MoDOT unit bid prices and bid tabulations

Unit prices bid on 1,896 Missouri DOT contracts let from 17 JAN 2020 to 16 OCT 2026, read from MoDOT's own tabulations. 303 pay items have enough recent bids for a page of their own; every item is in the explorer.

Contracts
1,896
Bids
5,865
Unit prices
293,103

Data through 16 OCT 2026, the latest MoDOT letting read. Compiled by Mirage Metrics.

Price a MoDOT pay item

Pay items bid most often in Missouri

Check my bid

Add the lines you are pricing, with your quantity and unit price. Each line is placed against what bidders carried in the last 24 months, at a similar quantity when enough bids exist. Your numbers stay in this browser.

Columns: item code, quantity, unit price, with or without a header row.

Competitors

Who bids, how often they are low, how far off they are when they lose, and how much they leave on the table when they win.

Sort by: most bids counts every bid a firm submitted; most low bids counts the contracts where it was the low bidder; win rate is low bids divided by bids, for firms with five bids or more; low bid volume adds up its low bids in dollars. Gap when not low is the average distance from its total to the low bid; left on table is the average distance from its low bid to the second bid.

283 firms in Missouri, the 50 with the most bids shown.

BidderBidsLow bidsWin rateGap when not lowLeft on tableLow bid volume
Emery Sapp & Sons, Inc.53612624%+17%+10%$509.4M
Capital Paving & Construction, LLC38810828%+18%+14%$398.7M
Pace Construction Company, LLC26110139%+15%+9.0%$362.2M
N.B. West Contracting Company1796838%+17%+14%$250.3M
Blevins Asphalt Construction Company, Inc.1367958%+12%+10%$125.2M
Phillips Hardy, Inc.1262520%+22%+11%$71.9M
Magruder Paving, LLC1234537%+11%+10%$251.6M
Collins & Hermann, Inc.1144640%+63%+23%$72.8M
APAC-Central, Inc.1114137%+13%+8.0%$160.1M
Ideker, Inc.964446%+15%+11%$184.9M
Louis-Company, LLC892427%+32%+18%$55.0M
Robertson Contractors, Inc.832429%+18%+6.0%$66.2M
Apex Paving Co.834352%+11%+8.0%$130.3M
Radmacher Brothers Excavating Co., Inc.811519%+23%+12%$56.3M
Lehman Construction, LLC802126%+30%+6.0%$35.3M
Superior Bowen Asphalt Company, LLC771925%+16%+8.0%$66.1M
E & C Bridge, LLC763141%+15%+13%$39.5M
Concrete Strategies, LLC742432%+40%+17%$62.6M
Missouri Petroleum Products Company, LLC741723%+29%+14%$20.5M
Gershenson Construction Co., Inc.731419%+20%+4.0%$113.1M
Vance Brothers, Inc.733244%+16%+37%$52.6M
Gene Haile Excavating, Inc.712434%+22%+7.0%$25.9M
KCI Construction Company702029%+22%+35%$93.7M
Don Schnieders Excavating Company, Inc.651218%+29%+10%$22.5M
Mera Excavating, LLC641219%+28%+13%$12.1M
Above And Below Contracting, LLC63711%+32%+10%$25.2M
Hartman and Company, Inc.633352%+12%+7.0%$82.3M
Herzog Contracting Corp.624369%+8.0%+18%$162.8M
Widel, Inc.582340%+28%+15%$16.8M
Kozeny-Wagner, Inc.571425%+25%+14%$77.5M
S & A Equipment & Builders, LLC571526%+26%+17%$19.7M
Joe's Bridge & Grading, Inc.562341%+11%+10%$34.8M
R. V. Wagner, Inc.541833%+27%+19%$45.2M
Putz Construction, LLC531936%+45%+27%$10.2M
CSD Environmental Services, Inc.531223%+71%+47%$13.7M
West Plains Bridge & Grading, LLC511224%+23%+15%$42.3M
RL Persons Construction, Inc.5148%+46%+19%$4.2M
Leavenworth Excavating & Equipment Company, Inc.502244%+26%+25%$49.6M
James H. Drew Corporation491429%+40%+20%$12.8M
Comanche Construction, Inc.441227%+33%+22%$32.0M
H.R. Quadri Contractors, LLC442659%+37%+20%$52.6M
Branco Enterprises, Inc.411332%+25%+20%$12.5M
Gerstner Electric, Inc.412561%+21%+27%$28.0M
W. L. Miller Company382155%+9.0%+18%$57.7M
Realm Construction Inc.362261%+20%+13%$26.6M
Clarkson Construction Company361644%+23%+15%$80.2M
Hardy Construction, LLC34412%+23%+24%$9.6M
Meyer Electric Company, Inc.33515%+26%+14%$3.6M
Fronabarger Concreters, Inc.33927%+14%+14%$8.6M
J M Scheidle, LLC331030%+21%+12%$12.1M

Lettings

Open any contract to read the full tabulation: every line, every bidder.

