AI deployment for megaprojects

Spain and Portugal's megaprojects in 3D

Projects
68
In 3D
68
Companies named
158

Who owns and builds each project, its cost and its stage, every figure linked to its source, every site in 3D; how the map is made.

68 projects on the map.

Base map: Natural Earth. Sites, structures and the land around: OpenStreetMap contributors, ODbL. Each mark sits on its site.Every project as text, with its owner, its builders and its sources, below the map

Who builds Spain's and Portugal's megaprojects

The companies named on the most projects of this map, by number of projects; open a company to see its projects. A company counts once per project, whatever its number of lots, and a joint venture counts for each of its members.

Contractors

General contractors, lot contractors and EPC contractors, on two projects or more (86 named in all).

1FCC14 projects
2Acciona9 projects
3Dragados8 projects
3Ferrovial8 projects
5COMSA7 projects
5Mota-Engil7 projects
5Sacyr7 projects
8OHLA6 projects
9Copisa5 projects
10Convensa4 projects
10Rover4 projects
10Sando4 projects
10SANJOSE4 projects
10Teixeira Duarte4 projects
15ACA3 projects
15Altuna y Uria3 projects
15Azvi3 projects
15Gabriel Couto3 projects
15Puentes y Calzadas3 projects
20Acsa (Sorigué)2 projects
20Aldesa2 projects
20Alves Ribeiro2 projects
20CHM2 projects
20Copasa2 projects
20Etermar2 projects

Owners and developers

The public owners, the developers and the concessionaires, on two projects or more (54 named in all).

1Adif15 projects
2Dirección General de Carreteras14 projects
2Ministerio de Transportes y Movilidad Sostenible14 projects
4Infraestruturas de Portugal6 projects
5Junta de Andalucía3 projects
6Ayuntamiento de Madrid2 projects
6Comunidad de Madrid2 projects
6Consejería de Fomento2 projects
6Departament de Territori2 projects
6E.P.E2 projects
6Euskal Trenbide Sarea2 projects
6Generalitat de Catalunya2 projects
6Infraestructures de la Generalitat de Catalunya2 projects
6Metro do Porto2 projects
6Metropolitano de Lisboa2 projects
6Red Eléctrica2 projects

Compiled by Mirage Metrics, November 2026, from the projects on the map and those listed under it.

A company missing, or a project missing from a company's row? Write to mehdi@miragemetrics.com with a public source. Share the ranking on LinkedIn.

All 68 projects on the map

The same projects as the map above, as text, by family. Each name opens the project's page, with every figure, the companies and their roles, and the sources.

