Data through 10 NOV 2026, the latest WisDOT letting read. Compiled by Mirage Metrics.

Price a WisDOT pay item

Pay items bid most often in Wisconsin

Pay itemCodeUnitLow-bid medianLow bids
Mobilization619.1000EACH$132,813696
Traffic control signs643.0900DAY$0.38689
Traffic control643.5000EACH$9,525.00689
Traffic control barricades type III643.0420DAY$0.60644
Traffic control warning lights type A643.0705DAY$0.12620
Sawing asphalt690.0150LF$1.98617
Base aggregate dense 1 1/4-inch305.0120TON$21.80596
Excavation common205.0100CY$18.00592
Tack coat455.0605GAL$3.71595
Mobilizations erosion control628.1905EACH$200.00589
Silt fence maintenance628.1520LF$0.01588
Silt fence628.1504LF$2.25590

Check my bid

Add the lines you are pricing, with your quantity and unit price. Each line is placed against what bidders carried in the last 24 months, at a similar quantity when enough bids exist. Your numbers stay in this browser.

Columns: item code, quantity, unit price, with or without a header row.

Competitors

Who bids, how often they are low, how far off they are when they lose, and how much they leave on the table when they win.

Sort by: most bids counts every bid a firm submitted; most low bids counts the contracts where it was the low bidder; win rate is low bids divided by bids, for firms with five bids or more; low bid volume adds up its low bids in dollars. Gap when not low is the average distance from its total to the low bid; left on table is the average distance from its low bid to the second bid.

138 firms in Wisconsin, the 50 with the most bids shown.

BidderBidsLow bidsWin rateGap when not lowLeft on tableLow bid volume
Lunda Construction Company4745612%+16%+8.0%$130.2M
Sheet Piling Services LLC3116120%+14%+7.0%$87.9M
Zenith Tech., Inc. - Waukesha2927225%+19%+12%$345.9M
Zignego Company, Inc.2454016%+16%+6.0%$697.0M
James Peterson Sons, Inc.1992814%+13%+3.0%$147.9M
Radtke Contractors Inc.1995829%+12%+6.0%$33.7M
Northeast Asphalt, Inc18812365%+9.0%+9.0%$589.7M
Larson Construction Co., Inc.1789352%+9.0%+8.0%$61.7M
Rock Road Companies, Inc.1695533%+10%+8.0%$292.6M
Payne and Dolan, Inc1588956%+9.0%+9.0%$345.1M
Vinton Construction Company1585635%+9.0%+6.0%$419.5M
Janke General Contractors, Inc.1441813%+22%+12%$15.1M
Michels Road & Stone, Inc.1392216%+11%+5.0%$334.6M
Lalonde Contractors Incorporated1193227%+12%+5.0%$161.9M
Hoffman Construction Company1051918%+12%+3.0%$519.3M
Pheifer Brothers Construction Co., Inc.1032726%+12%+5.0%$23.0M
Stark Pavement Corporation1031616%+12%+3.0%$55.3M
Integrity Grading and Excavating, Inc.981010%+16%+7.0%$135.9M
Musson Bros., Inc.962627%+10%+4.0%$178.4M
American Asphalt of Wisconsin867486%+5.0%+10%$251.8M
Concrete Structures, Inc.803443%+9.0%+8.0%$23.5M
A-1 Excavating LLC751520%+18%+5.0%$67.6M
A.W. Oakes & Son, Inc.741622%+14%+4.0%$139.1M
Haas Sons, Inc.742128%+13%+6.0%$49.4M
R.G. Huston Company, Inc.561221%+17%+12%$86.7M
Gerke Excavating Inc561629%+10%+7.0%$36.6M
Monarch Paving Company555091%+6.0%+9.0%$239.3M
McCabe Construction, Inc.511020%+7.0%+5.0%$13.7M
Parisi Construction, LLC491122%+13%+8.0%$15.9M
Chippewa Concrete Services, Inc.482756%+7.0%+7.0%$133.9M
Kraemer North America, LLC4337%+17%+3.0%$142.7M
Highway Landscapers, Inc.391128%+42%+12%$9.1M
Pember Companies, Inc.37514%+15%+5.0%$2.9M
Pitlik & Wick, Inc.361028%+15%+7.0%$28.9M
Mashuda Contractors, Inc.351234%+7.0%+4.0%$110.0M
Norcon Corporation33927%+26%+17%$9.1M
Iverson Construction, A Div. of Mathy Co322991%+4.0%+8.0%$111.3M
Mathy Construction Company3030100%+4.0%$204.3M
Peters Concrete Company28829%+8.0%+4.0%$28.6M
Relyco Plus, LLC281243%+7.0%+3.0%$21.9M
D L Gasser Construction272593%+6.0%+8.0%$107.6M
Century Fence Company261558%+25%+20%$16.2M
Granite Construction Company2514%+23%+9.0%$802K
Super Western, Inc.25416%+11%+10%$18.7M
Mega Rentals, Inc.23522%+47%+26%$6.0M
Earth, Inc.21314%+12%+22%$9.8M
Fahrner Asphalt Sealers, LLC191053%+13%+18%$8.8M
MCC, Inc.19842%+10%+11%$17.4M
H. James & Sons, Inc16744%+10%+10%$33.8M
Mattison Contractors, Inc.161169%+20%+10%$21.4M

Lettings

Open any contract to read the full tabulation: every line, every bidder.

Latest WisDOT contracts in the data.

Monroe - Brodhead; CTH S Intersection (STH 011, Green County Monroe - Broadhead)10 Nov 202620261110002Green4 bidslow $2,661,820Rock Road Companies, Inc.Monroe - Brodhead; E Jct STH 81 Intersection (STH 011, Green County Monroe - Brodhead)10 Nov 202620261110003Green4 bidslow $2,821,533Rock Road Companies, Inc.Town of Bradford, O Riley Road; Turtle Creek Bridge B-53-0390 (LOC STR, Rock County Town of Bradford, O'Riley Rd)10 Nov 202620261110004Rock6 bidslow $2,103,060Concrete Structures, Inc.Regionwide Tree Clearing; Various Locations (VAR HWY, Southwest Region Wide Regionwide Tree Clearing)10 Nov 202620261110005Southwest Region Wide3 bidslow $28,389Interstate Tree Landscaping5629-00-7610 Nov 202620261110006Grant6 bidslow $909,889Radtke Contractors Inc.Edmund - Mineral Point; Mineral Point Branch Br B-25-198 (STH 039, Iowa County Edmund - Mineral Point)10 Nov 202620261110009Iowa4 bidslow $2,256,362Lunda Construction CompanyC Madison, Mineral Point Road; USH 12 to High Point Road (LOC STR, Dane County C Madison, Mineral Point Road)10 Nov 202620261110011Dane4 bidslow $3,526,335Rock Road Companies, Inc.City of Middleton, CTH M; Pheasant Br Creek Bridge B-13-0905 (CTH M, Dane County City of Middleton, CTH M)10 Nov 202620261110012Dane7 bidslow $3,706,000R.G. Huston Company, Inc.V Deforest, North Towne Road; Vinburn Road Intersection (LOC STR, Dane County Village of Deforest, N Towne Road)10 Nov 202620261110013Dane2 bidslow $980,415Rock Road Companies, Inc.C Milwaukee, W National Ave; 27th St to 1st St (STH 059, Milwaukee County C Milwaukee, W National Ave)10 Nov 202620261110014Milwaukee3 bidslow $26,868,079Lalonde Contractors IncorporatedMilwaukee - Mequon; 0.1 Mi S of Fairlane to Teutonia (STH 057, Milwaukee County Milwaukee - Mequon)10 Nov 202620261110015Milwaukee5 bidslow $3,862,192Payne and Dolan, Inc3170-09-7010 Nov 202620261110017Walworth5 bidslow $18,813,968James Peterson Sons, Inc.

Sources and checks

Each price is copied from a bid tabulation the owner published after the letting. Nothing is estimated or averaged before it reaches this page.

OwnerLettingsContractsBidsPricesCheckHow it was read
Texas DOT9 Jan 2020 to 19 Nov 20268,90937,8241,860,794ReconciledTxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Ohio DOT23 Jan 2020 to 12 Nov 20264,40815,8161,093,243ReconciledODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Illinois DOT15 Jan 2021 to 18 Sep 20265,49416,087932,368ReconciledIDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Florida DOT31 Jan 2018 to 28 Oct 20261,7387,302814,861ReconciledFDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
North Carolina DOT15 Jan 2013 to 20 Oct 20261,6596,770767,334ReconciledNCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Virginia DOT29 Jan 2002 to 28 Oct 20267,62818,240674,864ReconciledVDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Wisconsin DOT11 Jan 2022 to 10 Nov 20261,5985,095608,530ReconciledWisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Indiana DOT12 Jan 2022 to 5 Nov 20262,0827,109552,581ReconciledINDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Washington State DOT29 Dec 1999 to 7 Oct 20261,3175,732365,366ReconciledWSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
New York State DOT6 Jan 2022 to 15 Oct 20261,0803,894344,856ReconciledNYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Kentucky Transportation Cabinet22 Nov 2019 to 22 Oct 20264,4149,448336,278ReconciledKYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
New Jersey DOT22 Jun 2017 to 16 Apr 20269343,363314,765ReconciledNJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
Missouri DOT17 Jan 2020 to 16 Oct 20261,8965,865293,103ReconciledMoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
South Carolina DOT11 Jan 2022 to 13 Oct 20261,0373,257175,917ReconciledSCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Tennessee DOT9 Feb 2018 to 2 Oct 20261,2573,169156,766ReconciledTDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Alabama DOT28 Jan 2022 to 28 Aug 20269932,677153,448ReconciledALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Oregon DOT7 Jan 2021 to 13 Aug 20263941,571131,407Not checkableODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Arkansas DOT12 Jan 2022 to 4 Nov 20261,1182,57880,673ReconciledARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Colorado DOT17 May 2023 to 10 Sep 202614547239,455ReconciledCDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.
Iowa DOT19 Jan 2022 to 20 Oct 202611241512,634ReconciledIowa DOT bid tabulation PDFs: the letting of 19 January 2022 (read from the Internet Archive's copy of Iowa DOT's file) and lettings of August to October 2026. On A+B contracts the item total is kept and the time part dropped. Bids that did not match their published total are left out.
Caltrans25 Apr 2023 to 9 May 202333954,418ReconciledCaltrans bid summary PDFs; scanned pages read by OCR. Bids that did not match their published total are left out.

How each bid was checked

For every bidder, quantity times unit price was summed over all lines of the contract and compared with the total bid printed by the owner. A bid is published only when the two match to within one dollar. The states marked not checkable or third party are explained in the table.

Read the numbers like an estimator

  • Item codes and measurement rules are each owner's. Prices are compared inside one state and never pooled across states.
  • Unit price moves with quantity, location and season. Set your quantity and region before you trust a median.
  • Some bidders price a line at a cent and load the cost elsewhere. Those token prices, and bids more than three times the low bid, are left out of statistics by default and stay visible in tabulations.
  • The low bidder's price on one line is not always the lowest price on that line. Orange marks the bidder who was low on the whole contract.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

The WisDOT pay items bid most often

Pay itemCodeUnitLow-bid medianLow bidsWindowBids, all time
Mobilization619.1000EACH$132,813696Last 24 months5,019
Traffic control signs643.0900DAY$0.38689Last 24 months4,917
Traffic control643.5000EACH$9,525.00689Last 24 months4,904
Traffic control barricades type III643.0420DAY$0.60644Last 24 months4,691
Traffic control warning lights type A643.0705DAY$0.12620Last 24 months4,520
Sawing asphalt690.0150LF$1.98617Last 24 months4,366
Base aggregate dense 1 1/4-inch305.0120TON$21.80596Last 24 months4,311
Excavation common205.0100CY$18.00592Last 24 months4,307
Tack coat455.0605GAL$3.71595Last 24 months4,266
Mobilizations erosion control628.1905EACH$200.00589Last 24 months4,242
Silt fence maintenance628.1520LF$0.01588Last 24 months4,218
Silt fence628.1504LF$2.25590Last 24 months4,213
Base aggregate dense 3/4-inch305.0110TON$30.13579Last 24 months4,090
Mobilizations emergency erosion control628.1910EACH$150.00538Last 24 months3,943
Fertilizer type B629.0210CWT$102.20543Last 24 months3,937
On-the-job training graduate at $5.00/HRASP.1T0GHRS$5.00532Last 24 months3,882
On-the-job training apprentice at $5.00/HRASP.1T0AHRS$5.00529Last 24 months3,869
Seed water630.0500MGAL$10.00500Last 24 months3,663
Removing small sign supports638.3000EACH$30.00451Last 24 months3,471
Construction staking subgrade650.4500LF$0.01421Last 24 months3,414
Construction staking slope stakes650.9920LF$1.00430Last 24 months3,369
Traffic control drums643.0300DAY$0.25497Last 24 months3,367
Removing signs type II638.2602EACH$30.00423Last 24 months3,350
Geotextile type HR645.0120SY$5.00443Last 24 months3,345
Water624.0100MGAL$45.00448Last 24 months3,259
Signs type II reflective F637.2230SF$25.48388Last 24 months3,081
Field office type B642.5001EACH$7,000.00439Last 24 months2,984
Traffic control signs PCMS643.1050DAY$45.00406Last 24 months2,810
Asphaltic surface465.0105TON$150.00428Last 24 months2,794
Seeding temporary630.0200LB$4.52376Last 24 months2,778
Sawing concrete690.0250LF$2.55385Last 24 months2,609
Topsoil625.0100SY$6.00386Last 24 months2,570
Moving signs type II638.2102EACH$115.00350Last 24 months2,509
Incentive density HMA pavement460.2000DOL$1.00335Last 24 months2,486
Construction staking base650.5000LF$1.00299Last 24 months2,475
Bar steel reinforcement HS coated structures505.0600LB$1.50296Last 24 months2,432
Temporary ditch checks628.7504LF$8.50352Last 24 months2,417
Construction staking curb gutter and curb & gutter650.5500LF$1.50353Last 24 months2,382
Removing curb & gutter204.0150LF$8.00356Last 24 months2,371
Erosion mat urban class I type B628.2008SY$2.00331Last 24 months2,343
Traffic control covering signs type II643.0920EACH$50.00326Last 24 months2,304
Marking line epoxy 4-inch646.1020LF$0.98186Last 24 months2,301
Grubbing201.0205STA$449.00295Last 24 months2,285
Geotextile type DF schedule A645.0111SY$5.00270Last 24 months2,283
Rubberized membrane waterproofing516.0500SY$45.00270Last 24 months2,275
Incentive strength concrete structures715.0502DOL$1.00275Last 24 months2,270
Signs type II reflective H637.2210SF$23.00296Last 24 months2,241
Culvert pipe checks628.7555EACH$20.00337Last 24 months2,238
Riprap heavy606.0300CY$83.78284Last 24 months2,221
Traffic control warning lights type C643.0715DAY$0.14319Last 24 months2,177
Protective surface treatment502.3200SY$4.00272Last 24 months2,143
Pipe underdrain wrapped 6-inch612.0406LF$8.00249Last 24 months2,112
MGS guardrail terminal eat614.2610EACH$3,725.00294Last 24 months2,090
Salvaged topsoil625.0500SY$3.00252Last 24 months2,084
Removing guardrail204.0165LF$3.00308Last 24 months2,066
Marking stop line epoxy 18-inch646.6120LF$16.00309Last 24 months2,065
Mulching627.0200SY$0.50248Last 24 months2,060
Removing concrete pavement204.0100SY$10.00282Last 24 months2,055
Concrete masonry bridges502.0100CY$820.00251Last 24 months2,044
Incentive iri ride740.0440DOL$1.00328Last 24 months2,032
Bar steel reinforcement HS structures505.0400LB$1.35244Last 24 months2,030
Inlet protection type C628.7015EACH$69.00301Last 24 months2,020
Backfill structure type A210.1500TON$26.75243Last 24 months1,964
Asphaltic surface driveways and field entrances465.0120TON$195.00293Last 24 months1,906
Construction staking storm sewer650.4000EACH$130.00248Last 24 months1,860
Removing small pipe culverts203.0100EACH$510.97274Last 24 months1,852
Riprap medium606.0200CY$118.65274Last 24 months1,850
MGS guardrail 3614.2300LF$28.00263Last 24 months1,825
Seeding mixture no. 20630.0120LB$8.92246Last 24 months1,794
Removing asphaltic surface204.0110SY$7.50283Last 24 months1,765
Marking arrow epoxy646.5020EACH$280.00239Last 24 months1,747
Removing concrete sidewalk204.0155SY$10.04263Last 24 months1,723
Removing asphaltic surface milling204.0120SY$3.03305Last 24 months1,694
Inlet protection type A628.7005EACH$106.00228Last 24 months1,691
Markers culvert end633.5200EACH$70.00240Last 24 months1,655
MGS thrie beam transition614.2500LF$92.00232Last 24 months1,644
Construction staking pipe culverts650.6000EACH$189.07235Last 24 months1,595
Traffic control signs fixed message643.1000SF$16.00239Last 24 months1,535
Seeding mixture no. 30630.0130LB$9.00212Last 24 months1,526
Removing asphaltic surface butt joints204.0115SY$12.47270Last 24 months1,515
Rock bags628.7570EACH$14.05208Last 24 months1,514
Clearing201.0105STA$750.00177Last 24 months1,503
Construction staking curb ramps650.9000EACH$175.00235Last 24 months1,497
Construction staking resurfacing reference650.8000LF$0.13275Last 24 months1,473
Posts wood 4X6-inch X 14-FT634.0614EACH$95.00174Last 24 months1,463
Incentive compressive strength concrete pavement715.0720DOL$1.00176Last 24 months1,461
Drilled tie bars416.0610EACH$11.95218Last 24 months1,448
Marking diagonal epoxy 12-inch646.7120LF$12.13213Last 24 months1,443
Concrete curb & gutter 30-inch type D601.0411LF$41.59211Last 24 months1,443
Turbidity barriers628.6005SY$45.00173Last 24 months1,429
Removing inlets204.0220EACH$494.72193Last 24 months1,405
Marking crosswalk epoxy transverse line 6-inch646.7420LF$13.25199Last 24 months1,390
Borrow208.0100CY$20.00196Last 24 months1,377
Temporary pedestrian barricade644.1810LF$5.00229Last 24 months1,366
Marking word epoxy646.5120EACH$345.38184Last 24 months1,352
Seeding mixture no. 40630.0140LB$13.75205Last 24 months1,347
Conduit rigid nonmetallic schedule 40 2-inch652.0225LF$10.00171Last 24 months1,326
Asphaltic flumes465.0315SY$65.93168Last 24 months1,307
Concrete collars for pipe520.8000EACH$844.00192Last 24 months1,288
Marking line epoxy 6-inch646.2020LF$0.85242Last 24 months1,274
Marking island nose epoxy646.8220EACH$301.74183Last 24 months1,249
Marking removal line 4-inch646.9000LF$0.75154Last 24 months1,242
Posts wood 4X6-inch X 16-FT634.0616EACH$99.28146Last 24 months1,237
Marking curb epoxy646.8120LF$8.25182Last 24 months1,212
Marking line grooved wet ref epoxy 6-inch646.2040LF$1.31299Last 24 months1,203
Concrete median sloped nose620.0300SF$15.00162Last 24 months1,178
Inlet protection type B628.7010EACH$62.00160Last 24 months1,176
Inlet protection type D628.7020EACH$125.00142Last 24 months1,170
Concrete curb pedestrian601.0600LF$50.42190Last 24 months1,150
HMA pavement 4 MT 58-28 S460.6224TON$85.81147Last 24 months1,141
Concrete sidewalk 5-inch602.0410SF$8.91159Last 24 months1,132
Drilled dowel bars416.0620EACH$16.88156Last 24 months1,129
Posts wood 4X6-inch X 18-FT634.0618EACH$105.00121Last 24 months1,108
Pigmented surface sealer502.3210SY$9.00143Last 24 months1,105
Inlet covers type H611.0624EACH$1,050.00145Last 24 months1,099
Temporary pedestrian curb ramp644.1601DAY$10.45176Last 24 months1,082
Field office type C642.5201EACH$10,500139Last 24 months1,080
Construction staking concrete pavement650.7000LF$2.15121Last 24 months1,073
Curb ramp detectable warning field yellow602.0505SF$50.00172Last 24 months1,071
Piling steel HP 10-inch X 42 LB550.1100LF$48.88110Last 24 months1,057
Marking line epoxy 8-inch646.3020LF$1.4286Last 24 months1,052
Inlets 2X3-FT611.3230EACH$2,413.00149Last 24 months1,050
Conduit rigid nonmetallic schedule 40 3-inch652.0235LF$12.00129Last 24 months1,033
HMA pavement 4 LT 58-28 S460.5224TON$85.05157Last 24 months1,024
Concrete sidewalk 4-inch602.0405SF$7.53160Last 24 months1,021
Select crushed material312.0110TON$19.16123Last 24 months1,017
HMA pavement 3 MT 58-28 S460.6223TON$83.30122Last 24 months1,016
Posts wood 4X6-inch X 12-FT634.0612EACH$91.50120Last 24 months1,008
Concrete pavement approach slab415.0410SY$275.61128Last 24 months1,004
Adjusting inlet covers611.8115EACH$671.79161Last 24 months983
Removing concrete bases204.0195EACH$346.82129Last 24 months983
Apron endwalls for culvert pipe reinforced concrete 24-inch522.1024EACH$1,650.00142Last 24 months979
Manholes 4-FT diameter611.2004EACH$3,545.46129Last 24 months975
Moving small sign supports638.4000EACH$100.00159Last 24 months974
Storm sewer pipe reinforced concrete class IV 12-inch608.0412LF$89.00131Last 24 months974
Inlets 4-FT diameter611.3004EACH$3,070.00127Last 24 months965
Traffic control arrow boards643.0800DAY$10.2580Last 24 months964
Electrical wire lighting 12 AWG655.0610LF$1.00125Last 24 months964
Tracking pads628.7560EACH$1,000.0087Last 24 months956
Adjusting manhole covers611.8110EACH$780.00147Last 24 months938
Erosion mat class I type B628.2004SY$1.18119Last 24 months938
Asphaltic surface temporary465.0125TON$130.00123Last 24 months937
Transformer bases breakaway 11 1/2-inch bolt circle657.0255EACH$675.00117Last 24 months923
Manholes 5-FT diameter611.2005EACH$5,105.00107Last 24 months920
Manhole covers type J611.0530EACH$786.00120Last 24 months910
Temporary pedestrian detectable warning field644.1605SF$9.96168Last 24 months894
Railing tubular type M513.4061LF$300.00113Last 24 months890
Removing fence204.0170LF$3.55117Last 24 months886
HMA cold weather paving450.4000TON$3.40112Last 24 months855
Concrete curb & gutter 30-inch type A601.0409LF$44.48124Last 24 months832
Low bidder's median unit price per pay item, Wisconsin

Every other WisDOT pay item with a page

417 more pay items, by item code. Any item without a page is in the explorer above.

The WisDOT market in the last three months

Computed from the bids in the data for 10 AUG 2026 to 10 NOV 2026, against the same three months a year earlier. A contract is counted once, at its letting date.

Last three monthsSame months a year earlier
Contracts let10371
Letting dates43
Low bids, total$643,327,245$435,183,671
Median bidders per contract34
WisDOT lettings, 10 AUG 2026 to 10 NOV 2026 against 10 AUG 2025 to 10 NOV 2025

Pay items whose low-bid median moved most between the last six months and the twelve before (220 items had at least fifteen low bids in each window). Quantity mix and location move these medians as much as the market does.

Pay itemCodeUnitLast 6 months12 months beforeChangeLow bids
Mobilizations emergency erosion control628.1910EACH$200.00$110.00+82%101 / 255
Traffic control643.5000EACH$15,598$10,040+55%128 / 323
Mobilization619.1000EACH$189,907$123,798+53%129 / 325
Construction staking concrete pavement650.7000LF$3.25$2.25+44%22 / 57
Concrete curb & gutter 6-inch sloped 36-inch type D601.0557LF$61.59$43.27+42%27 / 48
Seed water630.0500MGAL$5.00$10.00-50%90 / 235
Traffic control flexible tubular marker bases643.0600EACH$6.00$11.50-48%19 / 30
Grubbing201.0220ID$19.00$32.50-42%18 / 48
Installing and maintaining climbing turtle exclusion fence999.2100.SLF$3.26$5.00-35%18 / 19
Marking line epoxy 4-inch646.1020LF$0.66$1.00-34%28 / 76
WisDOT pay items moving most, low bidder's median, last six months against the twelve before

Who bids on WisDOT work

WisDOT bidders with the most bids in the data

59 firms have a page with their full record: all WisDOT bidders.

Latest lettings

LetContractCountyProjectBidsLow bidLow bidderSource
10 NOV 202620261110002GreenMonroe - Brodhead; CTH S Intersection (STH 011, Green County Monroe - Broadhead)4$2,661,820Rock Road Companies, Inc.WisDOT
10 NOV 202620261110003GreenMonroe - Brodhead; E Jct STH 81 Intersection (STH 011, Green County Monroe - Brodhead)4$2,821,533Rock Road Companies, Inc.WisDOT
10 NOV 202620261110004RockTown of Bradford, O Riley Road; Turtle Creek Bridge B-53-0390 (LOC STR, Rock County Town of Bradford, O'Riley Rd)6$2,103,060Concrete Structures, Inc.WisDOT
10 NOV 202620261110005Southwest Region WideRegionwide Tree Clearing; Various Locations (VAR HWY, Southwest Region Wide Regionwide Tree Clearing)3$28,389Interstate Tree LandscapingWisDOT
10 NOV 202620261110006Grant5629-00-766$909,889Radtke Contractors Inc.WisDOT
10 NOV 202620261110009IowaEdmund - Mineral Point; Mineral Point Branch Br B-25-198 (STH 039, Iowa County Edmund - Mineral Point)4$2,256,362Lunda Construction CompanyWisDOT
10 NOV 202620261110011DaneC Madison, Mineral Point Road; USH 12 to High Point Road (LOC STR, Dane County C Madison, Mineral Point Road)4$3,526,335Rock Road Companies, Inc.WisDOT
10 NOV 202620261110012DaneCity of Middleton, CTH M; Pheasant Br Creek Bridge B-13-0905 (CTH M, Dane County City of Middleton, CTH M)7$3,706,000R.G. Huston Company, Inc.WisDOT
10 NOV 202620261110013DaneV Deforest, North Towne Road; Vinburn Road Intersection (LOC STR, Dane County Village of Deforest, N Towne Road)2$980,415Rock Road Companies, Inc.WisDOT
10 NOV 202620261110014MilwaukeeC Milwaukee, W National Ave; 27th St to 1st St (STH 059, Milwaukee County C Milwaukee, W National Ave)3$26,868,079Lalonde Contractors IncorporatedWisDOT
10 NOV 202620261110015MilwaukeeMilwaukee - Mequon; 0.1 Mi S of Fairlane to Teutonia (STH 057, Milwaukee County Milwaukee - Mequon)5$3,862,192Payne and Dolan, IncWisDOT
10 NOV 202620261110017Walworth3170-09-705$18,813,968James Peterson Sons, Inc.WisDOT
Latest WisDOT contracts in the data

Every WisDOT letting since 2022, contract by contract: WisDOT letting results.

Where these numbers come from

WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

YearContracts
2022353
2023263
2024318
2025373
2026291
WisDOT contracts in the data, by year of letting

Every state's coverage and check is on the bid results hub.

Other states: Alabama, Arkansas, California, Colorado, Florida, Illinois, Indiana, Iowa, Kentucky, Missouri, New Jersey, New York, North Carolina, Ohio, Oregon, South Carolina, Tennessee, Texas, Virginia, Washington.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy