil | 203-07 | CY | $70.00 | 76 | Last 24 months | 290 |
| Queue protection truck | 712-08.12 | DAY | $1,299.67 | 86 | Last 24 months | 290 |
| Rock check dam | 209-08.07 | EACH | $833.00 | 66 | Last 24 months | 290 |
| Asphalt concrete mix (PG70-22) (bpmb-hm) grading a | 307-02.01 | TON | $147.00 | 57 | Last 24 months | 283 |
| 18" concrete pipe culvert (class iii) | 607-03.02 | LF | $126.88 | 57 | Last 24 months | 282 |
| Saw cutting asphalt pavement | 407-20.05 | LF | $7.75 | 64 | Last 24 months | 280 |
| Gr terminal (in-inline) mash tl-3 | 705-06.11 | EACH | $1,400.00 | 80 | Last 24 months | 277 |
| Plastic word pavement marking (stop ahead) | 716-03.03 | EACH | $700.00 | 58 | Last 24 months | 270 |
| Radius rail | 706-06.03 | LF | $42.00 | 66 | Last 24 months | 269 |
| Gr terminaltrailing end (type 13) mash tl-3 | 705-06.10 | EACH | $1,600.00 | 69 | Last 24 months | 264 |
| Painted pavement marking (stop line) | 716-05.05 | LF | $13.63 | 74 | Last 24 months | 263 |
| Acs mix(PG76-22) grading d | 411-03.10 | TON | $153.25 | 64 | Last 24 months | 262 |
| Removable pavement marking (stop line) | 712-09.04 | LF | $27.00 | 44 | Last 24 months | 261 |
| Asc mix (PG64-22) (bpmlc-hm) grading cs | 307-01.15 | TON | $145.35 | 74 | Last 24 months | 258 |
| Concrete combined curb & gutter | 702-03 | CY | $770.00 | 61 | Last 24 months | 256 |
| Borrow excavation (unclassified) | 203-03 | CY | $34.50 | 52 | Last 24 months | 250 |
| Epoxy coated reinforcing steel | 604-02.03 | LB | $1.84 | 48 | Last 24 months | 249 |
| 18" pipe culvert (side drain) | 607-39.02 | LF | $98.00 | 39 | Last 24 months | 247 |
| Markers (concrete r.o.w. posts) | 708-02.01 | EACH | $400.00 | 45 | Last 24 months | 245 |
| Bridge deck repairs (partial depth of slab) | 604-10.50 | SY | $750.00 | 47 | Last 24 months | 243 |
| P post slip base | 713-11.21 | EACH | $540.15 | 48 | Last 24 months | 241 |
| Class a concrete (bridges) | 604-03.01 | CY | $1,290.00 | 41 | Last 24 months | 239 |
| Removal of pavement marking (line) | 716-08.01 | LF | $1.00 | 58 | Last 24 months | 239 |
| Flexible delineator (white) | 713-02.14 | EACH | $50.53 | 53 | Last 24 months | 238 |
| SPRAY THERMO PVMT MRKNG (60 mil) (4IN LINE) | 716-13.01 | LM | $1,800.00 | 26 | Last 24 months | 237 |
| Expansion joint repairs | 604-10.44 | LF | $300.00 | 62 | Last 24 months | 236 |
| Granular backfill (bridges) | 303-01.02 | TON | $75.00 | 46 | Last 24 months | 236 |
| Seeding (without mulch) | 801-02 | UNIT | $50.00 | 54 | Last 24 months | 233 |
| Mowing | 806-01 | ACRE | $74.00 | 43 | Last 24 months | 231 |
| Plastic pavement marking (cross-walk) | 716-02.03 | LF | $13.67 | 50 | Last 24 months | 231 |
| Borrow excavation (graded solid rock) | 203-02.01 | TON | $50.00 | 45 | Last 24 months | 228 |
| Thrie beam bridge transition mash tl-3 | 705-06.25 | EACH | $3,100.00 | 45 | Last 24 months | 227 |
| 6" perforated pipe with vertical drain system | 710-09.01 | LF | $50.45 | 43 | Last 24 months | 226 |
| Sandbags | 209-09.01 | BAG | $8.81 | 48 | Last 24 months | 225 |
| Earth pad for guard rail end treatment | 705-04.10 | EACH | $1,500.00 | 52 | Last 24 months | 221 |
| Concrete curb ramp (retrofit) | 701-02.01 | SF | $45.00 | 51 | Last 24 months | 221 |
| Removal of pavement marking (stop line) | 716-08.05 | LF | $10.00 | 53 | Last 24 months | 221 |
| Pavement @ bridge ends | 604-03.04 | SY | $437.64 | 40 | Last 24 months | 219 |
| 6" pipe underdrain | 710-09.02 | LF | $24.44 | 43 | Last 24 months | 218 |
| Sediment filter bag (15' x 15') | 209-09.03 | EACH | $917.50 | 44 | Last 24 months | 217 |
| Concrete | 604-10.05 | SF | $496.79 | 18 | Last 24 months | 217 |
| Applied texture finish (new structures) | 604-04.01 | SY | $16.00 | 44 | Last 24 months | 215 |
| Signal cable - 7 conductor | 730-08.03 | LF | $3.12 | 40 | Last 24 months | 214 |
| Conduit 2" diameter (pvc schedule 40) | 730-12.02 | LF | $23.16 | 49 | Last 24 months | 214 |
| Acs mix(PG64-22) thin lift d asphalt | 411-03.12 | TON | $135.12 | 60 | Last 24 months | 214 |
| Concrete repairs | 604-10.54 | SF | $479.81 | 17 | Last 24 months | 212 |
| Concrete sidewalk (4 ") | 701-01.01 | SF | $15.21 | 54 | Last 24 months | 212 |
| Dry excavation (bridges) | 204-02.01 | CY | $35.00 | 44 | Last 24 months | 210 |
| Signal head assembly (130 with backplate) | 730-02.09 | EACH | $1,510.00 | 37 | Last 24 months | 210 |
| Temporary in stream diversion | 209-65.04 | LF | $90.00 | 41 | Last 24 months | 209 |
| 18" temporary drainage pipe | 621-03.02 | LF | $61.50 | 36 | Last 24 months | 208 |
| Steel bar reinforcement (bridges) | 604-03.02 | LB | $1.67 | 40 | Last 24 months | 208 |
| Granular backfill (roadway) | 303-01.01 | TON | $59.72 | 38 | Last 24 months | 207 |
| Portable barrier rail (mash tl-3) | 712-02.10 | LF | $60.00 | 51 | Last 24 months | 206 |
| Speed feedback sign assembly | 712-08.08 | EACH | $4,889.00 | 59 | Last 24 months | 205 |
| Concrete curb | 702-01 | CY | $1,029.62 | 52 | Last 24 months | 203 |
| Temporary sediment tube 12IN | 740-11.02 | LF | $5.55 | 40 | Last 24 months | 201 |
| Digital speed limit sign assembly | 712-08.09 | EACH | $5,022.00 | 60 | Last 24 months | 201 |
| Erosion control blanket (type ii) | 805-12.02 | SY | $1.96 | 42 | Last 24 months | 199 |
| Backfill material (flowable fill) | 204-08.01 | CY | $443.59 | 34 | Last 24 months | 199 |
59 more items have a page; search any item in the explorer above.