ProjectWhereOwnerBuilt byAmountStage
Almería rail integration phase 2 and intermodal stationAlmería, AndalusiaAdif and Adif Alta Velocidad, Junta de Andalucía, Ayuntamiento de AlmeríaSacyr€235 M (total project cost)Under construction
Barcelona La Sagrera station: structure and rail accessesBarcelona (Sant Andreu and Sant Martí districts), CataloniaAdif Alta VelocidadDragados, Acciona, Comsa and Acsa (Sorigué), Rubau, Copisa, FCC Construcción and Ferrovial Agromán€340 M (budget)Under construction
Bilbao southern rail bypass, phase 1: Serantes connection sectionOrtuella, Bizkaia, Basque CountryEuskal Trenbide Sarea (ETS)COMSA, Azvi, Iza Obras y Promociones€108 M (budget)Under construction
Burgos-Vitoria high-speed line: Burgos bypass-Valle de las Navas sectionBurgos, Rubena, Quintanapalla and Valle de las Navas, Burgos, Castile and LeónAdif Alta VelocidadGevora Construcciones, Copisa, Construcciones SarriónContract awarded, works not confirmed
Burgos-Vitoria high-speed line: Manzanos-La Puebla de Arganzón sectionManzanos (Ribera Baja, Álava) to La Puebla de Arganzón (Condado de Treviño, Burgos), Basque Country / Castile and LeónAdif Alta VelocidadOHLA, Sando (Construcciones Sánchez Domínguez), Altuna y Uria€272 M (budget)Contract awarded, works not confirmed
Burgos-Vitoria high-speed line: Pancorbo-Ameyugo sectionPancorbo and Ameyugo, Burgos, Castile and LeónAdif Alta VelocidadFerrovial, FCC Construcción, Contratas y Ventas (Convensa)€363 M (budget)Under construction
Linha do Alentejo: Poceirão-Bombel modernisation and doublingPalmela, Montijo and Vendas Novas, Lisbon / AlentejoInfraestruturas de PortugalZAGOPE - Construções e Engenharia€270 M (total project cost)Under construction
Linha do Norte: Ovar (Válega)-Espinho renewalVálega (Ovar) to Espinho, via Ovar and Esmoriz, Centro / NorteInfraestruturas de PortugalSomafel - Engenharia e Obras Ferroviárias, Construções Gabriel Couto, Teixeira Duarte€160 M (total project cost)Under construction
Linha do Oeste: Meleças-Caldas da Rainha modernisationMira Sintra-Meleças (Sintra) to Caldas da Rainha, via Malveira and Torres Vedras, Lisbon / CentroInfraestruturas de PortugalConstruções Gabriel A. S. Couto, M. Couto Alves, AldesaUnder construction
Loja bypass: Loja-A-92 sectionLoja, Granada, AndalusiaAdif Alta VelocidadCopisa, Copasa, CHMUnder construction
Loja bypass: Valle del Genil sectionLoja, Salar and Huétor-Tájar, Granada, AndalusiaAdif Alta VelocidadPuentes y Calzadas Infraestructuras, Rover Infraestructuras, Geotúnel€341 M (budget)Under construction
Lorca rail integration: underground line and Lorca-Sutullena stationLorca, Murcia, Region of MurciaAdif Alta VelocidadOHLA€400 M (budget)Under construction
Madrid Puerta de Atocha through stationMadrid (Arganzuela district), Community of MadridAdif Alta VelocidadDragados, Tecsa, Constructora San JoséUnder construction
Madrid-Extremadura high-speed line: Talayuela-Plasencia sectionTalayuela, Navalmoral de la Mata, Casatejada, Toril, Malpartida de Plasencia and Plasencia, Cáceres, ExtremaduraAdif Alta VelocidadHitachi Rail and Sistemas y Montajes Industriales (Grupo CPS), Nokia, Sociedad Ibérica and Syneox, FCC and Convensa€39 M (contract value, tender estimated value, overhead contact line and associated systems, works and maintenance, 48 months)Under construction
Minho line: Contumil-Ermesinde track quadruplingContumil (Porto) to Ermesinde (Valongo), via Rio Tinto and Águas Santas, NorteInfraestruturas de PortugalMota-Engil€226 M (total project cost)Under construction
Montcada i Reixac R2 undergrounding and new stationMontcada i Reixac, Barcelona, CataloniaAdifFerrovial Construcción, Comsa, FCC Construcción€621 M (budget)Under construction
Murcia-Cartagena high-speed link: Torre Pacheco-Cartagena sectionTorre Pacheco and Cartagena (Pozo Estrecho), Murcia, Region of MurciaAdif Alta VelocidadConstructora San José (SANJOSE), Acsa (Sorigué)Under construction
Navarra high-speed corridor: Tafalla-Campanas sectionTafalla to Campanas (Tiebas-Muruarte de Reta), Navarra, NavarreAdif Alta VelocidadS.A. de Obras y Servicios Copasa, Puentes y Calzadas Infraestructuras, Constructora San José€271 M (budget)Under construction
Porto-Lisbon high-speed line: Porto (Campanhã)-Oiã sectionPorto to Oiã (Oliveira do Bairro), through 10 municipalities, Norte / CentroInfraestruturas de Portugal, AVAN Norte - Gestão da Ferrovia de Alta VelocidadeMota-Engil, Serena, Teixeira Duarte€2 bn (total project cost)Under construction
València rail access canal and Joaquín Sorolla station remodellingValència (Quatre Carreres, Jesús and L'Eixample districts), Valencian CommunityAdif Alta VelocidadDragados, Rover Infraestructuras, Rover Rail€665 M (total project cost)Under construction
Rail: 20. Compiled by Mirage Metrics, November 2026
ProjectWhereOwnerBuilt byAmountStage
Barcelona Metro L9/L10 central section: Zona Universitària to La SagreraBarcelona (Les Corts, Sarrià-Sant Gervasi, Gràcia, Horta-Guinardó, Sant Andreu), CataloniaGeneralitat de Catalunya, Departament de Territori, Transports Metropolitans de Barcelona (TMB)€926 M (budget)Under construction
Bilbao Metro Line 5, Aperribai to Galdakao sectionGaldakao, Bizkaia, Basque CountryEuskal Trenbide Sarea (ETS)Metro Bengoetxe UTE (Acciona, Sacyr, Altuna y Uria, Bycam, equal shares)€91 M (budget)Under construction
Camp de Tarragona tram, phase 1: Cambrils Centre to Vila-seca (main works)Cambrils, Vinyols i els Arcs, Salou and Vila-seca, Tarragona, CataloniaInfraestructures de la Generalitat de Catalunya, Ferrocarrils de la Generalitat de Catalunya (FGC)COMSA, FCC Construcción, Syneox Rail and Garcia Riera (UTE)€112 M (contract value, main works lot (track, catenary, 11 stops, 5 substations), excl. vat)Contract awarded, works not confirmed
FGC Line 8 extension: Plaça Espanya to GràciaBarcelona (Sants-Montjuïc, Eixample Esquerra, Sant Gervasi, Gràcia), CataloniaGeneralitat de Catalunya, Departament de Territori / Infraestructures de la Generalitat de CatalunyaCopcisa, Copisa Constructora Pirenaica, Ferrovial Construcción, Sacyr Construcción€412 M (total project cost)Under construction
Lisbon Metro Circular Line: Rato to Cais do Sodré extensionLisbon (Estrela, Santos, Madragoa, Cais do Sodré; Campo Grande), LisbonMetropolitano de Lisboa, E.P.E.Zagope, Construção e Engenharia, Metro Santos Sodré ACE (Mota-Engil and Spie Batignolles International), Zagope and COMSA (ACE)€380 M (total project cost)Under construction
Lisbon Metro Red line extension: São Sebastião to AlcântaraLisbon (Campolide, Amoreiras, Campo de Ourique, Estrela, Alcântara), LisbonMetropolitano de Lisboa, E.P.E.Mota-Engil Engenharia e Construção, Spie Batignolles Internacional€405 M (total project cost)Contract awarded, works not confirmed
Madrid Metro Line 11 extension: Plaza Elíptica to Conde de CasalMadrid (Carabanchel, Arganzuela, Retiro), Community of MadridComunidad de Madrid, Consejería de Vivienda, Transportes e InfraestructurasAcciona Construcción, Dragados (ACS) and Rover Infraestructuras (UTE)€671 M (total project cost)Under construction
Madrid Metro Line 5 extension: Alameda de Osuna to Airport T1-T2-T3Madrid (Barajas district: Alameda de Osuna, Madrid-Barajas airport), Community of MadridComunidad de Madrid, Dirección General de Infraestructuras de Transporte ColectivoFCC Construcción, Sacyr Construcción and Becsa (Grupo Simetría), UTE Aeropuerto L5€189 M (budget)Under construction
Madrid Metro Line 6 (Circular) automation programmeMadrid (whole Line 6 ring), Community of MadridMetro de Madrid, S.A.Alstom Movilidad, UTE Puertas Andén Línea 6 (Faiveley Transport Ibérica, COMSA Instalaciones y Sistemas Industriales, COMSA)€231 M (budget, approx.)Under construction
Porto Metro Pink line (G): São Bento to Casa da MúsicaPorto (Baixa, Cedofeita, Massarelos, Boavista), NorteMetro do Porto, S.A.Ferrovial, ACA - Alberto Couto Alves€305 M (total project cost)Under construction
Porto Metro Ruby line (H): Casa da Música to Santo Ovídio, with the Ferreirinha bridgePorto (Boavista, Campo Alegre) and Vila Nova de Gaia (Arrábida, Candal, Devesas, Santo Ovídio), NorteMetro do Porto, S.A.ACA - Alberto Couto Alves, FCC Construcción, Contratas y Ventas€488 M (budget)Under construction
Seville Metro Line 3 North, subtramo II: Los Mares to San LázaroSevilla (Pino Montano, San Lázaro), AndalusiaJunta de Andalucía, Consejería de FomentoAzvi, Dragados and Martín Casillas (UTE)€132 M (budget)Under construction
Seville Metro Line 3 North, subtramo III: San Lázaro to Muñoz LeónSevilla (Macarena), AndalusiaJunta de Andalucía, Consejería de FomentoVías y Construcciones, Lantania and DSV Empresa Constructora y Ferroviaria (UTE)Under construction
Urban transit: 13. Compiled by Mirage Metrics, November 2026
ProjectWhereOwnerBuilt byAmountStage
A-11 Autovía del Duero: Langa de Duero bypass to Aranda de Duero bypassLanga de Duero (Soria), Zuzones, La Vid, Vadocondes, Fresnillo de las Dueñas and Aranda de Duero (Burgos), Castile and LeónMinisterio de Transportes y Movilidad Sostenible, Dirección General de CarreterasObrascón Huarte Lain (OHLA) and Asch Infraestructuras y Servicios (UTE)€212 M (budget)Under construction
A-11 Autovía del Duero: Olivares de Duero to Tudela de DueroOlivares de Duero, Villabáñez and Tudela de Duero, Valladolid, Castile and LeónMinisterio de Transportes y Movilidad Sostenible, Dirección General de Carreteras€81 M (budget)Partly in service, partly under construction
A-11 Autovía del Duero: Quintanilla de Arriba (west) to Olivares de DueroQuintanilla de Arriba, Valbuena de Duero and Olivares de Duero, Valladolid, Castile and LeónMinisterio de Transportes y Movilidad Sostenible, Dirección General de CarreterasUTE A11 Quintanilla-Olivares€233 M (budget)Partly in service, partly under construction
A-23 Autovía Mudéjar completion: Lanave to Embalse de Jabarrella to Sabiñánigo SurCaldearenas and Sabiñánigo, Huesca (Gállego valley, Jabarrella reservoir), AragonMinisterio de Transportes y Movilidad Sostenible, Dirección General de CarreterasSacyr Construcción, S.A.€14 M (budget)Under construction
A-23 Autovía Mudéjar: Sabiñánigo bypass (Sabiñánigo Este to Sabiñánigo Oeste)Sabiñánigo, Huesca, AragonMinisterio de Transportes y Movilidad Sostenible, Dirección General de CarreterasAldesa Construcciones and Rover Infraestructuras (UTE)€108 M (budget)Suspended
A-54 Lugo to Santiago motorway: Melide (south) to Arzúa (west)Melide, Santiso and Arzúa, A Coruña, GaliciaMinisterio de Transportes y Movilidad Sostenible, Dirección General de CarreterasConstrucciones Sánchez Domínguez Sando and Copisa Constructora Pirenaica (UTE)€117 M (total project cost)Under construction
A-63 Oviedo to La Espina motorway: Cornellana to SalasSalas (Cornellana to Salas), Asturias, AsturiasMinisterio de Transportes y Movilidad Sostenible, Dirección General de Carreteras€158 M (total project cost)Under construction
A-67 motorway widening to three lanes: Polanco to SantanderPolanco, Miengo, Piélagos, Santa Cruz de Bezana and Camargo, Cantabria, CantabriaMinisterio de Transportes y Movilidad Sostenible, Dirección General de CarreterasConstructora San José and Aceinsa Movilidad (UTE)€173 M (budget)Under construction
A-68 Arrúbal to Navarrete (Ronda Sur de Logroño)Arrúbal, Agoncillo, Murillo de Río Leza, Logroño, Villamediana de Iregua, Lardero, Navarrete, La Rioja, La RiojaMinisterio de Transportes y Movilidad Sostenible, Dirección General de CarreterasAcciona Construcción and Aquaterra (UTE Variante Logroño)€123 M (budget)Partly in service, partly under construction
A-7 Valencia by-pass upgrade: CV-32 junction to CV-35 junction (km 313 to 324)El Puig, Rafelbunyol, Massamagrell, Museros, Moncada, Bétera, Valencia, Godella and Paterna, Valencia, Valencian CommunityMinisterio de Transportes y Movilidad Sostenible, Dirección General de CarreterasDragados and Pavasal (UTE)€144 M (budget)Under construction
A-73 Burgos to Aguilar de Campoo motorway: Quintanaortuño to MontorioQuintanaortuño, Merindad de Río Ubierna (Ubierna) and Montorio, Burgos, Castile and LeónMinisterio de Transportes y Movilidad Sostenible, Dirección General de CarreterasFCC Construcción and Construcciones y Obras Llorente (UTE)€106 M (budget)Under construction
IP3 duplication and upgrade: Santa Comba Dão to ViseuSanta Comba Dão, Tondela and Viseu, district of Viseu, CentroInfraestruturas de Portugal, S.A.FerrovialUnder construction
Jaca bypass linking the A-21 and A-23 motorwaysJaca, Huesca, AragonMinisterio de Transportes y Movilidad Sostenible, Dirección General de CarreterasSacyr and Papsa Infraestructuras (Grupo Romero Polo) (UTE)€154 M (budget)Contract awarded, works not confirmed
Madrid A-5 undergrounding, Lot 1: Padre Piquer to BatánMadrid (Latina district), Community of MadridAyuntamiento de MadridFCC Construcción, Ferrovial Construcción€176 M (budget)Under construction
Madrid A-5 undergrounding, Lot 2: Batán to Avenida de PortugalMadrid (Latina district, by Casa de Campo), Community of MadridAyuntamiento de MadridDragados, Acciona Construcción€142 M (budget)Under construction
Puente del Centenario (SE-30, Seville): stay-cable replacement and wideningSeville, over the Canal de Alfonso XIII (port of Seville), AndalusiaMinisterio de Transportes y Movilidad Sostenible, Dirección General de CarreterasAcciona Construcción, Tecade and Freyssinet (UTE Sustitución Tirantes Puente del Centenario)€136 M (budget)Suspended
SE-40 Seville ring road: Valencina (A-8077) to Salteras (A-66)Valencina de la Concepción and Salteras, Sevilla, AndalusiaMinisterio de Transportes y Movilidad Sostenible, Dirección General de CarreterasAzvi and Martín Casillas (UTE)€125 M (budget)Under construction
Tenerife island ring road closure: El Tanque to Santiago del Teide (Erjos tunnel)El Tanque, Erjos and Santiago del Teide, Tenerife, Canary IslandsGobierno de Canarias, Consejería de Obras Públicas, Vivienda y MovilidadFCC Construcción, Syocsa-Inarsa and El Silbo (UTE)€21 M (budget)Under construction
Highways: 18. Compiled by Mirage Metrics, November 2026
ProjectWhereOwnerBuilt byAmountStage
New port of Lajes das FloresLajes das Flores, Flores Island, AzoresPortos dos Açores, S.A.Tecnovia Açores, Sociedade de Construções S.A., Etermar, Engenharia e Construção S.A., Teixeira Duarte, Engenharia e Construções S.A.€192 M (budget)Under construction
Port of Barcelona: liquid-bulk berths 34C, 34D and 34E on the Moll de l'EnergiaBarcelona, CataloniaAutoritat Portuària de BarcelonaFCC Construcción S.A., COMSA S.A.U.€124 M (budget)Contract awarded, works not confirmed
Sines Terminal XXI container terminal expansion, phase 3Sines, Setúbal district, AlentejoAPS, Administração dos Portos de Sines e do Algarve, PSA SinesMota-Engil, Engenharia e Construção, S.A., Etermar, Engenharia e Construção, S.A.€300 M (announced investment)Partly in service, partly under construction
Valencia North expansion: container quay and reclamation worksValència, Valencian CommunityAutoridad Portuaria de ValènciaAcciona Construcción S.A., Jan De Nul NV, Grupo Bertolín S.A.U.€657 M (budget)Under construction
Ports: 4. Compiled by Mirage Metrics, November 2026
ProjectWhereOwnerBuilt byAmountStage
Lisbon Humberto Delgado airport: Terminal 1 South Pier expansionLisboa, LisbonANA, Aeroportos de Portugal, S.A. (VINCI Airports)Mota-Engil, VINCI Construction Grands Projets, Alves Ribeiro€233 M (contract value, terminal 1 main works contract, vat not stated)Under construction
Palma de Mallorca airport: processor building and Module A worksPalma, Mallorca, Balearic IslandsAena S.M.E., S.A.Acciona Construcción S.A.€224 M (budget)Under construction
Airports: 2. Compiled by Mirage Metrics, November 2026
ProjectWhereOwnerBuilt byAmountStage
Bay of Biscay Spain-France HVDC interconnectionGatika and Lemoiz, Bizkaia; Cubnezais, Le Porge, Seignosse and Capbreton, France, Basque CountryInelfe, Red Eléctrica de España, RTEHitachi Energy / VINCI consortium, FASSET consortium€3.13 bn (total project cost)Under construction
Energy: 1. Compiled by Mirage Metrics, November 2026
ProjectWhereOwnerBuilt byAmountStage
Pisão dam and Crato multi-purpose hydraulic schemeCrato, Portalegre district, AlentejoCIMAA, Comunidade Intermunicipal do Alto AlentejoFCC Construcción, Alberto Couto Alves€222 M (total project cost)Under construction
Raising of the Yesa dam and reservoirYesa (Navarra); Sigüés, Artieda, Mianos, Undués de Lerda, Urriés, Los Pintanos and Salvatierra de Esca (Zaragoza), Navarre / AragonMinisterio para la Transición Ecológica (Dirección General del Agua) / Confederación Hidrográfica del EbroACS, Ferrovial, FCC€500 M (total project cost)Under construction
Salto de Chira pumped-storage hydroelectric plantMogán and San Bartolomé de Tirajana, Gran Canaria, Canary IslandsRed Eléctrica de España S.A.U. (Redeia)Dragados, Cobra Infraestructuras Hidráulicas, Obras Subterráneas (Ossa)€589 M (budget)Under construction
Dams and hydro: 3. Compiled by Mirage Metrics, November 2026
ProjectWhereOwnerBuilt byAmountStage
Algarve seawater desalination plant, AlbufeiraAlbufeira (freguesia de Albufeira e Olhos de Água), Faro district, AlgarveÁguas do Algarve, S.A.Aquapor, GS InimaUnder construction
Water: 1. Compiled by Mirage Metrics, November 2026
ProjectWhereOwnerBuilt byAmountStage
Hospital Central do Alentejo, ÉvoraÉvora, AlentejoULS do Alentejo Central (formerly ARS Alentejo), Ministério da SaúdeAcciona€237 M (total project cost)Under construction
Hospital de Lisboa Oriental (Todos-os-Santos), MarvilaMarvila, Lisboa, LisbonPortuguese State (Ministério da Saúde), Consortium of Hygeia Edifícios Hospitalares, InfraRed Infrastructure V Investments, Mota-Engil Engenharia e Construção, Mota-Engil Europa and Manvia€380 M (total project cost)Under construction
New Hospital of Aranda de DueroAranda de Duero, Burgos, Castile and LeónGerencia Regional de Salud de Castilla y León (Sacyl)FCC Construcción€118 M (budget)Under construction
New Hospital of Málaga (Hospital Virgen de la Esperanza)Málaga, AndalusiaServicio Andaluz de Salud (Junta de Andalucía)Construcciones Sánchez Domínguez-Sando S.A.U., Obrascón Huarte Laín S.A. (OHLA), Vialterra Infraestructuras S.A.€608 M (budget)Under construction
Hospitals: 4. Compiled by Mirage Metrics, November 2026
ProjectWhereOwnerBuilt byAmountStage
Estadio de Gran Canaria extension and refurbishment ('La Nube')Las Palmas de Gran Canaria, Canary IslandsInstituto Insular de Deportes de Gran Canaria (Cabildo de Gran Canaria)OHLA, Sando€235 M (budget)Procurement
La Nueva Romareda stadium, Zaragoza (Ibercaja Romareda)Zaragoza, AragonLa Nueva Romareda S.L.Obrascón Huarte Laín S.A. (OHLA), Altuna y Uria S.A., OHLA Servicios Ingesan S.A.€139 M (budget)Under construction
Stadiums: 2. Compiled by Mirage Metrics, November 2026

15 programmes and projects without a mark of their own

These are listed without a mark of their own: a programme whose sections are on the map one by one, or works whose site no published document or map places yet. Each keeps its record and moves onto the map once its site is known.

ProjectTypeOwnerStageWhy it is not on the map
Porto-Lisbon high-speed line (programme)RailInfraestruturas de Portugal, AVAN Norte (LusoLAV consortium), Sacyr, DST and Alberto Couto Alves consortiumUnder constructionA programme: its sections of EUR 100 million or more are on the map one by one
Murcia-Almería high-speed line (Mediterranean Corridor)RailAdif Alta VelocidadUnder constructionA programme: its sections of EUR 100 million or more are on the map one by one
Burgos-Vitoria high-speed line (programme)RailAdif Alta VelocidadUnder constructionA programme: its sections of EUR 100 million or more are on the map one by one
Navarra high-speed corridor: Castejón-Pamplona (programme)RailAdif Alta Velocidad, Gobierno de NavarraUnder constructionA programme: its sections of EUR 100 million or more are on the map one by one
Madrid-Extremadura high-speed lineRailAdif Alta VelocidadPartly in service, partly under constructionA programme: its sections of EUR 100 million or more are on the map one by one
Madrid-Extremadura high-speed line, Talayuela-Plasencia: signalling, ERTMS level 2 and fixed telecomsRailAdif Alta VelocidadContract awarded, works not confirmedThe signalling and train control contract of the Talayuela-Plasencia section, which is on the map
Antequera-Granada high-speed line: Loja bypassRailAdif Alta VelocidadUnder constructionA programme: its sections of EUR 100 million or more are on the map one by one
Bilbao southern rail bypass, phase 1RailMinisterio de Transportes y Movilidad Sostenible, Euskal Trenbide Sarea (ETS)Under constructionA programme: its sections of EUR 100 million or more are on the map one by one
Madrid Metro Line 6 platform screen doorsUrban transitMetro de Madrid, S.A.Under constructionA contract of the Line 6 automation programme, which is on the map
Seville Metro Line 3 North: Pino Montano to Prado de San SebastiánUrban transitJunta de Andalucía, Consejería de Fomento, Articulación del Territorio y ViviendaUnder constructionA programme: its sections of EUR 100 million or more are on the map one by one
Bilbao Metro Line 5: Sarratu (Basauri) to Galdakao HospitalUrban transitEuskal Trenbide Sarea (ETS), Gobierno VascoUnder constructionA programme: its sections of EUR 100 million or more are on the map one by one
Madrid A-5 undergrounding and Paseo Verde del SuroesteHighwaysAyuntamiento de MadridUnder constructionA programme: its sections of EUR 100 million or more are on the map one by one
Valencia North container terminal (North expansion of the Port of Valencia)PortsAutoridad Portuaria de València, Terminal Investment Limited (TIL, MSC group)Under constructionA programme: its sections of EUR 100 million or more are on the map one by one
Lisbon Humberto Delgado airport terminal modernisation and expansionAirportsANA, Aeroportos de Portugal, S.A. (VINCI Airports)Partly in service, partly under constructionA programme: its sections of EUR 100 million or more are on the map one by one
Palma de Mallorca airport integral remodellingAirportsAena S.M.E., S.A.Under constructionA programme: its sections of EUR 100 million or more are on the map one by one
Projects and programmes not on the map, with the reason

About this map

The map holds the infrastructure projects of EUR 100 million or more under construction in Spain and Portugal, or whose main works have been awarded, as of 26 Nov 2026. It started from a list of 82 rows compiled from the owners, the procurement records and the contractors' releases, one row per programme and one per section or lot of that size; each row was then researched again, its facts checked against the document that states them, and corrected where they were wrong.

  • Owners, contractors, designers and supervisors are named only where a source names them, each with its role; the members of a UTE or a consortium are listed with their share where the owner publishes it.
  • Amounts are given in euros as published, with what they are (a contract, a section's budget, a programme's total) and whether VAT is included. They are never converted or added together.
  • A stage needs a dated statement of its kind: a contract award or its formalisation, a start of works, a progress figure with its date, an opening. A planned date is marked as such.
  • Owners, gazettes and procurement records come first, then the companies and the funders, then the press; each source's type is shown on the project's page, and where two sources disagree both figures are kept.

The 3D model of each site is drawn to scale from OpenStreetMap (ODbL): the works as mapped and the land, roads, rail, water and buildings around them. The structure is drawn with its published figures; what no map or source gives is drawn as typical and listed under the model as illustrative. The islands are on the map: the Balearics, the Canaries, the Azores and Madeira.

Mirage Metrics builds AI agents for the construction teams that estimate and deliver projects like these: quantities from each drawing set, changes between revisions, and bid documents checked against each other. See AI construction software for contractors. This map is published as a reference and says nothing about any work by Mirage Metrics on these projects. Morocco's are on the Morocco megaprojects map, North America's on the infrastructure map.

To report an error, write to mehdi@miragemetrics.com with a public source. Corrections follow the editorial policy.

Questions readers ask

  • The infrastructure projects of EUR 100 million or more under construction in Spain and Portugal, or whose main works have been awarded: the high-speed lines and their stations, the metro, tram and light rail extensions, the motorways, bridges and road tunnels, the ports, the airport terminals, the Bay of Biscay interconnector with France, the dams and the pumped-storage plant, the desalination plant, and the hospitals and stadiums built under a single contract. The islands are included: the Balearics, the Canaries, the Azores and Madeira. A programme built in several sections is listed with its sections, and each section of EUR 100 million or more is on the map on its own.

  • From the owners first (Adif, Infraestruturas de Portugal, the Ministry of Transport, the regional governments, the metro companies, Aena, ANA, the port authorities, Red Eléctrica), then from the procurement records and gazettes (Spain's public sector procurement platform and the BOE, Portugal's Base and Diário da República), the funders' documents, the contractors' own releases, and the press where nothing better exists. Every fact carries a link to its source and the source's type on the project's page. Where two sources disagree, both figures are kept.

  • Each site is drawn to scale from OpenStreetMap: the works as mapped (a line's route with its tunnels and viaducts, a station, a terminal, a quay, a dam, a hospital's buildings), with the roads, rail, water, buildings and land around. The structure is drawn with the figures its owner, architect or builder publishes: a line's length and structures, a station's platforms, a terminal's floor area, a quay's length, a dam's height, a hospital's floors. What no map or source gives is drawn as typical and listed under each model as illustrative.

  • As the owner publishes them. Spanish and Portuguese contract awards are usually stated without VAT and tender budgets often with it; each amount says what it is (one contract, a section's budget, a programme's total) and whether VAT is included where the source says so. Amounts are never converted or added together.

  • The map describes these projects from public sources and says nothing about any work by Mirage Metrics on them. Mirage Metrics builds AI agents for the construction teams that estimate and deliver projects like these, and publishes the map as a reference.

  • Write to mehdi@miragemetrics.com with the project, the fact and a public source for the correction. A verified correction is made on the project's page and its date is updated, as the editorial policy describes.