Latest MoDOT contracts in the data.

Sources and checks

Each price is copied from a bid tabulation the owner published after the letting. Nothing is estimated or averaged before it reaches this page.

OwnerLettingsContractsBidsPricesCheckHow it was read
Texas DOT9 Jan 2020 to 19 Nov 20268,90937,8241,860,794ReconciledTxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Ohio DOT23 Jan 2020 to 12 Nov 20264,40815,8161,093,243ReconciledODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Illinois DOT15 Jan 2021 to 18 Sep 20265,49416,087932,368ReconciledIDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Florida DOT31 Jan 2018 to 28 Oct 20261,7387,302814,861ReconciledFDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
North Carolina DOT15 Jan 2013 to 20 Oct 20261,6596,770767,334ReconciledNCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Virginia DOT29 Jan 2002 to 28 Oct 20267,62818,240674,864ReconciledVDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Wisconsin DOT11 Jan 2022 to 10 Nov 20261,5985,095608,530ReconciledWisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Indiana DOT12 Jan 2022 to 5 Nov 20262,0827,109552,581ReconciledINDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Washington State DOT29 Dec 1999 to 7 Oct 20261,3175,732365,366ReconciledWSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
New York State DOT6 Jan 2022 to 15 Oct 20261,0803,894344,856ReconciledNYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Kentucky Transportation Cabinet22 Nov 2019 to 22 Oct 20264,4149,448336,278ReconciledKYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
New Jersey DOT22 Jun 2017 to 16 Apr 20269343,363314,765ReconciledNJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
Missouri DOT17 Jan 2020 to 16 Oct 20261,8965,865293,103ReconciledMoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
South Carolina DOT11 Jan 2022 to 13 Oct 20261,0373,257175,917ReconciledSCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Tennessee DOT9 Feb 2018 to 2 Oct 20261,2573,169156,766ReconciledTDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Alabama DOT28 Jan 2022 to 28 Aug 20269932,677153,448ReconciledALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Oregon DOT7 Jan 2021 to 13 Aug 20263941,571131,407Not checkableODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Arkansas DOT12 Jan 2022 to 4 Nov 20261,1182,57880,673ReconciledARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Colorado DOT17 May 2023 to 10 Sep 202614547239,455ReconciledCDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.
Iowa DOT19 Jan 2022 to 20 Oct 202611241512,634ReconciledIowa DOT bid tabulation PDFs: the letting of 19 January 2022 (read from the Internet Archive's copy of Iowa DOT's file) and lettings of August to October 2026. On A+B contracts the item total is kept and the time part dropped. Bids that did not match their published total are left out.
Caltrans25 Apr 2023 to 9 May 202333954,418ReconciledCaltrans bid summary PDFs; scanned pages read by OCR. Bids that did not match their published total are left out.

How each bid was checked

For every bidder, quantity times unit price was summed over all lines of the contract and compared with the total bid printed by the owner. A bid is published only when the two match to within one dollar. The states marked not checkable or third party are explained in the table.

Read the numbers like an estimator

  • Item codes and measurement rules are each owner's. Prices are compared inside one state and never pooled across states.
  • Unit price moves with quantity, location and season. Set your quantity and region before you trust a median.
  • Some bidders price a line at a cent and load the cost elsewhere. Those token prices, and bids more than three times the low bid, are left out of statistics by default and stay visible in tabulations.
  • The low bidder's price on one line is not always the lowest price on that line. Orange marks the bidder who was low on the whole contract.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