Latest lettings
| Let | Contract | County | Project | Bids | Low bid | Source |
|---|---|---|---|---|---|---|
| 02 OCT 2026 | CN261076 | Anderson County | The construction of a turn lane on s.r. 61 at the intersection of sinking springs road/lewallen hollow road (l.m. 17.55) in clinton, includi | 4 | $348,000 | TDOT |
| 02 OCT 2026 | CN261066 | Counties Anderson, Blount, Campbell, Carter, Claiborne, Cocke, Grainger, Greene, Hamblen, Hancock, Hawkins, Jefferson, Johnson, Knox, Loudon, Monroe, Morgan, Roane, Scott, Sevier, Sullivan, Unicoi, Union, And Washington | The random on-call asphalt pothole patching on various interstate and state routes | 1 | $1,223,250 | TDOT |
| 02 OCT 2026 | CN263064 | Bedford County | The construction of a concrete box bridge on old highway 64 over stokes branch (l.m. 0.11), including grading, drainage, and paving | 6 | $999,269 | TDOT |
| 02 OCT 2026 | CN263062 | Counties Bedford, Cheatham, Davidson, Dickson, Giles, Hickman, Houston, Humphreys, Lawrence, Lewis, Lincoln, Macon, Marshall, Maury, Montgomery, Moore, Perry, Robertson, Rutherford, Smith, Stewart, Sumner, Trousdale, Wayne, Williamson, And Wilson | The random on-call asphalt pothole patching on various interstate and state routes | 2 | $852,000 | TDOT |
| 02 OCT 2026 | CN264056 | Counties Benton, Carroll, Chester, Crockett, Decatur, Dyer, Fayette, Gibson, Hardeman, Hardin, Haywood, Henderson, Henry, Lake, Lauderdale, Madison, Mcnairy, Obion, Shelby, Tipton, And Weakley | The random on-call asphalt pothole patching on various interstate and state routes | 1 | $1,079,800 | TDOT |
| 02 OCT 2026 | CN264058 | Counties Benton, Gibson, Obion, And Weakley | F3-008,crp-9408(14),92svar-f3-001 the traffic signal modernization improvements at various intersections along various u.s. and state routes | 3 | $320,227 | TDOT |
| 02 OCT 2026 | CN262063 | Counties Bledsoe, Bradley, Cannon, Clay, Coffee, Cumberland, Dekalb, Fentress, Franklin, Grundy, Hamilton, Jackson, Marion, Mcminn, Meigs, Overton, Pickett, Polk, Putnam, Rhea, Sequatchie, Van Buren, Warren, And White | R2bvar-m3-070 the random on-call asphalt pothole patching on various interstate and state routes | 2 | $918,350 | TDOT |
| 02 OCT 2026 | CN262064 | Bradley County | The installation of signals on u.s. 11 (s.r. 2) at the intersection of 17th street northwest (l.m. 9.93) in cleveland | 2 | $83,100 | TDOT |
| 02 OCT 2026 | CN261065 | Campbell And Morgan Counties | The miscellaneous safety improvements on various local roads in campbell county, and on s.r. 62 in morgan county from petit lane (l.m. 24.99 | 4 | $441,843 | TDOT |
| 02 OCT 2026 | CN261070 | Carter County | The bridge rehabilitation on u.s. 19e (s.r. 37) under the bridges over laurel fork creek (l.m. 16.96), including slope repair near l.m. 17.1 | 3 | $1,996,731 | TDOT |
| 02 OCT 2026 | CN261067 | Carter County | The slope stabilization on s.r. 143 near l.m. 9.8 | 4 | $996,878 | TDOT |
| 02 OCT 2026 | CN261074 | Claiborne County | The construction of a concrete box beam bridge on s.r. 33 over south fork sycamore creek (l.m. 20.56), including grading, drainage, and pavi | 5 | $2,643,606 | TDOT |
Where these numbers come from
TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
| Year | Contracts |
|---|---|
| 2018 | 133 |
| 2019 | 35 |
| 2020 | 96 |
| 2022 | 3 |
| 2023 | 70 |
| 2024 | 320 |
| 2025 | 345 |
| 2026 | 255 |