The MoDOT pay items bid most often

Pay itemCodeUnitLow-bid medianLow bidsWindowBids, all time
Construction signs6161005SF$7.00426Last 24 months5,417
Channelizer (trim line)6161025EACH$15.00139Last 24 months3,562
Silt fence8061019LF$3.44316Last 24 months3,277
4 in. white standard waterborne pavement marking paint, type P beads6206000CLF$0.16189Last 24 months3,208
Sediment removal8061016CY$28.00311Last 24 months3,125
Tack coat4071005GAL$3.00299Last 24 months3,040
Type A crashworthy end terminal (MASH)6063014EACH$3,692.50270Last 24 months2,755
Advanced warning rail system6161008EACH$50.0093Last 24 months2,754
Truck or trailer mounted attenuator (TMA)6123000AEACH$1,000.00821All lettings2,379
4 in. yellow standard waterborne pavement marking paint, type P beads6206001CLF$0.16214Last 24 months2,346
Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less)6221001SY$3.64277Last 24 months2,337
Gravel (A) or crushed stone (B)3105002TON$55.60246Last 24 months2,336
Modified coldmilling (depth transitions)6224010SY$10.55238Last 24 months2,317
Preformed thermoplastic pavement marking, 24 in. white6200015LF$23.00289Last 24 months2,257
MGS guardrail6061060LF$29.68233Last 24 months2,211
Rock ditch check8061005LF$16.00184Last 24 months2,143
Type III moveable barricade6161030EACH$165.0079Last 24 months2,037
MGS bridge approach transition section (regular/no curb)6061069EACH$4,000.00189Last 24 months2,036
Flashing arrow panel6161040EACH$1,040.00178Last 24 months2,009
Permanent erosion control geotextile6240103ASY$4.00190Last 24 months1,890
Compacting embankment2036000CY$8.50159Last 24 months1,688
Placing type 2 rock blanket6113040CY$29.90147Last 24 months1,686
Furnishing type 2 rock blanket6113020CY$58.50144Last 24 months1,676
Preformed thermoplastic pavement marking, left/right arrow6200021EACH$290.00189Last 24 months1,642
Pavement marking removal6207001LF$1.10190Last 24 months1,641
Seeding - cool season grasses8051000AACRE$3,277.50222Last 24 months1,635
Changeable message sign without communication interface, contractor furnished, contractor retained6161098AEACH$2,587.85157Last 24 months1,610
Bituminous pavement mixture PG64-22 (surface leveling)4020520TON$86.59180Last 24 months1,587
Class A excavation2031000CY$21.73134Last 24 months1,543
Vertical drain at end bents7151001EACH$3,187.75156Last 24 months1,483
Shaping slopes, class III2153000100F$1,467.80123Last 24 months1,460
Mulching8025006ACRE$2,100.00199Last 24 months1,456
Slab drain7123610EACH$490.54128Last 24 months1,397
Clearing and grubbing2013000ACRE$7,448.06139Last 24 months1,395
SH-flat sheet9035004ASF$28.00174Last 24 months1,364
Type 1 aggregate for base (4 in. thick)3040143SY$15.0095Last 24 months1,334
Bridge approach slab (minor road)5031011ASY$215.00119Last 24 months1,326
Additional mobilization for seeding6181020EACH$600.00134Last 24 months1,310
Class 3 excavation2063000CY$30.00150Last 24 months1,298
Bituminous shoulder rumble strip6261000ASTA$19.45128Last 24 months1,247
2 in. PSST post - 12 GA.9031270ALF$25.00143Last 24 months1,208
Class B concrete (substructure)7032003CY$1,421.94110Last 24 months1,201
Class 1 excavation2061000CY$51.75111Last 24 months1,200
Flag assembly6161009EACH$20.45321All lettings1,186
SHF-flat sheet fluorescent9035069ASF$32.00178Last 24 months1,179
Bituminous pavement mixture PG64-22, (BP-1)4011209TON$112.00129Last 24 months1,150
Misc.permanent aggregate edge treatment3049910TON$42.00175Last 24 months1,139
Type 5 aggregate for base (4 in. thick)3040504SY$14.00127Last 24 months1,138
Type C berm8061050LF$19.5086Last 24 months1,123
Alternate ditch check8061006LF$11.53128Last 24 months1,083
6 in. white high build waterborne pavement marking paint, type L beads6205902ALF$0.3185Last 24 months1,070
Pile point reinforcement7027000EACH$165.1697Last 24 months1,064
2.5 in. PSST post - 12 GA.9031280LF$24.00139Last 24 months1,042
Embankment in place2035500CY$30.0093Last 24 months1,034
Type D barrier7034219ALF$147.78108Last 24 months1,019
Type 5 aggregate for base (6 in. thick)3040506SY$17.70139Last 24 months996
MGS end anchor6061080EACH$1,800.00108Last 24 months915
Plain neoprene bearing pad7161000EACH$275.0073Last 24 months899
Surface preparation for recoating structural steel7125200SF$8.0075Last 24 months886
Concrete footings, embedded9031010CY$2,075.0082Last 24 months868
Temporary traffic barrier, contractor furnished retained6173600DLF$33.35106Last 24 months867
Changeable message sign without communication interface, contractor furnished retained6161098AEACH$2,500.00255Last 24 months865
Temporary seeding8061017ACRE$1,945.00114Last 24 months858
4 in. yellow class 1 pavement marking paint (18-mil, type P beads)6206001DLF$0.16248Last 24 months848
Seeding - cool season mixtures8051000AACRE$3,850.00224All lettings846
Changeable message sign with communication interface, contractor furnished, contractor retained6161099EACH$3,750.0039Last 24 months845
Preformed thermoplastic pavement marking, 24 in. yellow6200018LF$20.75100Last 24 months838
Reinforcing steel (bridges)7061060LB$2.0073Last 24 months835
4 in. white class 1 pavement marking paint (18-mil, type P beads)6206000DLF$0.18237Last 24 months814
Concrete sidewalk, 4 in.6086004SY$77.15101Last 24 months810
Sediment trap rock8061004CY$100.0081Last 24 months800
Truncated domes6081012SF$33.10109Last 24 months796
Directional indicator barricade6161033EACH$85.0034Last 24 months795
MGS guardrail, 8 FT. posts, 6 FT. - 3 in. spacing6061061LF$32.1270Last 24 months787
Misc.optional pavement4019905SY$87.4591Last 24 months785
Rock lining6097000CY$145.0083Last 24 months776
Emulsified asphalt, seal coat4091048GAL$2.5392Last 24 months767
Laminated neoprene bearing pad7161002EACH$300.0067Last 24 months757
6 in. yellow high build waterborne pavement marking paint, type L beads6205903ALF$0.3059Last 24 months741
Galvanized structural steel piles (12 in)7021212LF$123.0065Last 24 months738
Subgrade compaction (6 in. depth) (pavement repair)6131012SY$1.0085Last 24 months735
Temporary long-term rumble strips6162002EACH$1,425.0054Last 24 months734
Slab on steel7034212SY$475.0091Last 24 months728
Field application of inorganic zinc primer7125210SF$3.7048Last 24 months705
Curb inlet check8061007AEACH$130.00100Last 24 months704
Channelizer (trim-line)6161025EACH$18.00219Last 24 months699
Compacting in cut2037075STA$1,113.5080Last 24 months689
Linear grading class 12071000STA$1,980.3682Last 24 months672
Cleaning and epoxy coating7040113SF$8.5386Last 24 months669
Temporary short-term rumble strips6162004EACH$1,325.00210All lettings666
Reinforcing steel (epoxy coated)7101000LB$2.5046Last 24 months646
Finish field coat (system G)7125370ASF$3.9348Last 24 months645
Intermediate field coat (system G)7125365ASF$4.5048Last 24 months642
Replacement sand barrel6122020EACH$433.1272Last 24 months639
Sequential flashing warning light6161055EACH$79.5773Last 24 months629
Removal of miscellaneous acm (non-friable)2024043SF$300.0069Last 24 months623
Concrete curb ramp6081010SY$170.3577Last 24 months615
Driven post anchor for 2 in. PSST - 12 GA.9031271AEACH$196.0396Last 24 months613
Paved approach, 8 in.6085008SY$120.0087Last 24 months607
Bituminous pavement mixture PG58-28H (surface leveling)4020521TON$88.0581Last 24 months602
Bituminous centerline rumble strip6261001STA$24.2056Last 24 months579
Type H barrier7034216LF$140.0068Last 24 months571
Removal of existing bridge deck2162500SF$12.5866Last 24 months562
Furnishing type 1 rock ditch liner6096010ACY$75.0056Last 24 months548
Breakaway assembly (perforated square steel tube)9031241EACH$319.1280Last 24 months545
Placing type 1 rock ditch liner6096041CY$97.5056Last 24 months544
Temporary removable marking tape 4 in., white6205301BLF$2.1062Last 24 months537
Relocating temporary traffic barrier6175010ALF$12.9065Last 24 months537
Linear grading class 22072000STA$1,788.0047Last 24 months536
Pavement marking removal (symbols)6207002EACH$100.0055Last 24 months533
Full depth pavement repair saw cut (for perimeter and internal saw cuts)6131014LF$6.0086Last 24 months533
Substructure repair (formed)7040101SF$200.0051Last 24 months518
Furnishing and placing concrete material for full depth pavement repair6131010SY$321.0082Last 24 months517
Type 1 or 5 aggregate for base (4 in. thick) (pavement repair)6131013SY$4.3583Last 24 months516
Slab on concrete NU-girder7034221SY$460.0038Last 24 months511
Subgrade compaction (6-inch depth)2101006A100F$1,166.5944Last 24 months505
Preformed thermoplastic pavement marking, 30 in white midblock6200036EACH$200.5040Last 24 months502
Temporary removable marking tape 4 in., yellow6205303BLF$2.0059Last 24 months498
Pipe posts9031220LB$9.3077Last 24 months494
Unclassified excavation2035000CY$20.7072Last 24 months486
Type 3 moveable barricade6161030EACH$170.00137Last 24 months481
Dowel bar (drilling, furnishing and installation) for full depth pavement repair6131015EACH$7.0076Last 24 months480
Base, concrete9029100CY$2,350.0078Last 24 months478
Driven post anchor for 2.5 in. PSST - 7 GA.9031281AEACH$275.0074Last 24 months476
Pre-bore for piling7026000LF$160.5042Last 24 months472
Concrete curb (6 in. height and under) type S6091010LF$59.9169Last 24 months467
Bituminous pavement mixture PG64-22 (base)4013000TON$180.9438Last 24 months464
Impact attenuator (relocation)6122030EACH$1,250.0049Last 24 months463
Turf type tall fescue sodding8031000ASY$13.5064Last 24 months462
Concrete post anchor for 2.5 in. PSST. - 7 GA.9031285EACH$378.5777Last 24 months456
Substructure repair (unformed)7040102SF$190.0045Last 24 months455
Preformed thermoplastic pavement marking, 12 in white, yield line triangles6200042EACH$55.0035Last 24 months454
Half-sole repair7040104SF$118.1155Last 24 months449
Class B-2 concrete7034214CY$3,758.2826Last 24 months445
Removal of existing expansion joint & adjacent concrete2164500LF$408.6526Last 24 months443
Changeable message sign with communication interface, contractor furnished retained6161099EACH$3,757.23122Last 24 months434
SH-flat sheet - signal sign9020833SF$40.0063Last 24 months433
Placing type 2 rock ditch liner6096042CY$45.0049Last 24 months433
Class 4 excavation2063300CY$57.7536Last 24 months433
Preformed thermoplastic pavement marking, 6 in. white6200009LF$6.0051Last 24 months431
Relocated signs6161010SF$8.0027Last 24 months427
Signal sign, mounting hardware9020834EACH$236.1162Last 24 months425
18 in. pipe group A7261018LF$100.0063Last 24 months422
Conduit, 3 in., trench with tracer wire9025300LF$21.0563Last 24 months422
Furnishing type 2 rock ditch liner6096020CY$51.5046Last 24 months421
Video camera inspection7011300EACH$600.0041Last 24 months421
Foundation inspection holes7011400LF$180.0041Last 24 months419
Curb blockout7034600LF$152.3039Last 24 months419
4 in. yellow high build waterborne pavement marking paint, type L beads6205901ALF$0.2333Last 24 months415
Cable, 16 AWG 2 conductor9028308LF$1.9464Last 24 months414
Low bidder's median unit price per pay item, Missouri

Every other MoDOT pay item with a page

153 more pay items, by item code. Any item without a page is in the explorer above.

The MoDOT market in the last three months

Computed from the bids in the data for 16 JUL 2026 to 16 OCT 2026, against the same three months a year earlier. A contract is counted once, at its letting date.

Last three monthsSame months a year earlier
Contracts let5543
Letting dates22
Low bids, total$142,971,324$131,133,190
Median bidders per contract33
MoDOT lettings, 16 JUL 2026 to 16 OCT 2026 against 16 JUL 2025 to 16 OCT 2025

Pay items whose low-bid median moved most between the last six months and the twelve before (95 items had at least fifteen low bids in each window). Quantity mix and location move these medians as much as the market does.

Pay itemCodeUnitLast 6 months12 months beforeChangeLow bids
Type 1 or 5 aggregate for base (4 in. thick) (pavement repair)6131013SY$16.10$1.00+1510%17 / 39
Subgrade compaction (6 in. depth) (pavement repair)6131012SY$6.00$1.00+500%17 / 42
Breakaway assembly (perforated square steel tube)9031241EACH$400.00$285.00+40%18 / 33
Concrete curb (6 in. height and under) type S6091010LF$80.00$58.41+37%15 / 43
Embankment in place2035500CY$30.70$23.00+33%20 / 39
Surface preparation for recoating structural steel7125200SF$8.00$18.64-57%21 / 28
Cleaning and epoxy coating7040113SF$6.42$12.00-46%36 / 19
Concrete footings, embedded9031010CY$2,000.00$2,949.50-32%17 / 34
Temporary seeding8061017ACRE$1,350.00$2,000.00-32%22 / 55
Mulching8025006ACRE$1,850.00$2,500.00-26%37 / 99
MoDOT pay items moving most, low bidder's median, last six months against the twelve before

Who bids on MoDOT work

MoDOT bidders with the most bids in the data

98 firms have a page with their full record: all MoDOT bidders.

Latest lettings

LetContractDistrictProjectBidsLow bidLow bidderSource
16 OCT 2026261016-A02NorthwestJNWM0144 - ROUTE 29 - ANDREW COUNTY3$197,400Tri-Star Hauling LLCMoDOT
16 OCT 2026261016-B01NortheastJNE0063, JNE0064, JNE0066, JNE0069 - Route 168, BU 61, W, 61OR - SHELBY, MARION COUNTIES2$5,871,147Emery Sapp & Sons, Inc.MoDOT
16 OCT 2026261016-B03NortheastJNE0107 - ROUTE 154 - RALLS, PIKE COUNTIES4$1,173,282Magruder Paving, LLCMoDOT
16 OCT 2026261016-B04NortheastJNE0235 - ROUTE 61 - LINCOLN COUNTY5$8,990,029Magruder Paving, LLCMoDOT
16 OCT 2026261016-B06NortheastJNE0259 - ROUTE 94 - MONTGOMERY COUNTY4$325,971N.B. West Contracting CompanyMoDOT
16 OCT 2026261016-D01CentralJCD0088-ROUTE 63-PHELPS, TEXAS COUNTIES5$9,530,000Pace Construction Company, LLCMoDOT
16 OCT 2026261016-D02CentralJCD0188-ROUTE W-HOWARD COUNTY2$730,052Capital Paving & Construction, LLCMoDOT
16 OCT 2026261016-D03CentralJCD0189 - ROUTE M - COOPER COUNTY2$905,653Capital Paving & Construction, LLCMoDOT
16 OCT 2026261016-D04CentralJCD0199 - ROUTE 5 - HOWARD COUNTY2$327,331Capital Paving & Construction, LLCMoDOT
16 OCT 2026261016-D05CentralJCD0205 - ROUTE CC, M - MONITEAU, MILLER COUNTIES3$675,084BMC Enterprises, Inc. dba Missouri Petroleum Products CompanyMoDOT
16 OCT 2026261016-D06CentralJCD0229, JCD0302 - ROUTES T, 87 - MONITEAU COUNTY5$435,919Gene Haile Excavating, Inc.MoDOT
16 OCT 2026261016-D07CentralJCD0230, JCD0260-VARIOUS ROUTES-VARIOUS COUNTIES7$1,122,268Southern Coatings of Tarpon Springs, LLCMoDOT
Latest MoDOT contracts in the data

Every MoDOT letting since 2022, contract by contract: MoDOT letting results.

MoDOT projects on the infrastructure map

Large Missouri DOT projects described on our infrastructure map, each with its owner's own sources:

Where these numbers come from

MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

YearContracts
2020228
2021248
2022257
2023267
2024335
2025338
2026223
MoDOT contracts in the data, by year of letting

Every state's coverage and check is on the bid results hub.

Other states: Alabama, Arkansas, California, Colorado, Florida, Illinois, Indiana, Iowa, Kentucky, New Jersey, New York, North Carolina, Ohio, Oregon, South Carolina, Tennessee, Texas, Virginia, Washington, Wisconsin.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy